Date:

REBAR INSTALLATION REQUEST NO:____________


Project: Proposed Two Storey SY Residence
Owner: Mr&Mrs.Carlos Sy Control No: SYCAR1499-RI-01
1499 Carissa St.Dasmariñas Village,Makati
Location: City
Contractor Nelmann Construction
Consultant: R.Sales
Installation Date:
TYPE OF STRUCTURE LEVEL LOCATION

CONTRACTOR'S AUTHORIZED JOINT SIGNATURE


CONCERNED TRADES SCOPE OF WORKS REMARKS
SIGNATURE/DATE CONSULTANT/GEN CON
Shop Drawing
Grade of steel as per spec.
Spacing as per drawing
Required clearance from formwork
Length of Splices(Lap length)
G Rebar Schedule
E Bars at opening provided
N Bars are cleaned
C Bars tied adequately
O Conduits in place
N Rebar clearance for concrete pouring
Coordination of pipes and sleeves
Setting-Out
Support systems in place
Bars are staggered as per dwg.
Others
Additional Items/Remarks/Comments:

Following the request for inspection, the works as per the above listed items and supportive documents have been evaluated and permission to proceed is hereby :

GRANTED REFUSED

Disclaimer: Signature of the contractor signifies that all related works have been inspected and are in accordance with drawing and/or specification.Construction
manager's signature do not necessarily imply completion on the specific scope of work nor relieve the contractor from rectification of defects and punch list.

REQUESTED BY: APPROVED BY:

General Contractor/Date Construction Manager/Date