Professional Documents
Culture Documents
Allorde - A1
Allorde - A1
Allorde - A1
REAR ELEVATION
LIGAO CITY, ALBAY
GROUND FLOOR PLAN WATER LINE LAYOUT DETAIL OF CATCH BASIN
2 ROOF PLAN LEFT-SIDE ELEVATION 7 DETAIL OF LAVATORY CONNECTION
SECTION THRU A DETAIL OF SEPTIC TANK
A2 9 FRONT ELEVATION P2 9 DETAIL OF WATER CLOSET ISOMETRIC DIAGRAM
RIGHT-SIDE ELEVATION SECTION THRU B -CONNECTION
8000 8000
1210
7821
G . I . G U T T E R
ARCHITECTURAL
P E R S P E C T I V E
6953
6040
2 % S L O P E
STRUCTURAL
C E R T I F I C A T I O N
600
I HEREBY CERTIFY AS A DULY LICENSED GEODETIC ENGINEER THAT THE 4075 675 3350
PROPOSED ONE-STOREY RESIDENTIAL BUILDING, LOCATED AT LOT 02, JOEPEN
THE SITE
25000
25000
TUBURAN, LIGAO CITY, ALBAY SHALL BE CONSTRUCTED WITHIN LOT NO. LAYON
CONSTRUCTION BR
AD
GY
RD ELEM.
RO
__________ AND SHALL NOT ENROACH ON ANY ADJOINING PROPERTY. SUPPLY 8100
N
SCHOOL
O
UY
SANITARY
BL
SA
BAY BRGY. HALL CHURCH OF
TUBURAN ALBAY GOD LIGAO
PROVINCIAL
HOSPITAL
VANDERPOL
RD
MARTHA'S MART
O
CHRISTIAN
AC
GEODETIC ENGINEER
AB
-T
ACADEMY
AO
LIG
ANG LIGAO
PRC NO. __________________________ PTR:____________________________ CALTEX DATING
HILL
DAAN ELECTRICAL
DATE:_____________________________ PLACE:_________________________ NATIONAL
MAYON
HILL
HOUSING
INSTITUTE OF AUTHORITY
SCIENCE AND
HIL
TECHNOLOGY
L
TECHNICAL DESCRIPTIONS
HILL
ELECTRONICS
R.A. 9266
SECTION 20
Drawings and specifications duly signed, stamped or
saArkitekto TE
D ARCHIT
C
PREPARED: PROJECT TITLE AND LOCATION: APPROVED: SHEET NO.:
E
I
UN