Drawing 1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

U

B T

155.63
TITIK C
LP 5 LP 2 LP 1 LP Luar

LT. 2 REST ROOM DRIVER

1,5 m
TOILET
6

GARDU

7
WANITA TOILET

5
-0.15

GENSET

CH : 3 m

98
-0.10
4

POS SECURITY

3
TOILET PRIA
10

LT. 2 R. SPAREPART

12
11 -0.15

PLN

CH : 3.5 m
UP
12

MUSHOLA
14
13

LT. 2 KANTIN
CH : 3 m CH : 3 m
CHEMICAL
14
15

CH : 3 m

.99
CH : 3 m
09

CH : 3 m
COR BETON CH : 3 m T.WUDHU
-0.10

NAIK
GUDANG TEPUNG GUDANG KARTON Mezzanine
19
18 CH : 7 m & KEMASAN FFL : 3.4 m 07
06
17
16
15
14 CH : 7 m CH : 3 m 08

29
13
12
WORKSHOP
11

CH : 3 m
10
9

WTP
8

7
6
5
4
3
2
1

05

GA
Gudang
Bagus
Oli
Foodgrade

Oli
PP 7 PP 9 PP 8
04

OLI
Freon
PP 5
10 11

lainnya

TL
Gudang

ANG
PP 1

dan

TANGKI MINYAK
Aki
.58

Catridge,
TANKI N2

Baterai

GUD
R. KONDENSOR
PREMIKS R. PANEL MDP R. PANEL COMPRESSOR FFL. ±0.00

Bekas

68.63
FFL. ±0.00 FFL. ±0.00
LAB CH. +4.00 CH. +4.00 CH. +4.00

Oli
CH : 5 m QC RND
ABF
CH : 5 m CH : 4 m GUDANG KARTON PRODUKSI
&

85
CH : 5 m
15 COMPRESSOR
CH : 4 m

mb TP
PRODUCT CHARGER FORKLIF

ah)
RM LOADING ANTEROOM CH : 4 m
CH=3.3m MW 1 SPC 1 CH=4m ANTEROOM
FN 1 WC 1 2 kWH

(Li WW
LFM 4 BN 1 IC 1 F1 CC 1 IF 1 5 kWH +10°C CH : 4 m
1,5 kWH 9 kWH 2,5 kWH 3 kWH 1 kWH
250 kWH 20 kWH ADM GUDANG
230 kWH CH=4m
RM ANTEROOM
CH=3.3m
VM 2 CH : 3.3 m
+10°C 45 kWH
IF 2
FK 230 kWH

KOLAM
11 kWH
LFM 3
MW 2

IKAN
SPC 2
1,5 kWH
FN 2 WC 2 BN 2 IC 2
F2 CC 2 5 kWH 2 kWH
9 kWH 2,5 kWH 3 kWH 1 kWH
20 kWH
250 kWH

APAN
0
VM 1

PENGEND
BAKTERI
45 kWH LFM 1
G2 1,5 kWH
CH : 4 m

.7
19 kWH

COLD ROOM
BC 1

Temp -20°C
LP4 96 kWH
VSC
SH 1 SH 2

CH : 6 m
G1 10 kWH
RM. STORAGE 19 kWH LFM 5 42 kWH 25 kWH
1,5 kWH
SSH 1
01
SPC 3
40 kWH SFC 1

AERASI
BAK
10 kWH IF 3 2 kWH

55
5 kWH TF 1
230 kWH
-20°C LFM 2
25 kWH
CH : 3.3 m
CH : 3.3 m LFM 6
1,5 kWH
1,5 kWH

I1 I2 PACKING
CSR 1
1 kWH
BC 3 SFC 2
34 kWH BC 2 SSH 2 15 kWH 15 kWH TF 2
5 kWH CH : 3.3 m

AERASI
BAK
96 kWH 10 kWH 25 kWH
IF 4
230 kWH
VT CSR 2
3.5 kWH VC 1 VC 2 1 kWH

PREPARATION AREA SHOWER 8 kWH 8 kWH


CS
CH : 3.3 m CH : 3.3 m
10 kWH

OFFICE LT. 2
SCREW COMPRESSOR BLAST BLAST

GUDANG CH : 3.3 m 11 10 9 8 7

COMPRESSOR ANGIN FLAKE ICE CHILLER 1 CHILLER 2 6


5 CHILLED 1 CHILLED 2 COMPRESSOR
50 kWH SANITATION 2
BOILER COLD 75 kWH 3,5 kWH 3,5 kWH 4
18 kWH 18 kWH COLD ROOM
& COMPRESSOR ANGIN R. K.
3
TOILET WANITA TOILET PRIA
FFL. ±0.00 BLAST
STORAGE HITACHI 2

KAYU
3x3m 3x3m
CH : 3.3 m FREEZER

1
5.5 kWH CH : 4 m CH : 4 m CH : 4 m PRODUCE CH : 3.3 m
±0.35 UP
CH : 3.3 m R. LOKER R. LOKER 32 kWH
SANITATION 1 CH : 3.3 m FFL ±0.35 FFL ±0.35 TEMP -40°C
R. LOCKER OFFICE LT. DASAR ±0.35 ±0.35
CH : 3.3 m
CH : 3.3 m ±0.35 CH : 3.3 m CH : 3.3 m
8 x 12 12 x 12 COMPRESSOR RUANG MESIN

SI
CH : 3.3 m

EQUALISA
FLAKE ICE & CHILLER CH : 3.3 m R. MEETING 1

BAK
R. MEDIS FFL. ±0.35
±0.35 LOBBY ±0.35
CH : 3.3 m COMPRESSOR
Limbah Limbah CH : 3.3 m BLAST FREEZER

Padatan Domestik 13
12
02 03
16 LP 3 PP 2 PP 6 LP 6 LP Office PP 3 PP 4

215.31
TITIK A TITIK B

D:\ROFI\logo\Logo STU jpg.jpg


PERBAIKAN
KETERANGAN / LEGEND PROYEK / PROJECT JUDUL LEMBAR / SHEET TITLE TANGGAL / DATE RE ISION

1234
PENANGKAL PETIR
56
PT. KARTIKA TEKNIK ABADI
RENCANA LIGHTING ARRESTER PT BATANG BOGA LESTARI
DIGAMBAR WAHYUDIN DISETUJUI RUSLI SOLIHIN
DRAWN BY APPRO ED BY
PT. BATANG BOGA LESTARI DUKUH MUNTUK, DESA KRENGSENG
KEC. GRINGSING, KAB. BATANG DIPERIKSA SKALA
CHECKED BY SCALE
NTS

C:\Users\wahyu\OneDrive\Documents\Drawing1.dws, 04/01/2023 23:40:41, DWG

You might also like