This document provides a bill of quantities and specifications for additional electrical and painting works for a mixed use building project. It includes 3 items:
1. Painting works including applying three coats of emulsion paint to internal plastered walls and concrete ceiling/exposed beams and columns of the bank room, totaling 15,960 birr.
2. Electrical works including distribution boards, electrical installation using PVC piping, 45 light points, 16 socket outlets, and light fittings including Philips TMS fluorescent lights and incandescent lamps, totaling 65,750 birr.
3. The grand total for both the painting and electrical additional works is 81,710 birr.
This document provides a bill of quantities and specifications for additional electrical and painting works for a mixed use building project. It includes 3 items:
1. Painting works including applying three coats of emulsion paint to internal plastered walls and concrete ceiling/exposed beams and columns of the bank room, totaling 15,960 birr.
2. Electrical works including distribution boards, electrical installation using PVC piping, 45 light points, 16 socket outlets, and light fittings including Philips TMS fluorescent lights and incandescent lamps, totaling 65,750 birr.
3. The grand total for both the painting and electrical additional works is 81,710 birr.
This document provides a bill of quantities and specifications for additional electrical and painting works for a mixed use building project. It includes 3 items:
1. Painting works including applying three coats of emulsion paint to internal plastered walls and concrete ceiling/exposed beams and columns of the bank room, totaling 15,960 birr.
2. Electrical works including distribution boards, electrical installation using PVC piping, 45 light points, 16 socket outlets, and light fittings including Philips TMS fluorescent lights and incandescent lamps, totaling 65,750 birr.
3. The grand total for both the painting and electrical additional works is 81,710 birr.
Project: G+3 Mixed Use Building Contractor No: AMBPCA/BC-01/2010 Location: Adola Woyu Town Kilta Eba(03) Kebele Client: Meda Buna Anferara Cooperative Contractor: Tarakegne Zeleke B.C Ite Quanti Description Unit Rate Amount m ty 1. PAINTING Apply three coats emulsion paint to Bank Room internal 1.10 m² 90.00 140.00 12,600.00 plastered wall surface. To Concrete ceiling and exposed beams,columns for Bank Room. m² 24.00 140.00 3,360.00 Total carried to Summary.................................................. 15,960.00 2. ELECTRICAL WORKS 2.1 DISTRIBUTION BOARDS Supply and install flush mounting main distribution board, MDB,with lockable doors and including bus bars of 35A /3P rating and consisting of :-(SDB-GF) ACB of 16A/1P No 1.00 7,000.00 7,000.00 ACB of 25A/1P No 1.00 7,000.00 7,000.00 2.2 ELECTRICAL INSTALATION PVC of 50mm diameter. Ml 50.00 120.00 6,000.00 2.3 LIGHT POINTS Flush mounted light points fed through PVC insulated conductors of 3x2.5mm² inside PVC conduits of 16mm diameter, including No 45.00 350.00 15,750.00 junction boxes with covers insulating screw cap connectors. 2.4 SOCKET OUTLET 16A/1P socket outlet fed through PVC insulated conductors of 3x2.5 mm² inside PVC conduits of 16mm diameter including No 16.00 750.00 12,000.00 junction boxes with covers,and insulating screw cap connectors all for flush mounting . 2.5 LIGHT FITTING AND LAMPS (Specified or Equivalent) a)Philips TMS, 01.2/40 With 1x40W Flourescent lamp. No 8.00 1,500.00 12,000.00
b)Incandescent lamp with reflection cover 60w. No 8.00 750.00 6,000.00
Total carried to Summary.................................................. 65,750.00
Grand Total of 1+2 ................................................. 81,710.00