S/N Description Unit Total Qty

Note: The contractor should read the specifications thoroughly and quote the price for each item. The BOQ should read in-conjunction with
specification, drawing & equipment schedule. The cost shall include the cost of the material, transportation, taxes, duties, lifting, shifting,
storing, handling, installation, testing and commissioning.
The Chiller selection program shall be AHRI certified and the factory shall be equipped with an AHRI certified test bed. The Chiller selection
would be performed by the vendor in front of the Client & Consultants when called for by them. The Chiller selection will also have to be
validated with AHRI.
Noise level shall be maximum of 85dBA at 1.5m distance from the equipmment in all directions.
Ratings for vendor would also take into consideration the low noise level offered by vendors.
The Chiller vendor shall submit the detailed GA drawing of the chiller & accessories.
1 WATER COOLED CENTRIFUGAL MAGNETIC CHILLERS WITH VFD
Supply, Installation, Testing & Commissioning of Water-cooled Liquid chilling Units complete with centrifugal Magnetic compressors, water-
1.01 cooled condenser, evaporator & Unit mounted factory fitted VFD. (In case of multi-compressor chiller, each compressor should be VFD driven)

The compressor will be a Centrifugal type powered by open/ semi hermetic / fully hermatic electric motor with R-134a/R-514a Refrigerant and
1.02 drive motor suitable for 415V +/-15%, 3 phase, 50cps @ 45 deg C drive assembly, guard, etc. Appropriate Voltage regulator to be considered to
overcome power quality issues for magnetic bearing chillers
Water cooled condenser will be of the shell and tube type 2-pass, designed for 235 psig working pressure on the refrigerant side. Shell will be
fabricated from rolled carbon steel plate with fusion welded seams have carbon steel tube sheets, drilled and reamed to accommodate the
tubes; and intermediate tube supports spaced not more than four feet apart. The refrigerant side will be designed & tested in accordance with
applicable pressure vessel code. Tubes shall be high-efficiency, internally and externally enhanced type having plain copper lands at all
1.03 intermediate tube supports to provide maximum tube wall thickness at the support area. Each tube will be roller expanded into the tube
sheets providing a leak proof seal, and be individually replaceable. Water velocity through the tubes will not exceed 8 fps.

Insulation of the chiller using 40mm Armaflex or equivalent insulation and cladded with 26 G Aluminum sheets. If required additional acoustic
1.04 jacketing shall be considered for compressor to meet noise level specified in tender spec.
Chiller sequencing and operation should be designed in such a way that one chiller starts with minimum capacity initially and load to the
1.05 maximum and enable the next chiller to start on demand through Chiller Plant Optimizer. The detailed sequence of operations to be discussed
and agreed before implementation
First charge of R-134a
1.06 R-514a refrigerant & oil.
Factory fitted flow switch to protect condenser & cooler from low flow. The flow switch must also allow up to minimum chilled water flow
1.07 through cooler
Micro-processor based controls with alpha-numeric display in English for all operating parameters such as supply voltage, frequency, load
current, chilled water inlet, chilled water outlet, condenser inlet and outlet temperature parameters, operating pressures, input power etc as
per tender specification.The processor must be fitted with card for external communication for parameters in open protocol such as
1.08 Bacnet/Modbus.
Shall be equipped with the quick start feature of less than or equal to 120 seconds/ 100% Load.

Power and control hardware including unit disconnecting / isolating Switch, one point start-stop, protective MCCBs for electric motors, VFD,
Harmonics shall comply to IEEE 519, complete with drives with harmonic filter, suction and discharge shut off valves, automatic capacity
1.09 control, safety features for under-voltage and over voltage, single phase preventor, trip circuit with sensing elements for HP/LP/Anti-freeze
etc.,shall also include the Cabling from the surge protection panel to the chiller.

Chiller has to be supplied with Automatic Tube cleaning system (ATCS) with lowest pressure drop (<2ft) with necessary accessories as required
& called for ATCS.
Installation & Commissioning of ATCS with necessary piping, Valves, cabling from the panel & actuator. The ATCS shall be provided for each
1.10 chiller independently & shall be integrated to the CPO with necessary cabling, trunking & necessary accessories.

Grooved coupling shall be part of the Chiller Package. Painting of all components etc. Price should also includes integral refrigerant piping with
1.11 liquid isolation valves, and wiring, flow swtiches / sensors, accessories as required and called for, automatic and safety controls mounted in
central control panel and all mounted on a steel frame complete.
The bidder shall submit a computerized selection sheet of the chiller offered as obtained from the manufacturer along with their offer from the
latest AHRI listed software version. Non-submittal of the computerized selection sheet shall be liable for bid rejection. The cooler and
1.12 condenser shall have applicable pressure code vessel stamping on the nameplate as a standard, without which the machines will be rejected.

1.13 Surge protection assembly along with UPS for mangentic compressors.
1.14 All the chiller should be covered with Tarpaulin till the installation or handover
1.15 Spring type Vibration Isolators as per manufacturer standard supplied from the factory
1.16 The procurement shall be processed only after duly verification / approval of Efficiency of chiller & selection by Consultant.

Tag No. B1_WCC-01 - 04 Nos. 4


Min. Actual Capacity 600 TR at Design Condition
Entering Chilled Water Temperature = 13.78OC (56.8OF)
Leaving Chilled Water Temperature =6.7OC (42.8OF)
Fouling Factor for Evaporator SI (FPS) Units = 0.0005
Entering Condenser Water Temperature = 27.0OC (89OF)
Leaving Condenser Water Temperature = 32.0 OC (99OF)
Fouling Factor for Condenser SI (FPS) Units = 0.001
The Min. COP at 100% capacity = 6.5 at AHRI conditions
The Min. COP at IPLV = 9.21 at IPLV conditions as per ASHRAE Path "B"

BMS Integeration with necessary cabling from CPO to BMS room to replicate CPO parameters. Facility shall be suitable to connect third party
2 BMS of any make including necessary hardware and software. (350 RMT of cabling). Set 1
Supply installation testing commissioning of Chiller Plant optimizer (CPO) with DDC controllers, Chiller Plant optimizer software, Integerators to
the Chillers, Pumps, Cooling Towers temperature sensors on the supply & return chilled & Condenser water header, for functioning of the
chiller plant manager system, CPO should be supplied with Latest workstation (Blade type) of Lenovo/Dell make with 3.40 G Hz Intel Core i7
processor, 1TB SATA HDD, Graphic card 1 GB, 16GB DDR4 RAM (Extendable to 32 GB), 64 bit compatible OS, 32 inch LCD display with user
Interface for commissioning & maintenance etc. (Refer attached CPO I/O summary for reference). Windows 11 Professional OS, MS Office, and
3 Symantec Antivirus Set 1
The price shall be inclusive of 2kva UPS, Battery, A4 size Laserjet Printer suitable for the application along with driver software, Required panel
& Cabling. (Inverter)
The detailed sequence of operations to be discussed and agreed before implementation

Factory inspection & fully assimilated load test to ensure full compliance with contract documents. The contactor shall allow for all cost for
attendance to enable factory tests to be witnessed by the employer & engineer. The contractor shall be responsible for all travel expenses of
4 the employer & engineer in witnessing factory test for the chillers. Charges for conducting performance test at manufacturer's factory for Lot 1
chillers in the presence of Client/Consultant / Client representative.

The Scope of arrangement of chiller Performance test shall be confirmed by Client


5 TOTAL VALUE FOR WATER COOLED CHILLERS

6 Transportation, Shifting, Loading, Unloading, Installation, Coordnation, Testing & Commissioning of Chillers Lot 1
6.01 Clearing the goods from ICD including customs clearance for all items as described under supply Lot 1
Loading to the transport vehicle
Local transport by road including transit insurance.
Interaction and clearance at various local points
6.02 Unloading at site Lot 1
Shifting of material to the point of installation including lifting using mechanical means to the designated area.
Note :
1. Vendor to study the methodology to lift/shift the chillers to Plant Room and only consultant/ PMC /client approval approved methodlogy to
be adopted.
2. Necessary permissions from authorities to be taken by the contractor before lifting / shifting the chillers
3. Necessary Insurance for the workmen, material and third party liability.
6.03 Installation, Levelling, Testing and commissioning charges including all consumables, tools and equipments. Lot 1
6.04 Coordination with HVAC & Electrical vendor for Cabling, pre-commissioning, testing & commsioning of all Chilling Units Lot 1

Adopter box with bus bar for cable termination changeover from Al to Copper and Copper Cabling (Size & No of cables as per manufacturer
7 Recommendation) from adopter box to chiller motor terminal including termination for water cooled chillers. Set 4

Supply, Installation, testing and commissioning outdoor mountable Temperature (Dry & Wet Bulb) & RH Sensors with all mounting accessories
8 to measure the ambient conditions. The sensor should be IP65 rated. No's 1

Supply, Installation, testing and commissioning of Water type Temperature sensors (Immersion) provide tamper proof elements having
9 stainless steel sheath, complete with all accessories for measuring Chilled water temperature in Header complete as per specification etc., IP 65 No's 4
rated Immersion Type Sensor.

#REF! PRICES FOR AMC


Comprehensive Annual Maintenance Contract charges for the Chiller packages after the DLP.
#REF! First year after DLP Lot 1
#REF! Second year after DLP Lot 1
#REF! Third year after DLP Lot 1
#REF! Fourth year after DLP Lot 1
#REF! Fifth year after DLP Lot 1

You might also like