Professional Documents
Culture Documents
2-1 16 Wom HCR Io9523-1 For Wm700hm
2-1 16 Wom HCR Io9523-1 For Wm700hm
17 Gul Way
Singapore-629194
W.O.M.
Southeast
d
17 Gul Way
Singapore-629194
Page 1 of 136
WORLDWIDE OILFIELD MACHINE
DATA BOOK
FOR
W.O.M. SOUTHEAST ASIA PTE LTD
Page 2 of 136
MR PRAMOD PADALE Date: 11/02/2012
Corporate QA Manager
TABLE OF CONTENTS
C CERTIFICATE OF COMPLIANCE
E TRACEABILITY SHEET
Page 3 of 136
WORLDWIDE OILFIELD MACHINE
SALES ORDER
Page 4 of 136
WOM Asia Pacific Pte Ltd. Sales Order No: C18-AP0131
17 Gul Way Order Taken By: HAMIDAH
Singapore 629194 Date : 08/02/2018
Phone: +65 6560 3857 Revision :
Fax: +65 6558 7562 Rev. Date :
Co. Reg. & GST Reg No.: 200722416H Customer PO No: 18-2039-PT
Line/Release Due Date UM Qty Item $0.00 Unit Price Net Amount
SPEC AS PER NACE MR0175, API 6A, PSL-3, PR-2, MC-DD, P+U, SS OVERLAY IN RTJ
NO TPI IS INCLUDED.
Line/Release Due Date UM Qty Item $0.00 Unit Price Net Amount
SPECS AS PER NACE MR0175, API 6A, PSL-3, PR-2, MC-DD, P+X, SS OVERLAYS IN RTJ
Line/Release Due Date UM Qty Item $0.00 Unit Price Net Amount
GST : 0.00
Freight: 0.00
Misc: 0.00
Prepaid: 0.00
Total (USD) : 0.00
Page 8 of 136
Page 9 of 136
WORLDWIDE OILFIELD MACHINE
CERTIFICATE OF COMPLIANCE
Page 10 of 136
Page 11 of 136
WORLDWIDE OILFIELD MACHINE
Page 12 of 136
Page 13 of 136
Page 14 of 136
Page 15 of 136
Page 16 of 136
Page 17 of 136
Page 18 of 136
Page 19 of 136
Page 20 of 136
Page 21 of 136
WORLDWIDE OILFIELD MACHINE
TRACEABILITY SHEET
Page 22 of 136
WORLDWIDE OILFIELD MACHINE S.O. 4024Y
DB-0740 STUD 8
AB-06110 STUD 6
1/10/2011
Ashwin Dimble Date
Assembled by
WOM/024/REV.0
Page 23 of 136
WORLDWIDE OILFIELD MACHINE , PVT. LTD.
Assembled by G.Patil
V. Murumkar
Page 24 of 136
WOM( I )/024/REV.
WORLDWIDE OILFIELD MACHINE
Page 25 of 136
WORLDWIDE OILFIELD MACHINE CERT NO 14398
AUTHORISED SIGNATURE
V. Murumkar
WOM /098/ REV. 0
Page 26 of 136
Worldwide Oilfield Machine
MAGNETIC PARTICLE INSPECTION REPORT
LOCATION NO. : 25308
DATE 3-10-09
WOM M/C SHOP
PART # CW-726H
BATCH # P21634
JOB DESCRIPTION BODY, 2 1/16"-5M MODEL 200 HYD.
ACCEPTED REJECTED
COMMENTS
SERIAL NO QTY SERIAL NO QTY
MATERIAL 4130
TEST SPECIFICATION 4.10.6
CUSTOMER NCR
TECHNICIAN D.D.LENDAVE
ASNT NDT MP LEVEL II
Page 27 of 136
MAGNUM FORGE & MACHINE WORKS NO 46547.2009
AN ISO 9001 MATERIAL TEST CERTIFICATION DATE 29/08/2009
COMPANY
CUSTOMER : WOM [I] PART NO : CW-726H-1 S.O. / P.O NO : : WOM/VND/F02562A
DESCRIPTION : BODY, 2 1/16"-5M MODEL 200 HYDRAULIC. INV. NO : -
DRAWING # :- HEAT NO : 87KB6062 QTY : 2
MATERIAL/SPEC/: 4130 HEAT CODE : X40 CUSTOMER SPEC 4.6.11 REV 9.0
:
GRADE/CL/YEAR
CUSTOMER :
BATCH NO : M32284 -3,5 JOB/ID # REQ. HBW : 197-235 (22 HRC 237HBW Max)
SERVICE : ANSI/NACE MR0175/ISO 15156-2: 2003
CHEMICAL ANALYSIS (%) (H2S) OBS .HBW : 207 235
C Mn Si P S Cr Ni Mo Cu Al Va Sn cb+Ta - TESTED BY ACC. STD.
OBSERVED 0.290 0.480 0.240 0.006 0.008 0.900 0.020 0.170 0.070 0.030 0.010 - - - DAYE/ 4.6.11 REV
00010782 9.0
Max 0.330 0.600 0.350 0.025 0.025 1.100 0.500 0.250 - - - - - - 4130
REQUIRED 0.280 0.400 0.150
Min - - 0.800 - 0.150 - - - - - -
TENSILE TEST (PSI) FORGED DOWN TEST BAR - HARDNESS 229 , 229 HBW] UT 19873
NDT
TENSILE YIELD %ELONG % R.A. TESTED BY ACC. STD. TEST MP
OBSERVED 105617 82506 23.78 69.08 1364 4.6.11 REV 9.0 REPORT LP
4130 NO.
REQUIRED min 95000 75000 18 35 ACC. STD API 6A PSL--3
CHARPY V-NOTCH IN FT.LBS. ( -50 °F )/ LATERAL EXAPANSION IN INCH HEAT TREATMENT (FORGED DOWN TEST BAR & FORGING)
DIRECTION OF ORIENTATION- LONGITUDINAL METHOD - FURNACE TEMP MONITORING
TESTED TEMP TIME COOLING WATER TEMP °F
Cert. No
1 2 3 AVG BY ACC. STD OPERATION °F AT MEDIUM
TEMP Start Finish
Obs. Charpy 58 84 58 66.67 MFMW/1412 Table 5.3 Quenching 1634 4 Water 84.2 91.4 24662
THE TEST RESULTS REPORTED HEREWITH ARE BASED ON SPECIFIED INSPECTION & TESTING . THIS CERTIFICATE IS ISSUED IN ACCORDANCE WITH DIN - EN 10204-3. 1
WE CERTIFY THAT THE TEST RESULTS AND PROCESS INFORMATION CONTAINED IN THIS REPORT ARE CORRECT AND MATERIAL MEETS THE REQUIREMENTS OF THE MATERIAL SPECIFICATION AND PURCHASE ORDER /CONTRACT.
ACCEPTED REJECTED
COMMENTS
SERIAL NO QTY SERIAL NO QTY
No recordable / unacceptable
3,5 02
indiacation obs
MFF# 21 Rev 0
Page 29 of 136
Worldwide Oilfield Machine
MAGNETIC PARTICLE INSPECTION REPORT
NO. : PM6696
LOCATION
DATE 10-5-09
WOM M/C SHOP
PART # CW-726H-1
BATCH # M32284
ACCEPTED REJECTED
COMMENTS
SERIAL NO QTY SERIAL NO QTY
CUSTOMER NCR
WOM/045/ REV #.
Page 30 of 136
WORLDWIDE OILFIELD MACHINE CERT NO 6755
AUTHORISED SIGNATURE
V. Murumkar
WOM /098/ REV. 0
Page 31 of 136
Worldwide Oilfield Machine
MAGNETIC PARTICLE INSPECTION REPORT
LOCATION NO. : 30464
DATE 26-09-09
WOM M/C SHOP
PART # CW-726H-1
BATCH # M32284
JOB DESCRIPTION BODY, 2 1/16"-5M MODEL 200 HYDRAULIC.
ACCEPTED REJECTED
COMMENTS
SERIAL NO QTY SERIAL NO QTY
CUSTOMER NCR
Page 32 of 136
WORLDWIDE OILFIELD MACHINE
LIQUID PENETRANT INSPECTION REPORT
LOCATION NO. : 8133
DATE 4-10-09
W.O.M M/C SHOP
PART # CW-726H-1
BATCH # M32284
ACCEPTED REJECTED
CUSTOMER NCR
Page 33 of 136
MAGNUM FORGE & MACHINE WORKS NO 43083.2009
AN ISO 9001 MATERIAL TEST CERTIFICATION DATE 22/04/2009
COMPANY
CUSTOMER : WOM {I} PART NO : CW-726H-2 S.O. / P.O NO : : WOM/VND/F02273
DESCRIPTION : BOTTOM PLUG, 2 1/16"-5M MODEL 200 HYD. INV. NO : -
DRAWING # :- HEAT NO : C05966 QTY : 19
MATERIAL/SPEC/: 4140 HEAT CODE : W88 CUSTOMER SPEC 4.6.10 REV 6.0
:
GRADE/CL/YEAR
CUSTOMER :
BATCH NO : M27661 -1-19 JOB/ID # REQ. HBW : 187-235 (22 HRC 237HBW Max)
SERVICE : ANSI/NACE MR0175/ISO 15156-2: 2009
CHEMICAL ANALYSIS (%) (H2S) OBS .HBW : 207 235
C Mn Si P S Cr Ni Mo Cu Al Va Sn cb+Ta - TESTED BY ACC. STD.
OBSERVED 0.390 0.830 0.230 0.013 0.007 0.950 0.190 0.170 0.170 - 0.003 - - MUSCO 4.6.10 REV
2008016942 6.0
Max 0.430 1.000 0.350 0.025 0.025 1.100 0.250 4140
REQUIRED 0.380 0.750 0.150
Min - - 0.800 0.150
TENSILE TEST (PSI) FORGED DOWN TEST BAR - HARDNESS 217 , 217 HBW] UT 17165
NDT
TENSILE YIELD %ELONG % R.A. TESTED BY ACC. STD. TEST MP
OBSERVED 116276 94291 22.54 68.151 1374 4.6.10 REV 6.0 REPORT LP
4140 NO.
REQUIRED min 85000 60000 18 35 ACC. STD API 6A PSL--3
CHARPY V-NOTCH IN FT.LBS. ( -50 °F )/ LATERAL EXAPANSION IN INCH HEAT TREATMENT (FORGED DOWN TEST BAR & FORGING)
DIRECTION OF ORIENTATION- LONGITUDINAL METHOD - FURNACE TEMP MONITORING
TESTED TEMP TIME COOLING WATER TEMP °F
Cert. No
1 2 3 AVG BY ACC. STD OPERATION °F AT MEDIUM
TEMP Start Finish
Obs. Charpy 34 28 40 34.00 MFMW/1417 Table 5.3 Quenching 1634 3.30 Polymer 84.2 91.4 22554,22788
THE TEST RESULTS REPORTED HEREWITH ARE BASED ON SPECIFIED INSPECTION & TESTING . THIS CERTIFICATE IS ISSUED IN ACCORDANCE WITH DIN - EN 10204-3. 1
WE CERTIFY THAT THE TEST RESULTS AND PROCESS INFORMATION CONTAINED IN THIS REPORT ARE CORRECT AND MATERIAL MEETS THE REQUIREMENTS OF THE MATERIAL SPECIFICATION AND PURCHASE ORDER /CONTRACT.
ACCEPTED REJECTED
COMMENTS
SERIAL NO QTY SERIAL NO QTY
NO RECORDABLE /
19
UNACCEPTABLE INDICATION
OBS
MFF# 21 Rev 0
Page 35 of 136
Worldwide Oilfield Machine
MAGNETIC PARTICLE INSPECTION REPORT
LOCATION NO. : 21801
DATE 9-05-09
WOM M/C SHOP
PART # CW-726H-2
BATCH # M27661
JOB DESCRIPTION BOTTOM PLUG, 2 1/16"-5M MODEL 200 HYD.
ACCEPTED REJECTED
COMMENTS
SERIAL NO QTY SERIAL NO QTY
CUSTOMER NCR
TECHNICIAN D.D.LENDAVE
ASNT NDT MP LEVEL II
Page 36 of 136
Page 37 of 136
MAGNUM FORGE & MACHINE WORKS
ULTRASONIC INSPECTION REPORT
LOCATION NO. : 19386
MFMW SHOP DATE 08/08/2009
M31510 -1-2 PART # 30510
08/08/2009
REV. AC
JOB DESCRIPTION BONNET, 2 1/16" - 5M TYPE 'FC' BATCH #M31510
ACCEPTED REJECTED
COMMENTS
SERIAL NO QTY SERIAL NO QTY
No recordable / unacceptable
02
indiacation obs
MFF# 21 Rev 0
Page 38 of 136
Worldwide Oilfield Machine
MAGNETIC PARTICLE INSPECTION REPORT
LOCATION NO. : 26165
DATE 13-11-00
WOM M/C SHOP
PART # 30510
BATCH # M31510
JOB DESCRIPTION BONNET, 2 1/16" - 5M TYPE 'FC'
ACCEPTED REJECTED
COMMENTS
SERIAL NO QTY SERIAL NO QTY
CUSTOMER NCR
TECHNICIAN D.D.LENDAVE
ASNT NDT MP LEVEL II
Page 39 of 136
MAGNUM FORGE & MACHINE WORKS NO 45507.2009
AN ISO 9001 MATERIAL TEST CERTIFICATION DATE 28/07/2009
COMPANY
CUSTOMER : WOM [I] PART NO : CW-725H S.O. / P.O NO : : WOM/VND/F02562
DESCRIPTION : OPERATING STEM, 2 1/16"-5M MODEL 200 HYDRAULIC INV. NO : -
DRAWING # :- HEAT NO : VBMU2435 QTY : 10
MATERIAL/SPEC/: 17-4PH HEAT CODE : X52 CUSTOMER SPEC 4.6.15 REV 7.0
:
GRADE/CL/YEAR
CUSTOMER :
BATCH NO : M30917 -1-10 JOB/ID # REQ. HBW : 265-311
SERVICE : ANSI/NACE MR0175/ISO 15156-2: 2003
CHEMICAL ANALYSIS (%) (H2S) OBS .HBW : 307
C Mn Si P S Cr Ni Mo Cu Al Va Sn cb+Ta - TESTED BY ACC. STD.
OBSERVED 0.030 0.720 0.360 0.038 0.020 15.400 3.900 0.100 3.100 - - - 0.220 VENUS 4.6.15 REV
INDUS./ 4067 7.0
Max 0.070 1.000 1.000 0.040 0.030 17.500 5.000 5.000 0.450 17-4PH
REQUIRED
Min 15.000 3.000 3.000 0.150
TENSILE TEST (PSI) FORGED DOWN TEST BAR - HARDNESS 302 , 302 HBW] UT 19224
NDT
TENSILE YIELD %ELONG % R.A. TESTED BY ACC. STD. TEST MP
OBSERVED 140966 128720 18.64 65.93 1445 4.6.15 REV 7.0 REPORT LP
17-4PH NO.
REQUIRED min 135000 105000 18 50 ACC. STD API 6A PSL--3
CHARPY V-NOTCH IN FT.LBS. ( -75 °F )/ LATERAL EXAPANSION IN INCH HEAT TREATMENT (FORGED DOWN TEST BAR & FORGING)
DIRECTION OF ORIENTATION- LONGITUDINAL METHOD - FURNACE TEMP MONITORING
TESTED TEMP TIME COOLING WATER TEMP °F
Cert. No
1 2 3 AVG BY ACC. STD OPERATION °F AT MEDIUM
TEMP Start Finish
Obs. Charpy 84 84 90 86.00 MFMW/ 1477 Table 5.3 SoL ANNEALING 1900 1.50 WATER VENUS
WIRE
Reqd. Charpy min 20 20 20 20 I AGE HAREDNED 1150 6 AIR By
Obs. Lateral Exp 0.042 0.043 0.05 0.045 II AGE HARDENED 1150 6 AIR VENUS
Reqd.Lateral Exp mi 0.015 0.015 0.015 0.015 WIRE
INDUSTRIES
[1] All Forgings were manufactured at Magnum forge and Machine Works,India [2] None Of the Forgings Received any Weld Repairs. [3] Size Of The Forged Down Bar : 4'' X 4''X 8'' Long and the Tensile and Imp
Test specimen taken with in 1/4T location and machined to ASTM A370 [4] Forging did not come in contact with mercury during manufacture,inspection and testing [5] Reduction Ratio min 3:1
THE TEST RESULTS REPORTED HEREWITH ARE BASED ON SPECIFIED INSPECTION & TESTING . THIS CERTIFICATE IS ISSUED IN ACCORDANCE WITH DIN - EN 10204-3. 1
WE CERTIFY THAT THE TEST RESULTS AND PROCESS INFORMATION CONTAINED IN THIS REPORT ARE CORRECT AND MATERIAL MEETS THE REQUIREMENTS OF THE MATERIAL SPECIFICATION AND PURCHASE ORDER /CONTRACT.
ACCEPTED REJECTED
COMMENTS
SERIAL NO QTY SERIAL NO QTY
No recordable / unacceptable
10
indiacation obs
MFF# 21 Rev 0
Page 41 of 136
Worldwide Oilfield Machine
MAGNETIC PARTICLE INSPECTION REPORT
LOCATION NO. : 24438
DATE 22-08-09
WOM M/C SHOP
PART # CW-725H
BATCH # M30917
JOB DESCRIPTION OPERATING STEM, 2 1/16"-5M MODEL 200 HYDRAULIC
ACCEPTED REJECTED
COMMENTS
SERIAL NO QTY SERIAL NO QTY
MATERIAL 17 4PH
CUSTOMER NCR
TECHNICIAN D.D.LENDAVE
ASNT NDT MP LEVEL II
Page 42 of 136
Page 43 of 136
Page 44 of 136
Worldwide Oilfield Machine
MAGNETIC PARTICLE INSPECTION REPORT
LOCATION NO. : 24697
DATE 31-08-09
WOM M/C SHOP
PART # CW-732H
BATCH # M30918
JOB DESCRIPTION BALANCE STEM, 2 1/16"-5M MODEL 200 HYDRAULIC
ACCEPTED REJECTED
COMMENTS
SERIAL NO QTY SERIAL NO QTY
MATERIAL 17 4PH
TEST SPECIFICATION 4.10.6
CUSTOMER NCR
Page 45 of 136
Page 46 of 136
Page 47 of 136
Page 48 of 136
Page 49 of 136
Page 50 of 136
Page 51 of 136
Page 52 of 136
Page 53 of 136
Page 54 of 136
Page 55 of 136
MAGNUM FORGE & MACHINE WORKS NO 48601.2009
AN ISO 9001 MATERIAL TEST CERTIFICATION DATE 16/11/2009
COMPANY
CUSTOMER : WOM [I] PART NO : SW-1000 S.O. / P.O NO : : WOM/VND/F02562
DESCRIPTION : SEAT RETAINER, 2 1/16"-10M MODEL 200M INV. NO : -
DRAWING # :- HEAT NO : H9324 QTY : 64
MATERIAL/SPEC/: 17-4PH HEAT CODE : Y60 CUSTOMER SPEC 4.6.15 REV 7.0
:
GRADE/CL/YEAR
CUSTOMER :
BATCH NO : M33002 -1-64 JOB/ID # REQ. HBW : 265-311 [33 HRC]
SERVICE : ANSI/NACE MR0175/ISO 15156-3: 2003
CHEMICAL ANALYSIS (%) (H2S) OBS .HBW : 285 311
C Mn Si P S Cr Ni Mo Cu Al Va Sn cb+Ta - TESTED BY ACC. STD.
OBSERVED 0.032 0.790 0.390 0.037 0.021 15.350 3.950 0.190 3.150 - - - 0.190 - BHANSALI 4.6.15 REV
000977 7.0
Max 0.070 1.000 1.000 0.040 0.030 17.500 5.000 5.000 0.450 17-4PH
REQUIRED
Min 15.000 3.000 3.000 0.150
TENSILE TEST (PSI) FORGED DOWN TEST BAR - HARDNESS 269 , 303 HBW] UT
NDT
TENSILE YIELD %ELONG % R.A. TESTED BY ACC. STD. TEST MP
OBSERVED 164503 127486 19.48 67.03 1548 4.6.15 REV 7.0 REPORT LP
17-4PH NO.
REQUIRED min 135000 105000 18 50 ACC. STD
CHARPY V-NOTCH IN FT.LBS. ( °F )/ LATERAL EXAPANSION IN INCH HEAT TREATMENT (FORGED DOWN TEST BAR & FORGING)
DIRECTION OF ORIENTATION- LONGITUDINAL METHOD - FURNACE TEMP MONITORING
TESTED TEMP TIME COOLING WATER TEMP °F
Cert. No
1 2 3 AVG BY ACC. STD OPERATION °F AT MEDIUM
TEMP Start Finish
Obs. Charpy Sol Annealing 1904 3.00 Water 27956
THE TEST RESULTS REPORTED HEREWITH ARE BASED ON SPECIFIED INSPECTION & TESTING . THIS CERTIFICATE IS ISSUED IN ACCORDANCE WITH DIN - EN 10204-3. 1
WE CERTIFY THAT THE TEST RESULTS AND PROCESS INFORMATION CONTAINED IN THIS REPORT ARE CORRECT AND MATERIAL MEETS THE REQUIREMENTS OF THE MATERIAL SPECIFICATION AND PURCHASE ORDER /CONTRACT.
ACCEPTED REJECTED
COMMENTS
SERIAL NO QTY SERIAL NO QTY
MATERIAL 17 4PH
CUSTOMER NCR
TECHNICIAN D.D.LENDAVE
ASNT NDT MP LEVEL II
Page 57 of 136
MAGNUM FORGE & MACHINE WORKS NO 48612.2009
AN ISO 9001 MATERIAL TEST CERTIFICATION DATE 16/11/2009
COMPANY
CUSTOMER : WOM [I] PART NO : SW-1000 S.O. / P.O NO : : WOM/VND/F02653
DESCRIPTION : SEAT RETAINER, 2 1/16"-10M MODEL 200M INV. NO : -
DRAWING # :- HEAT NO : H9324 QTY : 36
MATERIAL/SPEC/: 17-4PH HEAT CODE : Y60 CUSTOMER SPEC 4.6.15 REV 7.0
:
GRADE/CL/YEAR
CUSTOMER : P
BATCH NO : M33994 -1-36 JOB/ID # REQ. HBW : 265-311
SERVICE : ANSI/NACE MR0175/ISO 15156-2: 2003
CHEMICAL ANALYSIS (%) (H2S) OBS .HBW : 285 311
C Mn Si P S Cr Ni Mo Cu Al Va Sn cb+Ta - TESTED BY ACC. STD.
OBSERVED 0.032 0.790 0.390 0.037 0.021 15.350 3.950 0.190 3.150 - - - 0.190 - BHANSALI 4.6.15 REV
000977 7.0
Max 0.070 1.000 1.000 0.040 0.030 17.500 5.000 5.000 0.450 17-4PH
REQUIRED
Min 15.000 3.000 3.000 0.150
TENSILE TEST (PSI) FORGED DOWN TEST BAR - HARDNESS 269 , 303 HBW] UT
NDT
TENSILE YIELD %ELONG % R.A. TESTED BY ACC. STD. TEST MP
OBSERVED 164503 127486 19.48 67.03 1548 4.6.15 REV 7.0 REPORT LP
17-4PH NO.
REQUIRED min 135000 105000 18 50 ACC. STD
CHARPY V-NOTCH IN FT.LBS. ( °F )/ LATERAL EXAPANSION IN INCH HEAT TREATMENT (FORGED DOWN TEST BAR & FORGING)
DIRECTION OF ORIENTATION- LONGITUDINAL METHOD - FURNACE TEMP MONITORING
TESTED TEMP TIME COOLING WATER TEMP °F
Cert. No
1 2 3 AVG BY ACC. STD OPERATION °F AT MEDIUM
TEMP Start Finish
Obs. Charpy Sol Annealing 1904 3.00 Water 27956
THE TEST RESULTS REPORTED HEREWITH ARE BASED ON SPECIFIED INSPECTION & TESTING . THIS CERTIFICATE IS ISSUED IN ACCORDANCE WITH DIN - EN 10204-3. 1
WE CERTIFY THAT THE TEST RESULTS AND PROCESS INFORMATION CONTAINED IN THIS REPORT ARE CORRECT AND MATERIAL MEETS THE REQUIREMENTS OF THE MATERIAL SPECIFICATION AND PURCHASE ORDER /CONTRACT.
ACCEPTED REJECTED
COMMENTS
SERIAL NO QTY SERIAL NO QTY
MATERIAL 17 4PH
CUSTOMER NCR
TECHNICIAN D.D.LENDAVE
ASNT NDT MP LEVEL II
Page 59 of 136
Page 60 of 136
Worldwide Oilfield Machine
MAGNETIC PARTICLE INSPECTION REPORT
LOCATION NO. : 24597
DATE 28-08-09
WOM M/C SHOP
PART # CW-2214H
BATCH # M31000
JOB DESCRIPTION PISTON, 4 1/16" - 5M MODEL 200 HYDRAULIC
ACCEPTED REJECTED
COMMENTS
SERIAL NO QTY SERIAL NO QTY
CUSTOMER NCR
TECHNICIAN D.D.LENDAVE
ASNT NDT MP LEVEL II
Page 61 of 136
Worldwide Oilfield Machine
MAGNETIC PARTICLE INSPECTION REPORT
LOCATION NO. : 25170
DATE 22-09-09
WOM M/C SHOP
PART # CW-710H
BATCH # P21612
JOB DESCRIPTION CYLINDER, 2 1/16"-5M MODEL 200 HYDRAULIC
ACCEPTED REJECTED
COMMENTS
SERIAL NO QTY SERIAL NO QTY
MATERIAL
TEST SPECIFICATION 4.10.6
CUSTOMER NCR
TECHNICIAN D.D.LENDAVE
ASNT NDT MP LEVEL II
Page 62 of 136
MAGNUM FORGE & MACHINE WORKS NO 42569.2009
AN ISO 9001 MATERIAL TEST CERTIFICATION DATE 08/04/2009
COMPANY
CUSTOMER : WOM {I} PART NO : CW-710H-A S.O. / P.O NO : : WOM/VND/F02273
DESCRIPTION : THREADOLET CYLINDER 2 1/16"-10M HYDRAULIC MODEL 200 F.E. INV. NO :
DRAWING # :- HEAT NO : 89887 QTY : 59
MATERIAL/SPEC/: 4140 HEAT CODE : P71 CUSTOMER SPEC 4.6.11 REV 9.0
:
GRADE/CL/YEAR
CUSTOMER :
BATCH NO : M27659 -1-59 JOB/ID # REQ. HBW : 197-235 (22 HRC 237HBW Max)
SERVICE : ANSI/NACE MR0175/ISO 15156-2: 2003
CHEMICAL ANALYSIS (%) (H2S) OBS .HBW : 207 235
C Mn Si P S Cr Ni Mo Cu Al Va Sn cb+Ta - TESTED BY ACC. STD.
OBSERVED 0.385 0.755 0.255 0.025 0.015 1.100 0.018 0.231 - - - - - MCMW/ 807 4.6.11 REV
9.0
Max 0.430 1.000 0.350 0.025 0.025 1.100 0.250 4140
REQUIRED 0.380 0.750 0.150
Min - - 0.800 0.150
TENSILE TEST (PSI) FORGED DOWN TEST BAR - HARDNESS 235 , 235 HBW] UT
NDT
TENSILE YIELD %ELONG % R.A. TESTED BY ACC. STD. TEST MP
OBSERVED 112019 95927 24.4 66.36 MFMW/ 787 4.6.11 REV 9.0 REPORT LP
4140 NO.
REQUIRED min 95000 75000 18 35 ACC. STD
CHARPY V-NOTCH IN FT.LBS. ( -50 °F )/ LATERAL EXAPANSION IN INCH HEAT TREATMENT (FORGED DOWN TEST BAR & FORGING)
DIRECTION OF ORIENTATION- LONGITUDINAL METHOD - FURNACE TEMP MONITORING
TESTED TEMP TIME COOLING WATER TEMP °F
Cert. No
1 2 3 AVG BY ACC. STD OPERATION °F AT MEDIUM
TEMP Start Finish
Obs. Charpy 80 82 78 80 MFMW/ 825 Table 5.3 Quenching 1634 3 Polymer 84.2 91.4 22506
THE TEST RESULTS REPORTED HEREWITH ARE BASED ON SPECIFIED INSPECTION & TESTING . THIS CERTIFICATE IS ISSUED IN ACCORDANCE WITH DIN - EN 10204-3. 1
WE CERTIFY THAT THE TEST RESULTS AND PROCESS INFORMATION CONTAINED IN THIS REPORT ARE CORRECT AND MATERIAL MEETS THE REQUIREMENTS OF THE MATERIAL SPECIFICATION AND PURCHASE ORDER /CONTRACT.
ACCEPTED REJECTED
COMMENTS
SERIAL NO QTY SERIAL NO QTY
CUSTOMER NCR
Page 64 of 136
Page 65 of 136
Worldwide Oilfield Machine
MAGNETIC PARTICLE INSPECTION REPORT
LOCATION NO. : 25039
DATE 16-09-09
WOM M/C SHOP
PART # CW-710HA
BATCH # M31566
JOB DESCRIPTION CYLINDER, 2 1/16"-5M MODEL 200 HYDRAULIC
ACCEPTED REJECTED
COMMENTS
SERIAL NO QTY SERIAL NO QTY
CUSTOMER NCR
TECHNICIAN D.D.LENDAVE
ASNT NDT MP LEVEL II
Page 66 of 136
Page 67 of 136
Page 68 of 136
B-06
B-07
B-10
Page 69 of 136
B-11
B-12
B-13
B-14
Page 70 of 136
B-16
B-17
B-20
Page 71 of 136
Page 72 of 136
WORLDWIDE OILFIELD MACHINE
Page 73 of 136
Page 74 of 136
Page 75 of 136
Page 76 of 136
Page 77 of 136
Page 78 of 136
Page 79 of 136
Page 80 of 136
Page 81 of 136
Page 82 of 136
Page 83 of 136
Page 84 of 136
Page 85 of 136
Page 86 of 136
Page 87 of 136
Page 88 of 136
Page 89 of 136
Page 90 of 136
Page 91 of 136
Page 92 of 136
Page 93 of 136
Page 94 of 136
Page 95 of 136
Page 96 of 136
Page 97 of 136
Page 98 of 136
Page 99 of 136
Page 100 of 136
Page 101 of 136
Page 102 of 136
WORLDWIDE OILFIELD MACHINE
UT II 9/23/2012 9/24/2009
MPI II 2/28/2012 3/1/2009
Lendave Dadasaheb Dnyandeo LPI II 6/9/2012 6/10/2009
Visual Testing II 1/30/2013 1/31/2010
Latest Visual Acuity Record 2/20/2012 2/21/2011
UT II 8/8/2013 8/9/2010
MPI II 12/18/2011 12/20/2008
Shrikant C.Kulkarni
LPI II 8/24/2011 8/25/2008
Latest Visual Acuity Record 2/14/2012 2/15/2011
UT II 1/20/2014 1/21/20011
MPI II 9/11/2012 9/12/2009
Makarand D.Bhong
LPI II 12/22/2011 12/23/2008
Latest Visual Acuity Record 2/15/2012 2/16/2011
UT II 3/12/2012 3/13/2009
Rahul R. Shete LPI II 6/10/2016 6/11/2011
Latest Visual Acuity Record 9/8/2012 9/9/2011
UT II 2/18/2012 2/19/2009
Mahesh D. Sutar LPI II 4/8/2015 4/9/2010
Latest Visual Acuity Record 6/8/2011 6/9/2010
LP II 4/27/2013 4/28/2010
Rajendra D. Shinde
Latest Visual Acuity Record 2/15/2012 2/16/2011
UT II 3/1/2010 3/2/2007
Manoj A.Patil
Latest Visual Acuity Record 12/2/2010 12/3/2009
UT II 12/15/2011 12/16/2008
Shirish R. Kamble MP II 12/11/2011 11/13/2008
Latest Visual Acuity Record 2/20/2012 2/21/2011
UT II 7/21/2012 7/22/2009
Amit Mahajan LPI II 11/18/2012 11/19/2009
Latest Visual Acuity Record 6/15/2012 6/16/2011