Professional Documents
Culture Documents
MOD 3-15K TL3-X Quick Guide EN 202112
MOD 3-15K TL3-X Quick Guide EN 202112
1 . Overview
10-12mm
2.3 Communication module installation
Install Uninstall
▲Up Inverter side Inverter side
Inverter side Inverter side
1 2 3 4 5 6 7 8 9 10 11 12 13
(1)Front panel (2)Touch button (3)LCD screen (4)LED indicator (5)Mounting bracket
(6)Heat sink (7)DC switch (8)PV terminal (9)RS485 port (10)USB port
(11)Vent valve (12)AC terminal (13)Waterproof
Note:
Dual MPPTs for MOD 3-11KTL3-X,one string input per MPPT.Dual MPPTs for MOD 12-15KTL3-X ,one MPPT has one string,and other
3 . Electrical connection
one has two strings.
Please prepare the cable before connecting as follows.
Note: No. Cable name Type Recommend model
Note:
1.This document is for quick installation guidance only, please refer to User Manual for more details. Protective Single multi-core
1 6mm² 1.Please make sure all switches are in “OFF”
2.Growatt shall not be liable for any damage resulting from unproper installation. grounding wire yellow-green wire
Two or three polychromatic position before wiring. For personal safety,
2 AC output wire 6mm² please do not operate with electricity.
multi-core copper wires
2.If the diameter of the cable does not match
3 PV input wire PV wire(such as PV1-F) 4mm² - 6mm² the terminal, or the cable is aluminum wire,
4 Communication please contact our after-sales personnel.
RS485 /
2 . Installation wire
System overview 2.1 Installation requirements 3.1 Grounding 3.2 AC output connection
1 2
10-12mm
≥300mm 425.2 186.4
178.4
171.8 87.4
m
0m
≥30
≥300mm ≥300mm
391.5
3 4
141
213
Noted:Waterproof
must be blocked
with fireproof mud
≥300mm
to prevent water.
4mm² - 6mm²
4mm² - 6mm²
Negative metal terminal
Negative metal terminal
Please make sure the cable can not be Pull the PV cable make sure there
pulled out after pressing. is no loose or shaking.
4 5
Positive metal terminal
4. Connecting Meter
Set parameter Exporlimit Set OK
OFF ON If the local grid company requires to limit the
The following table describes how we can connect EASTRON meter (TPM-E)to inverter:
output power from your inverter systems,we
introduce the concept of Export Limit Rate.The
L1 L1
5 1
L1 Meter Pin NO. Description Meter Connection
L2 L2 L2 ratio of your system output power divided by
L3 L3 6 2 L3 General Meter
N N 7 3 N the rated power of the inverter is called Export
8 4 1/2/3/4 L1/L2/L3/N-in Grid L1/L2/L3/N Advanced CT Limited Rate.For example,if the local grid
B A
companyonly accepts 4kW from your 5kW
5/6/7/8 L1/L2/L3/ AC connector & Load L1/L2/L3/N system,then the Export Limit Rate of 5kW
N-out inverter should be 80%.
Password ExportLimit Rate
A RS485A SYS COM Pin 3 RS485A2 123 XXX.X%
4 All wiring is correct and securely connected. 9 Pay attention to clean up all construction residues.
Download Growatt New Energy
The wiring of the cable is reasonable, meets the Manual
5
requirements, and there is no phenomenon of broken skin.
GR-UM-213-A-02