Bmaowa - GBM 23 - 2024 - Q2
Bmaowa - GBM 23 - 2024 - Q2
• Date: Sunday;
BMAOWA Dec 18, 2022
• Time: 10.30
GENERAL BODY MEETING AM
• Venue: Near
(FY 2023-24) Association
Room
FINANCIAL UPDATE
July-Sep 2023
(Q2)
CORPUS DEFAULTER
Defaulters for prior years 104985 (4 Flats) 104985 (4 Flats)
Subsidy Receipts - - -
Gas Expenses
Operational Expenses
Bank Charges 0 0 0 0
Account Head Account Type Balance as at 30th Sep 2023 Balances as at 30th Jun 2023 Balances as at 31st Mar 2023
Current 27,02,852 1,03,63,370 42,07,507
● Quotes range from 10.5- 15 Cr for CPVC pipes. Parts & labor included.
○ CPVC pipe life est is 25-30 years
○
● This is an opportunity to install water meters as we replace pipes
○ Capex & opex model available
○ Will be additional
● Corpus collection
○ We are looking at approximately 93,750 per flat to build a corpus of 15 Cr (assuming
1600 flats)
○ We propose to collect 50,000 per unit per year in one shot or 12,500 per unit per
quarter.
○ We propose to kick start the project in phases starting from Q2 2025.
YES / NO
2023-2024 GBM BMAOWA Confidential
BMAOWA
MC Initiatives - Snapshot
● Recovered
approx 2.5L
from ACT -
long pending
since 2019.
● Recovered 84k
from Cricket
coach
Legal Updates
YES / NO
2023-2024 GBM BMAOWA Confidential
Resolution for Terrace waterproofing (6
BMAOWA blocks) for RWH and digging 4 open wells
YES / NO
◼ Painting project complete. 7 blocks (including C block rework), parking levels, podium
and peripheral road completed in this year
◼ Budget savings (vis-a-vis approvals in last year’s AGM and GBM) is ~37L* in Corpus
(* subject to negotiations with AkzoNobel and Arrow Interiors and recovery of excess
payment from MM)
◼ Conducted camera inspection for all borewells and revived L, K and A block
borewells (Yield increased by ~2000KL)
◼ Pilot initiated for installing overflow sensors for OHT, UG sumps and automate
pump room operations (pilot indicates a saving of ~20% in water consumption for G, H, I and J
blocks in Dec, compared to Nov)
◼ Pilot also initiated for installing digital water meters in G & F blocks for
measuring tanker water delivery and real time water management dashboards
* However, together with such solutions we need to avoid holding events on podium lawns to prevent soil compacting, which hampers rainwater drainage
◼ Rain shades installed to prevent rainwater ingress into OHT buffer area and arrest
seepages on all terraces.
◼ Additional speed breaker installed in Peripheral road to control overspeeding and rash
driving
◼ Terrace waterproofing (E, B and J blocks) and fire tank (C block) completed to address
seepages
THANK YOU!!