Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

KEY PLAN

N2XY 5C x 10sqmm

length 200 m
1 x NYY-3C x 2.5sqmm 2 x NYY-3C x 2.5sqmm
1 x EMT Conduit 25mm 2 x EMT Conduit 25mm
NLP002.01-2 NLP002.01-4 NLP002.02-2 NLP002.02-4 NLP002.03-2 NLP002.03-4

NLP002.01-1 NLP002.01-3 NLP002.02-1 NLP002.02-3 NLP002.03-1 NLP002.03-3

length 200 m
length 200 m

REFERENCE DRAWING

NLP003.01-2 NLP003.01-4 NLP003.02-2 NLP003.02-4 NLP003.03-2 NLP003.03-4

NLP003.01-1 NLP003.01-3 NLP003.02-1 NLP003.02-3 NLP003.03-1 NLP003.03-3


1 x EMT Conduit 25mm 2 x EMT Conduit 25mm
1 x NYY-3C x 2.5sqmm 2 x NYY-3C x 2.5sqmm

N2XY 5C x 16sqmm

REVISION

SULUT-1
COAL FIRED STEAM POWER PLANT
(2 x 50 MW)

PT. PLN ( PERSERO )

THIS DRAWING EMBODIES PROPRIETARY INFORMATION OF CONSORTIUM. THIS DRAWING OR THE MATERIAL DESCRIBED
THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN
THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED,IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY
PERMITTED BY CONSORTIUM.

Sumitomo
Heavy Industries, Ltd MEDCO ENERGI
Power

PT. Inti Karya Persada Tehnik - PT. PP (Persero) Tbk. - ITOCHU Corporation
Sumitomo Heavy Industries, Ltd. - PT. Medco Power Indonesia

You might also like