Date ………………………………..
Hydro test carried out as per Tender Document Vol-02 of 06,Section -4: Technical specification, Part
10A,clause no-4.22, page-986.
Unless specified otherwise, a structure whose top is covered shall be deemed to be water tight, if the
total drop in the surface level over a period of seven days does not exceed 40mm. drop in the surface
level over a period of seven days does not exceed 40mm.
Witnessed by:
Witnessed by:
Name Designation Signnature