INDUSTRIAL ENGINEERING AND OPERATIONS RESEARCH DEPARTMENT

COLLEGE OF ENGINEERING
UNIVERSITY OF THE PHILIPPINES DILIMAN

IE 135: Industrial Quality Control


1st Semester AY 2023-2024

Group Activity # 5

Instructions: Answer the following questions completely. Show all relevant solutions. Handwritten or
typewritten answers are acceptable.

1) A single sampling plan uses a sample size of 40, and an acceptance number of c=2. Using
hypergeometric and binomial probabilities, compute the respective probabilities of acceptance of
lots of 80 articles with 2, 6, 10 and 20% defective.

2) Using the nomograph, design a single sampling plan for attributes with AQL=0.04, LTPD=0.10,
Pa(“good” lot)=0.95, and Pa(“bad” lot)=0.50.
a. What is the probability of accepting the lot if p=0.05?
b. From (a), what are the corresponding AOQ and ATI given that rectification is done?

3) Derive an item-by-item sequential sampling plan for which p1=0.01, p2=0.10, α=0.05, and β=0.10.
What is the Average Sample Number when the incoming lot fraction defective is equal to s?

Deadline: Dec 18, 2023 (Mon), 12NN


Please submit via the designated submission bin in UVLe.