Arts Centre Melbourne Floor Covering Services 2022

Schedule 1: Schedule of Pricing Yr 1:

The billing rates supplied by the Tenderer, below, are to be based upon the
Tenderer’s ability to assure that all the terms and conditions in the Tender and
specifications for Floor Covering Services and accompanying attachments will be
met. All prices to be round to the nearest dollar.

Pricing Schedule

Table 1 – Floor Covering Services Fees

Deliverables $/Hr Cost


(excluding GST)
Labour (Normal Hours) Broad loom carpet
Labour (Overtime Rate) Broad loom carpet
Labour (Normal Hours) Carpet tile
Labour (Overtime Rate) Carpet tile
Mark-up rate for materials on a “cost plus” basis
Total

Table 2 – Additional Costs


$/Hr Cost
Total amount
(excluding GST)

a) Labour (Normal Hours) Continuous vinyl laying $


b) Labour (Overtime Hours) Continuous vinyl laying $
$/annum
c) Storage of Board loom carpet
d) Inventory Management

Please note - the above Pricing Schedule assumes

 Each of the above work items will be undertaken with, and under, the Facilities
Coordinator’s ongoing direction and involvement.

Tenderer’s are to note:

 All fields are to be filled in. Fields fill showing “N/A” or “included in price” will
deemed the tender documentation as “non-conforming”
 Establishment cost if applicable will be included in the tender prices submitted
 Tenders are to allow for, site induction and familiarisation which is at the
expense of the contractor.
 Arts Centre Melbourne does not provide car parking; car parking is at the
expense of the contractor.
 All costs rounded to the nearest dollar

Tenderer’s are to state:

a) The length of time that these rates will remain constant.

Page | 1
Arts Centre Melbourne Floor Covering Services 2022

For year 1 of a 3 year contract from the date of execution.

b) Any proposed or foreseen increase in rates.

c) Proposed mark-up to be applied to parts, materials and sub-contracted


services purchased by the Contractor for works outside the contract.
Mark up %

Additional materials and sub-contracting services rate %

Breakdown of Rates Charged

Area of Expense Percentage (%) Dollar Amount ($)


Wages, Allowances, Penalties % $
Annual Leave/Loadings % $
Sick Leave % $
Work Cover % $
Superannuation % $
Payroll Tax % $
Training % $
Equipment Purchase % $
Equipment Maintenance % $
Materials % $
Administration % $
Uniforms % $
Insurance % $
Other Overheads (specify) – % $
Leave Loading
Other Overheads (specify) – % $
Long Service Leave

Subtotal $

Profit Margin % $

Total Cost $