Construction of Qurayyah Combine Cycle Power Plant Project- C

DESCIPLINE: ELECTRICAL ITP NO.: 30621127-000-GIP-00033


INSPECTION & TEST PLAN FOR SITE SUBCON: REV. NO.: 005
DESCRIPTION: ELECTRICAL WORKS PAGE: 8 OF 15 RFI No.:

APPLICABLE INSPECTION LEVEL


REPORTING
STANDARD, BEMCO SEC
ACTIVITY ITEM NO. TEST AND INSPECTION ACTIVITY FORMAT/
SPECIFICATION OR
CHECKLIST CONST. QA/QC INITIAL SEC INITIAL
PROCEDURE

C LIGHTING AND SMALL POWER SYSTEM (including 480V receptacle)

LIGHTING FIXTURE AND LUMINAIRE 30621127-000-4QC-


1 PTS 9.8 H W S
INSTALLATION 41

LIGHTING SYSTEM TEST/PRE- 30621127-000-4QC-


2 PTS 9.8 H H W
COMMISSIONING 42

SMALL POWER INSTALLATION H W S


30621127-000-4QC-
3 PTS 9.8
43
480 V RECEPTACLES INSTALLATION H W W

ENERGIZATION/FUNCTIONAL TEST OF 30621127-000-4QC-


4 PTS 9.8 H H W
LIGHTING AND SMALL POWER SYSTEM 44

Prep : Masood A. Khan


LEGEND: R: REVIEW S: SURVEILLANCE W: WITNESS H: HOLD