Lift Plan No.: Date: / NOV / 2023
Location: MOD \ WTP Contractor/Sub-Contractor IGC / IGCS
Permit-To-Work No: Risk Assessment No:
Description of lifting operation: Loading, offloading a caravan by using a mobile crane
Boom length [m] 27 Max Operative radius [m] 12 SWL@max radius [t] 9
Webbing sling 6m
Webbing sling 6m
Webbing sling 6m
Webbing sling 8m
Hook block
Total weight of Lifting accessories [t] Colour Code: green
ENSURE THAT ALL LIFTING EQUIPMENT HAVE BEEN CHECKED AND DEEMED SUITABLE AND SAFE
Lifting Sketch – As required
Sketch of the General Arrangement / Rigging:
[crane position / lifted item / obs tacles and any additional details, as required]
Webbing Sling
Is lay down / landing area(s) adequate in both size and load bearing capacity? ✓
Environment Are the weather conditions within limits to avoid their effects on the safety of the lifting operation? ✓
IF ALL CONTROLS ARE NOT IN PLACE, THE OPERATION SHALL NOT
START!
Personnel involved
Position Name Certificate / Qualification Expiry Date
Lift. Appliance Operator
Banksman / Signalman
Rigger
Rigger
Lifting Supervisor
Any person involved with the job can call “ALL STOP!” at any time if something wrong is
observed