DAILY PROGRESS REPORT

Construction and Remodeling Of Existing Baiyappanahalli Depot for Bangalore


Client Name : BANGALORE METRO RAIL CORPORATION LIMITED Project Title :
Metro Rail Project, Phase-2A

Contractors Name: J.KUMAR AICPL-JV Weather: Sunny

DPR Date: 29-Dec-23

DPR NO. JKAICPL/BMRCL/2A/DPR- 209

BOQ.Item.No Work progress for the Month - DEC-23


Sr. Achieved Till Nov Cum %
Activity Unit Approx Scope Cum Achieved
no. Schedul 31st Planned for Cum for the Completed
No. For the day
e the Month month

Preparatory Works
1 A 1.0 Cleaning & Grubbing (CG) Ha 7.00 2.94 - - 2.940 42%
2 A 2.0 Removal of unservicable soil Cum 2,000.00 1,880.00 - - 1,880.000 94%
3 A 3.0 Cutting of Tree - - - -
4 A 3.1 300mm to 600mm Girth Each 50.00 - - - - 0%
5 A 3.2 600mm to 900mm Girth Each 50.00 - - - - 0%
6 A 3.3 900mm to 1800mm Girth Each 5.00 3.00 - - 3.000 60%
7 A 3.4 1800mm to 2700mm Girth Each 5.00 - - - - 0%
8 A 4.0 Excavation Cum 2,90,632.00 51,381.00 516.0 3,876.000 55,257.000 #VALUE!
9 A 6.0 Backfilling with excavated soil Cum 10,000.00 8,396.00 - - 8,396.000 84%
10 I 1.0 Survey work Acre 17.00 5.56 - - 5.561 33%
11 I 2.0 Temporary Barrication Rmt 600.00 - - - - 0%
12 I 11.0 Geotechnical Investigation Rmt 390.00 305.00 - - 305.000 78%
13 I 5.0 Plate Load Test Nos 2.00 - - - - 0%
14 I 7.0 Traffic Marshal Mandays 4,500.00 776.00 4.0 116.000 892.000 20%
15 I 8.0 Fully Furnished Site Office Sqm 75.00 - - - - 0%
16 I 9.0 Uprooting the tree roots 300-2400mm Each 50.00 24.00 - - 24.000 48%
17 I 10.0 Tranplanting the Trees 300 to 500mm Each 40.00 - - - - 0%
KD-1 Completion of stabling shed No.2 (8 lines) up to ground level. -

1 B 10 Diaphragm Wall Rmt 394.6 279.50 5.5 77.000 356.500 90%


2 Intital Pile test - - - -
3 B 2 Intial vertical load test on pile - - - -
4 B 2.1 800mm dia pile No 2 - - - - 0%
5 B 2.2 1000mm dia pile No 2 - - - - 0%
6 B 3 Intial lateral load test on pile - - - -
7 B 3.1 800mm dia pile No 2 - - - - 0%
8 1000mm dia pile No - -
9 B 4 Intial Pull out test on pile - - - -
10 B 4.1 800mm dia pile No 2 - - - - 0%
11 1000mm dia pile No - - - -
12 B 5 Routine dynamic load test on pile - - - -
13 800mm dia pile No - -
14 1000mm dia pile No - -
15 B 8 Integrity test 351 - - - - 0%
16 B 1 Drilling & Concreting of Piles - - - -
17 B 1.1 800mm dia Nos 236 - - - - 0%
18 B 1.2 1000mm dia pile Nos 144 - - - - 0%
19 Pile Cap - - - -
20 C 2 PCC Work -with M-15 Nos 78 - - - - 0%
21 C 3 RCC Work - M-35 Nos 78 - - - - 0%
22 Footings - - - -
23 C 2 PCC Work -with M-20 Cum 21.9 - - - - 0%
24 C 3 RCC Work - M-35 Cum 102.6 - - - - 0%
25 Columns - - - -
26 C 1 RCC Work - M50 Nos 141 - - - - 0%
27 Underground and At Grade Level - - - -
28 F 1 ATT Work Sqm 6720 - - - - 0%
29 C 2 PCC Work -with M-20 Cum 672 - - - - 0%
30 C 1 RCC Work - M35 Cum 5768 - - - - 0%
Completion of stabling shed No. 2 (8 lines) up to first floor including entry line
KD-2 -
structure at both the levels.
1 B 10 Diaphragm Wall Rmt 154 49.500 - 27.500 77.000 50%
2 Intital Pile test - - - -
3 B 2 Intial vertical load test on pile - - - -
4 B 2.1 800mm dia pile No 2.00 - -
5 B 2.2 1000mm dia pile No 2.00 - - - - 0%
6 B 3 Intial lateral load test on pile - - - -
7 B 3.2 1000mm dia pile No 3 - - - - 0%
8 B 4 Intial Pull out test on pile - - - -
9 B 4 1000mm dia pile No 3 - - - - 0%
10 Routine Pile test - - - -
11 B 5 Static routine vertical test - - - -
12 B 5.2 1000mm dia pile No 6.00 - - - - 0%
13 B 6 Static routine lateral test - - - -
14 B 6.2 1000mm dia pile No 6 - - - - 0%
15 B 7.0 Dynamic load test - - - -
16 B 7.2 1000mm dia pile No 3.00 - - - - 0%
17 B 1.0 Drilling & Concreting of Piles - - - -
18 B 1.1 800mm dia Nos 136 - - - - 0%
19 B 1.2 1000mm dia pile Nos 52 - 1.0 24.000 24.000 46%
20 Pile Cap - - - -
21 C 2 PCC Work -with M-15 Nos 42 - - - - 0%
22 C 3 RCC Work - M-35 Nos 42 - - - - 0%
23 Columns - - - -
24 C 1 RCC Work - M50 Nos 48 - - - - 0%
25 First Floor Beam and slab - - - -
26 C 1 RCC Work - M35 Cum 2791.14 - - - - 0%
27 Viaduct girder & slab - - - -
28 C 1 RCC Work - M50 Cum 779 - - - - 0%
KD-3 Completion of PD area for all floors in stabilizing shed No.2 (8 lines) -
1 Columns - - - -
2 C 1 RCC Work - M35 Cum 1185 - - - - 0%
3 Second & Terrace Floor Beam, Slab - - - -
4 C 1 RCC Work - M50 Cum 5062.5 - - - - 0%
Completion of stabling shed No.1(14 lines) up to Ground level beam and slab
KD-4 -
including dismantling of existing stabling shed and other related items.
1 B 1.0 Drilling & Concreting of Piles - - - -
2 B 1.2 For 1000 mm dia Pile by Hydraulic rig Nos 502.00 - - - - 0%
5 Concrete-M35-Pile Cap Cum 13445.62 - - - - 0%
6 Pile Cap - - - -
7 C 2 PCC Work -with M-15 Nos 152.00 - - - - 0%
8 C 3 RCC Work - M-35 Nos 152.00 - - - - 0%
9 Footings,Column,Beam,Slab - - - -
10 C 2 PCC Work -with M-20 Nos 165 - - - - 0%
11 C 3 RCC Work - M-35 Nos 165.00 - - - - 0%
12 C 1 RCC Work - M-35 Nos 108.00 - - - - 0%
13 G 1 Anti Termite Treatment Sqm 11,952.00 - - - - 0%

Demolishing brick work in cement mortar


14 J 3 Cum 745.00 10.18 - - 10.179 1%
manually / by mechanical means

Completion of steel structure including fabrication, erection, roof sheeting etc.


KD-5 and Architectural & PHE works for stabling shed No.1(14 lines) including -
entry line structure at both the levels.
1 Intital Pile test
2 B 2 Intial vertical load test on pile - - -
3 B 2.1 800mm dia pile Nos 1 1.00 - - 1.000 100%
4 B 2.2 1000mm dia pile Nos 1 1.00 - - 1.000 100%
5 B 3 Intial lateral load test on pile - - - -
6 B 3.2 1000mm dia pile Nos 3 - - - - 0%
7 B 3.1 800 dia pile Nos 2 1.00 - - 1.000 50%
8 B 4 Intial Pull out test on pile - -
9 B 4.1 1000mm dia pile Nos - - - - -
10 B 800mm dia pile Nos - - - - -
11 B 5 Routine dynamic load test on pile Nos - -
12 B 5.1 1000mm dia pile Nos 1 1.00 - - 1.000 100%
13 B 5.2 800mm dia pile Nos 1 1.00 - - 1.000 100%
14 Routine Lateral load test on pile - - -
15 1000mm dia pile No 1 1.00 - - 1.000 100%
16 800mm dia pile No 1 1.00 - - 1.000 100%
17 B 8 Pile Integrity test No 73 27.00 - 4.000 31.000 42%
18 Pille boring and concreting - -
19 B 1.1 800mm dia Nos 252 147.00 - - 147.000 58%
20 B 1.2 1000mm dia pile Nos 128 44.00 - - 44.000 34%
21 Pile Cap - -
22 C 2 PCC Work -with M-15 Nos 73 25.00 - 4.000 29.000 40%
23 C 3 RCC Work - M-35 Nos 73 24.00 - 6.000 30.000 41%
24 Grade slab (lvl 899.525) - - - -
25 F 1 ATT Work Sqm 7,034.00 - - - - 0%
26 C 2 PCC Work -with M-20 Cum 703.4 - - - - 0%
27 C 1 RCC Work - M35 Cum 1406.8 - - - - 0%
28 Columns - - - -
29 C 1 RCC Work - M35 1st Lift Nos 96 - - 14.000 14.000 15%
RCC Work - M35 2nd Lift Nos 96 - - - - 0%
30 Second & Terrace Floor Beam, Slab - - - -
31 C 1 RCC Work - M50 Cum 4659.112 - - - - 0%
Completion of water supply, plumbing works site development and Road
KD-6
works.
1 Retaining Wall - -
2 A 4 Excavation Rmt 1300 - - - - 0%
3 F 1 Anti Termite Sqm 2322.2 - - - - 0%
4 G 60 Waterproofing Sqm 16,738.82 - - - - 0%
5 C 2 PCC Work -with M-15 Rmt 1300 - - - - 0%
6 C 1 RCC Work-with-M-35 Rmt 1300 - - - - 0%
7 Backfilling Cum - - - -
8 Diaphragm Wall - - - -
9 A 10 RCC Work-with-M-35 Rmt 205 - - - - 0%
10 Drain Works - - - -
11 A 4 Excavation Cum 3108.75 - - - - 0%
12 C 2 PCC Work -with M-20 Cum 307.5 - - - - 0%
13 C 5 Pre Cast RCC Work-with-M-35 Cum 1338.75 - - - - 0%
14 Road Works - - - -
15 A 9 GSB Rmt 1500 - - - - 0%
16 A 10 WMM Rmt 1500 - - - - 0%
17 A 11 DBM Rmt 1500 - - - - 0%
18 A 12 Premix Carpet Rmt 1500 - - - - 0%
KD-7 Completion of Entire work as per the contract
Wednesday

Wednesday

Wednesday

Wednesday

Wednesday

Wednesday

Wednesday

Wednesday
Thursday

Thursday

Thursday

Thursday

Thursday

Thursday

Thursday

Thursday
Saturday

Saturday

Saturday

Saturday

Saturday

Saturday

Saturday
Tuesday

Tuesday

Tuesday

Tuesday

Tuesday

Tuesday

Tuesday
Monday

Monday

Monday

Monday

Monday

Monday

Monday
Sunday

Sunday

Sunday

Sunday

Sunday

Sunday

Sunday
Name of Work-Construction and Remodeling Of Existing Baiyappanahalli Depot for Bangalore Metro Rail Project,

Friday

Friday

Friday

Friday

Friday

Friday

Friday
Phase-2A

10-Mar
11-Mar
12-Mar
13-Mar
14-Mar
15-Mar
16-Mar
17-Mar
18-Mar
19-Mar
20-Mar
21-Mar
22-Mar
23-Mar
24-Mar
25-Mar
26-Mar
27-Mar
28-Mar
29-Mar
30-Mar
31-Mar
BOQ.Item.No Completed Qty Balance Qty as

10-Apr
11-Apr
12-Apr
13-Apr
14-Apr
15-Apr
16-Apr
17-Apr
18-Apr
19-Apr
20-Apr
1-Mar
2-Mar
3-Mar
4-Mar
5-Mar
6-Mar
7-Mar
8-Mar
9-Mar

1-Apr
2-Apr
3-Apr
4-Apr
5-Apr
6-Apr
7-Apr
8-Apr
9-Apr
Sr. no. Activity Unit Total
As On Date on date
Schedule No.
Preparatory works
1 A 1.0 Cleaning & Grubbing (CG) Ha 7.00 2.94 4.06 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.1 0.1
2 A 2.0 Removal of unservicable soil Cum 2,000.00 1880 120
3 A 3.0 Cutting of Tree 0 0
4 A 3.1 300mm to 600mm Girth Each 50.00 0 50
5 A 3.2 600mm to 900mm Girth Each 50.00 0 50
6 A 3.3 900mm to 1800mm Girth Each 5.00 3 2
7 A 3.4 1800mm to 2700mm Girth Each 5.00 0 5
8 A 4.0 Excavation Cum 290,632 55257 235375
9 A 6.0 Backfilling with excavated soil Cum 10,000.00 8396 1604
10 I 1.0 Survey work Acre 17.00 5.56 11 ### ### ### ### ### ### 0.2 0.2 ###
11 I 2.0 Temporary Barrication Rmt 600.00 0 600
12 I 11.0 Geotechnical Investigation Rmt 390.00 305.0 85
13 I 5.0 Plate Load Test Nos 2.00 0 2
14 I 7.0 Traffic Marshal Mandays 4,500.00 892 3608
15 I 8.0 Fully Furnished Site Office Sqm 75.00 0 75
16 I 9.0 Uprooting the tree roots 300-2400mm Each 50.00 24 26
17 I 10.0 Tranplanting the Trees 300 to 500mm Each 40.00 0 40
KD-1 Completion of stabling shed No.2 (8 lines) up to ground level.
1 B 10 Diaphragm Wall Rmt 394.6 356.50 38.100
2 Intital Pile test 0 0
3 B 2 Intial vertical load test on pile 0 0
4 B 2.1 800mm dia No 2 0 2
5 B 2.2 1000mm dia pile No 2 0 2
6 B 3 Intial lateral load test on pile 0 0
7 B 3.1 800mm dia pile No 2 0 2
8 B 4 Intial Pull out test on pile 0 0
9 B 4.1 800mm dia pile No 2 0 2
10 Routine Pile test 0 0
11 B 5 Static routine vertical test 0 0
12 B 5.1 800mm dia pile No 3 0 3
13 B 6 Static routine lateral test 0 0
14 B 6.1 800mm dia pile No 3 0 3
15 B 7 Dynamic load test 0 0
16 B 7.1 800mm dia pile No 2 1 1
17 B 8 Integrity test No 351 0 351
18 B 1 Drilling & Concreting of Piles 0 0
19 B 1.1 800mm dia Rmt. 236 0 236
20 B 1.2 1000mm dia pile Rmt. 144 0 144
21 Pile Cap 0 0
22 C 2 PCC Work -with M-15 Nos 78 0 78
23 C 3 RCC Work - M-35 Nos 78 0 78
24 Footings 0 0
25 C 2 PCC Work -with M-20 Cum 21.9 0 22
26 C 3 RCC Work - M-35 Cum 102.6 0 103
27 Columns 0 0
28 C 1 RCC Work - M50 Nos 141 0 141
29 Underground and At Grade Level 0 0
30 F 1 ATT Work Sqm 6720 0 6720
31 C 2 PCC Work -with M-20 Cum 672 0 672
32 C 1 RCC Work - M35 Cum 5768 0 5768
Completion of stabling shed No. 2 (8 lines) up to first floor including entry line structure at both the
KD-2
levels.
1 B 10 Diaphragm Wall Rmt 154 77.00 77.000
2 Intital Pile test 0 0
3 B 2 Intial vertical load test on pile 0 0
4 B 2.1 800mm dia pile No 2.00 0 0
5 B 2.2 1000mm dia pile No 2.00 0 2
6 B 3 Intial lateral load test on pile 0 0
7 B 3.2 1000mm dia pile No 2 0 2
8 B 4 Intial Pull out test on pile 0 0
9 B 4 1000mm dia pile No 2 0 2
10 Routine Pile test 0 0
11 B 5 Static routine vertical test 0 0
12 B 5.2 1000mm dia pile No 6.00 0 6
13 B 6 Static routine lateral test 0 0
14 B 6.2 1000mm dia pile No 6 0 6
15 B 7.0 Dynamic load test 0 0
16 B 7.2 1000mm dia pile No 3.00 0 3
17 B 1.0 Drilling & Concreting of Piles 0 0
18 B 1.1 800mm dia Nos 136 0 136
19 B 1.2 1000mm dia pile Nos 52 24 28
20 Pile Cap 0 0
21 C 2 PCC Work -with M-15 Nos 42 0 42
22 C 3 RCC Work - M-35 Nos 42 0 42
23 Columns 0 0
24 C 1 RCC Work - M50 Nos 48 0 48
25 First Floor Beam and slab 0 0
26 C 1 RCC Work - M35 Cum 2791.14 0 2791
27 Viaduct girder & slab 0 0
28 C 1 RCC Work - M50 Cum 779 0 779
KD-3 Completion of PD area for all floors in stabilizing shed No.2 (8 lines)
1 Columns 0 0
2 C 1 RCC Work - M35 Cum 1185 0 1185
3 Second & Terrace Floor Beam, Slab 0 0
4 C 1 RCC Work - M50 Cum 5062.5 0 5063
Completion of stabling shed No.1(14 lines) up to Ground level beam and slab including dismantling of
KD-4
existing stabling shed and other related items.
1 B 1.0 Drilling & Concreting of Piles 0 0
2 B 1.2 For 1000 mm dia Pile by Hydraulic rig Nos 502.00 0 502
5 Concrete-M35-Pile Cap Cum 13445.62 0 13446
6 Pile Cap 0 0
7 C 2 PCC Work -with M-15 Nos 152.00 0 152
8 C 3 RCC Work - M-35 Nos 152.00 0 152
9 Footings,Column,Beam,Slab 0 0
10 C 2 PCC Work -with M-20 Nos 165 0 165
11 C 3 RCC Work - M-35 Nos 165.00 0 165
12 C 1 RCC Work - M-35 Nos 108.00 0 108
13 G 1 Anti Termite Treatment Sqm 11,952.00 0 11952
Demolishing brick work in cement mortar
14 J 3 Cum 745.00 10.179 734.821
manually / by mechanical means
Completion of steel structure including fabrication, erection, roof sheeting etc. and Architectural &
KD-5
PHE works for stabling shed No.1(14 lines) including entry line structure at both the levels.
1 Intital Pile test 0 0
2 B 2 Intial vertical load test on pile 0 0
3 B 2.1 800mm dia pile No 1.00 1.0 0.0
4 B 2.2 1000mm dia pile No 1.00 1.0 0.0
5 B 3 Intial lateral load test on pile 0 0
6 B 3.1 1000mm dia pile No 3 0 3
7 B 3.2 800 mm dia pile No 6 1 5
8 B 4 Intial Pull out test on pile 0 0
9 B 4.1 1000mm dia pile No 2 0 2
10 B 800mm dia pile No 0
11 Routine dynamic load test on pile
12 1000mm dia pile No 1 1
13 800mm dia pile No 1 1
14 Routine Lateral load test on pile
15 1000mm dia pile No 1 1
16 800mm dia pile No 1 1
17 B 1.0 Pile Integrity test No 96.00 31 65
18 Pille boring and concreting
19 B 1.1 800mm dia Nos 252 147 105
20 B 1.2 1000mm dia pile Nos 128 44 84
21 Pile Cap 0 0
22 C 2.0 PCC Work -with M-20 Nos 73 29 44
23 C 3.0 RCC Work - M-35 Nos 73 30 43
24 Grade slab (lvl 899.525) 0 0
25 F 1 ATT Work Sqm 7,034.00 0 7034
26 C 2 PCC Work -with M-20 Cum 703.4 0 703
27 C 1 RCC Work - M35 Cum 1406.8 0 1407
28 Columns 0 0
29 C 1 RCC Work - M35 1st Lift Nos 96 14 82
RCC Work - M35 2nd Lift Nos 96
30 Second & Terrace Floor Beam, Slab 0 0
31 C 1 RCC Work - M50 Cum 4659.112 0 4659

KD-6 Completion of water supply, plumbing works site development and Road works.

1 Retaining Wall 0 0
2 A 4 Excavation Rmt 1300 0 1300
3 F 1 Anti Termite Sqm 2322.2 0 2322
4 G 60 Waterproofing Sqm 16738.81658 0 16739
5 C 2 PCC Work -with M-20 Rmt 1300 0 1300
6 C 1 RCC Work-with-M-35 Rmt 1300 0 1300
7 Backfilling Cum 0 0
8 Diaphragm Wall 0 0
9 A 10 RCC Work-with-M-35 Rmt 205 0 205
10 Drain Works 0 0
11 A 4 Excavation Cum 3108.75 0 3109
12 C 2 PCC Work -with M-20 Cum 307.5 0 308
13 C 5 Pre Cast RCC Work-with-M-35 Cum 1338.75 0 1339
14 Road Works 0 0
15 A 9 GSB Rmt 1500 0 1500
16 A 10 WMM Rmt 1500 0 1500
17 A 11 DBM Rmt 1500 0 1500
18 A 12 Premix Carpet Rmt 1500 0 1500
KD-7 Completion of Entire work as per the contract
21-Apr Friday
22-Apr Saturday

0.2 0.2
0.1 0.1
23-Apr Sunday
24-Apr Monday

0.2
25-Apr Tuesday
26-Apr Wednesday

0.1 ### 0.2


27-Apr Thursday

0.3 0.2

8
28-Apr Friday
29-Apr Saturday

8
0.3
30-Apr Sunday

8
3
20 40

1-May Monday
2-May Tuesday
3-May Wednesday

0.2 0.2
4-May Thursday
5-May Friday
6-May Saturday
7-May Sunday
8-May Monday
9-May Tuesday
0.2 0.2 0.2 0.3

10-May Wednesday
11-May Thursday
0.2

12-May Friday
13-May Saturday
### ### ### 80 90 60 70 ### ### ### ### ###

0.2

14-May Sunday
15-May Monday
###

16-May Tuesday
17-May Wednesday
18-May Thursday
2
11 13 23 20 40 20 27 27

19-May Friday
2

20-May Saturday
2

21-May Sunday
2

22-May Monday
4
8 35 32

23-May Tuesday
4
0

24-May Wednesday
4
7

25-May Thursday
4

26-May Friday
4

27-May Saturday
4
0 10 4.5
0.6

28-May Sunday
4
0

29-May Monday
4
3

30-May Tuesday
4
4

31-May Wednesday
4
4

1-Jun Thursday
4

2-Jun Friday
4
7

3-Jun Saturday
4

4-Jun Sunday
4

5-Jun Monday
4

6-Jun Tuesday
4

7-Jun Wednesday
4

8-Jun Thursday
4
11

9-Jun Friday
4

10-Jun Saturday
### 50 ### ### ### ###

11-Jun Sunday
4

12-Jun Monday
4

13-Jun Tuesday
4

14-Jun Wednesday
4

15-Jun Thursday
4

16-Jun Friday
4

17-Jun Saturday
4

18-Jun Sunday
4

19-Jun Monday
### ### ### ### ### ### ###
### ### ### 50 ### ### ### ### ### ### ### ### ### ### ### ### ###

20-Jun Tuesday
4

21-Jun Wednesday
4

22-Jun Thursday
4

23-Jun Friday
4

24-Jun Saturday
4

25-Jun Sunday
4

26-Jun Monday
4

27-Jun Tuesday
4

28-Jun Wednesday
4

29-Jun Thursday
4

30-Jun Friday
4

1-Jul Saturday
4

2-Jul Sunday
4

3-Jul Monday
4

4-Jul Tuesday
4

5-Jul Wednesday
4

6-Jul Thursday
4

7-Jul Friday
4

8-Jul Saturday
0 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
0 0 ### ### ### 60 ### 24 ### 60 ### ### 24 ### 24 0 ### 0 0

4
9-Jul Sunday
4
0

10-Jul Monday
4

11-Jul Tuesday
4

12-Jul Wednesday
4

13-Jul Thursday
### ### ### ###

4
0 0 0 0
10

0.5
0.5

1 2 2 1 2 3 2 2 3 3 3 2 4 4 0 3 4 3 3
14-Jul Friday

4
15-Jul Saturday

4
16-Jul Sunday

4
17-Jul Monday

4
18-Jul Tuesday

4
19-Jul Wednesday

4
20-Jul Thursday

4
21-Jul Friday

4
22-Jul Saturday

### ### ### ### ### ### ### ### ###

4
23-Jul Sunday

4
24-Jul Monday

0 ###

4
25-Jul Tuesday

4
0 26-Jul Wednesday

4
0
27-Jul Thursday

4
0

28-Jul Friday

4
0

29-Jul Saturday

4
0

30-Jul Sunday
4
0

31-Jul Monday
4
0

1-Aug Tuesday
4
0

2-Aug Wednesday
4
0

3-Aug Thursday
4
0

4-Aug Friday
4
0

5-Aug Saturday
4
0

6-Aug Sunday
4
0

7-Aug Monday
4
0

8-Aug Tuesday
4
0

9-Aug Wednesday
4
0

10-Aug Thursday
4
0

11-Aug Friday
4
0

12-Aug Saturday
4
0

13-Aug Sunday
4
0

14-Aug Monday
4
0

15-Aug Tuesday
0
0

16-Aug Wednesday
4
0

17-Aug Thursday
4
0

18-Aug Friday
4
0

19-Aug Saturday
4
0

20-Aug Sunday
4
0

21-Aug Monday
4
0

22-Aug Tuesday
4
0

23-Aug Wednesday
4
0

24-Aug Thursday
4
0

25-Aug Friday
4
0

26-Aug Saturday
4
0

27-Aug Sunday
4
0

28-Aug Monday
4
0

29-Aug Tuesday
4
0

30-Aug Wednesday
5.5
4

31-Aug Thursday
0 ###

0
4

1-Sep Friday
4

2-Sep Saturday
0 5.5
4

3-Sep Sunday
0
4

4-Sep Monday
0
4

5-Sep Tuesday
0 ### ### ### ###

6-Sep Wednesday
0 5.5
4

7-Sep Thursday
4

8-Sep Friday
0 5.5
4

9-Sep Saturday
4

10-Sep Sunday
0 5.5
4

11-Sep Monday
0 ### ### ### ### ###

12-Sep Tuesday
4

13-Sep Wednesday
0 ###

0 5.5 5.5
4

14-Sep Thursday
4
0

15-Sep Friday
0 5.5
4

16-Sep Saturday
0 ###

17-Sep Sunday
0 5.5
4

18-Sep Monday
0 ###

19-Sep Tuesday
0 5.5
4
0

20-Sep Wednesday
4

21-Sep Thursday
0 5.5
4

22-Sep Friday
0 60 100

23-Sep Saturday
4
90

24-Sep Sunday
4
0

25-Sep Monday
0 5.5 5.5 5.5
4
90

26-Sep Tuesday
0
4

27-Sep Wednesday
0 210

0
4

28-Sep Thursday
0
4
0

29-Sep Friday
4

30-Sep Saturday
4

1-Oct Sunday
0 160 150

2-Oct Monday
0 5.5 5.5 5.5
4
0
9

4 3 3 3 4 4 3 2 3 0 1 2 2 2 1 1 2 2 2 2 2 2 2 0 2 3 3 3 3 2 2 1 2 2 2 2 0 2 2 1 1 1 2 1 2 3 0 1 0 1 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 1 0 2 1 2 1 1 1 2 1 2 2 1 2 2 0 1 1 1 1 1 2 0 2 1 1 1 1 0 0 2 1 2 1 1 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 1 2 0 1 0 0 1 0 0 0 1 0 2 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0
3-Oct Tuesday

4
4-Oct Wednesday

160 110

0 5.5
4
5-Oct Thursday

130

0
4
6-Oct Friday

4
50
7-Oct Saturday

4 5.5
4
0
0.5
0

0 0 0 0
0 0 0 0

0 0 0 0
8-Oct Sunday

4
0
9-Oct Monday

0 5.5
4
0
10-Oct Tuesday

4
11-Oct Wednesday

4
12-Oct Thursday

0 5.5 5.5 0
4 4
0 118 130 0
13-Oct Friday

4
14-Oct Saturday

5.5
15-Oct Sunday

0 6
4 4
16-Oct Monday

0
4
17-Oct Tuesday

4
18-Oct Wednesday

4
19-Oct Thursday

4
20-Oct Friday

5.5 5.5 5.5


0
4
21-Oct Saturday
4
22-Oct Sunday
120 124 124 118 130 119 122 122 264

4
0

23-Oct Monday

5.5 5.5
0
4

24-Oct Tuesday
372

0
4
0

25-Oct Wednesday
4
0

26-Oct Thursday
4
0

27-Oct Friday

1
4

28-Oct Saturday
4

29-Oct Sunday
4

30-Oct Monday
4

5.5 5.5 5.5 5.5 5.5 11

31-Oct Tuesday
252 324 396 228

0
4
0

1-Nov Wednesday
4

2-Nov Thursday
5.5
0
4

3-Nov Friday
0
4

4-Nov Saturday
4

5-Nov Sunday
264 264 300 264

4
0

6-Nov Monday
4
0

7-Nov Tuesday
4
0

8-Nov Wednesday
5.5 5.5 5.5 5.5
0
4
0

9-Nov Thursday
4
0

10-Nov Friday
5.5
0

11-Nov Saturday
11
4
0

12-Nov Sunday
0
4
0

13-Nov Monday
0
4
0

14-Nov Tuesday
0
4

5.5 15-Nov Wednesday


4
0

16-Nov Thursday
0
4

17-Nov Friday
0 120

5.5
4

18-Nov Saturday
5..5
4
0

19-Nov Sunday
5.5
4

20-Nov Monday
0 240

0
4

21-Nov Tuesday
120

5.5
4

22-Nov Wednesday
5.50 5.5
4
0

23-Nov Thursday
5.5
4
0

24-Nov Friday
5.5
4
0

25-Nov Saturday
5.5
4
0

26-Nov Sunday
5.5
4

27-Nov Monday
5.5
4

28-Nov Tuesday
4

29-Nov Wednesday
4

30-Nov Thursday
0 5.5 5.5
4

1-Dec Friday
5.5 5.5 5.5
4

2-Dec Saturday
4

3-Dec Sunday
5.5
4

4-Dec Monday
0 132 341 324 192 180 180 300 228

5.5
4

5-Dec Tuesday
5.5
4
84

6-Dec Wednesday
5.5
4
0

7-Dec Thursday
5.5
4

8-Dec Friday
5.5
4

9-Dec Saturday
0 156 192

5.5
4

10-Dec Sunday
4

11-Dec Monday
144

12-Dec Tuesday
4

13-Dec Wednesday
144

5.5
4

14-Dec Thursday
4

15-Dec Friday
5.50
4
1 1 1 1 1 1 1 1 1 1 1 1

0.5

1
1

1
1
6 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 3 0 0 0 4

0 0 0
0 0 0

0 0 0 2 2 0 1 1 0 1 1 1 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 3 1 0 0 0 0 0 0 0 1 3
1 1 1 2 0 1 0 2 1 0 1 1 2 1 1 0 0 0 0 0 1 1 1 0 0 1 1 1 0 0 0 0 0 0 0 0 0 0 1 1 1 1

3
16-Dec Saturday

5.50
4
17-Dec Sunday

4
18-Dec Monday

5.5
4
19-Dec Tuesday

4
20-Dec Wednesday

5.5
4
21-Dec Thursday

84 264 240

4
22-Dec Friday

4
72
23-Dec Saturday

5.50 5.50
4
24-Dec Sunday

4
25-Dec Monday

5.5
4
26-Dec Tuesday

4
27-Dec Wednesday

4
28-Dec Thursday

4
29-Dec Friday
240 288 288 276 516

5.5 5.5 5.5


4
30-Dec Saturday
31-Dec Sunday
1-Jan Monday
2-Jan Tuesday
3-Jan Wednesday
4-Jan Thursday
5-Jan Friday
6-Jan Saturday
7-Jan Sunday
8-Jan Monday
9-Jan Tuesday
10-Jan Wednesday
11-Jan Thursday
12-Jan Friday
13-Jan Saturday
14-Jan Sunday
15-Jan Monday
16-Jan Tuesday
17-Jan Wednesday
18-Jan Thursday
19-Jan Friday
20-Jan Saturday
21-Jan Sunday
22-Jan Monday
23-Jan Tuesday
24-Jan Wednesday
25-Jan Thursday
26-Jan Friday
27-Jan Saturday
28-Jan Sunday
29-Jan Monday
30-Jan Tuesday
31-Jan Wednesday
1-Feb Thursday
2-Feb Friday
3-Feb Saturday
4-Feb Sunday
5-Feb Monday
6-Feb Tuesday
7-Feb Wednesday
8-Feb Thursday
9-Feb Friday
10-Feb Saturday
11-Feb Sunday
12-Feb Monday
13-Feb Tuesday
14-Feb Wednesday
15-Feb Thursday
16-Feb Friday
17-Feb Saturday
18-Feb Sunday
19-Feb Monday
20-Feb Tuesday
21-Feb Wednesday
22-Feb Thursday
23-Feb Friday
24-Feb Saturday
25-Feb Sunday
26-Feb Monday
1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1

3 4 4
WORK DONE STATEMENT FOR DIAPHRAGM WALL
1st Level Anchoring 2nd Level Anchoring
Capping Level-1-1/3 Level-1-2/3 Level-1-3/3 Level-2-1/3 Level-2-2/3 Level-2-3/3
D-Wall Length
Sl.No. Location DW DOC Beam
ID in "m"
DOC Fixed End Stressing Free End Fixed End Stressing Free End Fixed End Stressing Free End Fixed End Stressing Free End Fixed End Stressing Free End Fixed End Stressing Free End
Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting
1 SBL-02 DW-01 5.5
2 SBL-02 DW-02 5.5 10/18/2023
3 SBL-02 DW-03 5.5 10/7/2023
4 SBL-02 DW-04 5.5 9/30/2023
5 SBL-02 DW-05 5.5 9/21/2023
6 SBL-02 DW-06 5.5 9/12/2023
7 SBL-02 DW-07 5.5 9/17/2023 12/18/2023
8 SBL-02 DW-08 5.5 9/24/2023
9 SBL-02 DW-09 5.5 10/1/2023
10 SBL-02 DW-10 5.5 10/6/2023
11 SBL-02 DW-11 5.5 10/9/2023
12 SBL-02 DW-12 5.5 10/12/2023
13 SBL-02 DW-13 5.5 10/19/2023
14 SBL-02 DW-14 5.5 10/16/2023
15 SBL-02 DW-15 5.5 9/13/2023
16 SBL-02 DW-16 5.5 9/8/2023
17 SBL-02 DW-17 5.5 9/2/2023
18 SBL-02 DW-18 5.5 8/30/2023
19 SBL-02 DW-19 5.5 9/6/2023
20 SBL-02 DW-20 5.5 9/10/2023
21 SBL-02 DW-21 5.5 9/15/2023
22 SBL-02 DW-22 5.5 9/19/2023
23 SBL-02 DW-23 5.5 9/23/2023
24 SBL-02 DW-24 5.5 9/25/2023
25 SBL-02 DW-25 5.5 10/1/2023
26 SBL-02 DW-26 5.5 10/4/2023
27 SBL-02 DW-27 5.5 10/11/2023
28 SBL-02 DW-28 5.5 10/14/2023
29 SBL-02 DW-29 5.5 10/20/2023
30 SBL-02 DW-30 5.5 10/23/2023
31 SBL-02 DW-31 5.5 10/28/2023
32 SBL-02 DW-32 5.5 10/31/2023
33 SBL-02 DW-33 5.5 10/26/2023
34 SBL-02 DW-34 5.5 10/22/2023
35 SBL-02 DW-35 5.5 10/29/2023
36 SBL-02 DW-36 5.5 11/2/2023
37 SBL-02 DW-37 5.5 11/7/2023
38 SBL-02 DW-38 5.5 11/11/2023
39 SBL-02 DW-39 5.5 11/8/2023
40 SBL-02 DW-40 5.5 11/5/2023
41 SBL-02 DW-41 5.5 11/10/2023
42 SBL-02 DW-42 5.5
43 SBL-02 DW-43 5.5
44 SBL-02 DW-44 5.5 11/6/2023
45 SBL-02 DW-45 5.5 10/31/2023
46 SBL-02 DW-46 5.5 10/27/2023
47 SBL-02 DW-47 5.5 10/30/2023
48 SBL-02 DW-48 5.5 11/11/2023
49 SBL-02 DW-49 5.5 11/18/2023
50 SBL-02 DW-50 5.5 12/15/2023
51 SBL-02 DW-51 5.5 12/8/2023
52 SBL-02 DW-52 5.5 11/30/2023
53 SBL-02 DW-53 5.5 11/24/2023
54 SBL-02 DW-54 5.5 11/21/2023
55 SBL-02 DW-55 5.5 11/26/2023
1st Level Anchoring 2nd Level Anchoring
Capping Level-1-1/3 Level-1-2/3 Level-1-3/3 Level-2-1/3 Level-2-2/3 Level-2-3/3
D-Wall Length
Sl.No. Location DW DOC Beam
ID in "m"
DOC Fixed End Stressing Free End Fixed End Stressing Free End Fixed End Stressing Free End Fixed End Stressing Free End Fixed End Stressing Free End Fixed End Stressing Free End
Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting
56 SBL-02 DW-56 5.5 11/29/2023
57 SBL-02 DW-57 5.5 12/4/2023
58 SBL-02 DW-58 5.5 12/6/2023
59 SBL-02 DW-59 5.5 12/16/2023
60 SBL-02 DW-60 5.5 12/18/2023
61 SBL-02 DW-61 5.5 12/28/2023
62 SBL-02 DW-62 5.5
63 SBL-02 DW-63 5.5 12/25/2023
64 SBL-02 DW-64 5.5 12/13/2023
65 SBL-02 DW-65 5.5 12/20/2023
66 SBL-02 DW-66 5.5 12/22/2023
67 SBL-02 DW-67 5.5 12/23/2023
68 SBL-02 DW-68 5.5 12/27/2023
69 SBL-02 DW-69 5.5 12/29/2023
70 SBL-02 DW-70 5.5
71 SBL-02 DW-71 5.5
72 SBL-02 DW-72 5.5
73 SBL-02 DW-73 5.5
74 EDS-02 DW-74 5.5
75 EDS-02 DW-75 5.5
76 EDS-02 DW-76 5.5
77 EDS-02 DW-77 5.5
78 EDS-02 DW-78 5.5
79 EDS-02 DW-79 5.5
80 EDS-02 DW-80 5.5
81 EDS-02 DW-81 5.5
82 EDS-02 DW-82 5.5
83 EDS-02 DW-83 5.5
84 EDS-02 DW-84 5.5
85 EDS-02 DW-85 5.5
86 EDS-02 DW-86 5.5
87 EDS-02 DW-87 5.5
88 EDS-02 DW-88 5.5 11/19/2023
89 EDS-02 DW-89 5.5 11/25/2023
90 EDS-02 DW-90 5.5 11/21/2023
91 EDS-02 DW-91 5.5 11/17/2023
92 EDS-02 DW-92 5.5 11/15/2023
93 EDS-02 DW-93 5.5 11/23/2023
94 EDS-02 DW-94 5.5 11/27/2023
95 EDS-02 DW-95 5.5 11/29/2023
96 EDS-02 DW-96 5.5 12/1/2023
97 EDS-02 DW-97 5.5 12/3/2023
98 EDS-02 DW-98 5.5 11/30/2023
99 EDS-02 DW-99 5.5 12/5/2023
100 EDS-02 DW-100 5.5 12/7/2023
101 EDS-02 DW-101 5.5 12/9/2023
102 SBL-01 DW-102 5.5
103 SBL-01 DW-103 5.5
104 SBL-01 DW-104 5.5
105 SBL-01 DW-105 5.5
106 SBL-01 DW-106 5.5
107 SBL-01 DW-107 5.5
108 SBL-01 DW-108 5.5
109 SBL-01 DW-109 5.5
110 SBL-01 DW-110 5.5
111 SBL-01 DW-111 5.5
112 SBL-01 DW-112 5.5
1st Level Anchoring 2nd Level Anchoring
Capping Level-1-1/3 Level-1-2/3 Level-1-3/3 Level-2-1/3 Level-2-2/3 Level-2-3/3
D-Wall Length
Sl.No. Location DW DOC Beam
ID in "m"
DOC Fixed End Stressing Free End Fixed End Stressing Free End Fixed End Stressing Free End Fixed End Stressing Free End Fixed End Stressing Free End Fixed End Stressing Free End
Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting
113 SBL-01 DW-113 5.5
114 SBL-01 DW-114 5.5
115 SBL-01 DW-115 5.5
116 SBL-01 DW-116 5.5
117 SBL-01 DW-117 5.5
118 SBL-01 DW-118 5.5
119 SBL-01 DW-119 5.5
120 SBL-01 DW-120 5.5
121 SBL-01 DW-121 5.5
122 SBL-01 DW-122 5.5
123 SBL-01 DW-123 5.5
124 SBL-01 DW-124 5.5
125 SBL-01 DW-125 5.5
126 SBL-01 DW-126 5.5
127 SBL-01 DW-127 5.5
128 SBL-01 DW-128 5.5
129 SBL-01 DW-129 5.5
130 SBL-01 DW-130 5.5
131 SBL-01 DW-131 5.5
132 SBL-01 DW-132 5.5
133 SBL-01 DW-133 5.5
134 SBL-01 DW-134 5.5
135 SBL-01 DW-135 5.5
136 SBL-01 DW-136 5.5
137 SBL-01 DW-137 5.5
138 SBL-01 DW-138 5.5
139 SBL-01 DW-139 5.5
140 SBL-01 DW-140 5.5
141 SBL-01 DW-141 5.5
142 SBL-01 DW-142 5.5
143 SBL-01 DW-143 5.5
144 SBL-01 DW-144 5.5
145 SBL-01 DW-145 5.5
146 SBL-01 DW-146 5.5
147 SBL-01 DW-147 5.5
148 SBL-01 DW-148 5.5
149 SBL-01 DW-149 5.5
150 SBL-01 DW-150 5.5

79 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
01/29/2024
WORK DONE STATEMENT OF ENTRY DECK STRUCTURE (EDS)-01 h
Piling Details Pile Cap Details Column Details
Type Dia of No. of Pile Code (PL) Pile DOC Pile Pile Cap Size in "m" PIT PCC Pile Cap Column Column Size in "m" Starter Column DOC
Sl. No. GRID No.
of Pile Pile Piles P1 P2 P3 P4 P5 P6 P1 P2 P3 P4 P5 P6 Code L W D DOT DOC DOC Code L W D DOC 1st Lift 2nd Lift 3rd Lift
1 GRID-27 FP 0.8 4 1 2 3 4 PC-1 3.70 3.70 1.50 C-1 2.25 0.5
2 GRID-27 FP 0.8 4 5 6 7 8 PC-1 3.70 3.70 1.50 C-2 2.25 0.5
3 GRID-27 FP 0.8 4 9 10 11 12 PC-1 3.70 3.70 1.50 C-3 2.25 0.5
4 GRID-27 FP 0.8 4 13 14 15 16 PC-1 3.70 3.70 1.50 C-4 2.25 0.5
5 GRID-27 FP 0.8 4 17 18 19 20 PC-1 3.70 3.70 1.50 C-5 2.25 0.5
6 GRID-27 FP 0.8 4 21 22 23 24 PC-1 3.70 3.70 1.50 C-6 2.25 0.5
7 GRID-27 FP 0.8 4 25 26 27 28 PC-1 3.70 3.70 1.50 C-7 2.25 0.5
8 GRID-27 FP 0.8 4 29 30 21 32 PC-1 3.70 3.70 1.50 C-8 2.25 0.5
9 GRID-27 FP 0.8 4 33 34 35 36 PC-1 3.70 3.70 1.50 C-9 2.25 0.5
10 GRID-28 FP 0.8 4 37 38 39 40 PC-1 3.70 3.70 1.50 C-12 2.25 0.5
11 GRID-28 FP 0.8 4 41 42 43 44 PC-1 3.70 3.70 1.50 C-13 2.25 0.5
12 GRID-28 FP 0.8 4 45 46 47 48 PC-1 3.70 3.70 1.50 C-14 2.25 0.5
13 GRID-28 FP 0.8 4 49 50 51 52 PC-1 3.70 3.70 1.50 C-15 2.25 0.5
14 GRID-28 FP 0.8 4 53 54 55 56 PC-1 3.70 3.70 1.50 C-16 2.25 0.5
15 GRID-28 FP 0.8 4 57 58 59 60 PC-1 3.70 3.70 1.50 C-17 2.25 0.5
16 GRID-28 FP 0.8 4 61 62 63 64 PC-1 3.70 3.70 1.50 C-18 2.25 0.5
17 GRID-28 FP 0.8 4 65 66 67 68 PC-1 3.70 3.70 1.50 C-19 2.25 0.5
18 GRID-28 FP 0.8 4 69 70 71 72 PC-1 3.70 3.70 1.50 C-20 2.25 0.5
19 GRID-29 FP 0.8 4 73 74 75 76 PC-1 3.70 3.70 1.50 C-21 2.25 0.5
20 GRID-29 FP 0.8 4 77 78 79 80 PC-1 3.70 3.70 1.50 C-22 2.25 0.5
21 GRID-29 FP 0.8 4 81 82 83 84 PC-1 3.70 3.70 1.50 C-23 2.25 0.5
22 GRID-29 FP 0.8 4 85 86 87 88 PC-1 3.70 3.70 1.50 C-24 2.25 0.5
23 GRID-29 FP 0.8 4 89 90 91 92 6/27/2023 PC-1 3.70 3.70 1.50 C-25 2.25 0.5
24 GRID-29 FP 0.8 4 93 94 95 96 6/24/2023 6/29/2023 PC-1 3.70 3.70 1.50 C-26 2.25 0.5
25 GRID-29 FP 0.8 4 97 98 99 100 6/29/2023 6/23/2023 7/6/2023 6/27/2023 PC-1 3.70 3.70 1.50 C-27 2.25 0.5
26 GRID-29 FP 0.8 4 101 102 103 104 7/1/2023 7/2/2023 7/5/2023 7/7/2023 PC-1 3.70 3.70 1.50 C-28 2.25 0.5
27 GRID-29 FP 0.8 4 105 106 107 108 7/1/2023 7/9/2023 7/11/2023 7/12/2023 PC-1 3.70 3.70 1.50 C-29 2.25 0.5
28 C-32 2.25 0.5
GRID-30 & 31 FP 1.0 6 109 110 111 112 113 114 8/6/2023 8/2/2023 8/1/2023 7/30/2023 7/4/2023 8/31/2023 PC-4 6.60 4.00 1.50 11/25/2023
29 C-45 2.25 0.5
30 C-33 2.25 0.5
GRID-30 & 31 FP 0.8 6 115 116 117 118 119 120 7/15/2023 7/20/2023 7/21/2023 7/14/2023 7/16/2023 7/18/2023 PC-3 6.30 3.70 1.50 12/13/2023 12/8/2023 12/21/2023
31 C-44 2.25 0.5
32 C-34 2.25 0.5
GRID-30 & 31 FP 0.8 6 121 122 123 124 125 126 7/19/2023 7/21/2023 7/15/2023 7/23/2023 7/25/2023 7/16/2023 PC-3 6.30 3.70 1.50 12/13/2023 12/8/2023 12/23/2023
33 C-43 2.25 0.5
34 C-35 2.25 0.5
GRID-30 & 31 FP 0.8 6 127 128 129 130 131 132 7/21/2023 7/19/2023 7/16/2023 7/22/2023 7/17/2023 7/18/2023 PC-3 6.30 3.70 1.50 12/13/2023 12/6/2023
35 C-42 2.25 0.5
36 C-36 2.5 0.6
GRID-30 & 31 FP 0.8 6 133 134 135 136 137 138 8/27/2023 7/20/2023 8/26/2023 7/18/2023 PC-2 6.30 3.70 1.50
37 C-41 2.5 0.6
38 C-37 2.5 0.6
GRID-30 & 31 FP 0.8 6 139 140 141 142 143 144 8/27/2023 8/29/2023 PC-2 6.30 3.70 1.50
39 C-40 2.5 0.6
40 C-38 2.5 0.6
GRID-30 & 31 FP 0.8 6 145 146 147 148 149 150 PC-2 6.30 3.70 1.50
41 C-39 2.5 0.6
42 GRID-32 FP 0.8 4 175 176 177 178 6/28/2023 6/25/2023 7/3/2023 6/30/2023 PC-5 3.70 3.70 1.50 C-48 2.5 0.6
43 GRID-32 FP 0.8 4 171 172 173 174 7/4/2023 7/5/2023 7/7/2023 7/6/2023 PC-1 3.70 3.70 1.50 11/25/2023 12/8/2023 12/19/2023 C-49 2.25 0.5 12/27/2023
44 GRID-32 FP 0.8 4 167 168 169 170 7/14/2023 7/15/2023 7/17/2023 7/13/2023 PC-1 3.70 3.70 1.50 11/22/2023 11/18/2023 11/29/2023 C-50 2.25 0.5 12/5/2023 12/25/2023
45 GRID-32 FP 0.8 4 163 164 165 166 7/1/2023 7/3/2023 7/4/2023 7/6/2023 PC-1 3.70 3.70 1.50 11/4/2023 11/4/2023 11/16/2023 C-51 2.25 0.5 12/4/2023 12/20/2023
46 GRID-32 FP 0.8 4 159 160 161 162 7/2/2023 7/4/2023 7/5/2023 7/7/2023 PC-1 3.70 3.70 1.50 11/22/2023 11/18/2023 11/28/2023 C-52 2.25 0.5 12/4/2023 12/25/2023
47 GRID-32 FP 0.8 4 155 156 157 158 7/30/2023 7/31/2023 7/27/2023 7/27/2023 PC-1 3.70 3.70 1.50 10/18/2023 10/14/2023 10/27/2023 C-53 2.25 0.5 11/10/2023 12/25/2023
48 GRID-32 FP 0.8 4 151 152 153 154 8/1/2023 9/2/2023 8/29/2023 8/29/2023 PC-5 3.70 3.70 1.50 11/25/2023 11/19/2023 11/27/2023 C-54 2.5 0.6 12/6/2023
49 GRID-33 FP 1.0 4 199 200 201 202 8/25/2023 8/26/2023 8/19/2023 8/24/2023 PC-6 4.00 4.00 1.50 9/20/2023 9/15/2023 10/18/2023 C-55 2.5 0.8 12/5/2023
50 GRID-33 FP 0.8 4 195 196 197 198 7/9/2023 7/11/2023 7/13/2023 7/8/2023 PC-1 3.70 3.70 1.50 12/13/2023 11/30/2023 12/20/2023 C-56 2.25 0.5 12/27/2023
51 GRID-33 FP 0.8 4 191 192 193 194 7/12/2023 7/8/2023 7/10/2023 7/14/2023 PC-1 3.70 3.70 1.50 10/18/2023 10/19/2023 10/25/2023 C-57 2.25 0.5 11/10/2023 12/20/2023
52 GRID-33 FP 0.8 4 187 188 189 190 7/13/2023 7/10/2023 7/12/2023 7/8/2023 PC-1 3.70 3.70 1.50 11/4/2023 11/4/2023 11/15/2023 C-58 2.25 0.5 11/18/2023 12/20/2023
53 GRID-33 FP 0.8 4 183 184 185 186 7/11/2023 7/13/2023 7/15/2023 7/8/2023 PC-1 3.70 3.70 1.50 C-59 2.25 0.5
54 GRID-33 FP 0.8 4 179 180 181 182 7/21/2023 7/20/2023 9/4/2023 9/5/2023 PC-1 3.70 3.70 1.50 C-60 2.25 0.5
55 GRID-34 FP 0.8 4 219 220 221 222 7/17/2023 7/23/2023 9/5/2023 9/6/2023 PC-1 3.70 3.70 1.50 C-63 2.25 0.5
56 GRID-34 FP 0.8 4 215 216 217 218 7/24/2023 7/26/2023 7/22/2023 7/19/2023 PC-1 3.70 3.70 1.50 10/18/2023 10/14/2023 10/22/2023 C-64 2.25 0.5 11/14/2023 12/12/2023
57 GRID-34 FP 0.8 4 211 212 213 214 7/29/2023 7/26/2023 7/28/2023 7/27/2023 PC-1 3.70 3.70 1.50 10/18/2023 10/14/2023 10/25/2023 C-65 2.25 0.5 11/14/2023 12/12/2023
58 GRID-34 FP 0.8 4 207 208 209 210 7/31/2023 8/2/2023 8/3/2023 7/31/2023 PC-1 3.70 3.70 1.50 11/4/2023 11/2/2023 11/14/2023 C-66 2.25 0.5 11/18/2023 12/12/2023
59 GRID-34 FP 0.8 4 203 204 205 206 8/12/2023 8/13/2023 8/5/2023 8/10/2023 PC-5 3.70 3.70 1.50 9/20/2023 9/9/2023 10/16/2023 C-67 2.5 0.6 11/10/2023
60 C-68 2.5 0.7 11/4/2023 12/25/2023
GRID-35 & 36 FP 1.0 6 235 236 237 238 239 240 8/22/2023 8/18/2023 8/15/2023 8/12/2023 8/11/2023 8/10/2023 PC-7 6.60 4.00 1.50 10/18/2023 9/22/2023 10/21/2023
61 C-75 2.5 0.7 11/3/2023 12/28/2023
62 C-69 2.5 0.7
GRID-35 & 36 FP 1.0 6 229 230 231 232 233 234 8/8/2023 8/6/2023 8/2/2023 8/5/2023 8/3/2023 8/1/2023 PC-7 6.60 4.00 1.50 11/4/2023 10/30/2023 11/10/2023

26
Piling Details Pile Cap Details Column Details 01/29/2024
Type Dia of No. of Pile Code (PL) Pile DOC Pile Pile Cap Size in "m" PIT PCC Pile Cap Column Column Size in "m" Starter Column DOC
Sl. No. GRID No.
of Pile Pile Piles P1 P2 P3 P4 P5 P6 P1 P2 P3 P4 P5 P6 Code L W D DOT DOC DOC Code L W D DOC 1st Lift 2nd Lift 3rd Lift
GRID-35 & 36 FP 1.0 6 229 230 231 232 233 234 8/8/2023 8/6/2023 8/2/2023 8/5/2023 8/3/2023 8/1/2023 PC-7 6.60 4.00 1.50 11/4/2023 10/30/2023 11/10/2023
63 C-74 2.5 0.7 12/27/2023
64 C-70 2.5 0.6 11/18/2023
GRID-35 & 36 FP 1.0 6 223 224 225 226 227 228 7/27/2023 7/30/2023 7/25/2023 7/26/2023 7/29/2023 7/22/2023 PC-8 6.60 4.00 1.50 10/18/2023 10/19/2023 10/29/2023
65 C-73 2.5 0.6
66 GRID-37 FP 1.0 4 241 242 243 244 8/17/2023 8/23/2023 8/7/2023 8/13/2023 PC-9 4.00 4.00 1.50 9/20/2023 9/15/2023 10/14/2023 C-76 2.5 0.8 10/31/2023
67 GRID-37 FP 1.0 4 245 246 247 248 7/28/2023 7/31/2023 7/26/2023 7/25/2023 PC-9 4.00 4.00 1.50 11/22/2023 11/18/2023 12/1/2023 C-77 2.5 0.8
68 GRID-38 FP 1.0 4 249 250 251 252 8/26/2023 8/17/2023 8/24/2023 7/23/2023 PC-9 4.00 4.00 1.50 11/4/2023 10/27/2023 11/9/2023 C-80 2.5 0.8
69 GRID-38 FP 0.8 4 253 254 255 256 8/11/2023 8/12/2023 8/7/2023 8/9/2023 PC-1 3.70 3.70 1.50 9/20/2023 9/12/2023 10/18/2023 C-81 2.25 0.5 11/3/2023 12/28/2023
70 GRID-39 FP 0.8 4 257 258 259 260 8/20/2023 8/22/2023 8/9/2023 8/11/2023 PC-1 3.70 3.70 1.50 9/20/2023 9/6/2023 10/15/2023 C-82 2.25 0.5 10/31/2023 12/28/2023
71 GRID-39 FP 1.0 4 261 262 263 264 8/3/2023 8/4/2023 8/14/2023 8/12/2023 PC-9 4.00 4.00 1.50 11/4/2023 10/26/2023 11/11/2023 C-83 2.5 0.8
72 GRID-40 FP 0.8 4 265 266 267 268 8/1/2023 8/5/2023 8/3/2023 8/8/2023 PC-1 3.70 3.70 1.50 C-86 2.25 0.5
73 GRID-40 FP 0.8 4 269 270 271 272 8/19/2023 8/14/2023 8/9/2023 8/11/2023 PC-1 3.70 3.70 1.50 9/20/2023 9/4/2023 10/12/2023 C-87 2.25 0.5 10/28/2023 12/28/2023
74 GRID-41 FP 0.8 4 273 274 275 276 8/16/2023 8/18/2023 8/11/2023 8/13/2023 PC-1 3.70 3.70 1.50 9/20/2023 9/4/2023 10/14/2023 C-88 2.25 0.5 10/28/2023
75 GRID-41 FP 0.8 4 277 278 279 280 8/2/2023 8/4/2023 8/5/2023 8/8/2023 PC-1 3.70 3.70 1.50 C-89 2.25 0.5
76 GRID-42 FP 0.8 4 285 286 287 288 8/30/2023 8/10/2023 8/4/2023 8/9/2023 PC-1 3.70 3.70 1.50 C-92 2.25 0.5
77 GRID-42 FP 0.8 4 289 290 291 292 8/22/2023 8/19/2023 8/13/2023 8/17/2023 PC-1 3.70 3.70 1.50 9/20/2023 9/2/2023 10/19/2023 C-93 2.25 0.5 11/4/2023
78 GRID-43 FP 0.8 4 293 294 295 296 8/21/2023 8/25/2023 8/23/2023 8/28/2023 PC-1 3.70 3.70 1.50 9/20/2023 8/31/2023 10/13/2023 C-94 2.25 0.5 10/31/2023
79 GRID-43 FP 0.8 4 297 298 299 300 8/24/2023 8/20/2023 8/18/2023 8/23/2023 PC-1 3.70 3.70 1.50 C-95 2.25 0.5
80 GRID-27 FP 1.0 305 306 307 308 309 310 C-10 2.25 0.5
81 GRID-28 FP 1.0 18 311 312 313 314 315 316 C-11 2.25 0.5
82 GRID-29 FP 1.0 317 318 319 320 321 322 C-30 2.25 0.5
83 GRID-30 & 31 FP 1.0 323 324 325 326 327 328 C-31 2.25 0.5
8 PC-10-A
84 GRID-30 & 31 FP 1.0 329 330 C-46 2.25 0.5
85 GRID-32 FP 1.0 331 332 333 334 335 336 C-47 2.5 0.6
86 GRID-34 FP 1.0 16 337 338 339 340 341 342 PC-11 C-61 2.5 0.6
87 GRID-34 FP 1.0 343 344 345 346 C-62 2.5 0.6
88 GRID-35 & 36 FP 1.0 347 348 349 350 351 352 C-71 2.5 0.8
8 PC-11-A
89 GRID-35 & 36 FP 1.0 353 354 C-72 2.5 0.8
90 GRID-37 FP 1.0 355 356 357 358 359 360 C-78 2.5 1
91 GRID-38 FP 1.0 361 362 363 364 365 366 C-79 2.5 0.7
92 GRID-39 FP 1.0 367 368 369 370 371 372 C-84 2.25 0.5
93 GRID-40 FP 1.0 34 373 374 375 376 377 378 PC-12 C-85 2.25 0.5
94 GRID-41 FP 1.0 379 380 381 382 383 384 C-90 2.25 0.5
95 GRID-42 FP 1.0 385 386 387 388 C-91 2.25 0.5
96 GRID-43 C-96 2.25 0.5

380 380 191 73 31 30 29 96 25 14 0 0

27
01/29/2024
WORK DONE STATEMENT OF ENTRY DECK STRUCTURE (EDS)-02
Piling Details Pile Cap Details Column Details
Type Dia of No. of Pile Code (PL) Pile DOC As Built Pile Pile Cap Size in "m" PIT PCC Pile Cap Column Column Size in "m" Starter Column DOC
Sl. No. GRID No. As Built Drawing As Built Drawing
of Pile Pile Piles P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 Drawing Code L W D DOT DOC DOC Code L W D DOC 1st Lift 2nd Lift 3rd Lift
1 C-200
Grid-26 FP 1.0 10 600 601 602 603 604 605 606 607 608 609 - - - - - PC-50
2 C-201
3 Grid-26 FP 1.0 4 666 667 668 669 - - - - - - - - - - - PC-57 4.00 4.00 1.50 C-214
4 C-220
Grid-26 FP 1.0 10 690 691 692 693 694 695 696 697 698 699 - - - - - PC-64
5 C-221
6 C-202
Grid-27 FP 1.0 10 610 611 612 613 614 615 616 617 618 619 - - - - - PC-51
7 C-203
8 Grid-27 FP 1.0 4 670 671 672 673 - - - - - - - - - - - PC-58 4.00 4.00 1.50 C-215
9 C-222
Grid-27 FP 1.0 10 700 701 702 703 704 705 706 707 708 709 - - - - - PC-65
10 C-223
11 C-204
Grid-28 FP 1.0 10 620 621 622 623 624 625 626 627 628 629 - - - - - PC-52
12 C-205
13 Grid-28 FP 1.0 4 674 675 676 677 - - - - - - - - - - - PC-59 4.00 4.00 1.50 C-216
14 C-224
Grid-28 FP 1.0 10 710 711 712 713 714 715 716 717 718 719 - - - - - PC-66
15 C-225
16 C-206
17 C-207
Grid-29 & 30 FP 1.0 12 630 631 632 633 634 635 636 637 638 639 640 641 - - - PC-53
18 C-208
19 C-209
20 C-217
Grid-29 & 30 FP 1.0 6 678 679 680 681 682 683 - - - - - - - - - PC-60
21 C-218
22 C-226
23 C-227
Grid-29 & 30 FP 1.0 15 720 721 722 723 724 725 726 727 728 729 730 731 732 733 734 PC-67
24 C-228
25 C-229
26 Grid-31 FP 1.0 6 642 643 644 645 646 647 - - - - - - - - - PC-54 C-210
27 Grid-31 FP 1.0 6 684 685 686 687 688 689 - - - - - - - - - PC-61 C-219
28 C-230
Grid-31 FP 1.0 10 735 736 737 738 739 740 741 742 743 744 - - - - - PC-68
29 C-231
30 C-211
Grid-32 FP 1.0 10 648 649 650 651 652 653 654 655 656 657 - - - - - PC-62
31 C-212
32 C-232
Grid-32 FP 1.0 10 645 646 647 648 649 650 651 652 653 654 - - - - - PC69
33 C-233
34 C-213
Grid-33 FP 1.0 8 658 659 660 661 662 663 664 665 - - - - - PC-63
35 C-214
36 C-234
Grid-33 FP 1.0 10 655 656 657 658 659 660 661 662 663 664 - - - - - PC-70
37 C-235
38 C-41
Grid-34 & 35 FP 0.8 6 103 104 105 106 107 108 - - - - - - - - - PC-5
39 C-47
40 C-42
Grid-34 & 35 FP 0.8 6 97 98 99 100 101 102 - - - - - - - - - PC-5
41 C-46
42 C-43
Grid-34 & 35 FP 1.0 6 91 92 93 94 95 96 - - - - - - - - - PC-6
43 C-45
44 Grid-36 FP 0.8 4 109 110 111 112 - - - - - - - - - - - PC-07 4.00 4.00 1.50 C-50
45 Grid-36 FP 0.8 4 113 114 115 116 - - - - - - - - - - - PC-07 4.00 4.00 1.50 C-51
46 Grid-36 FP 1.0 4 117 118 119 120 - - - - - - - - - - - PC-08 4.00 4.00 1.50 C-52
47 Grid-37 FP 0.8 4 125 126 127 128 - - - - - - - - - - - PC-07 4.00 4.00 1.50 C-54
48 Grid-37 FP 1.0 4 121 122 123 124 - - - - - - - - - - - PC-07 4.00 4.00 1.50 C-53
49 Grid-38 FP 0.8 4 129 130 131 132 - - - - - - - - - - - PC-07 4.00 4.00 1.50 C-57
50 Grid-38 FP 1.0 4 133 134 135 136 - - - - - - - - - - - PC-08 4.00 4.00 1.50 C-58
51 Grid-39 FP 0.8 4 141 142 143 144 - - - - - - - - - - - PC-07 4.00 4.00 1.50 C-60
52 Grid-39 FP 1.0 4 137 138 139 140 - - - - - - - - - - - PC-08 4.00 4.00 1.50 C-59
53 C-63
Grid-40 & 41 FP 1.0 6 145 146 147 148 149 150 - - - - - - - - - PC-06
54 C-64
55 Grid-42 FP 1.0 4 151 152 153 154 - - - - - - - - - - - PC-08 4.00 4.00 1.50 C-67
56 Grid-43 FP 1.0 4 155 156 157 158 - - - - - - - - - - - PC-08 4.00 4.00 1.50 C-68
57 Grid-44 FP 1.0 4 159 160 161 162 - - - - - - - - - - - 12/11/2023 12/13/2023 12/2/2023 12/8/2023 PC-08 4.00 4.00 1.50 C-71
58 Grid-45 FP 1.0 4 163 164 165 166 - - - - - - - - - - - 12/7/2023 12/9/2023 12/1/2023 12/5/2023 PC-08 4.00 4.00 1.50 C-72
59 C-74
Grid-46 & 47 FP 1.0 6 167 168 169 170 171 172 - - - - - - - - - 12/12/2023 12/14/2023 12/16/2023 12/3/2023 12/19/2023 12/21/2023 PC-09
60 C-76
61 Grid-48 FP 1.0 4 173 174 175 176 - - - - - - - - - - - 12/18/2023 12/20/2023 12/23/2023 12/25/2023 PC-10 4.00 4.00 1.50 C-79
62 Grid-49 FP 1.0 4 177 178 179 180 - - - - - - - - - - - 12/15/2023 12/22/2023 12/27/2023 12/29/2023 PC-10 4.00 4.00 1.50 C-80
63 Grid-50 FP 1.0 4 181 182 183 184 - - - - - - - - - - - 12/26/2023 12/28/2023 PC-10 4.00 4.00 1.50 C-83
64 Grid-51 FP 1.0 4 185 186 187 188 - - - - - - - - - - - PC-10 4.00 4.00 1.50 C-84
65 C-87
Grid-52 & 53 FP 1.0 6 189 190 191 192 193 194 - - - - - - - - - PC-11
66 C-88

269 269 24 42 0 0 0 66 0 0 0 0

EDS-02, RETAINING WALL DETAILS


67 FP 1.0 15 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287
68 FP 1.0 15 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302
69 FP 1.0 15 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317
70 FP 1.0 15 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332
71 FP 1.0 15 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347
72 FP 1.0 15 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362
73 FP 1.0 15 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377
74 FP 1.0 15 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392
75 FP 1.0 15 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407
76 FP 1.0 15 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422
77 FP 1.0 15 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437
78 FP 1.0 15 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452
79 FP 1.0 9 453 454 455 456 457 458 459 460 461
80
81
82
83
84
85
86

189 189 0 0 0 0 0 0 0 0 0 0 0 0 0

28
Name of Work-Construction and Remodeling Of Existing Baiyappanahalli Depot for Bangalore Metro Rail
Project, Phase-2A
DPR Date: 29/Dec/23
Sl No. Work Activity
1 EDS-2, PL-180 Casted. -
2 SBL-2, Excavation in Progress
3 SBL-2, D-Wall 69 Casted
KEY PLAN
Y PLAN
KEY PLAN
Progress Photos
Work Location EDS-02 Work Location EDS-2 Work Location SBL-2 Work Location SBL-2

Description TBT Work Activity PL-182 Casted Work Activity Excavation Work in Progress Work Activity D-Wall 61

Work Location Work Location Work Location Work Location

Description Description Description Description


DAILY LABOUR REPORT DEPOT
Date EDS-01 SBL-02 Miscellaneous-1 & C-DAC
SKILLE UNSKIL SKILLE UNSKIL SKILLE UNSKIL Total Remarks
PLANT
D LED D LED D LED
12/Aug/2023 38 13 12 5 8 51 TOTAL
127 127
13/Aug/2023 38 13 9 3 3 32 98 98
14/Aug/2023 38 13 12 3 5 39 110 110
15/Aug/2023 6 6 6
16/Aug/2023 40 17 12 3 4 41 117 117
17/Aug/2023 39 16 12 4 5 38 114 114
18/Aug/2023 35 14 15 6 5 42 117 117
19/Aug/2023 35 14 15 6 4 47 121 121
20/Aug/2023 10 5 5 3 4 29 56 56
21/Aug/2023 22 14 17 18 45 3 119 119
22/Aug/2023 22 14 17 23 5 40 121 121
23/Aug/2023 22 14 23 31 5 33 128 128
24/Aug/2023 20 24 23 31 5 48 151 151
25/Aug/2023 22 14 23 33 5 49 146 146
26/Aug/2023 22 14 25 33 4 45 143 143
27/Aug/2023 20 14 25 33 2 38 132 132
28/Aug/2023 22 14 25 33 4 49 147 147
29/Aug/2023 22 14 27 33 4 46 146 146
30/Aug/2023 22 14 26 31 4 44 141 141
31/Aug/2023 22 14 27 33 4 41 141 141
1/Sep/2023 13 13 13 14 2 35 90 90
2/Sep/2023 13 13 13 14 2 34 89 89
3/Sep/2023 0 0 0 0 2 29 31 31
4/Sep/2023 10 3 45 5 2 30 95 95
5/Sep/2023 10 3 47 7 1 32 100 100
6/Sep/2023 8 2 47 7 1 29 94 94
7/Sep/2023 5 4 47 7 1 32 96 96
8/Sep/2023 5 4 50 7 2 30 98 98
9/Sep/2023 1 3 37 42 2 34 119 119
10/Sep/2023 0 1 37 45 2 26 111 111
11/Sep/2023 0 1 37 45 1 35 119 119
12/Sep/2023 0 1 33 39 24 12 109 109
13/Sep/2023 0 1 37 45 1 29 113 113
14/Sep/2023 0 1 23 33 1 38 96 96
15/Sep/2023 0 1 15 16 0 31 63 63
16/Sep/2023 0 1 24 34 1 37 97 97
17/Sep/2023 0 1 15 30 0 7 53 53
18/Sep/2023 0 1 24 34 0 34 93 93
19/Sep/2023 0 1 0 1 0 38 40 40
20/Sep/2023 0 1 24 34 0 40 99 99
21/Sep/2023 0 1 26 36 2 51 116 116
22/Sep/2023 3 5 26 36 2 38 110 110
23/Sep/2023 4 5 28 38 0 50 125 125
24/Sep/2023 4 5 24 10 0 32 75 75
25/Sep/2023 7 13 27 28 1 33 109 109
26/Sep/2023 4 6 27 36 0 35 108 108
27/Sep/2023 11 6 20 23 0 44 104 104
28/Sep/2023 11 6 27 33 0 42 119 119
29/Sep/2023 10 2 12 36 0 46 106 106
30/Sep/2023 14 1 27 33 0 48 123 123
1/Oct/2023 0 0 23 33 0 36 92 92
2/Oct/2023 0 0 0 1 0 6 7 7
3/Oct/2023 11 4 23 33 0 48 119 119
4/Oct/2023 15 20 26 33 0 49 143 143
5/Oct/2023 16 15 26 33 0 45 135 135
6/Oct/2023 14 15 26 33 0 44 132 132
7/Oct/2023 16 9 23 33 0 48 129 129
8/Oct/2023 10 6 13 11 0 34 74 74
9/Oct/2023 14 7 23 33 0 46 123 123
10/Oct/2023 16 11 23 33 0 51 134 134
11/Oct/2023 24 8 23 33 0 48 136 136
12/Oct/2023 21 8 23 37 0 52 141 141
13/Oct/2023 17 12 23 40 0 48 140 140
14/Oct/2023 22 8 24 18 0 45 117 117
15/Oct/2023 0 5 28 19 0 44 96 96
16/Oct/2023 24 16 28 19 0 54 141 141
17/Oct/2023 24 16 29 13 0 47 129 129
18/Oct/2023 30 13 30 12 0 64 149 149
19/Oct/2023 25 13 29 13 0 55 135 135
20/Oct/2023 26 19 30 13 0 51 139 139
21/Oct/2023 14 13 30 13 0 55 125 125
22/Oct/2023 14 13 30 14 0 55 126 126
23/Oct/2023 14 13 26 21 0 42 116 116
24/Oct/2023 0 0 Holiday
25/Oct/2023 17 24 26 21 0 57 145 145
26/Oct/2023 26 16 28 14 0 54 138 138
27/Oct/2023 14 17 29 20 0 52 132 132
28/Oct/2023 17 23 25 18 0 51 134 134
29/Oct/2023 13 15 20 10 0 35 93 93
30/Oct/2023 15 17 25 18 0 55 130 130
31/Oct/2023 15 22 21 20 0 56 134 134
1/Nov/2023 Holiday
2/Nov/2023 20 19 25 21 0 60 145 145
3/Nov/2023 14 15 29 22 0 57 137 137
4/Nov/2023 15 13 29 22 0 53 132 132
5/Nov/2023 11 27 27 22 0 47 134 134
6/Nov/2023 15 12 29 30 0 39 125 125
7/Nov/2023 14 15 29 30 0 56 144 144
8/Nov/2023 19 16 29 31 0 50 145 145
9/Nov/2023 19 18 29 30 0 47 143 143
10/Nov/2023 14 23 26 31 0 51 145 145
11/Nov/2023 14 21 26 29 0 50 140 140
12/Nov/2023 Holiday
13/Nov/2023 12 16 13 15 0 42 98 98
14/Nov/2023 13 13 13 23 0 50 112 112
15/Nov/2023 12 16 12 20 0 59 119 119
16/Nov/2023 12 15 15 21 0 55 118 118
17/Nov/2023 4 29 33 46 52 164 164
9
8
7
6
5
4
3
2
1

15
14
13
12
11
10
Sr. no.

JCB

PTR
Paver
Grader

Bowser
Dumper
Excavator

Crane/hydra
Boom placer
Hydraulic Rig
Transit mixer
Water tanker
Tandum roller

Batching Plant
Soil compactor
Resource List

Total
Machineries

Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Unit

1
4
2
0
7
0
1
0
0
1
0
0
5
3
2

25
Resource/Machinery List
For the Day

1/Apr/23 Saturday

2/Apr/23 Sunday

3/Apr/23 Monday
1

4/Apr/23 Tuesday
1

5/Apr/23 Wednesday
1

6/Apr/23 Thursday
1

7/Apr/23 Friday
1

8/Apr/23 Saturday
1

9/Apr/23 Sunday
1

10/Apr/23 Monday
1

11/Apr/23 Tuesday
1

12/Apr/23 Wednesday
1

13/Apr/23 Thursday
1

14/Apr/23 Friday
1

15/Apr/23 Saturday
1

16/Apr/23 Sunday
1

17/Apr/23 Monday
1

18/Apr/23 Tuesday
1

19/Apr/23 Wednesday
1

20/Apr/23 Thursday
1

21/Apr/23 Friday
1

22/Apr/23 Saturday

23/Apr/23 Sunday
1

24/Apr/23 Monday
1

25/Apr/23 Tuesday
1

26/Apr/23 Wednesday
1

27/Apr/23 Thursday
1

28/Apr/23 Friday
2
1

29/Apr/23 Saturday
2
1
1

30/Apr/23 Sunday

1/May/23 Monday
2
1
1

2/May/23 Tuesday
2
1
1

3/May/23 Wednesday
3
1
1

4/May/23 Thursday
3
1
1

5/May/23 Friday
3
1
1

6/May/23 Saturday
1
3
1
1

7/May/23 Sunday
1
3
1
1

8/May/23 Monday
1
3
1
1

9/May/23 Tuesday
1
3
1
1

10/May/23 Wednesday
1
3
1
1

11/May/23 Thursday
1
3
1
1

12/May/23 Friday
1
3
1
1

13/May/23 Saturday
1
0
1
0

14/May/23 Sunday
1
3
1
1

15/May/23 Monday
1
3
1
1

16/May/23 Tuesday
1
3
1
1

17/May/23 Wednesday
1
3
1
1

18/May/23 Thursday
1
3
1
1

19/May/23 Friday
1
3
1
1

20/May/23 Saturday
1
3
1
1

21/May/23 Sunday
1
3
1
1

22/May/23 Monday
0
3
1
1

23/May/23 Tuesday
0
3
1
1

24/May/23 Wednesday
0
3
1
1

25/May/23 Thursday
0
3
1
1

26/May/23 Friday
0
3
1
1

27/May/23 Saturday
0
0
1
0

28/May/23 Sunday
0
3
1
1

29/May/23 Monday
0
3
1
1

30/May/23 Tuesday
0
3
1
1

31/May/23 Wednesday
0
3
1
1

1/Jun/23 Thursday
0
3
1
1

2/Jun/23 Friday
0
3
1
1
3/Jun/23 Saturday

0
1
1
3
1
1
4/Jun/23 Sunday

0
1
1
3
1
1
5/Jun/23 Monday

1
1
1
1
3
1
1
6/Jun/23 Tuesday

0
1
1
1
5
1
1
7/Jun/23 Wednesday

0
1
1
1
5
1
1
8/Jun/23 Thursday

0
1
1
1
5
1
1 9/Jun/23 Friday

0
1
1
1
6
1
1

10/Jun/23 Saturday

0
1
1
11/Jun/23 Sunday

0
1
1
12/Jun/23 Monday

1
1
1
13/Jun/23 Tuesday

1
1
1

14/Jun/23 Wednesday

1
1
1

15/Jun/23 Thursday

2
1
1
1

16/Jun/23 Friday

2
1
1
1

17/Jun/23 Saturday
2
1
1
1

2 18/Jun/23 Sunday
1
1
1

19/Jun/23 Monday
2
1
1
1

20/Jun/23 Tuesday
2
1
1
1

21/Jun/23 Wednesday
3
1
1
1

22/Jun/23 Thursday
2
1
1
1

23/Jun/23 Friday
3
1
1
1

24/Jun/23 Saturday
3
1
1
1

25/Jun/23 Sunday
3
1
1
1

26/Jun/23 Monday
3
1
1
1

27/Jun/23 Tuesday
3
1
1
1

28/Jun/23 Wednesday
3
1
1
1

29/Jun/23 Thursday
3
1
1
1

30/Jun/23 Friday
1
3
1
1
1

1/Jul/23 Saturday
1
3
1
2
1
1

2/Jul/23 Sunday
1
3
1
2
1
1

3/Jul/23 Monday
1
3
1
2
1
1

4/Jul/23 Tuesday
1
3
1
2
1
1

5/Jul/23 Wednesday
1
3
1
2
1
1

6/Jul/23 Thursday
1
3
1
2
1
1

7/Jul/23 Friday
1
3
1
2
1
1

8/Jul/23 Saturday
1
3
1
2
1
1

9/Jul/23 Sunday
1
3
1
2
1
1

10/Jul/23 Monday
1
3
1
2
1
1

11/Jul/23 Tuesday
1
3
1
2
1
1

12/Jul/23 Wednesday
1
3
1
2
1
1

13/Jul/23 Thursday
1
3
1
2
1
1

14/Jul/23 Friday
1
3
1
2
1
1

15/Jul/23 Saturday
1
3
1
2
1
1

16/Jul/23 Sunday
1
3
1
2
1
1

17/Jul/23 Monday
1
3
1
2
1
1

18/Jul/23 Tuesday
1
3
1
2
1
1

19/Jul/23 Wednesday
1
3
1
2
1
1

20/Jul/23 Thursday
1
3
1
2
1
1

21/Jul/23 Friday
1
3
1
2
1
1

22/Jul/23 Saturday
1
3
1
2
1
1

23/Jul/23 Sunday
1
3
2
2
1
1

24/Jul/23 Monday
1
3
2
2
1
1

25/Jul/23 Tuesday
1
3
2
2
1
1

26/Jul/23 Wednesday
1
3
2
2
1
1

27/Jul/23 Thursday
1
3
2
2
1
1

28/Jul/23 Friday
1
3
2
2
1
1

29/Jul/23 Saturday
1
3
2
2
1
1

30/Jul/23 Sunday
1
3
2
2
1
1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

Monday
11 11 11 11 10 10 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14

31/Jul/23
1
3
2
2
1
1
0
3
2
2

1/Aug/23 Tuesday
1
3
2
3
1
1
0
3
2
1

2/Aug/23 Wednesday
1
3
2
3
0
1
0
3
2
1

3/Aug/23 Thursday
1
2
2
3
0
1
0
3
2
1

4/Aug/23 Friday
1
2
2
3
0
1
0
3
2
1

5/Aug/23 Saturday
1
2
2
3
0
1
0
3
2
1

6/Aug/23 Sunday
1
2
2
3
0
1
0
3
2
1

7/Aug/23 Monday
1
2
2
3
0
1
0
3
2
1

8/Aug/23 Tuesday
1
2
2
3
0
1
0
3
2
1

9/Aug/23 Wednesday
1
4
2
3
0
1
0
3
2
2

10/Aug/23 Thursday
1
4
2
3
0
1
0
3
2
2

11/Aug/23 Friday
1
4
2
3
0
1
0
3
2
2

12/Aug/23 Saturday
1
4
2
3
0
1
0
3
2
2

13/Aug/23 Sunday
1
4
2
3
0
1
0
3
2
2

14/Aug/23 Monday

15/Aug/23 Tuesday
1
4
2
3
0
1
0
3
2
2

16/Aug/23 Wednesday
1
4
2
3
0
1
0
3
2
2

17/Aug/23 Thursday
1
4
2
3
0
1
0
3
2
2

18/Aug/23 Friday
1
4
2
3
0
1
0
3
2
2

19/Aug/23 Saturday
1
3
2
3
0
1
0
1
1
2
20/Aug/23 Sunday

1
4
2
3
0
1
0
3
2
2
21/Aug/23 Monday

1
4
2
3
0
1
0
3
2
2
22/Aug/23 Tuesday

1
4
2
3
0
1
0
3
2
2
23/Aug/23 Wednesday

1
4
2
3
0
1
0
3
2
2
24/Aug/23 Thursday

1
4
2
3
0
1
0
3
2
2
25/Aug/23 Friday

1
5
2
3
0
1
0
3
2
2 26/Aug/23 Saturday

1
5
2
3
0
1
0
3
2
2

27/Aug/23 Sunday

1
5
2
3
0
1
0
3
2
2

28/Aug/23 Monday

1
5
2
5
0
1
0
3
2
3

29/Aug/23 Tuesday

1
5
2
5
0
1
0
3
2
3

30/Aug/23 Wednesday

1
5
2
5
0
1
0
3
2
3

31/Aug/23 Thursday

1
5
2
5
0
1
0
3
2
3

1/Sep/23 Friday

1
5
2
5
0
1
0
3
2
3

2/Sep/23 Saturday

1
5
2
5
0
1
0
3
2
3

3/Sep/23 Sunday

1
5
2
5
0
1
0
3
2
3

4/Sep/23 Monday
1
5
2
5
1
1
0
3
2
3

5/Sep/23 Tuesday
1
5
2
5
1
1
0
3
2
3

6/Sep/23 Wednesday
1
5
2
5
1
1
0
3
2
3

7/Sep/23 Thursday
1
5
2
5
1
1
0
3
2
3

8/Sep/23 Friday
1
5
2
5
1
1
0
3
2
3

9/Sep/23 Saturday
1
5
2
5
1
1
0
3
2
3

10/Sep/23 Sunday
1
5
2
5
0
1
0
3
2
3

11/Sep/23 Monday
1
5
2
5
0
1
0
3
2
3

12/Sep/23 Tuesday
1
5
2
5
0
1
0
3
2
3

13/Sep/23 Wednesday
1
5
1
5
0
1
0
3
2
3

14/Sep/23 Thursday
1
5
1
5
0
1
0
3
2
3

15/Sep/23 Friday
1
5
1
5
0
1
0
3
2
3

16/Sep/23 Saturday
1
5
1
5
0
1
0
3
2
3

17/Sep/23 Sunday
1
5
1
5
0
1
0
3
2
3

18/Sep/23 Monday
1
5
1
5
0
1
0
3
2
3

19/Sep/23 Tuesday
1
3
1
5
0
1
0
3
2
2

20/Sep/23 Wednesday
1
3
1
5
0
1
0
3
2
2

21/Sep/23 Thursday
1
3
1
5
0
1
0
5
2
2

22/Sep/23 Friday
1
3
1
5
0
1
0
5
2
2

23/Sep/23 Saturday
1
3
1
5
0
1
0
5
2
2

24/Sep/23 Sunday
1
3
1
5
0
1
0
5
2
2

25/Sep/23 Monday
1
3
1
5
0
1
0
5
2
2

26/Sep/23 Tuesday
1
3
1
5
0
1
0
5
2
2

27/Sep/23 Wednesday
1
3
1
5
0
1
0
5
2
2

28/Sep/23 Thursday
1
3
1
5
0
1
0
5
2
2

29/Sep/23 Friday
1
3
1
5
0
1
0
5
2
2

30/Sep/23 Saturday
1
3
1
5
0
1
0
5
2
2

1/Oct/23 Sunday
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

2/Oct/23 Monday
1
3
0
5
0
1
0
5
2
2

3/Oct/23 Tuesday
1
4
0
5
0
1
0
5
2
2

4/Oct/23 Wednesday
1
4
0
5
0
1
0
5
2
2

5/Oct/23 Thursday
1
4
0
5
0
1
0
5
2
2

6/Oct/23 Friday
1
4
0
5
0
1
0
5
2
2

7/Oct/23 Saturday
1
4
0
5
0
1
0
5
2
2

8/Oct/23 Sunday
1
4
0
5
0
1
0
5
2
2

9/Oct/23 Monday
1
4
0
5
0
1
0
5
2
2

10/Oct/23 Tuesday
1
4
0
5
0
1
0
5
2
2

11/Oct/23 Wednesday
1
4
0
5
0
1
0
5
2
2

12/Oct/23 Thursday
1
4
0
5
0
1
0
5
2
2

13/Oct/23 Friday
1
4
0
5
0
1
0
5
2
2

14/Oct/23 Saturday
1
4
0
5
0
1
0
5
2
2

15/Oct/23 Sunday
1
5
0
5
0
1
0
5
2
2

16/Oct/23 Monday
1
5
0
5
0
1
0
5
2
2

17/Oct/23 Tuesday
1
5
0
5
0
1
0
5
2
2

18/Oct/23 Wednesday
1
5
0
5
0
1
0
5
2
2

19/Oct/23 Thursday
1
5
0
5
0
1
0
5
2
2

20/Oct/23 Friday
1
5
0
5
0
1
0
5
2
2

21/Oct/23 Saturday
1
5
0
5
0
1
0
5
2
2

22/Oct/23 Sunday
1
5
0
5
0
1
0
5
2
2

23/Oct/23 Monday

Holiday 24/Oct/23 Tuesday


1
5
0
5
0
1
0
5
2
2

25/Oct/23 Wednesday
1
5
0
5
0
1
0
5
2
2

26/Oct/23 Thursday
1
5
0
5
0
1
1
5
2
2

27/Oct/23 Friday
1
5
0
5
0
1
1
5
2
2

28/Oct/23 Saturday
1
5
0
5
0
1
1
5
2
2

29/Oct/23 Sunday
1
5
0
5
0
1
1
5
2
2

30/Oct/23 Monday
1
5
0
5
0
1
1
5
2
2

31/Oct/23 Tuesday

Holiday 1/Nov/23 Wednesday


1
5
0
5
0
1
1
5
2
2

2/Nov/23 Thursday
1
5
0
5
0
1
1
5
2
2

3/Nov/23 Friday
1
5
0
5
0
1
1
5
2
2

4/Nov/23 Saturday
1
5
0
5
0
1
1
5
2
2

5/Nov/23 Sunday
1
5
0
5
0
1
1
5
2
2
6/Nov/23 Monday

1
5
0
5
0
1
1
5
2
2
7/Nov/23 Tuesday

1
5
0
5
0
1
1
5
2
2
8/Nov/23 Wednesday

1
5
0
5
0
1
1
5
2
2
9/Nov/23 Thursday

1
5
0
5
0
1
1
5
2
2
10/Nov/23 Friday

1
5
0
5
0
1
1
5
2
2
11/Nov/23 Saturday
Holiday 12/Nov/23 Sunday

1
5
0
5
0
1
1
5
2
2

13/Nov/23 Monday

1
5
0
5
0
1
5
2
2

14/Nov/23 Tuesday

1
5
0
5
0
1
5
2
2

15/Nov/23 Wednesday

1
5
0
5
0
1
5
2
2

16/Nov/23 Thursday

1
5
0
5
0
1
5
2
2

17/Nov/23 Friday

1
6
2
7
1
1
5
3
2

18/Nov/23 Saturday

1
6
2
7
1
1
5
3
2

19/Nov/23 Sunday

1
6
2
7
1
1
5
3
2

20/Nov/23 Monday

1
6
3
7
1
1
5
3
2

21/Nov/23 Tuesday
1
6
3
7
1
1
5
3
2

22/Nov/23 Wednesday
1
6
3
7
1
1
5
3
2

23/Nov/23 Thursday
1
6
3
7
1
1
5
3
2

24/Nov/23 Friday
1
6
3
7
1
1
5
3
2

25/Nov/23 Saturday
1
6
3
7
1
1
5
3
2

26/Nov/23 Sunday
1
6
3
7
1
1
5
3
2

27/Nov/23 Monday
1
6
3
7
1
1
5
3
2

28/Nov/23 Tuesday
1
6
3
7
1
1
5
3
2

29/Nov/23 Wednesday
1
6
3
7
1
1
5
3
2

30/Nov/23 Thursday
1
6
3
7
1
1
5
3
2

1/Dec/23 Friday
1
6
3
7
1
1
5
3
2

2/Dec/23 Saturday
1
6
3
7
1
1
5
3
2

3/Dec/23 Sunday
1
6
3
7
1
1
5
3
2

4/Dec/23 Monday
1
6
3
7
1
1
5
3
2

5/Dec/23 Tuesday
1
6
3
7
1
1
5
3
2

6/Dec/23 Wednesday
1
6
3
7
1
1
5
3
2

7/Dec/23 Thursday
1
6
3
7
1
1
5
3
2

8/Dec/23 Friday
1
6
3
7
1
1
5
3
2

9/Dec/23 Saturday
1
6
3
7
1
1
5
3
2

10/Dec/23 Sunday
1
6
3
7
1
1
5
3
2

11/Dec/23 Monday
1
6
3
7
1
1
5
3
2

12/Dec/23 Tuesday
1
6
3
7
1
1
5
3
2

13/Dec/23 Wednesday
1
6
3
7
1
1
5
3
2

14/Dec/23 Thursday
1
6
3
7
1
1
5
3
2

15/Dec/23 Friday
1
6
3
7
1
1
5
3
2

16/Dec/23 Saturday
1
6
3
7
1
1
5
3
2

17/Dec/23 Sunday
1
6
3
7
1
1
5
3
2

18/Dec/23 Monday
1
6
3
7
1
1
5
3
2

19/Dec/23 Tuesday
1
6
3
7
1
1
5
3
2

20/Dec/23 Wednesday
1
6
3
7
1
1
5
3
2

21/Dec/23 Thursday
1
4
2
7
1
1
5
3
2

22/Dec/23 Friday
1
4
2
7
1
1
5
3
2

23/Dec/23 Saturday
1
4
2
7
1
1
5
3
2

24/Dec/23 Sunday
1
4
2
7
1
1
5
3
2

25/Dec/23 Monday
1
4
2
7
1
1
5
3
2

26/Dec/23 Tuesday
1
4
2
7
1
1
5
3
2

27/Dec/23 Wednesday
1
4
2
7
1
1
5
3
2

28/Dec/23 Thursday
1
4
2
7
1
1
5
3
2

29/Dec/23 Friday

30/Dec/23 Saturday

31/Dec/23 Sunday
1/Jan/24 Monday

2/Jan/24 Tuesday

3/Jan/24 Wednesday

4/Jan/24 Thursday

5/Jan/24 Friday

6/Jan/24 Saturday

7/Jan/24 Sunday

8/Jan/24 Monday

9/Jan/24 Tuesday

10/Jan/24 Wednesday
11/Jan/24 Thursday

12/Jan/24 Friday

13/Jan/24 Saturday

14/Jan/24 Sunday

15/Jan/24 Monday

16/Jan/24 Tuesday

17/Jan/24 Wednesday
18/Jan/24 Thursday
19/Jan/24 Friday

20/Jan/24 Saturday

21/Jan/24 Sunday

22/Jan/24 Monday
23/Jan/24 Tuesday

24/Jan/24 Wednesday
25/Jan/24 Thursday

26/Jan/24 Friday

27/Jan/24 Saturday

28/Jan/24 Sunday

29/Jan/24 Monday

30/Jan/24 Tuesday

31/Jan/24 Wednesday
1/Feb/24 Thursday

2/Feb/24 Friday

3/Feb/24 Saturday

4/Feb/24 Sunday
5/Feb/24 Monday

6/Feb/24 Tuesday

7/Feb/24 Wednesday

8/Feb/24 Thursday

9/Feb/24 Friday
10/Feb/24 Saturday

11/Feb/24 Sunday

12/Feb/24 Monday

13/Feb/24 Tuesday

14/Feb/24 Wednesday
15/Feb/24 Thursday

16/Feb/24 Friday

17/Feb/24 Saturday

18/Feb/24 Sunday

19/Feb/24 Monday
20/Feb/24 Tuesday

21/Feb/24 Wednesday
22/Feb/24 Thursday

23/Feb/24 Friday

24/Feb/24 Saturday
25/Feb/24 Sunday

26/Feb/24 Monday
Sl. No Date Hindrances
1 5/22/2023 Support Required from Client
1 Alignment for entire works is pending
2 Decision is pending regarding change in Pile cut off level at EDS-01 area.

2 6/1/2023 Support Required from Client


1 GFC Drawings for new Alignment
2 Site Clearance-Ballast & Scrap Materials

3 8/2/2023 Support Required from Client


1 D-wall GFC -Test Track area
2 Handover of remaining area of Depot.

4 8/11/2023 Support Required from Client


1 EDS-01 Area HAL Boundary portion to be handed over.

5 9/7/2023 Support Required from Client


1 Night work stopped by Police
2 Piling works completed as per work front availability, piling rig is idle at EDS-01

6 11/21/2023 EDS-01 Area HAL Boundary portion to be handed over.


7 11/21/2023 SBL-1 Area To be Handed Over

8 12/11/2023 EDS-01 Area HAL Boundary portion to be handed over.


9 12/11/2023 SBL-1 Area To be Handed Over.
Status

Awaiting
Clear

Clear
Clear

Clear
Awaiting

Awaiting
Awaiting

Awaiting
Awaiting

Awaiting
Awaiting

Awaiting
Awaiting
Project Quality Plan Submission & Approval Status
Description Letter No. Document No Revision Submission Date Result Status

J.Kumar-AICPL 0 17-May-23 Re-submit


Submission of Project Quality Plan J.Kumar-AICPL/2A/23-24/PQP/22
JV/BMRCL/2A/PQP-001
Submission of Inspection and Test Plan for PQP-Reg J.Kumar-AICPL JV/2A/23-24/PQP ITP/48 0 12-Jun-23 Re-submit

Submission of Work Method Statement for Geo Technical Soil Investigation-Reg. BMRCL/2A/23-24/02 JKAICPL/BMRCL/2A/MS-001 0 20-Apr-23 Re-Submit
Request for Approval of mix design for precast cover blocks BMRCL/2A/23-24/21 0 16-May-23 Awaiting
JKAICPL/BMRCL/2A/MS-002 19-May-23 Approved
Submission of Method Statements-Bored Cast in-situ pile J.Kumar-AICPL JV/2A/23-24/MS/23 0
Submission of Soil Sample Test reports on OGL for Baiyappanahalli Metro Depot-reg J.Kumar-AICPL JV/2A/23-24/Soil Reports/33 0 1-Jun-23 Awaiting
Re-submission of work method statement for Geo-technical soil investigation after incorporating J.Kumar-AICPL JV/2A/23-24/Method Statement/39 JKAICPL/BMRCL/2A/MS-001 Awaiting
Engineer's Observations-Reg 1 6-Jun-23
Revised submission of method statement for bored cast in situ piles after incorporating Engineer's JKAICPL/BMRCL/2A/MS-002 Awaiting
comments J.Kumar-AICPL JV/2A/23-24/60 1 22-Jun-23
0 Resubmit
Submission of Method Statements for Excavation,Earthwork and Box Drain J.Kumar-AICPL JV/2A/23-24/Method Statement/74 4-Jul-23
0 Awaiting
Submission of Method Statement for Pile Cap J.Kumar-AICPL JV/2A/23-24/Method Statement/76 06.07.2023
0 Awaiting
Submission of method statement for test pile no.5 and 6 for both vertical and lateral load tests J.Kumar-AICPL JV/2A/23-24/Method Statement/78 06.07.2023
0 Awaiting
Submission of method statement for Diaphragm Wall J.Kumar-AICPL JV/2A/23-24/Method statement/79 07.07.2023
Submission of Revised Method Statements for Excavation,Earthwork and Box Drain J.Kumar-AICPL JV/2A/23-24/102 1 7/24/2023 Awaiting
Submission of revised anchor design for test pile no 6-800 mm dia J.Kumar-AICPL JV/2A/23-24/106 1 7/25/2023 Awaiting
Submission of Revised Method Statements for bored cast-in situ pile after incorporating RITES 1 Awaiting
comments J.Kumar-AICPL JV/2A/23-24/115 7/31/2023
Submission of certificate of Accreditation for Nexus test labs for vendor approval J.Kumar-AICPL JV/2A/23-24/121 0 8/5/2023 Awaiting
Submission of pre-approved BMRCL vendor approval letter for M/S SP Enterprises towards supply J.Kumar-AICPL JV/2A/23-24/122 0 8/5/2023 Awaiting
of Traffic marshalls

Submission of pre-approved BMRCL vendor approval letter for 3rd party examiner Md. Hilal Kizar J.Kumar-AICPL JV/2A/23-24/123 0 8/5/2023 Awaiting

Submission of credentials for approval of 3rd party examiner viz. M/s Automech Engineering India
J.Kumar-AICPL JV/2A/23-24/124 0 8/5/2023 Awaiting
Pvt. Ltd.
Submission of credentials of M/s Geo Dynamics as 3rd testing agency for pile integrity testing
J.Kumar-AICPL JV/2A/23-24/125 0 8/7/2023 Awaiting
works and submission of Method Statement of Low strain Integrity test on pile
Submission of mix design for anchor pile HT strand grouting & sonic tube grouting using C-bex
J.Kumar-AICPL JV/2A/23-24/134 0 8/19/2023 Awaiting
100

Submission of compliance of QA/QC related site observation report (SOR) no 1,2,3 and 4 of RITES J.Kumar-AICPL JV/2A/23-24/137 0 8/22/2023

Submission of Compliances for mix design report of M-35 grade concrete for piling & diaphragm
J.Kumar-AICPL JV/2A/23-24/141 0 8/25/2023
wall works
Submission of mix design report for M-35 grade concrete using waterproofing compund J.Kumar-AICPL JV/2A/23-24/143 0 8/25/2023
Submission of Compliances for mix design report of M-35 grade concrete for piling & diaphragm
J.Kumar-AICPL JV/2A/23-24/146 0
wall works 8/26/2023
Submission of mix design report for M-35 grade concrete for piling works considering 2-hour
J.Kumar-AICPL JV/2A/23-24/151 0
retention period (Trial mix no 10) 8/31/2023
Submission of mix design report for M-35 grade concrete for retaining wall works (Trial mix no 4) J.Kumar-AICPL JV/2A/23-24/152 0
8/31/2023
Submission of Method Statement for Retaining wall J.Kumar-AICPL JV/2A/23-24/150 0 8/31/2023 Awaiting
Submission of revised method statement for Pile Cap after incorporating Engineer's and
J.Kumar-AICPL JV/2A/23-24/176 0 Awaiting
Designated Engineer's comments 9/20/2023
Submission of mix design report for M50 grade concrete for column, beam, slab, portal frame and
J.Kumar-AICPL JV/2A/23-24/177 0 Awaiting
other structures (Trial mix no 14) 9/20/2023
Submission of revised method of statement for excavation after incorporating designated J.Kumar-AICPL JV/2A/23-24/181 0 Awaiting
engineer's comments 9/26/2023
Proposal to use mix design submitted for M-35 grade concrete for retaining wall works trial mix J.Kumar-AICPL JV/2A/23-24/183 0
no 4 for pile cap works as well 9/26/2023

Request for approval of Reinforcement BMRCL/2A/23-24/06 0 28-Apr-23 Approved


Request for approval of GGBS from M/s JSW Cement Limited BMRCL/2A/23-24/07 0 28-Apr-23 Approved
Request for approval of OPC Cement from M/s JSW Cement Limited BMRCL/2A/23-24/08 0 28-Apr-23 Awaiting
Request for approval of Portland slag Cement from M/s JSW Cement Limited BMRCL/2A/23-24/09 0 28-Apr-23 Awaiting
Request for approval of source for coarse & fine aggregates BMRCL/2A/23-24/10 0 28-Apr-23 Approved
Request for approval of Admixtures from M/s Fosroc Chemicals India Pvt Ltd BMRCL/2A/23-24/11 0 28-Apr-23 Approved
Request for approval of OPC Cement from M/s ACC Ltd. BMRCL/2A/23-24/12 0 28-Apr-23 Awaiting
Request for approval of OPC Cement from M/s Ultratech Cement Limited BMRCL/2A/23-24/14 0 29-Apr-23 Approved
Request for Approval of source & agency of concrete-M/s ACC Limited BMRCL/2A/23-24/19 0 9-May-23 Awaiting
Request for Approval of source & agency of concrete-M/s Ultratech Limited BMRCL/2A/23-24/20 0 9-May-23 Approved
Submission of Mix Design for concrete grade M35 for pile, M35 for retaining walls, M20 PCC, and 0 Approved
M50 Reg J.Kumar-AICPL JV/2A/23-24/Mix Design/53 15-Jun-23
Submission of test reports of OGL soil samples for EDS 1,EDS 2 and SBL 2 areas J.Kumar-AICPL JV/2A/23-24/Test Report/75 0 06.07.2023 Awaiting
Submission of mix design for sonic tube grouting using Cebex 200 material J.Kumar-AICPL JV/2A/23-24/IPC/81 0 11.07.2023 Awaiting
Submission of compliance report for Ultratech Mix Design for M20,M35 and M50 after 1 Awaiting
incorporating Engineer and Designated Engineer's observations J.Kumar-AICPL JV/2A/23-24/86 12.07.2023
Submission of Mix Design Report for M20 grade Concrete for PCC J.Kumar-AICPL JV/2A/23-24/98 0 7/19/2023 Awaiting
Submission of Mix Design Report for M35grade Concrete for Piling and Diaphragm Wall J.Kumar-AICPL JV/2A/23-24/99 0 7/19/2023 Approved

Awaiting
Submission of credentials for supply of PVC water stoppers for vendor approval (Kanta Polymers) J.Kumar-AICPL JV/2A/23-24/110 0 7/27/2023
Submission of credentials for conducting pile related tests (Baroni pile creations) J.Kumar-AICPL JV/2A/23-24/113 0 7/27/2023 Awaiting
Submissionn of credential of M/s FOSROC for supply of water proofing compound viz Conplast
J.Kumar-AICPL JV/2A/23-24/142 Awaiting
WL-Xtra for approval 0 8/25/2023
Submission of credentials for supply of coarse and fine aggregates for vendor approval (Universal J.Kumar-AICPL JV/2A/23-24/195 Awaiting
Infra minerals pvt ltd) 0 10/4/2023

Firm/Agencies approval for Confirmatory Bore Hole Test-Reg BMRCL/2A/23-24/01 0 20-Apr-23 Awaiting
Request for approval of agency for coarse & fine aggregates BMRCL/2A/23-24/10 0 28-Apr-23 Approved
Request for approval of Testing Laboratory BMRCL/2A/23-24/13 0 28-Apr-23 Approved
Proposal for usage of Polymer Slurry-M/s Vidhya Enterprises & M/s Eco Drilling fluids Pvt Ltd. J.Kumar-AICPL JV/2A/23-24/Vendor Approval/26 0 24-May-23 Approved
Requesting for approval of Sonic Pipes-M/s Dextra India Pvt. Ltd & M/s Sanfield (India) Limited J.Kumar-AICPL JV/2A/23-24/Vendor Approval/27 0 24-May-23 Approved
Submission of Vendor Credentials-M/s Struct Geo Tech Research Laboratories Pvt. Ltd. J.Kumar-AICPL JV/2A/23-24/Vendor Approval/28 1 24-May-23 Awaiting
Request for Approval of Testing Laboratory-M/s Stedrant Technology Private Limited J.Kumar-AICPL JV/2A/23-24/Third Party Lab/34 0 1-Jun-23 Awaiting
Approval of Agencies for Third Party proof check-M/s Chetan Infratech Consultants Pvt. Ltd. J.Kumar-AICPL JV/2A/23-24/Design/35 0 1-Jun-23 Awaiting
Approval of Agency for deployment of traffic marshal-Reg J.Kumar-AICPL JV/2A/23-24/HSE/36 0 1-Jun-23 Approved
J.Kumar-AICPL JV/2A/23-24/QC 3rd Party Lab/43 0 Awaiting
Request for approval to conduct Third Party testing to M/s Stedrant Technoclinic Pvt Ltd. 12-Jun-23
Request for approval to conduct Third Party testing reinforcement steel sample to M/s Structwel J.Kumar-AICPL JV/2A/23-24/Steel testing/45 0 Awaiting
Designers & Consultants Pvt Ltd. 12-Jun-23
Submission of credentials for vendor approval for supply of rebar couplers (sanfield India Ltd) J.Kumar-AICPL JV/2A/23-24/Vendor Approval/71 0 Approved
including threading of rebars 30.06.2023
Submission of credentials for supply of Powergrout NS3 for vendor approval (Ultratech) J.Kumar-AICPL JV/2A/23-24/Vendor Approval/72 0 30.06.2023 Awaiting
J.Kumar-AICPL JV/2A/23-24/110 Awaiting
Submission of credentials for supply of PVC water stoppers for vendor approval (Kanta Polymers) 0 7/27/2023
Submission of credentials for conducting pile related tests (Baroni pile creations) J.Kumar-AICPL JV/2A/23-24/113 0 7/27/2023 Awaiting
Submission of Credentials of M/s Maruti techno Rubber Pvt Ltd for supply of PVC water stoppers J.Kumar-AICPL JV/2A/23-24/130 Awaiting
0 8/16/2023
Submission of credentials for conducting 3rd party material testing & confirmatory bore hole J.Kumar-AICPL JV/2A/23-24/162 Awaiting
testing for vendor approval-M/s Gooly Consultancy Services 0 9/13/2023

Code A- Approved
Code B- Approved with Comments
Code C- Revise and Resubmit
Code D- Rejected
Remarks
TATA steel, JSW, Jindal, Rastriya Ispat Nigam, SAIL
JSW Cement Limited
JSW Cement Limited
JSW Cement Limited
Nutave
M/s Fosroc Chemicals India Pvt. Ltd.
M/s ACC Ltd.
M/s Ultratech Ltd.
M/s ACC Ltd.
M/s Ultratech Ltd.

M/s Struct Geotech Research Laboratories Pvt. Ltd.


Nutave
Structwel Design and Consultants Pvt Ltd.
M/s Vidhya Enterprises & M/s Eco Drilling fluids Pvt Ltd.
M/s Dextra India Pvt. Ltd & M/s Sanfield (India) Limited
M/s Struct Geo Tech Research Laboratories Pvt. Ltd.
M/s Stedrant Technology Private Limited
M/s Chetan Infratech Consultants Pvt. Ltd.
M/s S.P Enterprises
M/s Stedrant Technoclinic Pvt Ltd.

M/s Structwel Designers & Consultants Pvt Ltd.

M/s Sanfield India Ltd


M/S Ultratech
M/s Kanta Polymers
M/s Baroni pile creations
M/s Maruti Techno Rubber Pvt Ltd.

M/s Gooly Consultancy Services


Sr No Item Description
1 Submission of Health, Safety & Environment
2 Re-submission of SHE plan

Note:
Code A- Approved
Code B- Approved with Comments
Code C- Revise and Resubmit
Code D- Rejected
EHS Approval Status
Document No Revision Company Name
J.Kumar-AICPL JV/2A/23-24/HSE
0 J.Kumar-AICPL JV
PLAN/001
J.Kumar-AICPL JV/2A/23-24/SHE-001 1 J.Kumar-AICPL JV
al Status
Submission Date Result Date Result Status
5/22/2023 Re-submit
6/6/2023 Approved
Remarks
Letter Submitted
Sr No Letter No
1 BMRCL/2A/23-24/01

2 BMRCL/2A/23-24/02

3 JKAICPL/23-24/11

4 JKAICPL/23-24/12

5 BMRCL/2A/23-24/03

6 BMRCL/2A/23-24/04
7 BMRCL/2A/23-24/05
8 BMRCL/2A/23-24/06
9 BMRCL/2A/23-24/07
10 BMRCL/2A/23-24/08

11 BMRCL/2A/23-24/09

12 BMRCL/2A/23-24/10

13 BMRCL/2A/23-24/11
14 BMRCL/2A/23-24/12
15 BMRCL/2A/23-24/13
16 BMRCL/2A/23-24/14
17 BMRCL/2A/23-24/15
18 BMRCL/2A/23-24/16
19 BMRCL/2A/23-24/17
20 BMRCL/2A/23-24/18
21 BMRCL/2A/23-24/19

22 BMRCL/2A/23-24/20
23 BMRCL/2A/23-24/21
24 J.Kumar-AICPL JV/2A/23-24/PQP/22
25 J.Kumar-AICPL JV/2A/23-24/MS/23
26 J.Kumar-AICPL JV/2A/23-24/MS/24
27
J.Kumar-AICPL JV/2A/23-24/HSE/25
28
J.Kumar-AICPL JV/2A/23-24/Vendor Approval/26
29
J.Kumar-AICPL JV/2A/23-24/Vendor Approval/27
30
J.Kumar-AICPL JV/2A/23-24/Vendor Approval/28
31 J.Kumar-AICPL JV/2A/23-24/29

32 J.Kumar-AICPL JV/2A/23-24/MOU/30

33 J.Kumar-AICPL JV/2A/23-24/Pile/31
34 J.Kumar-AICPL JV/2A/23-24/Site Clearance/32
35 J.Kumar-AICPL JV/2A/23-24/Soil Reports/33

36 J.Kumar-AICPL JV/2A/23-24/Third Party Lab/34

37 J.Kumar-AICPL JV/2A/23-24/Design/35

38 J.Kumar-AICPL JV/2A/23-24/HSE/36
39 J.Kumar-AICPL JV/2A/23-24/Test Pile/37
40 J.Kumar-AICPL JV/2A/23-24/SHE/38

41 J.Kumar-AICPL JV/2A/23-24/Method Statement/39

42 J.Kumar-AICPL JV/2A/23-24/BBS/40

43 J.Kumar-AICPL JV/2A/23-24/Insurance/41

44 J.Kumar-AICPL JV/2A/23-24/CLRA Form/42

45 J.Kumar-AICPL JV/2A/23-24/QC 3rd Party Lab/43


46 J.Kumar-AICPL JV/2A/23-24/Steel Design/44
47 J.Kumar-AICPL JV/2A/23-24/Steel testing/45
48 J.Kumar-AICPL JV/2A/23-24/Test pile EDS-01/46
49 J.Kumar-AICPL JV/2A/23-24/Key Cv's/47
50 J.Kumar-AICPL JV/2A/23-24/PQP ITP/48
51 J.Kumar-AICPL JV/2A/23-24/SHE CV's/49
52 J.Kumar-AICPL JV/2A/23-24/Work Programme/50

53 J.Kumar-AICPL JV/2A/23-24/CLRA/51

54 J.Kumar-AICPL JV/2A/23-24/Organization Charts/52


55 J.Kumar-AICPL JV/2A/23-24/Mix Design/53

56 J.Kumar-AICPL JV/2A/23-24/54
57
J.Kumar-AICPL JV/2A/23-24/Retaining wall EDS-01/55
58 J.Kumar-AICPL JV/2A/23-24/General/56
59 J.Kumar-AICPL JV/2A/23-24/Pile cap EDS-01/57
60 J.Kumar-AICPL JV/2A/23-24/BBS/58
61 J.Kumar-AICPL JV/2A/23-24/BBS/CBH Report/59
62
J.Kumar-AICPL JV/2A/23-24/BBS/60
63 J.Kumar-AICPL JV/2A/23-24/BBS/61
64
J.Kumar-AICPL JV/2A/23-24/NDT Test/62
65
J.Kumar-AICPL JV/2A/23-24/Design/63
66
J.Kumar-AICPL JV/2A/23-24/Drawing requirement/65
67
JKAICPL/23-24/22-1
68 J.Kumar-AICPL JV/2A/23-24/NDT Test/66
69 J.Kumar-AICPL JV/2A/23-24/Survey/67
70
J.Kumar-AICPL JV/2A/23-24/GFC Drawings/68

71
J.Kumar-AICPL JV/2A/23-24/General/69
72
J.Kumar-AICPL JV/2A/23-24/General/70
73
J.Kumar-AICPL JV/2A/23-24/Vendor Approval/71
74
J.Kumar-AICPL JV/2A/23-24/Vendor Approval/72

75

J.Kumar-AICPL JV/2A/23-24/General/73
76
J.Kumar-AICPL JV/2A/23-24/Method Statement/74

77
J.Kumar-AICPL JV/2A/23-24/Test Report/75
78 J.Kumar-AICPL JV/2A/23-24/Method Statement/76
79 J.Kumar-AICPL JV/2A/23-24/IPC/77

80
J.Kumar-AICPL JV/2A/23-24/Method Statement/78
81 J.Kumar-AICPL JV/2A/23-24/Method statement/79
82 J.Kumar-AICPL JV/2A/23-24/IPC/80
83
J.Kumar-AICPL JV/2A/23-24/IPC/81

84
J.Kumar-AICPL JV/2A/23-24/82
85 J.Kumar-AICPL JV/2A/23-24/83

86
J.Kumar-AICPL JV/2A/23-24/84
87 J.Kumar-AICPL JV/2A/23-24/85

88
J.Kumar-AICPL JV/2A/23-24/86
89 J.Kumar-AICPL JV/2A/23-24/87
90 J.Kumar-AICPL JV/2A/23-24/88

91
J.Kumar-AICPL JV/2A/23-24/89

92
J.Kumar-AICPL JV/2A/23-24/90

93
J.Kumar-AICPL JV/2A/23-24/91

94
J.Kumar-AICPL JV/2A/23-24/92

95
J.Kumar-AICPL JV/2A/23-24/93

96
J.Kumar-AICPL JV/2A/23-24/94

97
J.Kumar-AICPL JV/2A/23-24/95

98
J.Kumar-AICPL JV/2A/23-24/96

99
J.Kumar-AICPL JV/2A/23-24/97
100 J.Kumar-AICPL JV/2A/23-24/98

101
J.Kumar-AICPL JV/2A/23-24/99
102 J.Kumar-AICPL JV/2A/23-24/100
103 J.Kumar-AICPL JV/2A/23-24/101
104
J.Kumar-AICPL JV/2A/23-24/102
105 J.Kumar-AICPL JV/2A/23-24/103
106 J.Kumar-AICPL JV/2A/23-24/104

107
J.Kumar-AICPL JV/2A/23-24/105
108 J.Kumar-AICPL JV/2A/23-24/106
109
J.Kumar-AICPL JV/2A/23-24/107

110
J.Kumar-AICPL JV/2A/23-24/108
111
J.Kumar-AICPL JV/2A/23-24/109

112
J.Kumar-AICPL JV/2A/23-24/110

113
J.Kumar-AICPL JV/2A/23-24/111
114 J.Kumar-AICPL JV/2A/23-24/112

115
J.Kumar-AICPL JV/2A/23-24/113

116
J.Kumar-AICPL JV/2A/23-24/114
117
J.Kumar-AICPL JV/2A/23-24/115

118
J.Kumar-AICPL JV/2A/23-24/116

119
J.Kumar-AICPL JV/2A/23-24/117

120
J.Kumar-AICPL JV/2A/23-24/118
121 J.Kumar-AICPL JV/2A/23-24/119

122 J.Kumar-AICPL JV/2A/23-24/120

123 J.Kumar-AICPL JV/2A/23-24/121

124 J.Kumar-AICPL JV/2A/23-24/122

125 J.Kumar-AICPL JV/2A/23-24/123

126 J.Kumar-AICPL JV/2A/23-24/124

127 J.Kumar-AICPL JV/2A/23-24/125

128 J.Kumar-AICPL JV/2A/23-24/126

129 J.Kumar-AICPL JV/2A/23-24/127

130 J.Kumar-AICPL JV/2A/23-24/128

131 J.Kumar-AICPL JV/2A/23-24/129

132 J.Kumar-AICPL JV/2A/23-24/130

133 J.Kumar-AICPL JV/2A/23-24/131

134 J.Kumar-AICPL JV/2A/23-24/132

135 J.Kumar-AICPL JV/2A/23-24/133

136 J.Kumar-AICPL JV/2A/23-24/134


137 J.Kumar-AICPL JV/2A/23-24/135

138 J.Kumar-AICPL JV/2A/23-24/136

139 J.Kumar-AICPL JV/2A/23-24/137

140 J.Kumar-AICPL JV/2A/23-24/138

141 J.Kumar-AICPL JV/2A/23-24/139

142 J.Kumar-AICPL JV/2A/23-24/140

143 J.Kumar-AICPL JV/2A/23-24/141

144 J.Kumar-AICPL JV/2A/23-24/142

145 J.Kumar-AICPL JV/2A/23-24/143

146 J.Kumar-AICPL JV/2A/23-24/144

147 J.Kumar-AICPL JV/2A/23-24/145

148 J.Kumar-AICPL JV/2A/23-24/146

149 J.Kumar-AICPL JV/2A/23-24/147

150 J.Kumar-AICPL JV/2A/23-24/148

151 J.Kumar-AICPL JV/2A/23-24/149

152 J.Kumar-AICPL JV/2A/23-24/150

153 J.Kumar-AICPL JV/2A/23-24/151

154 J.Kumar-AICPL JV/2A/23-24/152

155 J.Kumar-AICPL JV/2A/23-24/153

156 J.Kumar-AICPL JV/2A/23-24/154

157 J.Kumar-AICPL JV/2A/23-24/155

158 J.Kumar-AICPL JV/2A/23-24/156

159 J.Kumar-AICPL JV/2A/23-24/157


160 J.Kumar-AICPL JV/2A/23-24/158
161 J.Kumar-AICPL JV/2A/23-24/159

162 J.Kumar-AICPL JV/2A/23-24/160

163 J.Kumar-AICPL JV/2A/23-24/161

164 J.Kumar-AICPL JV/2A/23-24/162

165 J.Kumar-AICPL JV/2A/23-24/163

166 J.Kumar-AICPL JV/2A/23-24/164

167 J.Kumar-AICPL JV/2A/23-24/165

168 J.Kumar-AICPL JV/2A/23-24/166

169 J.Kumar-AICPL JV/2A/23-24/167

170 J.Kumar-AICPL JV/2A/23-24/168

171 J.Kumar-AICPL JV/2A/23-24/169

172 J.Kumar-AICPL JV/2A/23-24/170

173 J.Kumar-AICPL JV/2A/23-24/171

174 J.Kumar-AICPL JV/2A/23-24/172

175 J.Kumar-AICPL JV/2A/23-24/173

176 J.Kumar-AICPL JV/2A/23-24/174

177 J.Kumar-AICPL JV/2A/23-24/175

178 J.Kumar-AICPL JV/2A/23-24/176

179 J.Kumar-AICPL JV/2A/23-24/177

180 J.Kumar-AICPL JV/2A/23-24/178


181 J.Kumar-AICPL JV/2A/23-24/179

182 J.Kumar-AICPL JV/2A/23-24/180

183 J.Kumar-AICPL JV/2A/23-24/181

184 J.Kumar-AICPL JV/2A/23-24/182

185 J.Kumar-AICPL JV/2A/23-24/183

186 J.Kumar-AICPL JV/2A/23-24/184


187 J.Kumar-AICPL JV/2A/23-24/185

188 J.Kumar-AICPL JV/2A/23-24/186

189 J.Kumar-AICPL JV/2A/23-24/187

190 J.Kumar-AICPL JV/2A/23-24/188

191 J.Kumar-AICPL JV/2A/23-24/189

192 J.Kumar-AICPL JV/2A/23-24/190

193 J.Kumar-AICPL JV/2A/23-24/191

194 J.Kumar-AICPL JV/2A/23-24/192

195 J.Kumar-AICPL JV/2A/23-24/193

196 J.Kumar-AICPL JV/2A/23-24/194

197 J.Kumar-AICPL JV/2A/23-24/195

198 J.Kumar-AICPL JV/2A/23-24/196

199 J.Kumar-AICPL JV/2A/23-24/197

200 J.Kumar-AICPL JV/2A/23-24/198

201 J.Kumar-AICPL JV/2A/23-24/199

202 J.Kumar-AICPL JV/2A/23-24/200

203 J.Kumar-AICPL JV/2A/23-24/201

204 J.Kumar-AICPL JV/2A/23-24/202

205 J.Kumar-AICPL JV/2A/23-24/203

206 J.Kumar-AICPL JV/2A/23-24/204

207 J.Kumar-AICPL JV/2A/23-24/205

208 J.Kumar-AICPL JV/2A/23-24/206


209 J.Kumar-AICPL JV/2A/23-24/207

210 J.Kumar-AICPL JV/2A/23-24/208

211 J.Kumar-AICPL JV/2A/23-24/209


212 J.Kumar-AICPL JV/2A/23-24/210
213 J.Kumar-AICPL JV/2A/23-24/211

214 J.Kumar-AICPL JV/2A/23-24/212


215 J.Kumar-AICPL JV/2A/23-24/213

216 J.Kumar-AICPL JV/2A/23-24/214

217 J.Kumar-AICPL JV/2A/23-24/215

218 J.Kumar-AICPL JV/2A/23-24/216

219 J.Kumar-AICPL JV/2A/23-24/217

220 J.Kumar-AICPL JV/2A/23-24/218

221 J.Kumar-AICPL JV/2A/23-24/219

222 J.Kumar-AICPL JV/2A/23-24/220

223 J.Kumar-AICPL JV/2A/23-24/221

224 J.Kumar-AICPL JV/2A/23-24/222

225 J.Kumar-AICPL JV/2A/23-24/223

226 J.Kumar-AICPL JV/2A/23-24/224


227 J.Kumar-AICPL JV/2A/23-24/225
228 J.Kumar-AICPL JV/2A/23-24/226

229 J.Kumar-AICPL JV/2A/23-24/227


230 J.Kumar-AICPL JV/2A/23-24/228
231 J.Kumar-AICPL JV/2A/23-24/229
232 J.Kumar-AICPL JV/2A/23-24/230
233 J.Kumar-AICPL JV/2A/23-24/231
234 J.Kumar-AICPL JV/2A/23-24/232
235 J.Kumar-AICPL JV/2A/23-24/233
236 J.Kumar-AICPL JV/2A/23-24/234
237 J.Kumar-AICPL JV/2A/23-24/235
238 J.Kumar-AICPL JV/2A/23-24/236

239 J.Kumar-AICPL JV/2A/23-24/237

240 J.Kumar-AICPL JV/2A/23-24/238

241 J.Kumar-AICPL JV/2A/23-24/239

242 J.Kumar-AICPL JV/2A/23-24/240

243 J.Kumar-AICPL JV/2A/23-24/241


244 J.Kumar-AICPL JV/2A/23-24/242

245 J.Kumar-AICPL JV/2A/23-24/243

246 J.Kumar-AICPL JV/2A/23-24/244

247 J.Kumar-AICPL JV/2A/23-24/245

248 J.Kumar-AICPL JV/2A/23-24/246

249 J.Kumar-AICPL JV/2A/23-24/247

250 J.Kumar-AICPL JV/2A/23-24/248

251 J.Kumar-AICPL JV/2A/23-24/249

252 J.Kumar-AICPL JV/2A/23-24/250


253 J.Kumar-AICPL JV/2A/23-24/251
254 J.Kumar-AICPL JV/2A/23-24/252

255 J.Kumar-AICPL JV/2A/23-24/253


256 J.Kumar-AICPL JV/2A/23-24/254
257 J.Kumar-AICPL JV/2A/23-24/255

258 J.Kumar-AICPL JV/2A/23-24/256

259 J.Kumar-AICPL JV/2A/23-24/257

260 J.Kumar-AICPL JV/2A/23-24/258

261 J.Kumar-AICPL JV/2A/23-24/259

262 J.Kumar-AICPL JV/2A/23-24/260

263 J.Kumar-AICPL JV/2A/23-24/261

264 J.Kumar-AICPL JV/2A/23-24/262


265 J.Kumar-AICPL JV/2A/23-24/264
266 J.Kumar-AICPL JV/2A/23-24/265
267 J.Kumar-AICPL JV/2A/23-24/266

268 J.Kumar-AICPL JV/2A/23-24/267

269 J.Kumar-AICPL JV/2A/23-24/268

270 J.Kumar-AICPL JV/2A/23-24/269


271 J.Kumar-AICPL JV/2A/23-24/270
Letter Submitted
Description Revision Enclosure Details
Firm/Agencies approval for Confirmatory Bore Hole Test-Reg 0 Credentials
Requesting Survey coordinates for Confirmatory Borehole test &
Submission of Work Method Statement for Geo Technical Soil 0 Nil
Investigation-Reg.
Submission of performance Bank Security for the works of
Construction & Remodeling of existing Baiyapanahalli Depot for 0 Bank Guarantee
Bangalore Metro Rail Project-Phase-2A

Return of EMD (Bank Guarantee No. 00640100000792 dated 0


01.11.2022)

Request for allocation of land near by Baiyappanahalli metro depot 0 Location of identified land
site
Permission for Entry to Baiyappanahalli Metro Depot for Work 0 List of Authorized Personnel
Execution
Request for approval of BMRCL staff office Layout 0 BMRCL staff office layout
Request for approval of Reinforcement 0 Vendor Credential documents
Request for approval of GGBS from M/s JSW Cement Limited 0 Vendor Credential documents

Request for approval of OPC Cement from M/s JSW Cement Limited 0 Vendor Credential documents

Request for approval of Portland slag Cement from M/s JSW Cement 0 Vendor Credential documents
Limited
Request for approval of source and agency for coarse & fine 0 Vendor Credential documents
aggregates
Request for approval of Admixtures from M/s Fosroc Chemicals India 0 Vendor Credential documents
Pvt Ltd
Request for approval of OPC Cement from M/s ACC Ltd. 0 Vendor Credential documents
Request for approval of Testing Laboratory 0 Vendor Credential documents
Request for approval of OPC Cement from M/s Ultratech Cement 0 Vendor Credential documents
Limited
Submission of Fencing working drawing 0 Fencing Working Drawing
Proposal for Confirmatory Bore Hole Location 0 Coordinate Drawing
0 Proposed location of entry gate
Seeking permission for access to site
and CBH 3 & 4
Proposal to lower Pile cut-off level to existing ground level 0 Details of Pile Cap Drawing
Request for Approval of source & agency of concrete-M/s ACC 0 Vendor Credential documents
Limited
Request for Approval of source & agency of concrete-M/s Ultratech 0 Vendor Credential documents
Limited
Request for Approval of mix design for precast cover blocks 0 Mix Design Proportion sheet
Submission of Project Quality Plan 0 Project Quality Plan
Submission of Method Statements-Bored Cast in-situ pile 0 Method Statements
Request for Approval of bar bending Schedule 0 BBS
0 SHE Plan, EM Plan, CDM Plan,
Submission of Health, Safety and Environment plan
TMP, Security plan
Proposal for usage of Polymer Slurry-M/s Vidhya Enterprises & M/s 0 Previous Approval Letters
Eco Drilling fluids Pvt Ltd.
Requesting for approval of Sonic Pipes-M/s Dextra India Pvt. Ltd & 0 Previous Approval Letters
M/s Sanfield (India) Limited
Submission of Vendor Credentials-M/s Struct Geo Tech Research 1
Laboratories Pvt. Ltd. Vendor Credential documents
Submission of Survey Drawings(Topography) and request for GAD 0 Survey Drawing (Topo)
drawings
Submission of Memorandum of Understanding(MOU) for Medical 0
Facilities MOU-3pages
Request for Pile Termination Criteria in Weathered Rock, Soft Rock, 0
Hard Rock & Friction pile-reg
Request for Site Clearance-reg 0 Photographs
Submission of Soil Sample Test reports on OGL for Baiyappanahalli 0 Soil Sample Test Reports-24
Metro Depot-reg pages
Request for Approval of Testing Laboratory-M/s Stedrant Technology 0 BMRCL Approved Vendor List-1
Private Limited page
Vendor Credenatials- M/s
Approval of Agencies for Third Party proof check-M/s Chetan 0 Chetan Infratech Consultants
Infratech Consultants Pvt. Ltd. Pvt Ltd
0 Vendor Credenatials- M/s S.P
Approval of Agency for deployment of traffic marshal-Reg Enterprises
Proposal for Test pile in entry deck-1 location-reg 0 EDS-01 Layout drawing
Re-submission of SHE plan after incorporating Engineer's 1
Observations-Reg SHE Plan-168 pages
Re-submission of work method statement for Geo-technical soil 1
investigation after incorporating Engineer's Observations-Reg Method Statement & HIRA
Submission of Bar Bending schedule for EDS-01 Pile PC1 to PC9- 0
Reg BBS

0 Workmen Compensation Policy,


Submission of Contractor's Insurances Contractor's All Risk policy
Requesting to issue Form V under Contract Labour regulation and 0
Abolition act-Reg
Request for approval to conduct Third Party testing to M/s Stedrant 0
Technoclinic Pvt Ltd.
Proposal to change Pile circular rings to Helical rings-Reg 0
Request for approval to conduct Third Party testing reinforcement 0
steel sample to M/s Structwel Designers & Consultants Pvt Ltd.
Proposal for Test pile detail and location in entry deck-1-reg 0
Submission of CV's of Contractor's Personnel (Key and other 0
positions)
Submission of Inspection and Test Plan for PQP-Reg 0
Submission of CV's of Contractor's HSE Personnel 0
Submission of Initial Work Programme, Baseline Physical Progress S 0
curve and three month rolling programme
Submission of contractor requisition form, PF, ESIC Registration
copy, child labour declaration and request to issue form V for labour 0
license
Submission of Organization Charts of Head Office ans Site-Reg 0
Submission of Mix Design for concrete grade M35 for pile, M35 for 0
retaining walls, M20 PCC, and M50 Reg
Cost Analysis & comparison
Regarding replacement of Diaphragm Wall with Retaining wall 3 report
2 Entry Deck EDS-01 Layout
Proposal for Retaining wall Retaining wall detail
Request to Handover remaining land 0
Regarding discrepancies of pile cap sizes of EDS-01 area 0
Request for approval of Bar bending Schedule fo test pile 5 & 6 3 BBS & Drawings
Submission of Geotechnical investigation report for 8 no of bore holes 0
Revised submission of method statement for bored cast in situ piles 1
after incorporating Engineer's comments MS
Undertaking to start working piles 0
Regarding ndt for checking the integrity of concrete piles after 0
installation
Request to remove L from vertical rebar above cutoff level for 0
working and test piles
Regarding Discrepancy and missing details in various GFC drawing 0
issues and request to issue additional GFC Drawings
0 Original General POA dated 27-
Submission og General power of Attorney 05-2023
Regarding Cross Hole Sonic Logging Test 0
Submission of Traversing records for X,Y and Z 0
Regarding Revised Pile Lengths and clarification on termination 0
criteria for pure friction pile.
Request to issue letter to Traffic Police and other relevant Authorities
of Bengaluru to allows us operate 24/7 on specified rods for 0
movement of construction vehicles/machineries
Request to allot nearby land/dumping yard for disposal of excess 0
earth excavated from 2A site
Submission of credentials for vendor approval for supply of rebar 0 Company profile
couplers (sanfield India Ltd) including threading of rebars
Submission of credentials for supply of Powergrout NS3 for vendor 0
approval (Ultratech) Company profile

Contract agreement original with


hard binding- 1 sets containing
0 Book 1 to Book 5 (Page Nos. 1
to 1524),Contract agreement
original with hard binding- 8 sets
Return of original contract agreement and 8 sets of photocopies aftr containing Book 1 to Book 5
hard binding (Page Nos. 1 to 1524)
Submission of Method Statements for Excavation,Earthwork and Box 0
Drain
Submission of test reports of OGL soil samples for EDS 1,EDS 2 and 0
SBL 2 areas
Submission of Method Statement for Pile Cap 0 5
Request to issue letter to us for working 24x7 0 Nil
Submission of method statement for test pile no.5 and 6 for both 0
vertical and lateral load tests 4
Submission of method statement for Diaphragm Wall 0 1
Submission of IPC 1 for period 18th May'23 to 30th june'23 0
Submission of mix design for sonic tube grouting using Cebex 200 0
material
Submission of Electrical Undergrond utility encountered at EDS 1 0
area
Submission of indemnity bond against materail advance 0
Submission of Tax Invoice for IPC 1 for period 18th May'23 to 30Th 0
jun'23
Regarding submission of E Invoice 0
Submission of compliance report for Ultratech Mix Design for
M20,M35 and M50 after incorporating Engineer and Designated 0
Engineer's observations 1
Submission of 1st SHE Monthly Report 0
Submission of 1st Progress Report 0
0
Submission of bar bending Schedule for Pile cap Nos.1 to 9 of EDS 1
Submission of Original Quality Control Reports IPC 1 period 18th 0
May'23 to 30th Jun'23
Submission of CV of Key Person (Deputy Project Manager NO. 2) of 0
Mr.Manjunath R
Request for permission to operate construction vehicles/machinery 0
round the clock
Requesting to forward letter to structwell designers and consultants 0
PVT ltd for testing
Request to approve additional item of cross hole sonic logging test 0
including sonic tubes, grout etc complete
Regarding BMRCL Verbal communication for revision of Diaphragm 0
wall and Retaining wall at SBL 2 location
Submission of Shop drawings for D-wall of SBL 2 parallel to Old 0
madras road
Regarding BMRCL Verbal communication for revision of Diaphragm 1
wall and Retaining wall at SBL 2 location
Submission of Mix Design Report for M20 grade Concrete for PCC 0
Submission of Mix Design Report for M235grade Concrete for Piling 0
and Diaphragm Wall

Submission of Bar Bending Schedule for Diaphragm Wall 0


Submission of Revised Method Statements for Excavation,Earthwork 0
and Box Drain
Submission of SHE Compliance Report 0
Submission of Labour Licenses 0
Submission of claim for stamp duties & similar charges for signing 0
contract agreement
Submission of revised anchor design for test pile no 6-800 mm dia 0
Reg-Balance land acquisition, underground electrical utility hindrance 0
& yet to handover SBL1 at EDS 1 location

0
Request to shift vehicles seized & parked by Police at EDS2 Location
Reg- Variation in embankment or backfilling quantity for BOQ item 0
no A(6)
Submission of credentials for supply of PVC water stoppers for 0
vendor approval (Kanta Polymers)
Submission of ambient air quality & noise level monitoring reports 0
for EDS 1, SBL 2 & RMC batching plant locations for 2A site
Submissionof records of Minutes of meeting held at BMRCL Head Offi 0
Submission of credentials for conducting pile related tests (Baroni 0
pile creations)
Clarification required for discrepancies noticed for column sizes of 0
EDS 2
Submission of Revised Method Statements for bored cast-in situ pile 1
after incorporating RITES comments
Submission of rate analysis for supply of unskilled labour to BMRCL 0
for removal of test track
Request BMRCL's team presence for weekly review meeting at 2A 0
metro depot site every Tuesday at 11:00 AM
Submission of D-wal Shop Drawing & anchor design by third party 0
consultant
Submission of IPC no 2 for period 01-07-23 to 31-07-23 0
Submission of original & scanned copies of Quality control reports
0
for IPC no 2 for period 01.07.2023 to 31.07.2023
Submission of certificate of Accreditation for Nexus test labs for
0
vendor approval
Submission of pre-approved BMRCL vendor approval letter for M/S
0
SP Enterprises towards supply of Traffic marshalls
Submission of pre-approved BMRCL vendor approval letter for 3rd
0
party examiner Md. Hilal Kizar
Submission of credentials for approval of 3rd party examiner viz.
0
M/s Automech Engineering India Pvt. Ltd.
Submission of credentials of M/s Geo Dynamics as 3rd testing
agency for pile integrity testing works and submission of Method 0
Statement of Low strain Integrity test on pile
Regarding submission of revised initial work program incorporating
0
date of commencement as 03.05.2023
Submission of D-wall Design calculations 0
Submission of 2nd Monthly SHE Monthly Report for month of July-
0
2023

Submission of 2nd Monthly Progress Report for month of July-2023 0

Submission of Credentials of M/s Maruti techno Rubber Pvt Ltd for


0
supply of PVC water stoppers
Submission of documents for our RMC plant & weighbridge 0
Submission of Compliance report for Safety related SOR as received
0
from designated Engineer RITES
Submission of drawing for RMC plant & other facilities 0
Submission of mix design for anchor pile HT strand grouting & sonic
0
tube grouting using C-bex 100
Submission of compliance of SHE related site observation report no
0
2,3 & 4
Submission of CV of key person (Quality Assurance Specialist no. 2)
0
of Mr. Vikash Thakur
Submission of compliance of QA/QC related site observation report
0
(SOR) no 1,2,3 and 4 of RITES
Submission of pending SHE related compliances & submission of
0
status for SOR's issued by BMRCL till date
Submission of record of meetings date 22-08-23 0
Submission of Compliances for mix design report of M-35 grade
0
concrete for piling & diaphragm wall works
Submission of closure report for QA&QC related site observation
0
report SOR no 5
Submissionn of credential of M/s FOSROC for supply of water
0
proofing compound viz Conplast WL-Xtra for approval
Submission of mix design report for M-35 grade concrete using
0
waterproofing compund

Submission of rate analysis for providing and adding waterproofing


0
compound to M35 grade concrete for diaphragm wall works

Regarding operating item no 7.38 of Volume 2 of KPWD SOR for


0
Buildings 2021-22
Submission of Compliances for mix design report of M-35 grade
0
concrete for piling & diaphragm wall works
Submission of Compliance for SHE related Site Observation Report
0
(SOR) no 18 to 18 issued by RITES
Submission of Aug'23 baseline environmental monitoring data for
0
EDS-01, SBL-02 and RMC Batching plant locations for 2A site

Submission of compliances for observations issued through SHE


0
walk no 1 by BMRCL dt 19.08.2023 vide email

Submission of Method Statement for Retaining wall 0

Submission of mix design report for M-35 grade concrete for piling
0
works considering 2-hour retention period (Trial mix no 10)
Submission of mix design report for M-35 grade concrete for
0
retaining wall works (Trial mix no 4)
Submission of revised rate analysis for supply of unskilled labour to
0
BMRCL for removal of test track
Submission of rate analysis for supply of mobile hydraulic crane of
0
15T capacity to BMRCL for removal of test track
Submission of closure report for QA&QC related site observation
0
report SOR no 13 issued by BMRCL

Submission of IPC-03 for period 1st August 2023 to 31st August 2023 0
Submission of D-wall shop drawing 0
Submission of quotation for removal of test track 0
Submission of original & scanned copies of Quality control reports
0
for IPC no 3 for period 01.08.2023 to 31.08.2023
Submission of Bar Bending Schedule for Diaphragm Wall 0
Proposal to conduct Initial vertical load test by Dynamic pile load
0
method in lieu of reaction load method
Submission of credentials for conducting 3rd party material testing
& confirmatory bore hole testing for vendor approval-M/s Gooly 0
Consultancy Services
Submission of 3rd Monthly SHE report for period of 01-08-23 to 31-
0
08-23
Submission of compliance for QA/QC related site observation report
0
SOR no 3 issued by BMRCL
Submission of compliance for QA/QC related site observation report
0
SOR no 11 issued by BMRCL
Submission of compliance for QA/QC related site observation report
0
SOR no 7 issued by BMRCL
Submission of 3rd monthly progress report for period of 26-07-23 to
0
25-08-23
Submission of ground anchor design for diaphragm wall at SBL-02
0
location
Submission of competency certificates for various staff working
0
during piling operations
Submission of compliance report for SHE related SOR no 8 & 46 0
Reg- Replacement of certain SHE personnel with new staff due to
0
intra transfer
Submission of BBS for typical column at EDS-01 location 0
Submission of design and drawings of Diaphragm wall reinforcement
0
cage & stop end lifting plan
Submission of revised method statement for Diaphragm wall after
0
incorporating Engineer's & Designated Engineer's comments
Submission of compliance for She related SOR no 67 to 79 0
Submission of revised method statement for Pile Cap after
0
incorporating Engineer's and Designated Engineer's comments

Submission of mix design report for M50 grade concrete for column,
0
beam, slab, portal frame and other structures (Trial mix no 14)

Submission of D-wall shop drawing 0


Requesting for certification of ongoing works 0
Request to provide final anchor design and drawings for Diaphragm
0
wall on test track side
Submission of revised method of statement for excavation after 0
incorporating designated engineer's comments
Submission of compliance for QA/QC related SOR no 14 issued by 0
BMRCL
Proposal to use mix design submitted for M-35 grade concrete for 0
retaining wall works trial mix no 4 for pile cap works as well
Submission of compliance for SHE related SOR no 19 to 35 issued by 0
RITES
Submission of indemnity bond against material advance 0
Submission of No objection Certificate (NOC) from land owner for
disposal of muck, surplus earth and other waste generated from 2A 0
Baiyappanahalli Depot site
Proposal to shift location of test pile no 1 (1000mm dia) within EDS 2 0
area
Regarding pending approvals from BMRCL 0
Submission of compliances for observations issued through SHE 0
walk no 2 by BMRCL dt 22.09.2023 vide email
Submission of compliance for QA/QC related SOR no 7 issued by 0
RITES
Submission of revised mix design for M35 grade concrete for 0
Diaphragm wall using water proofing compound
Regarding interference of piles and pile cap of portal frame 0
structure into KPTCL substation land
Submission of original & scanned copies of Quality control reports
for IPC 4 for period 01.09.2023 to 30.09.2023 0
Submission of IPC no 04 for period 01-09-23 to 30-09-23 0
Submission of credentials for supply of coarse and fine aggregates 0
for vendor approval (Universal Infra minerals pvt ltd)
Submission of Pile cap shuttering design calculations 0
Submission of method statement for dynamic pile load testing on 0
test pile no 5 of 1000 mm dia
Submission of method statement for initial and routine lateral pile 0
load test
Submission of compliance report for QA/QC related SOR no 17 0
issued by BMRCL
Submission of 28 days compressive strength reports for mix design
of M50 grade concrete for column, beam, slab , portal frame and 0
other structures (Trial mix no 14)
Submission of water permeability test report for M35 grade 0
concrete for retaining wall and pile cap works (Trial mix no 4)
Submission of test reports on initial vertical pile load test on TP-01- 0
800 dia
Submission of 4th monthly SHE report for period 01.09.2023 to 0
30.09.2023
Submission of compliance for SHE SOR no 80 to 89 0
Submission of credential of M/s Heritage Infraspace (India) Pvt. Ltd 0
for supply of PVC water stopper
Submission of pile intiegrity test report in EDS AREA 1 0
Submission of Monthly report for the month of september- 2023 0
Submission of crediantials for vendor approval for supply of 0
polymer( Sharma Drilling fluid )
Submission of column ashuttering design calculations 0
Submission of compliances for SHE NO. 36 to 45 issued by RITES 0
Request for change of bank account number 0
Submission of method for QA/QC related SOR No. 21 issued by 0
BMRCL
Submission of method statement for routine dynamic pile load 0
testing on working pile no.PL and PL 247
Submission of compliances for observatuon issues thtiugh SHE walk 0
No.03 by BMPCL dt 21.10.2023 via email
Submission of form 32 Certificate after inspection by 3rd party 0
testing agency viz, Automech engineering
Submission of design and drawings of Diaphragm wall reinforcement 0
cage lifting sequence
Submission of CV and crediential of all time nurising assistant Mr, 0
Pohor Debbarma appointed at the project
Submission of IPC No. 5 for period 01.10.2023 to 31.10.2023 0
Submission of advance payment security bank gurantee no 0
0651IGF231020848
Submission of pile intiegrity test report for 4 No. of piles- PL 155,PL 0
213 and 215
Submission of working platform design calculation 0
Submission of Mix Design for concrete grade M35 for D Wall using
water proofing compound inccorporating aggregate and M Sand from 0
united Infra Minerals
Submission of Mix Design for concrete grade M35 for Retaining Wall
and pile cap inccorporating aggregate and M Sand from united Infra 0
Minerals
Submission of 5 month SHE report for period 01.10.2023 0
Submission of compliance for inspection No. 007 0
Submission of compliance to mix design report for M50 grade 0
concrete
Submission of compliance to mix design report for M35 grade 0
concrete for retaining wall works(Trial Mis No. 04)
Submission of iateral load test report on test pile TP- 06 0
Submission of SHE Compliance Report 0
Submission of Pile Integrity Test Reports in EDS-01 Area 0
Submission of Pile Integrity Test Reports in EDS-01 Area 0
Submission of Credentials of PEB Fabricatior. 0
Submission of Original and Scanned Copies of Quality Control 0
Reports for IPC No. 5 for the Period of 1-10-2023 to 31-10-2023
Submission of Compliance for SOR No. 104 to 110
Submission of High Strain Dynamic Load Test report on pile

Submission of D-Wall Capping beam details & proposal for flood wall
Submission of Credentials of Banagalore Institute of Safety &
Technology for Training Related Matters
Submission of Quality Compliance for QA/QC SOR No. 21 Issued by
RITES
Submission of Quality Compliance for QA/QC SOR No. 14 Issued by
RITES
Submission of Quality Compliance for QA/QC SOR No. 12 Issued by
RITES
Regarding Balance Work Front Handover and Balance land
Acquisition form BMRCL
Submission of compliance for observations issued through SHE walk
No. 4 (SOR No. 30 to 39) by BMRCL dt 23-11-23 vide email.
Proposal to use mix design submitted for anchor pile HT strand
groutung using cebex 100 for Diaphragm wall anchor grouting as
well.
Submission of Compliance for SHE SOR No.65 to 76 issued by
RITES
Submission of Quality Compliance for QA/QC SOR No. 06 Issued by
BMRCL
Submission of Compliance for QA-QC SOR No. 22 issued by
BMRCL.
Submission of Quality Compliance for QA/QC SOR No. 15 Issued by
RITES
Submission of Quality Compliance for QA/QC SOR No. 11 Issued by
RITES
Submission of Quality Compliance for QA/QC SOR No. 26 Issued by
RITES
Submission of Pile Integrity Test Reports for 3 no's of piles PL-109,
PL-154, PL-173.
Submission of Initial Latral Load Test Report on test pile TP-05.
Submission of Routine Lateral Load Test Report on Working Piles
PL-112 & PL-174
Submission of Pile Integrity Test Reports for 3 no's of piles PL-161,
PL-168, PL-246.
Submission of IPC No-06 for the period 01-11-2023
Submission of Sixth Monthly SHE report for the period 01-11-2023 to
30-11-2023.
Subission of original and scanned copies of quality control reports
for IPC No. 6
Submission of 5th monthly progress report for period 26-09-2023 to
25-10-2023.
Submission of 5th monthly progress report for period 26-10-2023 to
25-11-2023.
Submission of Mix design for M-35 Grade concrete for piling
incorporating aggregate and M Sand from United Infra Minerals.
Submission of Mix design for M-50 Grade concrete for column,
beam, slab, portal frame and other structures trial mix no.17.
Submission of Compatibility report of using combination of super
plasticizer and water proffing compound for min design of M-35
grade concrete for Diaphragm Wall.
Submission of records of Minutes Of Meeting held at
Submission of Method Statement for Diaphragm Wall Anchoring
Submission of Method Statement for Column
Regarding Approval for PEB M/s Acetech PEB Systems Pvt Ltd.
Submission of Design and Drawing of D-Wall Reingorcement cage
Lift Sequence.
Submission of Pile Integrity Test Report in EDS-1 area
Submission of Original Advance Payment Security Bank Guarantees
Towards 2nd Instalement of Mobilization Advance.
Submission of Revised Method Statement for Bored Cast in Situ
Piles (R3) after Incorporating RITES Comments.
Submission Date Remarks
20-Apr-23

20-Apr-23

20-Apr-23 Bank Gurantee Number-


00640100000904

EMD Bank Gurantee


20-Apr-23 Number-
00640100000792

21-Apr-23

25-Apr-23
28-Apr-23
28-Apr-23
28-Apr-23
28-Apr-23

28-Apr-23

28-Apr-23

28-Apr-23
28-Apr-23
28-Apr-23
29-Apr-23
3-May-23
3-May-23
3-May-23
8-May-23
9-May-23

9-May-23
16-May-23
17-May-23
18-May-23
22-May-23
22-May-23

24-May-23

24-May-23
24-May-23

25-May-23

1-Jun-23

1-Jun-23
1-Jun-23

1-Jun-23

1-Jun-23

1-Jun-23

1-Jun-23
1-Jun-23

6-Jun-23

6-Jun-23

7-Jun-23

6-Jun-23

7-Jun-23

12-Jun-23
12-Jun-23

12-Jun-23
12-Jun-23

12-Jun-23
12-Jun-23
15-Jun-23

15-Jun-23

15-Jun-23
15-Jun-23

15-Jun-23

19-Jun-23
19-Jun-23
20-Jun-23
20-Jun-23
20-Jun-23
22-Jun-23

22-Jun-23
22-Jun-23

6/23/2023

6/23/2023

6/24/2023

6/26/2023
26-Jun-23
28.06.2023

27.06.2023

30.06.2023

30.06.2023

30.06.2023

30.06.2023

30.06.2023

04.07.2023

06.07.2023
06.07.2023
05.07.2023

06.07.2023
07.07.2023
08.07.2023
11.07.2023

11.07.2023
11.07.2023

12.07.2023
12.07.2023

12.07.2023
12.07.2023
12.07.2023

12.07.2023

13.07.2023

13.07.2023

7/14/2023

7/14/2023

7/14/2023

7/14/2023

7/15/2023

7/17/2023
7/19/2023

7/19/2023

7/24/2023

7/25/2023
7/25/2023
7/24/2023

7/25/2023
7/25/2023

7/25/2023

7/25/2023
7/27/2023

7/27/2023

7/27/2023
7/27/2023

7/27/2023

7/29/2023

7/31/2023

7/31/2023

8/1/2023

8/3/2023
8/5/2023
8/5/2023

8/5/2023

8/5/2023

8/5/2023

8/5/2023

8/7/2023

8/10/2023
8/11/2023

8/11/2023

8/13/2023

8/16/2023
8/16/2023

8/17/2023
8/19/2023

8/19/2023
8/21/2023

8/22/2023

8/22/2023

8/22/2023
8/22/2023

8/24/2023

8/25/2023

8/25/2023

8/25/2023

8/25/2023

8/25/2023

8/26/2023

8/31/2023

8/31/2023

8/31/2023

8/31/2023

8/31/2023

8/31/2023

8/31/2023

8/31/2023

9/4/2023

9/5/2023
9/8/2023
9/9/2023
9/9/2023
9/11/2023

9/13/2023

9/13/2023

9/13/2023

9/13/2023

9/13/2023

9/13/2023

9/13/2023

9/13/2023

9/13/2023
9/14/2023

9/14/2023
9/15/2023

9/15/2023

9/18/2023
9/18/2023

9/20/2023

9/20/2023
9/21/2023
9/22/2023

9/25/2023

9/26/2023

9/26/2023

9/26/2023

9/27/2023
9/27/2023

9/28/2023

9/28/2023
9/28/2023

9/29/2023

10/3/2023

10/3/2023

10/4/2023

10/4/2023
10/4/2023

10/4/2023
10/5/2023

10/7/2023

10/7/2023

10/7/2023

10/7/2023

10/7/2023

10/10/2023

10/11/2023
10/11/2023

10/17/2023
10/19/2023
10/20/2023

10/20/2023
10/21/2023
10/25/2023
10/27/2023

11/30/2023
10/30/2023

10/30/2023

10/30/2023

10/31/2023

10/31/2023
11/2/2023

11/3/2023

11/3/2023
11/4/2023

11/4/2023

11/4/2023
11/9/2023
11/9/2023

11/9/2023

11/9/2023
11/10/2023
11/11/2023
11/18/2023
11/18/2023
11/20/2023

11/20/2023

11/23/2023

11/24/2023

11/23/2023

11/24/2023

11/24/2023

11/24/2023

11/24/2023
11/27/2023

11/27/2023

11/29/2023

11/29/2023

12/1/2023

12/1/2023

12/1/2023

12/1/2023

12/2/2023
12/2/2023

12/2/2023

12/2/2023
12/2/2023

12/11/2023

12/11/2023

12/11/2023

12/11/2023

12/12/2023

12/12/2023

12/12/2023
12/12/2023
12/18/2023
12/19/2023
12/19/2023

12/19/2023
12/21/2023

12/26/2023
12/27/2023
Letter Received
Sr No Letter No
1 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2022-23/01/111
2 BMRC/ORR/PHASE 2A/BYP.DEPOT/2023-24/02/570
3 BMRC/ORR/PHASE 2A/BYP.DEPOT/2022-23/03/571
4 BMRC/ORR/PHASE 2A/BYP.DEPOT/2022-23/04/1276
5 BMRC/ORR/PHASE 2A/BYP.DEPOT/2022-23/05/1277
6 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/06/1627
7 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/07/1993
8 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/08/1994
9 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/09/1992

10 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/10/2047
11 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/11/2581
12 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/12/2582
13 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/13/2583
14 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/14/2765

15 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/15/2766
16 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/16/3001
17 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/17/3041
18 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/18/3061

19 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/19/3384

20 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/20/3385
21 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/21/3386
22 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/23
23 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/24/3771
24 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/25/4229
25 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/26/4347
26 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/28/4392
27 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/29/4394
28 BMRCL/ORR/Phase-2A/Pkg-2/BYP.DEPOT/2023/30/4736
29 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/29A
30 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/29B
31 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/31/4822
32
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/32/4824
33 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/33/5006

34 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/34/5026
35 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/35/5352
36
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/36/5413
37
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/37/5447
38 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/38/5488
39
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/39/5661
40
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/40/5660
41 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/41/5662

42
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/42/5664
43 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/43/5671
44 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/44/5672
45 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/45/5673
46 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/46/5924
47
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/47/6100
48 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/48/6164

49 BMRCL/PHASE 2A/ED/ORR/Package-2/BYP.DEPOT/2023-6067

50 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/49/6505
51 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/50
52
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/51
53 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/53
54 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/54
55 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/05
56 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/06
57 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/07
58 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/56/7617
59 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/57
60 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/08
61 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/58
62 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/59
63 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/60
64 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/61
65 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/62
66 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/63
67 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/64
68 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/65
69 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/66
70 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/09
71 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/10
72 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/67
73 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/68
74 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/69
75 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/10A
76 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/70
77 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/71
78 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/12
79 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/72
80 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/73
81 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/74
82 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/75
83 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/13
84 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/14
85 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/76
86 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/15
87 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/77
88 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/16
89 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/78
90 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/79
91 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/17
92 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/18
93 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/80
94 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/81
95 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/82
96 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/19
97 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/20
98 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/83
99 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/84
100 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/85
101 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/21
102 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/86
103 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/22
104 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/23
105 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/87
106 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/88
107 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/89
108
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/90

109
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/91
110 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/92
111
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/93
112 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/94
113
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/95
114 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/96
115 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/97
116 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/98
117
BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/28/12077
118 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-23/99
119 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/28/100
120 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/101/12375
121 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/102/12512
122 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/103/13119
123
BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/30/13107
124
BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/31/13108
125
BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/32/13109
126
BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/33/13479
127 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/104/13480
128 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/105/13539
129 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/106
130 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/107
131 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/108

132
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/109

133
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/110
134 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/111/14471
135 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/112
136 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/113
137 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/114
138 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/115
139 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/39
140 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/40
141 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/41
142 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/42
143 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/116
144
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/117
145 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/118
146
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/119
147
Letter Received
Description Enclosure Details
Handing Over of Land-Reg. Site Hand Over Drawing
Master Plan at Grade Level and Underground Level Issue of GFC drawings.-Reg
GFC drawings -27 nos Issue of GFC drawings.-Reg
Boundary Wall Plan, Section, Elevation Issue of GFC drawings.-Reg
GFC drawings -20 nos Issue of GFC drawings.-Reg
Approval of Reinforcement-Reg
Approval of OPC Cement from Ultratech Cement Limited-
Reg
Approval of GGBS from JSW Cement Limited-Reg
Approval of Source and Agency for Coarse and fine
Aggregates-Reg
Approval of usage of Admixture from source M/s Fosroc
Chemicals Pvt Ltd
Issue of GFC drawings of details of Twin Cell Culvert Issue of GFC drawings.-Reg
Submission of work Method Statement for Geo-Technical
Soil Investigation-reg
Approval of Third Party Testing laboratory
Approval for source of agency for supply of concrete-
Ultratech
General Procedure for approval of Vendor for materials and
products for use in BMRCL works
Observations on submitted SHE Plan-reg
RFI Format-reg RFI- Format
Allocation of BMRCL Land of 2.141 acre near
Baiyappanahalli on monthly rental basis-reg
Submission of Product Approval-M/s Vidhya Enterprises &
M/s Eco Drilling Fluids Pvt. Ltd. 0
Submission of Product Approval (Sonic Pipe)-M/s Dextra
India Pvt. Ltd. 0
Maintenance of site registers-reg 39
Contract Documents-Reg
Issue of GFC Drawings-Reg 6
Control of GFC Drawings 1
Observations on Method Statement 0
Issue of GFC Drawings-Reg 2
Issue of GFC Drawings-Reg 8
Authoised Representative for M/s J.Kumar/AICPL JV 0
Issue of GFC Drawings of details of Test pile 5&6 2
Approval of BBS for test pile 0
Approval of BBS for Working pile
NDT for Checking the integrity of concrete piles after
installation 0
Regarding discrepancies of pile cap sizes of EDS-01 area-
reg.
BMRC-PAD-BYPN-STR-STD-
Issue of GFC drawings of Pile Standard details-reg. 0001
Kick of meeting held on 09.06.2023
SHE Inspection Report No-1
Safety,Helth,and Environment SHE Inspection Report-reg SHER NO. 01 to 26
Permission to execute the works at Baiyappanahalli Metro
Depot. 0
Observations of Method Statement for Excavation-rg 0
Vendor Approval for supply of rebar couplers from M/s
Sanfield India Limited-reg. 0
Submission of Ultratec Trail Mix design for concrete grade
M20,M35, and M50 -reg
Date of Commencement-reg 0

BMRC-PAD-BYPN-STR-SBL02-
0001-SHEET 02,SHEET
13A,13B,13C,13D,13E,13F,13G,
Issue of GFC Drawing 13H
Comments on Initial Work Programme-reg 0
Prcessing of Contractor'bill for releasing of payments-reg 0
Royalty on minerals used in construction works-reg 0
Issue of GFC Drawings 0
Submission of mix design for sonic tube grout using Cebex
200 material 0
BMRCL Environment, Health and safety Requirement 0
Permission t=for movement of construction equipment to
carry out Metro Construction works at Baiyappanahalli 0
Metro Depot-reg
Revised Method Statement for Bored cast in situ piles(R1) 0
Approval of Bar Bending Schedule of Pile Cap-reg 0
Approval of Bar Bending Schedule for Working
Pile(1000mm)-reg 0
Issue of GFC Drawings 0
Submission of Quality work observations-Reg 0
Testing of Materials reg 0
Testing of Materials reg 0
Testing of Materials reg 0
Approval for conducting testing and examination of lifting
0
appliances/gears and pressure vessels/Plants-reg
Submission of Safety work observations 0
Testing of Materials reg 0
Pending SHE Observation 0
Submission of Method Statement for Diaphragm Wall 0
Issue of GFC Drawings 0
Submission of Mix design report for M-35 grade concrete
0
for piling & diaphragm wall
Submission of method statement for Pile cap 0
Approval of submitted SHE plan 0
Approval for deploying Traffic Marshall Agency 0
Reg: Submission of revised Initial work program
0
incorporating date of commencement as 03-05-23
Submission of Safety work observations 0
Testing of Materials reg 0
Testing of Materials reg 0
Submission of Mix design report for M-35 grade concrete
for piling & diaphragm wall 0
Issue of GFC Drawings 0
Approval of Trial mix-M35 Grade for Pile and Diaphragm
wall structures 0
Testing of Materials reg 0
Issue of GFC Drawings-reg 0
Issue of GFC Drawings-reg 0
Testing of Materials reg 0
Submission of Quality work observations-Reg 0
Submission of inspection & Test Plan for materials-ITP-reg 0
Submission of Project Quality plan (QAP)-ITP-reg 0
Submission of Method of statement for Excavation-R1-reg
0
Testing of Materials reg 0
Testing of Materials reg 0
Issue of GFC Drawings 0
Testing of Materials reg 0
Submission of mix design report for M-35 grade concrete
using water proofing compound for Diaphragm Wall-reg 0
Testing of Materials reg 0
Issue of GFC Drawings-reg 0
Issue of GFC Drawings-reg 0
Testing of Materials reg 0
Testing of Materials reg 0
Submission of Safety work observations 0
Work in progress certificate 0
Submission of Quality work observations 0
Testing of Materials reg 0
Testing of Materials reg 0
Submission of Quality work observations-reg 0
Observations on monthly progress report-reg 0
Issue of GFC Drawings 0
Testing of Materials reg 0
Submission of Quality work observations 0
Testing of Materials reg 0
Testing of Materials reg 0
Submission of Safety work observations 0
Issue of gfc drawing 0
Issue of gfc drawing 0
Submission of mix Design report for M35 grade concrete
using water proofing compound for DW 0
Submission of mix Design report for M50 grade concretefor
column beam, slab , portal frame and other structure trial
mix no 14 0
Obseation of method statement for dw R1 0
Obseation of revise method statement for bored cast in C2
piles (R2) 0
Obseation of revise method statement forpile cap (R1) 0
Submission of mix design report for M35 grade concretefor
retaining wall works trial mix no 4 0
Submission of revise method statement for Execution (R2) 0
Issue of IFC drawings 0
Ubmission of quality work observation 0
Testing of Materials
0
submit of quality works observations 0
submit of safety works observations 0
Revised bank guarantee formats 0
Submission of quality work observation 0
Submission of quality work observation 0
Testing of Materials
0
Testing of Materials
0
Testing of Materials
0
Testing of Materials
0
Submission of Safety work observations 0
Approval for Conduction SHE Trainings 0
Issue of GFC Drawings 0
Issue of GFC Drawings 0
Submission of Quality Work Observation 0
Submission of Mix Design for M-30 grade concrete D-Wall
using water proofing compound incorporating aggregates
and M-sand from untied infra. 0
Submission of Mix Design for M-35 grade concrete Pile Cap
using water proofing compound incorporating aggregates
and M-sand from untied infra. 0
Submission of Safety work observations 0
Submission of Safety work observations 0
Issue of GFC Drawings
Issue of GFC Drawings
Issue of GFC Drawings
Testing of Materials
Testing of Materials
Testing of Materials
Testing of Materials
Submissio of Quality Work Observation
Submission of mix design report for M-35 grade concrete
using water proofing compound for Diaphragm Wall-reg
Observation on Method Statement for Retaining Wall
Approval for Testing and Examination of Lifting Appliances
gears and Pressure Vessels
Received Date Remarks
3-Apr-23
13-Apr-23
13-Apr-23
25-Apr-23
25-Apr-23
3-May-23
8-May-23
8-May-23
8-May-23

8-May-23
19-May-23

19-May-23
19-May-23

22-May-23

22-May-23
25-May-23
25-May-23

26-May-23

1-Jun-23

1-Jun-23

1-Jun-23
7-Jun-23
8-Jun-23
15-Jun-23
16-Jun-23
17-Jun-23
17-Jun-23
6/23/2023
6/21/2023
6/21/2023
6/24/2023

6/24/2023

28-Jun-23

30-Jun-23
4-Jul-23
5-Jul-23

5-Jul-23
6-Jul-23

10-Jul-23

10-Jul-23
10-Jul-23

10-Jul-23
10-Jul-23
10-Jul-23
10-Jul-23
7/14/2023

7/15/2023
7/17/2023

7/14/2023

7/24/2023
7/24/2023

7/24/2023
7/25/2023
7/26/2023
7/28/2023
7/28/2023
8/3/2023
8/11/2023
8/12/2023
8/16/2023
8/17/2023
8/17/2023
8/18/2023
8/18/2023
8/18/2023
8/23/2023
8/23/2023
8/24/2023
8/24/2023
8/23/2023
8/23/2023

8/26/2023
8/28/2023

8/28/2023
8/28/2023
8/30/2023
8/30/2023
8/30/2023
9/1/2023
9/7/2023
9/7/2023

9/7/2023
9/5/2023
9/9/2023
9/14/2023
9/12/2023

9/15/2023
9/15/2023
9/19/2023
9/19/2023
9/20/2023
9/20/2023
9/21/2023
9/22/2023
9/23/2023
10/3/2023
10/3/2023
10/4/2023
10/4/2023
10/6/2023
10/9/2023
10/11/2023
10/12/2023
10/16/2023
10/16/2023
10/18/2023
10/18/2023

10/19/2023

10/19/2023
10/19/2023
10/19/2023
10/19/2023

10/19/2023
10/20/2023
10/25/2023
10/25/2023

11/2/2023
11/2/2023
11/4/2023
11/7/2023
11/8/2023
11/20/2023

11/20/2023

11/20/2023

11/20/2023

11/24/2023
11/24/2023
11/25/2023
12/2/2023
12/2/2023
12/2/2023

12/9/2023

12/9/2023
12/13/2023
12/16/2023
12/21/2023
12/21/2023
12/21/2023
12/20/2023
12/20/2023
12/20/2023
12/21/2023
12/23/2023

12/23/2023
12/23/2023
12/28/2023
Name of Project: Baiyyapanahalli Metro Depot

Rain Register
Rain Timings Site Condition
Sl. No Date Day
From To Disturbed Undisturbed
1 5/3/2023 Wednesday 10:00 12:00 Soil loading Survey Works
Soil loading &
2 5/5/2023 Friday 9:00 12:00
survey works
Soil loading &
3 5/6/2023 Saturday 14:00 17:00
survey works
Soil loading &
4 5/8/2023 Monday 16:30 18:00
survey works
5 11-May-23 Thursday 20:00 0:00
Soil loading &
6 20-May-23 Saturday 16:30 18:00
survey works
Soil loading &
7 21-May-23 Sunday 15:00 17:30
survey works
8 22-May-23 Monday 17:00 19:00
Soil loading &
9 30-May-23 Wednesday 13:00 18:00
survey works
10 1-Jun-23 Thursday 18:00 22:00
11 9-Jun-23 Friday 18:00 20:00
12 11-Jun-23 Sunday 17:00 18:30
Excavation &
13 6/12/2023 Monday 18:00 20:00
Backfilling works
14 6/14/2023 Wednesday 18:00 19:30
15 6/20/2023 Tuesday 9:00 14:00 All Activities
16 6/21/2023 Wednesday 10:00 14:00
17:00 20:00
Excavation &
17 6/25/2023 Sunday 09:00pm 10;00pm
Backfilling works
Excavation &
18 6/27/2023 Tuesday
05:00pm 06;30 Backfilling works

19 7/6/2023 Thursday Continuous Drizzing


and heavy rain
20 7/7/2023 Friday Continuous Drizzing
and heavy rain
21 7/8/2023 Saturday Continuous Drizzing
and heavy rain
22 7/9/2023 Sunday Continuous Drizzing
and heavy rain
23 7/10/2023 Monday Continuous Drizzing
and heavy rain
24 7/11/2023 Tuesday Continuous Drizzing
and heavy rain
25 7/12/2023 Wednesday Continuous Drizzing
and heavy rain
26 7/13/2023 Thursday 05:00pm Continuous Drizzing
and heavy rain
27 7/14/2023 Friday 05:30pm Continuous Drizzing
and heavy rain
28 7/15/2023 Saturday 05:45pm Continuous Drizzing
and heavy rain
29 7/24/2023 Monday Continuous Drizzing
11:00am 14:00 and heavy rain
30 7/25/2023 Tuesday 11:00am 17:00 Continuous Drizzing
and heavy rain
Approach Road Continuous Drizzing
31 7/26/2023 Wednesday 11:00am 18:00
Damaged and heavy rain
32 7/28/2023 Friday 12:00 14:00 Drizzling
Approach Road
33 8/19/2023 Saturday
4:00 6:00 Damaged Heavy Rain
34 8/31/2023 Thursday 20:30 0:00 Heavy Rain
35 9/5/2023 Tuesday 19:00 22:00 Heavy Rain
36 9/7/2023 Thursday 18:00 19:00 Drizzling
37 9/13/2023 Wednesday 19:00 22:00 Heavy Rain
38 9/20/2023 Wednesday 19:00 22:00 Heavy Rain
39 9/24/2023 Sunday 21:00 23:00 Heavy Rain
40 10/8/2023 Sunday 19:30 23:00:00 Heavy Rain
41 10/9/2023 Monday 19:30 23:00:00 Heavy Rain
42 10/10/2023 Tuesday 18:00 20:00:00 Heavy Rain
43 10/11/2023 Wednesday 14:00 16:00 Heavy Rain
44 11/3/2023 Saturday 14:00 18:00 Drizzling
45 11/6/2023 Tuesday 17:00PM 3:00AM Heavy Rain
46 11/7/2023 Wednesday 17:00PM 1:00AM Heavy Rain
47 11/22/2023 Wednesday 7:00 PM 8:00 PM Heavy Rain
48 11/23/2023 Thursday 6:00 PM 6:30 PM Drizzling
49 11/24/2023 Friday 6:00 PM 6:30 PM Drizzling
yyapanahalli Metro Depot

n Register

Activities Affected Remarks


Approach Area damaged due to heavy rain at night
Soil loading and dumping

Soil loading and dumping, Survey works

Soil loading and dumping, Survey works


Road Damaged due to heavy rainfall

Concrete works for Entry Gate

Piling works, Excavation, Backfilling, RMC plant erection works


Piling works, Concreting
Piling works, Concreting
Piling works, Excavation, Backfilling, RMC plant erection works

Piling works, Excavation, Backfilling, RMC plant erection works

Piling works, Excavation, Backfilling, RMC plant erection works

Piling works, Excavation, Backfilling, RMC plant erection works

Piling works, Excavation, Backfilling, RMC plant erection works

Piling works, Excavation, Backfilling, RMC plant erection works

Piling works, Excavation, Backfilling, RMC plant erection works

Piling works, Excavation, Backfilling, RMC plant erection works


Piling works, Excavation, Backfilling, RMC plant erection works

Piling works, Excavation, Backfilling, RMC plant erection works

Piling works, Excavation, Backfilling, RMC plant erection works

Piling works, Excavation, Backfilling, RMC plant erection works

Piling works, Excavation, RMC plant works

Piling works, Excavation, RMC plant works

Piling works, Excavation, RMC plant works


Guide wall excavation works

Piling works, D-wall works


Excavation works

D-wall works
D-wall works
D-wall works
D-wall works
D-wall works, Excavation works
D-wall works, Excavation works
D-wall works, Excavation, pile cap works
D-wall works, Excavation works
D-wall works, Excavation works
D-wall works, Guide wall, Excavation works
D-wall works, Guide wall, Excavation works
D-wall works, Guide wall, Excavation works
D-wall works, Guide wall, Excavation works