Following the request for inspection, the works as per the above listed items and supportive documents have been evaluated and permission to proceed is hereby :
GRANTED REFUSED
Disclaimer: Signature of the contractor signifies that all related works have been inspected and are in accordance with drawing and/or specification.Construction
manager's signature do not necessarily imply completion on the specific scope of work nor relieve the contractor from rectification of defects and punch list.