Professional Documents
Culture Documents
Industrial Engineering and Operations Research Department College of Engineering University of The Philippines Diliman
Industrial Engineering and Operations Research Department College of Engineering University of The Philippines Diliman
COLLEGE OF ENGINEERING
UNIVERSITY OF THE PHILIPPINES DILIMAN
Group Activity # 5
Instructions: Answer the following questions completely. Show all relevant solutions. Handwritten or
typewritten answers are acceptable.
1) A single sampling plan uses a sample size of 40, and an acceptance number of c=2. Using
hypergeometric and binomial probabilities, compute the respective probabilities of acceptance of
lots of 80 articles with 2, 6, 10 and 20% defective.
2) Using the nomograph, design a single sampling plan for attributes with AQL=0.04, LTPD=0.10,
Pa(“good” lot)=0.95, and Pa(“bad” lot)=0.50.
a. What is the probability of accepting the lot if p=0.05?
b. From (a), what are the corresponding AOQ and ATI given that rectification is done?
3) Derive an item-by-item sequential sampling plan for which p1=0.01, p2=0.10, α=0.05, and β=0.10.
What is the Average Sample Number when the incoming lot fraction defective is equal to s?