DPR Dated 29-12-2023
DPR Dated 29-12-2023
DPR Dated 29-12-2023
Preparatory Works
1 A 1.0 Cleaning & Grubbing (CG) Ha 7.00 2.94 - - 2.940 42%
2 A 2.0 Removal of unservicable soil Cum 2,000.00 1,880.00 - - 1,880.000 94%
3 A 3.0 Cutting of Tree - - - -
4 A 3.1 300mm to 600mm Girth Each 50.00 - - - - 0%
5 A 3.2 600mm to 900mm Girth Each 50.00 - - - - 0%
6 A 3.3 900mm to 1800mm Girth Each 5.00 3.00 - - 3.000 60%
7 A 3.4 1800mm to 2700mm Girth Each 5.00 - - - - 0%
8 A 4.0 Excavation Cum 2,90,632.00 51,381.00 516.0 3,876.000 55,257.000 #VALUE!
9 A 6.0 Backfilling with excavated soil Cum 10,000.00 8,396.00 - - 8,396.000 84%
10 I 1.0 Survey work Acre 17.00 5.56 - - 5.561 33%
11 I 2.0 Temporary Barrication Rmt 600.00 - - - - 0%
12 I 11.0 Geotechnical Investigation Rmt 390.00 305.00 - - 305.000 78%
13 I 5.0 Plate Load Test Nos 2.00 - - - - 0%
14 I 7.0 Traffic Marshal Mandays 4,500.00 776.00 4.0 116.000 892.000 20%
15 I 8.0 Fully Furnished Site Office Sqm 75.00 - - - - 0%
16 I 9.0 Uprooting the tree roots 300-2400mm Each 50.00 24.00 - - 24.000 48%
17 I 10.0 Tranplanting the Trees 300 to 500mm Each 40.00 - - - - 0%
KD-1 Completion of stabling shed No.2 (8 lines) up to ground level. -
Wednesday
Wednesday
Wednesday
Wednesday
Wednesday
Wednesday
Wednesday
Thursday
Thursday
Thursday
Thursday
Thursday
Thursday
Thursday
Thursday
Saturday
Saturday
Saturday
Saturday
Saturday
Saturday
Saturday
Tuesday
Tuesday
Tuesday
Tuesday
Tuesday
Tuesday
Tuesday
Monday
Monday
Monday
Monday
Monday
Monday
Monday
Sunday
Sunday
Sunday
Sunday
Sunday
Sunday
Sunday
Name of Work-Construction and Remodeling Of Existing Baiyappanahalli Depot for Bangalore Metro Rail Project,
Friday
Friday
Friday
Friday
Friday
Friday
Friday
Phase-2A
10-Mar
11-Mar
12-Mar
13-Mar
14-Mar
15-Mar
16-Mar
17-Mar
18-Mar
19-Mar
20-Mar
21-Mar
22-Mar
23-Mar
24-Mar
25-Mar
26-Mar
27-Mar
28-Mar
29-Mar
30-Mar
31-Mar
BOQ.Item.No Completed Qty Balance Qty as
10-Apr
11-Apr
12-Apr
13-Apr
14-Apr
15-Apr
16-Apr
17-Apr
18-Apr
19-Apr
20-Apr
1-Mar
2-Mar
3-Mar
4-Mar
5-Mar
6-Mar
7-Mar
8-Mar
9-Mar
1-Apr
2-Apr
3-Apr
4-Apr
5-Apr
6-Apr
7-Apr
8-Apr
9-Apr
Sr. no. Activity Unit Total
As On Date on date
Schedule No.
Preparatory works
1 A 1.0 Cleaning & Grubbing (CG) Ha 7.00 2.94 4.06 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.1 0.1
2 A 2.0 Removal of unservicable soil Cum 2,000.00 1880 120
3 A 3.0 Cutting of Tree 0 0
4 A 3.1 300mm to 600mm Girth Each 50.00 0 50
5 A 3.2 600mm to 900mm Girth Each 50.00 0 50
6 A 3.3 900mm to 1800mm Girth Each 5.00 3 2
7 A 3.4 1800mm to 2700mm Girth Each 5.00 0 5
8 A 4.0 Excavation Cum 290,632 55257 235375
9 A 6.0 Backfilling with excavated soil Cum 10,000.00 8396 1604
10 I 1.0 Survey work Acre 17.00 5.56 11 ### ### ### ### ### ### 0.2 0.2 ###
11 I 2.0 Temporary Barrication Rmt 600.00 0 600
12 I 11.0 Geotechnical Investigation Rmt 390.00 305.0 85
13 I 5.0 Plate Load Test Nos 2.00 0 2
14 I 7.0 Traffic Marshal Mandays 4,500.00 892 3608
15 I 8.0 Fully Furnished Site Office Sqm 75.00 0 75
16 I 9.0 Uprooting the tree roots 300-2400mm Each 50.00 24 26
17 I 10.0 Tranplanting the Trees 300 to 500mm Each 40.00 0 40
KD-1 Completion of stabling shed No.2 (8 lines) up to ground level.
1 B 10 Diaphragm Wall Rmt 394.6 356.50 38.100
2 Intital Pile test 0 0
3 B 2 Intial vertical load test on pile 0 0
4 B 2.1 800mm dia No 2 0 2
5 B 2.2 1000mm dia pile No 2 0 2
6 B 3 Intial lateral load test on pile 0 0
7 B 3.1 800mm dia pile No 2 0 2
8 B 4 Intial Pull out test on pile 0 0
9 B 4.1 800mm dia pile No 2 0 2
10 Routine Pile test 0 0
11 B 5 Static routine vertical test 0 0
12 B 5.1 800mm dia pile No 3 0 3
13 B 6 Static routine lateral test 0 0
14 B 6.1 800mm dia pile No 3 0 3
15 B 7 Dynamic load test 0 0
16 B 7.1 800mm dia pile No 2 1 1
17 B 8 Integrity test No 351 0 351
18 B 1 Drilling & Concreting of Piles 0 0
19 B 1.1 800mm dia Rmt. 236 0 236
20 B 1.2 1000mm dia pile Rmt. 144 0 144
21 Pile Cap 0 0
22 C 2 PCC Work -with M-15 Nos 78 0 78
23 C 3 RCC Work - M-35 Nos 78 0 78
24 Footings 0 0
25 C 2 PCC Work -with M-20 Cum 21.9 0 22
26 C 3 RCC Work - M-35 Cum 102.6 0 103
27 Columns 0 0
28 C 1 RCC Work - M50 Nos 141 0 141
29 Underground and At Grade Level 0 0
30 F 1 ATT Work Sqm 6720 0 6720
31 C 2 PCC Work -with M-20 Cum 672 0 672
32 C 1 RCC Work - M35 Cum 5768 0 5768
Completion of stabling shed No. 2 (8 lines) up to first floor including entry line structure at both the
KD-2
levels.
1 B 10 Diaphragm Wall Rmt 154 77.00 77.000
2 Intital Pile test 0 0
3 B 2 Intial vertical load test on pile 0 0
4 B 2.1 800mm dia pile No 2.00 0 0
5 B 2.2 1000mm dia pile No 2.00 0 2
6 B 3 Intial lateral load test on pile 0 0
7 B 3.2 1000mm dia pile No 2 0 2
8 B 4 Intial Pull out test on pile 0 0
9 B 4 1000mm dia pile No 2 0 2
10 Routine Pile test 0 0
11 B 5 Static routine vertical test 0 0
12 B 5.2 1000mm dia pile No 6.00 0 6
13 B 6 Static routine lateral test 0 0
14 B 6.2 1000mm dia pile No 6 0 6
15 B 7.0 Dynamic load test 0 0
16 B 7.2 1000mm dia pile No 3.00 0 3
17 B 1.0 Drilling & Concreting of Piles 0 0
18 B 1.1 800mm dia Nos 136 0 136
19 B 1.2 1000mm dia pile Nos 52 24 28
20 Pile Cap 0 0
21 C 2 PCC Work -with M-15 Nos 42 0 42
22 C 3 RCC Work - M-35 Nos 42 0 42
23 Columns 0 0
24 C 1 RCC Work - M50 Nos 48 0 48
25 First Floor Beam and slab 0 0
26 C 1 RCC Work - M35 Cum 2791.14 0 2791
27 Viaduct girder & slab 0 0
28 C 1 RCC Work - M50 Cum 779 0 779
KD-3 Completion of PD area for all floors in stabilizing shed No.2 (8 lines)
1 Columns 0 0
2 C 1 RCC Work - M35 Cum 1185 0 1185
3 Second & Terrace Floor Beam, Slab 0 0
4 C 1 RCC Work - M50 Cum 5062.5 0 5063
Completion of stabling shed No.1(14 lines) up to Ground level beam and slab including dismantling of
KD-4
existing stabling shed and other related items.
1 B 1.0 Drilling & Concreting of Piles 0 0
2 B 1.2 For 1000 mm dia Pile by Hydraulic rig Nos 502.00 0 502
5 Concrete-M35-Pile Cap Cum 13445.62 0 13446
6 Pile Cap 0 0
7 C 2 PCC Work -with M-15 Nos 152.00 0 152
8 C 3 RCC Work - M-35 Nos 152.00 0 152
9 Footings,Column,Beam,Slab 0 0
10 C 2 PCC Work -with M-20 Nos 165 0 165
11 C 3 RCC Work - M-35 Nos 165.00 0 165
12 C 1 RCC Work - M-35 Nos 108.00 0 108
13 G 1 Anti Termite Treatment Sqm 11,952.00 0 11952
Demolishing brick work in cement mortar
14 J 3 Cum 745.00 10.179 734.821
manually / by mechanical means
Completion of steel structure including fabrication, erection, roof sheeting etc. and Architectural &
KD-5
PHE works for stabling shed No.1(14 lines) including entry line structure at both the levels.
1 Intital Pile test 0 0
2 B 2 Intial vertical load test on pile 0 0
3 B 2.1 800mm dia pile No 1.00 1.0 0.0
4 B 2.2 1000mm dia pile No 1.00 1.0 0.0
5 B 3 Intial lateral load test on pile 0 0
6 B 3.1 1000mm dia pile No 3 0 3
7 B 3.2 800 mm dia pile No 6 1 5
8 B 4 Intial Pull out test on pile 0 0
9 B 4.1 1000mm dia pile No 2 0 2
10 B 800mm dia pile No 0
11 Routine dynamic load test on pile
12 1000mm dia pile No 1 1
13 800mm dia pile No 1 1
14 Routine Lateral load test on pile
15 1000mm dia pile No 1 1
16 800mm dia pile No 1 1
17 B 1.0 Pile Integrity test No 96.00 31 65
18 Pille boring and concreting
19 B 1.1 800mm dia Nos 252 147 105
20 B 1.2 1000mm dia pile Nos 128 44 84
21 Pile Cap 0 0
22 C 2.0 PCC Work -with M-20 Nos 73 29 44
23 C 3.0 RCC Work - M-35 Nos 73 30 43
24 Grade slab (lvl 899.525) 0 0
25 F 1 ATT Work Sqm 7,034.00 0 7034
26 C 2 PCC Work -with M-20 Cum 703.4 0 703
27 C 1 RCC Work - M35 Cum 1406.8 0 1407
28 Columns 0 0
29 C 1 RCC Work - M35 1st Lift Nos 96 14 82
RCC Work - M35 2nd Lift Nos 96
30 Second & Terrace Floor Beam, Slab 0 0
31 C 1 RCC Work - M50 Cum 4659.112 0 4659
KD-6 Completion of water supply, plumbing works site development and Road works.
1 Retaining Wall 0 0
2 A 4 Excavation Rmt 1300 0 1300
3 F 1 Anti Termite Sqm 2322.2 0 2322
4 G 60 Waterproofing Sqm 16738.81658 0 16739
5 C 2 PCC Work -with M-20 Rmt 1300 0 1300
6 C 1 RCC Work-with-M-35 Rmt 1300 0 1300
7 Backfilling Cum 0 0
8 Diaphragm Wall 0 0
9 A 10 RCC Work-with-M-35 Rmt 205 0 205
10 Drain Works 0 0
11 A 4 Excavation Cum 3108.75 0 3109
12 C 2 PCC Work -with M-20 Cum 307.5 0 308
13 C 5 Pre Cast RCC Work-with-M-35 Cum 1338.75 0 1339
14 Road Works 0 0
15 A 9 GSB Rmt 1500 0 1500
16 A 10 WMM Rmt 1500 0 1500
17 A 11 DBM Rmt 1500 0 1500
18 A 12 Premix Carpet Rmt 1500 0 1500
KD-7 Completion of Entire work as per the contract
21-Apr Friday
22-Apr Saturday
0.2 0.2
0.1 0.1
23-Apr Sunday
24-Apr Monday
0.2
25-Apr Tuesday
26-Apr Wednesday
0.3 0.2
8
28-Apr Friday
29-Apr Saturday
8
0.3
30-Apr Sunday
8
3
20 40
1-May Monday
2-May Tuesday
3-May Wednesday
0.2 0.2
4-May Thursday
5-May Friday
6-May Saturday
7-May Sunday
8-May Monday
9-May Tuesday
0.2 0.2 0.2 0.3
10-May Wednesday
11-May Thursday
0.2
12-May Friday
13-May Saturday
### ### ### 80 90 60 70 ### ### ### ### ###
0.2
14-May Sunday
15-May Monday
###
16-May Tuesday
17-May Wednesday
18-May Thursday
2
11 13 23 20 40 20 27 27
19-May Friday
2
20-May Saturday
2
21-May Sunday
2
22-May Monday
4
8 35 32
23-May Tuesday
4
0
24-May Wednesday
4
7
25-May Thursday
4
26-May Friday
4
27-May Saturday
4
0 10 4.5
0.6
28-May Sunday
4
0
29-May Monday
4
3
30-May Tuesday
4
4
31-May Wednesday
4
4
1-Jun Thursday
4
2-Jun Friday
4
7
3-Jun Saturday
4
4-Jun Sunday
4
5-Jun Monday
4
6-Jun Tuesday
4
7-Jun Wednesday
4
8-Jun Thursday
4
11
9-Jun Friday
4
10-Jun Saturday
### 50 ### ### ### ###
11-Jun Sunday
4
12-Jun Monday
4
13-Jun Tuesday
4
14-Jun Wednesday
4
15-Jun Thursday
4
16-Jun Friday
4
17-Jun Saturday
4
18-Jun Sunday
4
19-Jun Monday
### ### ### ### ### ### ###
### ### ### 50 ### ### ### ### ### ### ### ### ### ### ### ### ###
20-Jun Tuesday
4
21-Jun Wednesday
4
22-Jun Thursday
4
23-Jun Friday
4
24-Jun Saturday
4
25-Jun Sunday
4
26-Jun Monday
4
27-Jun Tuesday
4
28-Jun Wednesday
4
29-Jun Thursday
4
30-Jun Friday
4
1-Jul Saturday
4
2-Jul Sunday
4
3-Jul Monday
4
4-Jul Tuesday
4
5-Jul Wednesday
4
6-Jul Thursday
4
7-Jul Friday
4
8-Jul Saturday
0 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
0 0 ### ### ### 60 ### 24 ### 60 ### ### 24 ### 24 0 ### 0 0
4
9-Jul Sunday
4
0
10-Jul Monday
4
11-Jul Tuesday
4
12-Jul Wednesday
4
13-Jul Thursday
### ### ### ###
4
0 0 0 0
10
0.5
0.5
1 2 2 1 2 3 2 2 3 3 3 2 4 4 0 3 4 3 3
14-Jul Friday
4
15-Jul Saturday
4
16-Jul Sunday
4
17-Jul Monday
4
18-Jul Tuesday
4
19-Jul Wednesday
4
20-Jul Thursday
4
21-Jul Friday
4
22-Jul Saturday
4
23-Jul Sunday
4
24-Jul Monday
0 ###
4
25-Jul Tuesday
4
0 26-Jul Wednesday
4
0
27-Jul Thursday
4
0
28-Jul Friday
4
0
29-Jul Saturday
4
0
30-Jul Sunday
4
0
31-Jul Monday
4
0
1-Aug Tuesday
4
0
2-Aug Wednesday
4
0
3-Aug Thursday
4
0
4-Aug Friday
4
0
5-Aug Saturday
4
0
6-Aug Sunday
4
0
7-Aug Monday
4
0
8-Aug Tuesday
4
0
9-Aug Wednesday
4
0
10-Aug Thursday
4
0
11-Aug Friday
4
0
12-Aug Saturday
4
0
13-Aug Sunday
4
0
14-Aug Monday
4
0
15-Aug Tuesday
0
0
16-Aug Wednesday
4
0
17-Aug Thursday
4
0
18-Aug Friday
4
0
19-Aug Saturday
4
0
20-Aug Sunday
4
0
21-Aug Monday
4
0
22-Aug Tuesday
4
0
23-Aug Wednesday
4
0
24-Aug Thursday
4
0
25-Aug Friday
4
0
26-Aug Saturday
4
0
27-Aug Sunday
4
0
28-Aug Monday
4
0
29-Aug Tuesday
4
0
30-Aug Wednesday
5.5
4
31-Aug Thursday
0 ###
0
4
1-Sep Friday
4
2-Sep Saturday
0 5.5
4
3-Sep Sunday
0
4
4-Sep Monday
0
4
5-Sep Tuesday
0 ### ### ### ###
6-Sep Wednesday
0 5.5
4
7-Sep Thursday
4
8-Sep Friday
0 5.5
4
9-Sep Saturday
4
10-Sep Sunday
0 5.5
4
11-Sep Monday
0 ### ### ### ### ###
12-Sep Tuesday
4
13-Sep Wednesday
0 ###
0 5.5 5.5
4
14-Sep Thursday
4
0
15-Sep Friday
0 5.5
4
16-Sep Saturday
0 ###
17-Sep Sunday
0 5.5
4
18-Sep Monday
0 ###
19-Sep Tuesday
0 5.5
4
0
20-Sep Wednesday
4
21-Sep Thursday
0 5.5
4
22-Sep Friday
0 60 100
23-Sep Saturday
4
90
24-Sep Sunday
4
0
25-Sep Monday
0 5.5 5.5 5.5
4
90
26-Sep Tuesday
0
4
27-Sep Wednesday
0 210
0
4
28-Sep Thursday
0
4
0
29-Sep Friday
4
30-Sep Saturday
4
1-Oct Sunday
0 160 150
2-Oct Monday
0 5.5 5.5 5.5
4
0
9
4 3 3 3 4 4 3 2 3 0 1 2 2 2 1 1 2 2 2 2 2 2 2 0 2 3 3 3 3 2 2 1 2 2 2 2 0 2 2 1 1 1 2 1 2 3 0 1 0 1 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 1 0 2 1 2 1 1 1 2 1 2 2 1 2 2 0 1 1 1 1 1 2 0 2 1 1 1 1 0 0 2 1 2 1 1 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 1 2 0 1 0 0 1 0 0 0 1 0 2 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0
3-Oct Tuesday
4
4-Oct Wednesday
160 110
0 5.5
4
5-Oct Thursday
130
0
4
6-Oct Friday
4
50
7-Oct Saturday
4 5.5
4
0
0.5
0
0 0 0 0
0 0 0 0
0 0 0 0
8-Oct Sunday
4
0
9-Oct Monday
0 5.5
4
0
10-Oct Tuesday
4
11-Oct Wednesday
4
12-Oct Thursday
0 5.5 5.5 0
4 4
0 118 130 0
13-Oct Friday
4
14-Oct Saturday
5.5
15-Oct Sunday
0 6
4 4
16-Oct Monday
0
4
17-Oct Tuesday
4
18-Oct Wednesday
4
19-Oct Thursday
4
20-Oct Friday
4
0
23-Oct Monday
5.5 5.5
0
4
24-Oct Tuesday
372
0
4
0
25-Oct Wednesday
4
0
26-Oct Thursday
4
0
27-Oct Friday
1
4
28-Oct Saturday
4
29-Oct Sunday
4
30-Oct Monday
4
31-Oct Tuesday
252 324 396 228
0
4
0
1-Nov Wednesday
4
2-Nov Thursday
5.5
0
4
3-Nov Friday
0
4
4-Nov Saturday
4
5-Nov Sunday
264 264 300 264
4
0
6-Nov Monday
4
0
7-Nov Tuesday
4
0
8-Nov Wednesday
5.5 5.5 5.5 5.5
0
4
0
9-Nov Thursday
4
0
10-Nov Friday
5.5
0
11-Nov Saturday
11
4
0
12-Nov Sunday
0
4
0
13-Nov Monday
0
4
0
14-Nov Tuesday
0
4
16-Nov Thursday
0
4
17-Nov Friday
0 120
5.5
4
18-Nov Saturday
5..5
4
0
19-Nov Sunday
5.5
4
20-Nov Monday
0 240
0
4
21-Nov Tuesday
120
5.5
4
22-Nov Wednesday
5.50 5.5
4
0
23-Nov Thursday
5.5
4
0
24-Nov Friday
5.5
4
0
25-Nov Saturday
5.5
4
0
26-Nov Sunday
5.5
4
27-Nov Monday
5.5
4
28-Nov Tuesday
4
29-Nov Wednesday
4
30-Nov Thursday
0 5.5 5.5
4
1-Dec Friday
5.5 5.5 5.5
4
2-Dec Saturday
4
3-Dec Sunday
5.5
4
4-Dec Monday
0 132 341 324 192 180 180 300 228
5.5
4
5-Dec Tuesday
5.5
4
84
6-Dec Wednesday
5.5
4
0
7-Dec Thursday
5.5
4
8-Dec Friday
5.5
4
9-Dec Saturday
0 156 192
5.5
4
10-Dec Sunday
4
11-Dec Monday
144
12-Dec Tuesday
4
13-Dec Wednesday
144
5.5
4
14-Dec Thursday
4
15-Dec Friday
5.50
4
1 1 1 1 1 1 1 1 1 1 1 1
0.5
1
1
1
1
6 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 3 0 0 0 4
0 0 0
0 0 0
0 0 0 2 2 0 1 1 0 1 1 1 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 3 1 0 0 0 0 0 0 0 1 3
1 1 1 2 0 1 0 2 1 0 1 1 2 1 1 0 0 0 0 0 1 1 1 0 0 1 1 1 0 0 0 0 0 0 0 0 0 0 1 1 1 1
3
16-Dec Saturday
5.50
4
17-Dec Sunday
4
18-Dec Monday
5.5
4
19-Dec Tuesday
4
20-Dec Wednesday
5.5
4
21-Dec Thursday
84 264 240
4
22-Dec Friday
4
72
23-Dec Saturday
5.50 5.50
4
24-Dec Sunday
4
25-Dec Monday
5.5
4
26-Dec Tuesday
4
27-Dec Wednesday
4
28-Dec Thursday
4
29-Dec Friday
240 288 288 276 516
1 1 1 1 1
3 4 4
WORK DONE STATEMENT FOR DIAPHRAGM WALL
1st Level Anchoring 2nd Level Anchoring
Capping Level-1-1/3 Level-1-2/3 Level-1-3/3 Level-2-1/3 Level-2-2/3 Level-2-3/3
D-Wall Length
Sl.No. Location DW DOC Beam
ID in "m"
DOC Fixed End Stressing Free End Fixed End Stressing Free End Fixed End Stressing Free End Fixed End Stressing Free End Fixed End Stressing Free End Fixed End Stressing Free End
Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting
1 SBL-02 DW-01 5.5
2 SBL-02 DW-02 5.5 10/18/2023
3 SBL-02 DW-03 5.5 10/7/2023
4 SBL-02 DW-04 5.5 9/30/2023
5 SBL-02 DW-05 5.5 9/21/2023
6 SBL-02 DW-06 5.5 9/12/2023
7 SBL-02 DW-07 5.5 9/17/2023 12/18/2023
8 SBL-02 DW-08 5.5 9/24/2023
9 SBL-02 DW-09 5.5 10/1/2023
10 SBL-02 DW-10 5.5 10/6/2023
11 SBL-02 DW-11 5.5 10/9/2023
12 SBL-02 DW-12 5.5 10/12/2023
13 SBL-02 DW-13 5.5 10/19/2023
14 SBL-02 DW-14 5.5 10/16/2023
15 SBL-02 DW-15 5.5 9/13/2023
16 SBL-02 DW-16 5.5 9/8/2023
17 SBL-02 DW-17 5.5 9/2/2023
18 SBL-02 DW-18 5.5 8/30/2023
19 SBL-02 DW-19 5.5 9/6/2023
20 SBL-02 DW-20 5.5 9/10/2023
21 SBL-02 DW-21 5.5 9/15/2023
22 SBL-02 DW-22 5.5 9/19/2023
23 SBL-02 DW-23 5.5 9/23/2023
24 SBL-02 DW-24 5.5 9/25/2023
25 SBL-02 DW-25 5.5 10/1/2023
26 SBL-02 DW-26 5.5 10/4/2023
27 SBL-02 DW-27 5.5 10/11/2023
28 SBL-02 DW-28 5.5 10/14/2023
29 SBL-02 DW-29 5.5 10/20/2023
30 SBL-02 DW-30 5.5 10/23/2023
31 SBL-02 DW-31 5.5 10/28/2023
32 SBL-02 DW-32 5.5 10/31/2023
33 SBL-02 DW-33 5.5 10/26/2023
34 SBL-02 DW-34 5.5 10/22/2023
35 SBL-02 DW-35 5.5 10/29/2023
36 SBL-02 DW-36 5.5 11/2/2023
37 SBL-02 DW-37 5.5 11/7/2023
38 SBL-02 DW-38 5.5 11/11/2023
39 SBL-02 DW-39 5.5 11/8/2023
40 SBL-02 DW-40 5.5 11/5/2023
41 SBL-02 DW-41 5.5 11/10/2023
42 SBL-02 DW-42 5.5
43 SBL-02 DW-43 5.5
44 SBL-02 DW-44 5.5 11/6/2023
45 SBL-02 DW-45 5.5 10/31/2023
46 SBL-02 DW-46 5.5 10/27/2023
47 SBL-02 DW-47 5.5 10/30/2023
48 SBL-02 DW-48 5.5 11/11/2023
49 SBL-02 DW-49 5.5 11/18/2023
50 SBL-02 DW-50 5.5 12/15/2023
51 SBL-02 DW-51 5.5 12/8/2023
52 SBL-02 DW-52 5.5 11/30/2023
53 SBL-02 DW-53 5.5 11/24/2023
54 SBL-02 DW-54 5.5 11/21/2023
55 SBL-02 DW-55 5.5 11/26/2023
1st Level Anchoring 2nd Level Anchoring
Capping Level-1-1/3 Level-1-2/3 Level-1-3/3 Level-2-1/3 Level-2-2/3 Level-2-3/3
D-Wall Length
Sl.No. Location DW DOC Beam
ID in "m"
DOC Fixed End Stressing Free End Fixed End Stressing Free End Fixed End Stressing Free End Fixed End Stressing Free End Fixed End Stressing Free End Fixed End Stressing Free End
Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting
56 SBL-02 DW-56 5.5 11/29/2023
57 SBL-02 DW-57 5.5 12/4/2023
58 SBL-02 DW-58 5.5 12/6/2023
59 SBL-02 DW-59 5.5 12/16/2023
60 SBL-02 DW-60 5.5 12/18/2023
61 SBL-02 DW-61 5.5 12/28/2023
62 SBL-02 DW-62 5.5
63 SBL-02 DW-63 5.5 12/25/2023
64 SBL-02 DW-64 5.5 12/13/2023
65 SBL-02 DW-65 5.5 12/20/2023
66 SBL-02 DW-66 5.5 12/22/2023
67 SBL-02 DW-67 5.5 12/23/2023
68 SBL-02 DW-68 5.5 12/27/2023
69 SBL-02 DW-69 5.5 12/29/2023
70 SBL-02 DW-70 5.5
71 SBL-02 DW-71 5.5
72 SBL-02 DW-72 5.5
73 SBL-02 DW-73 5.5
74 EDS-02 DW-74 5.5
75 EDS-02 DW-75 5.5
76 EDS-02 DW-76 5.5
77 EDS-02 DW-77 5.5
78 EDS-02 DW-78 5.5
79 EDS-02 DW-79 5.5
80 EDS-02 DW-80 5.5
81 EDS-02 DW-81 5.5
82 EDS-02 DW-82 5.5
83 EDS-02 DW-83 5.5
84 EDS-02 DW-84 5.5
85 EDS-02 DW-85 5.5
86 EDS-02 DW-86 5.5
87 EDS-02 DW-87 5.5
88 EDS-02 DW-88 5.5 11/19/2023
89 EDS-02 DW-89 5.5 11/25/2023
90 EDS-02 DW-90 5.5 11/21/2023
91 EDS-02 DW-91 5.5 11/17/2023
92 EDS-02 DW-92 5.5 11/15/2023
93 EDS-02 DW-93 5.5 11/23/2023
94 EDS-02 DW-94 5.5 11/27/2023
95 EDS-02 DW-95 5.5 11/29/2023
96 EDS-02 DW-96 5.5 12/1/2023
97 EDS-02 DW-97 5.5 12/3/2023
98 EDS-02 DW-98 5.5 11/30/2023
99 EDS-02 DW-99 5.5 12/5/2023
100 EDS-02 DW-100 5.5 12/7/2023
101 EDS-02 DW-101 5.5 12/9/2023
102 SBL-01 DW-102 5.5
103 SBL-01 DW-103 5.5
104 SBL-01 DW-104 5.5
105 SBL-01 DW-105 5.5
106 SBL-01 DW-106 5.5
107 SBL-01 DW-107 5.5
108 SBL-01 DW-108 5.5
109 SBL-01 DW-109 5.5
110 SBL-01 DW-110 5.5
111 SBL-01 DW-111 5.5
112 SBL-01 DW-112 5.5
1st Level Anchoring 2nd Level Anchoring
Capping Level-1-1/3 Level-1-2/3 Level-1-3/3 Level-2-1/3 Level-2-2/3 Level-2-3/3
D-Wall Length
Sl.No. Location DW DOC Beam
ID in "m"
DOC Fixed End Stressing Free End Fixed End Stressing Free End Fixed End Stressing Free End Fixed End Stressing Free End Fixed End Stressing Free End Fixed End Stressing Free End
Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting Grouting
113 SBL-01 DW-113 5.5
114 SBL-01 DW-114 5.5
115 SBL-01 DW-115 5.5
116 SBL-01 DW-116 5.5
117 SBL-01 DW-117 5.5
118 SBL-01 DW-118 5.5
119 SBL-01 DW-119 5.5
120 SBL-01 DW-120 5.5
121 SBL-01 DW-121 5.5
122 SBL-01 DW-122 5.5
123 SBL-01 DW-123 5.5
124 SBL-01 DW-124 5.5
125 SBL-01 DW-125 5.5
126 SBL-01 DW-126 5.5
127 SBL-01 DW-127 5.5
128 SBL-01 DW-128 5.5
129 SBL-01 DW-129 5.5
130 SBL-01 DW-130 5.5
131 SBL-01 DW-131 5.5
132 SBL-01 DW-132 5.5
133 SBL-01 DW-133 5.5
134 SBL-01 DW-134 5.5
135 SBL-01 DW-135 5.5
136 SBL-01 DW-136 5.5
137 SBL-01 DW-137 5.5
138 SBL-01 DW-138 5.5
139 SBL-01 DW-139 5.5
140 SBL-01 DW-140 5.5
141 SBL-01 DW-141 5.5
142 SBL-01 DW-142 5.5
143 SBL-01 DW-143 5.5
144 SBL-01 DW-144 5.5
145 SBL-01 DW-145 5.5
146 SBL-01 DW-146 5.5
147 SBL-01 DW-147 5.5
148 SBL-01 DW-148 5.5
149 SBL-01 DW-149 5.5
150 SBL-01 DW-150 5.5
79 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
01/29/2024
WORK DONE STATEMENT OF ENTRY DECK STRUCTURE (EDS)-01 h
Piling Details Pile Cap Details Column Details
Type Dia of No. of Pile Code (PL) Pile DOC Pile Pile Cap Size in "m" PIT PCC Pile Cap Column Column Size in "m" Starter Column DOC
Sl. No. GRID No.
of Pile Pile Piles P1 P2 P3 P4 P5 P6 P1 P2 P3 P4 P5 P6 Code L W D DOT DOC DOC Code L W D DOC 1st Lift 2nd Lift 3rd Lift
1 GRID-27 FP 0.8 4 1 2 3 4 PC-1 3.70 3.70 1.50 C-1 2.25 0.5
2 GRID-27 FP 0.8 4 5 6 7 8 PC-1 3.70 3.70 1.50 C-2 2.25 0.5
3 GRID-27 FP 0.8 4 9 10 11 12 PC-1 3.70 3.70 1.50 C-3 2.25 0.5
4 GRID-27 FP 0.8 4 13 14 15 16 PC-1 3.70 3.70 1.50 C-4 2.25 0.5
5 GRID-27 FP 0.8 4 17 18 19 20 PC-1 3.70 3.70 1.50 C-5 2.25 0.5
6 GRID-27 FP 0.8 4 21 22 23 24 PC-1 3.70 3.70 1.50 C-6 2.25 0.5
7 GRID-27 FP 0.8 4 25 26 27 28 PC-1 3.70 3.70 1.50 C-7 2.25 0.5
8 GRID-27 FP 0.8 4 29 30 21 32 PC-1 3.70 3.70 1.50 C-8 2.25 0.5
9 GRID-27 FP 0.8 4 33 34 35 36 PC-1 3.70 3.70 1.50 C-9 2.25 0.5
10 GRID-28 FP 0.8 4 37 38 39 40 PC-1 3.70 3.70 1.50 C-12 2.25 0.5
11 GRID-28 FP 0.8 4 41 42 43 44 PC-1 3.70 3.70 1.50 C-13 2.25 0.5
12 GRID-28 FP 0.8 4 45 46 47 48 PC-1 3.70 3.70 1.50 C-14 2.25 0.5
13 GRID-28 FP 0.8 4 49 50 51 52 PC-1 3.70 3.70 1.50 C-15 2.25 0.5
14 GRID-28 FP 0.8 4 53 54 55 56 PC-1 3.70 3.70 1.50 C-16 2.25 0.5
15 GRID-28 FP 0.8 4 57 58 59 60 PC-1 3.70 3.70 1.50 C-17 2.25 0.5
16 GRID-28 FP 0.8 4 61 62 63 64 PC-1 3.70 3.70 1.50 C-18 2.25 0.5
17 GRID-28 FP 0.8 4 65 66 67 68 PC-1 3.70 3.70 1.50 C-19 2.25 0.5
18 GRID-28 FP 0.8 4 69 70 71 72 PC-1 3.70 3.70 1.50 C-20 2.25 0.5
19 GRID-29 FP 0.8 4 73 74 75 76 PC-1 3.70 3.70 1.50 C-21 2.25 0.5
20 GRID-29 FP 0.8 4 77 78 79 80 PC-1 3.70 3.70 1.50 C-22 2.25 0.5
21 GRID-29 FP 0.8 4 81 82 83 84 PC-1 3.70 3.70 1.50 C-23 2.25 0.5
22 GRID-29 FP 0.8 4 85 86 87 88 PC-1 3.70 3.70 1.50 C-24 2.25 0.5
23 GRID-29 FP 0.8 4 89 90 91 92 6/27/2023 PC-1 3.70 3.70 1.50 C-25 2.25 0.5
24 GRID-29 FP 0.8 4 93 94 95 96 6/24/2023 6/29/2023 PC-1 3.70 3.70 1.50 C-26 2.25 0.5
25 GRID-29 FP 0.8 4 97 98 99 100 6/29/2023 6/23/2023 7/6/2023 6/27/2023 PC-1 3.70 3.70 1.50 C-27 2.25 0.5
26 GRID-29 FP 0.8 4 101 102 103 104 7/1/2023 7/2/2023 7/5/2023 7/7/2023 PC-1 3.70 3.70 1.50 C-28 2.25 0.5
27 GRID-29 FP 0.8 4 105 106 107 108 7/1/2023 7/9/2023 7/11/2023 7/12/2023 PC-1 3.70 3.70 1.50 C-29 2.25 0.5
28 C-32 2.25 0.5
GRID-30 & 31 FP 1.0 6 109 110 111 112 113 114 8/6/2023 8/2/2023 8/1/2023 7/30/2023 7/4/2023 8/31/2023 PC-4 6.60 4.00 1.50 11/25/2023
29 C-45 2.25 0.5
30 C-33 2.25 0.5
GRID-30 & 31 FP 0.8 6 115 116 117 118 119 120 7/15/2023 7/20/2023 7/21/2023 7/14/2023 7/16/2023 7/18/2023 PC-3 6.30 3.70 1.50 12/13/2023 12/8/2023 12/21/2023
31 C-44 2.25 0.5
32 C-34 2.25 0.5
GRID-30 & 31 FP 0.8 6 121 122 123 124 125 126 7/19/2023 7/21/2023 7/15/2023 7/23/2023 7/25/2023 7/16/2023 PC-3 6.30 3.70 1.50 12/13/2023 12/8/2023 12/23/2023
33 C-43 2.25 0.5
34 C-35 2.25 0.5
GRID-30 & 31 FP 0.8 6 127 128 129 130 131 132 7/21/2023 7/19/2023 7/16/2023 7/22/2023 7/17/2023 7/18/2023 PC-3 6.30 3.70 1.50 12/13/2023 12/6/2023
35 C-42 2.25 0.5
36 C-36 2.5 0.6
GRID-30 & 31 FP 0.8 6 133 134 135 136 137 138 8/27/2023 7/20/2023 8/26/2023 7/18/2023 PC-2 6.30 3.70 1.50
37 C-41 2.5 0.6
38 C-37 2.5 0.6
GRID-30 & 31 FP 0.8 6 139 140 141 142 143 144 8/27/2023 8/29/2023 PC-2 6.30 3.70 1.50
39 C-40 2.5 0.6
40 C-38 2.5 0.6
GRID-30 & 31 FP 0.8 6 145 146 147 148 149 150 PC-2 6.30 3.70 1.50
41 C-39 2.5 0.6
42 GRID-32 FP 0.8 4 175 176 177 178 6/28/2023 6/25/2023 7/3/2023 6/30/2023 PC-5 3.70 3.70 1.50 C-48 2.5 0.6
43 GRID-32 FP 0.8 4 171 172 173 174 7/4/2023 7/5/2023 7/7/2023 7/6/2023 PC-1 3.70 3.70 1.50 11/25/2023 12/8/2023 12/19/2023 C-49 2.25 0.5 12/27/2023
44 GRID-32 FP 0.8 4 167 168 169 170 7/14/2023 7/15/2023 7/17/2023 7/13/2023 PC-1 3.70 3.70 1.50 11/22/2023 11/18/2023 11/29/2023 C-50 2.25 0.5 12/5/2023 12/25/2023
45 GRID-32 FP 0.8 4 163 164 165 166 7/1/2023 7/3/2023 7/4/2023 7/6/2023 PC-1 3.70 3.70 1.50 11/4/2023 11/4/2023 11/16/2023 C-51 2.25 0.5 12/4/2023 12/20/2023
46 GRID-32 FP 0.8 4 159 160 161 162 7/2/2023 7/4/2023 7/5/2023 7/7/2023 PC-1 3.70 3.70 1.50 11/22/2023 11/18/2023 11/28/2023 C-52 2.25 0.5 12/4/2023 12/25/2023
47 GRID-32 FP 0.8 4 155 156 157 158 7/30/2023 7/31/2023 7/27/2023 7/27/2023 PC-1 3.70 3.70 1.50 10/18/2023 10/14/2023 10/27/2023 C-53 2.25 0.5 11/10/2023 12/25/2023
48 GRID-32 FP 0.8 4 151 152 153 154 8/1/2023 9/2/2023 8/29/2023 8/29/2023 PC-5 3.70 3.70 1.50 11/25/2023 11/19/2023 11/27/2023 C-54 2.5 0.6 12/6/2023
49 GRID-33 FP 1.0 4 199 200 201 202 8/25/2023 8/26/2023 8/19/2023 8/24/2023 PC-6 4.00 4.00 1.50 9/20/2023 9/15/2023 10/18/2023 C-55 2.5 0.8 12/5/2023
50 GRID-33 FP 0.8 4 195 196 197 198 7/9/2023 7/11/2023 7/13/2023 7/8/2023 PC-1 3.70 3.70 1.50 12/13/2023 11/30/2023 12/20/2023 C-56 2.25 0.5 12/27/2023
51 GRID-33 FP 0.8 4 191 192 193 194 7/12/2023 7/8/2023 7/10/2023 7/14/2023 PC-1 3.70 3.70 1.50 10/18/2023 10/19/2023 10/25/2023 C-57 2.25 0.5 11/10/2023 12/20/2023
52 GRID-33 FP 0.8 4 187 188 189 190 7/13/2023 7/10/2023 7/12/2023 7/8/2023 PC-1 3.70 3.70 1.50 11/4/2023 11/4/2023 11/15/2023 C-58 2.25 0.5 11/18/2023 12/20/2023
53 GRID-33 FP 0.8 4 183 184 185 186 7/11/2023 7/13/2023 7/15/2023 7/8/2023 PC-1 3.70 3.70 1.50 C-59 2.25 0.5
54 GRID-33 FP 0.8 4 179 180 181 182 7/21/2023 7/20/2023 9/4/2023 9/5/2023 PC-1 3.70 3.70 1.50 C-60 2.25 0.5
55 GRID-34 FP 0.8 4 219 220 221 222 7/17/2023 7/23/2023 9/5/2023 9/6/2023 PC-1 3.70 3.70 1.50 C-63 2.25 0.5
56 GRID-34 FP 0.8 4 215 216 217 218 7/24/2023 7/26/2023 7/22/2023 7/19/2023 PC-1 3.70 3.70 1.50 10/18/2023 10/14/2023 10/22/2023 C-64 2.25 0.5 11/14/2023 12/12/2023
57 GRID-34 FP 0.8 4 211 212 213 214 7/29/2023 7/26/2023 7/28/2023 7/27/2023 PC-1 3.70 3.70 1.50 10/18/2023 10/14/2023 10/25/2023 C-65 2.25 0.5 11/14/2023 12/12/2023
58 GRID-34 FP 0.8 4 207 208 209 210 7/31/2023 8/2/2023 8/3/2023 7/31/2023 PC-1 3.70 3.70 1.50 11/4/2023 11/2/2023 11/14/2023 C-66 2.25 0.5 11/18/2023 12/12/2023
59 GRID-34 FP 0.8 4 203 204 205 206 8/12/2023 8/13/2023 8/5/2023 8/10/2023 PC-5 3.70 3.70 1.50 9/20/2023 9/9/2023 10/16/2023 C-67 2.5 0.6 11/10/2023
60 C-68 2.5 0.7 11/4/2023 12/25/2023
GRID-35 & 36 FP 1.0 6 235 236 237 238 239 240 8/22/2023 8/18/2023 8/15/2023 8/12/2023 8/11/2023 8/10/2023 PC-7 6.60 4.00 1.50 10/18/2023 9/22/2023 10/21/2023
61 C-75 2.5 0.7 11/3/2023 12/28/2023
62 C-69 2.5 0.7
GRID-35 & 36 FP 1.0 6 229 230 231 232 233 234 8/8/2023 8/6/2023 8/2/2023 8/5/2023 8/3/2023 8/1/2023 PC-7 6.60 4.00 1.50 11/4/2023 10/30/2023 11/10/2023
26
Piling Details Pile Cap Details Column Details 01/29/2024
Type Dia of No. of Pile Code (PL) Pile DOC Pile Pile Cap Size in "m" PIT PCC Pile Cap Column Column Size in "m" Starter Column DOC
Sl. No. GRID No.
of Pile Pile Piles P1 P2 P3 P4 P5 P6 P1 P2 P3 P4 P5 P6 Code L W D DOT DOC DOC Code L W D DOC 1st Lift 2nd Lift 3rd Lift
GRID-35 & 36 FP 1.0 6 229 230 231 232 233 234 8/8/2023 8/6/2023 8/2/2023 8/5/2023 8/3/2023 8/1/2023 PC-7 6.60 4.00 1.50 11/4/2023 10/30/2023 11/10/2023
63 C-74 2.5 0.7 12/27/2023
64 C-70 2.5 0.6 11/18/2023
GRID-35 & 36 FP 1.0 6 223 224 225 226 227 228 7/27/2023 7/30/2023 7/25/2023 7/26/2023 7/29/2023 7/22/2023 PC-8 6.60 4.00 1.50 10/18/2023 10/19/2023 10/29/2023
65 C-73 2.5 0.6
66 GRID-37 FP 1.0 4 241 242 243 244 8/17/2023 8/23/2023 8/7/2023 8/13/2023 PC-9 4.00 4.00 1.50 9/20/2023 9/15/2023 10/14/2023 C-76 2.5 0.8 10/31/2023
67 GRID-37 FP 1.0 4 245 246 247 248 7/28/2023 7/31/2023 7/26/2023 7/25/2023 PC-9 4.00 4.00 1.50 11/22/2023 11/18/2023 12/1/2023 C-77 2.5 0.8
68 GRID-38 FP 1.0 4 249 250 251 252 8/26/2023 8/17/2023 8/24/2023 7/23/2023 PC-9 4.00 4.00 1.50 11/4/2023 10/27/2023 11/9/2023 C-80 2.5 0.8
69 GRID-38 FP 0.8 4 253 254 255 256 8/11/2023 8/12/2023 8/7/2023 8/9/2023 PC-1 3.70 3.70 1.50 9/20/2023 9/12/2023 10/18/2023 C-81 2.25 0.5 11/3/2023 12/28/2023
70 GRID-39 FP 0.8 4 257 258 259 260 8/20/2023 8/22/2023 8/9/2023 8/11/2023 PC-1 3.70 3.70 1.50 9/20/2023 9/6/2023 10/15/2023 C-82 2.25 0.5 10/31/2023 12/28/2023
71 GRID-39 FP 1.0 4 261 262 263 264 8/3/2023 8/4/2023 8/14/2023 8/12/2023 PC-9 4.00 4.00 1.50 11/4/2023 10/26/2023 11/11/2023 C-83 2.5 0.8
72 GRID-40 FP 0.8 4 265 266 267 268 8/1/2023 8/5/2023 8/3/2023 8/8/2023 PC-1 3.70 3.70 1.50 C-86 2.25 0.5
73 GRID-40 FP 0.8 4 269 270 271 272 8/19/2023 8/14/2023 8/9/2023 8/11/2023 PC-1 3.70 3.70 1.50 9/20/2023 9/4/2023 10/12/2023 C-87 2.25 0.5 10/28/2023 12/28/2023
74 GRID-41 FP 0.8 4 273 274 275 276 8/16/2023 8/18/2023 8/11/2023 8/13/2023 PC-1 3.70 3.70 1.50 9/20/2023 9/4/2023 10/14/2023 C-88 2.25 0.5 10/28/2023
75 GRID-41 FP 0.8 4 277 278 279 280 8/2/2023 8/4/2023 8/5/2023 8/8/2023 PC-1 3.70 3.70 1.50 C-89 2.25 0.5
76 GRID-42 FP 0.8 4 285 286 287 288 8/30/2023 8/10/2023 8/4/2023 8/9/2023 PC-1 3.70 3.70 1.50 C-92 2.25 0.5
77 GRID-42 FP 0.8 4 289 290 291 292 8/22/2023 8/19/2023 8/13/2023 8/17/2023 PC-1 3.70 3.70 1.50 9/20/2023 9/2/2023 10/19/2023 C-93 2.25 0.5 11/4/2023
78 GRID-43 FP 0.8 4 293 294 295 296 8/21/2023 8/25/2023 8/23/2023 8/28/2023 PC-1 3.70 3.70 1.50 9/20/2023 8/31/2023 10/13/2023 C-94 2.25 0.5 10/31/2023
79 GRID-43 FP 0.8 4 297 298 299 300 8/24/2023 8/20/2023 8/18/2023 8/23/2023 PC-1 3.70 3.70 1.50 C-95 2.25 0.5
80 GRID-27 FP 1.0 305 306 307 308 309 310 C-10 2.25 0.5
81 GRID-28 FP 1.0 18 311 312 313 314 315 316 C-11 2.25 0.5
82 GRID-29 FP 1.0 317 318 319 320 321 322 C-30 2.25 0.5
83 GRID-30 & 31 FP 1.0 323 324 325 326 327 328 C-31 2.25 0.5
8 PC-10-A
84 GRID-30 & 31 FP 1.0 329 330 C-46 2.25 0.5
85 GRID-32 FP 1.0 331 332 333 334 335 336 C-47 2.5 0.6
86 GRID-34 FP 1.0 16 337 338 339 340 341 342 PC-11 C-61 2.5 0.6
87 GRID-34 FP 1.0 343 344 345 346 C-62 2.5 0.6
88 GRID-35 & 36 FP 1.0 347 348 349 350 351 352 C-71 2.5 0.8
8 PC-11-A
89 GRID-35 & 36 FP 1.0 353 354 C-72 2.5 0.8
90 GRID-37 FP 1.0 355 356 357 358 359 360 C-78 2.5 1
91 GRID-38 FP 1.0 361 362 363 364 365 366 C-79 2.5 0.7
92 GRID-39 FP 1.0 367 368 369 370 371 372 C-84 2.25 0.5
93 GRID-40 FP 1.0 34 373 374 375 376 377 378 PC-12 C-85 2.25 0.5
94 GRID-41 FP 1.0 379 380 381 382 383 384 C-90 2.25 0.5
95 GRID-42 FP 1.0 385 386 387 388 C-91 2.25 0.5
96 GRID-43 C-96 2.25 0.5
27
01/29/2024
WORK DONE STATEMENT OF ENTRY DECK STRUCTURE (EDS)-02
Piling Details Pile Cap Details Column Details
Type Dia of No. of Pile Code (PL) Pile DOC As Built Pile Pile Cap Size in "m" PIT PCC Pile Cap Column Column Size in "m" Starter Column DOC
Sl. No. GRID No. As Built Drawing As Built Drawing
of Pile Pile Piles P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 Drawing Code L W D DOT DOC DOC Code L W D DOC 1st Lift 2nd Lift 3rd Lift
1 C-200
Grid-26 FP 1.0 10 600 601 602 603 604 605 606 607 608 609 - - - - - PC-50
2 C-201
3 Grid-26 FP 1.0 4 666 667 668 669 - - - - - - - - - - - PC-57 4.00 4.00 1.50 C-214
4 C-220
Grid-26 FP 1.0 10 690 691 692 693 694 695 696 697 698 699 - - - - - PC-64
5 C-221
6 C-202
Grid-27 FP 1.0 10 610 611 612 613 614 615 616 617 618 619 - - - - - PC-51
7 C-203
8 Grid-27 FP 1.0 4 670 671 672 673 - - - - - - - - - - - PC-58 4.00 4.00 1.50 C-215
9 C-222
Grid-27 FP 1.0 10 700 701 702 703 704 705 706 707 708 709 - - - - - PC-65
10 C-223
11 C-204
Grid-28 FP 1.0 10 620 621 622 623 624 625 626 627 628 629 - - - - - PC-52
12 C-205
13 Grid-28 FP 1.0 4 674 675 676 677 - - - - - - - - - - - PC-59 4.00 4.00 1.50 C-216
14 C-224
Grid-28 FP 1.0 10 710 711 712 713 714 715 716 717 718 719 - - - - - PC-66
15 C-225
16 C-206
17 C-207
Grid-29 & 30 FP 1.0 12 630 631 632 633 634 635 636 637 638 639 640 641 - - - PC-53
18 C-208
19 C-209
20 C-217
Grid-29 & 30 FP 1.0 6 678 679 680 681 682 683 - - - - - - - - - PC-60
21 C-218
22 C-226
23 C-227
Grid-29 & 30 FP 1.0 15 720 721 722 723 724 725 726 727 728 729 730 731 732 733 734 PC-67
24 C-228
25 C-229
26 Grid-31 FP 1.0 6 642 643 644 645 646 647 - - - - - - - - - PC-54 C-210
27 Grid-31 FP 1.0 6 684 685 686 687 688 689 - - - - - - - - - PC-61 C-219
28 C-230
Grid-31 FP 1.0 10 735 736 737 738 739 740 741 742 743 744 - - - - - PC-68
29 C-231
30 C-211
Grid-32 FP 1.0 10 648 649 650 651 652 653 654 655 656 657 - - - - - PC-62
31 C-212
32 C-232
Grid-32 FP 1.0 10 645 646 647 648 649 650 651 652 653 654 - - - - - PC69
33 C-233
34 C-213
Grid-33 FP 1.0 8 658 659 660 661 662 663 664 665 - - - - - PC-63
35 C-214
36 C-234
Grid-33 FP 1.0 10 655 656 657 658 659 660 661 662 663 664 - - - - - PC-70
37 C-235
38 C-41
Grid-34 & 35 FP 0.8 6 103 104 105 106 107 108 - - - - - - - - - PC-5
39 C-47
40 C-42
Grid-34 & 35 FP 0.8 6 97 98 99 100 101 102 - - - - - - - - - PC-5
41 C-46
42 C-43
Grid-34 & 35 FP 1.0 6 91 92 93 94 95 96 - - - - - - - - - PC-6
43 C-45
44 Grid-36 FP 0.8 4 109 110 111 112 - - - - - - - - - - - PC-07 4.00 4.00 1.50 C-50
45 Grid-36 FP 0.8 4 113 114 115 116 - - - - - - - - - - - PC-07 4.00 4.00 1.50 C-51
46 Grid-36 FP 1.0 4 117 118 119 120 - - - - - - - - - - - PC-08 4.00 4.00 1.50 C-52
47 Grid-37 FP 0.8 4 125 126 127 128 - - - - - - - - - - - PC-07 4.00 4.00 1.50 C-54
48 Grid-37 FP 1.0 4 121 122 123 124 - - - - - - - - - - - PC-07 4.00 4.00 1.50 C-53
49 Grid-38 FP 0.8 4 129 130 131 132 - - - - - - - - - - - PC-07 4.00 4.00 1.50 C-57
50 Grid-38 FP 1.0 4 133 134 135 136 - - - - - - - - - - - PC-08 4.00 4.00 1.50 C-58
51 Grid-39 FP 0.8 4 141 142 143 144 - - - - - - - - - - - PC-07 4.00 4.00 1.50 C-60
52 Grid-39 FP 1.0 4 137 138 139 140 - - - - - - - - - - - PC-08 4.00 4.00 1.50 C-59
53 C-63
Grid-40 & 41 FP 1.0 6 145 146 147 148 149 150 - - - - - - - - - PC-06
54 C-64
55 Grid-42 FP 1.0 4 151 152 153 154 - - - - - - - - - - - PC-08 4.00 4.00 1.50 C-67
56 Grid-43 FP 1.0 4 155 156 157 158 - - - - - - - - - - - PC-08 4.00 4.00 1.50 C-68
57 Grid-44 FP 1.0 4 159 160 161 162 - - - - - - - - - - - 12/11/2023 12/13/2023 12/2/2023 12/8/2023 PC-08 4.00 4.00 1.50 C-71
58 Grid-45 FP 1.0 4 163 164 165 166 - - - - - - - - - - - 12/7/2023 12/9/2023 12/1/2023 12/5/2023 PC-08 4.00 4.00 1.50 C-72
59 C-74
Grid-46 & 47 FP 1.0 6 167 168 169 170 171 172 - - - - - - - - - 12/12/2023 12/14/2023 12/16/2023 12/3/2023 12/19/2023 12/21/2023 PC-09
60 C-76
61 Grid-48 FP 1.0 4 173 174 175 176 - - - - - - - - - - - 12/18/2023 12/20/2023 12/23/2023 12/25/2023 PC-10 4.00 4.00 1.50 C-79
62 Grid-49 FP 1.0 4 177 178 179 180 - - - - - - - - - - - 12/15/2023 12/22/2023 12/27/2023 12/29/2023 PC-10 4.00 4.00 1.50 C-80
63 Grid-50 FP 1.0 4 181 182 183 184 - - - - - - - - - - - 12/26/2023 12/28/2023 PC-10 4.00 4.00 1.50 C-83
64 Grid-51 FP 1.0 4 185 186 187 188 - - - - - - - - - - - PC-10 4.00 4.00 1.50 C-84
65 C-87
Grid-52 & 53 FP 1.0 6 189 190 191 192 193 194 - - - - - - - - - PC-11
66 C-88
269 269 24 42 0 0 0 66 0 0 0 0
189 189 0 0 0 0 0 0 0 0 0 0 0 0 0
28
Name of Work-Construction and Remodeling Of Existing Baiyappanahalli Depot for Bangalore Metro Rail
Project, Phase-2A
DPR Date: 29/Dec/23
Sl No. Work Activity
1 EDS-2, PL-180 Casted. -
2 SBL-2, Excavation in Progress
3 SBL-2, D-Wall 69 Casted
KEY PLAN
Y PLAN
KEY PLAN
Progress Photos
Work Location EDS-02 Work Location EDS-2 Work Location SBL-2 Work Location SBL-2
Description TBT Work Activity PL-182 Casted Work Activity Excavation Work in Progress Work Activity D-Wall 61
15
14
13
12
11
10
Sr. no.
JCB
PTR
Paver
Grader
Bowser
Dumper
Excavator
Crane/hydra
Boom placer
Hydraulic Rig
Transit mixer
Water tanker
Tandum roller
Batching Plant
Soil compactor
Resource List
Total
Machineries
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Unit
1
4
2
0
7
0
1
0
0
1
0
0
5
3
2
25
Resource/Machinery List
For the Day
1/Apr/23 Saturday
2/Apr/23 Sunday
3/Apr/23 Monday
1
4/Apr/23 Tuesday
1
5/Apr/23 Wednesday
1
6/Apr/23 Thursday
1
7/Apr/23 Friday
1
8/Apr/23 Saturday
1
9/Apr/23 Sunday
1
10/Apr/23 Monday
1
11/Apr/23 Tuesday
1
12/Apr/23 Wednesday
1
13/Apr/23 Thursday
1
14/Apr/23 Friday
1
15/Apr/23 Saturday
1
16/Apr/23 Sunday
1
17/Apr/23 Monday
1
18/Apr/23 Tuesday
1
19/Apr/23 Wednesday
1
20/Apr/23 Thursday
1
21/Apr/23 Friday
1
22/Apr/23 Saturday
23/Apr/23 Sunday
1
24/Apr/23 Monday
1
25/Apr/23 Tuesday
1
26/Apr/23 Wednesday
1
27/Apr/23 Thursday
1
28/Apr/23 Friday
2
1
29/Apr/23 Saturday
2
1
1
30/Apr/23 Sunday
1/May/23 Monday
2
1
1
2/May/23 Tuesday
2
1
1
3/May/23 Wednesday
3
1
1
4/May/23 Thursday
3
1
1
5/May/23 Friday
3
1
1
6/May/23 Saturday
1
3
1
1
7/May/23 Sunday
1
3
1
1
8/May/23 Monday
1
3
1
1
9/May/23 Tuesday
1
3
1
1
10/May/23 Wednesday
1
3
1
1
11/May/23 Thursday
1
3
1
1
12/May/23 Friday
1
3
1
1
13/May/23 Saturday
1
0
1
0
14/May/23 Sunday
1
3
1
1
15/May/23 Monday
1
3
1
1
16/May/23 Tuesday
1
3
1
1
17/May/23 Wednesday
1
3
1
1
18/May/23 Thursday
1
3
1
1
19/May/23 Friday
1
3
1
1
20/May/23 Saturday
1
3
1
1
21/May/23 Sunday
1
3
1
1
22/May/23 Monday
0
3
1
1
23/May/23 Tuesday
0
3
1
1
24/May/23 Wednesday
0
3
1
1
25/May/23 Thursday
0
3
1
1
26/May/23 Friday
0
3
1
1
27/May/23 Saturday
0
0
1
0
28/May/23 Sunday
0
3
1
1
29/May/23 Monday
0
3
1
1
30/May/23 Tuesday
0
3
1
1
31/May/23 Wednesday
0
3
1
1
1/Jun/23 Thursday
0
3
1
1
2/Jun/23 Friday
0
3
1
1
3/Jun/23 Saturday
0
1
1
3
1
1
4/Jun/23 Sunday
0
1
1
3
1
1
5/Jun/23 Monday
1
1
1
1
3
1
1
6/Jun/23 Tuesday
0
1
1
1
5
1
1
7/Jun/23 Wednesday
0
1
1
1
5
1
1
8/Jun/23 Thursday
0
1
1
1
5
1
1 9/Jun/23 Friday
0
1
1
1
6
1
1
10/Jun/23 Saturday
0
1
1
11/Jun/23 Sunday
0
1
1
12/Jun/23 Monday
1
1
1
13/Jun/23 Tuesday
1
1
1
14/Jun/23 Wednesday
1
1
1
15/Jun/23 Thursday
2
1
1
1
16/Jun/23 Friday
2
1
1
1
17/Jun/23 Saturday
2
1
1
1
2 18/Jun/23 Sunday
1
1
1
19/Jun/23 Monday
2
1
1
1
20/Jun/23 Tuesday
2
1
1
1
21/Jun/23 Wednesday
3
1
1
1
22/Jun/23 Thursday
2
1
1
1
23/Jun/23 Friday
3
1
1
1
24/Jun/23 Saturday
3
1
1
1
25/Jun/23 Sunday
3
1
1
1
26/Jun/23 Monday
3
1
1
1
27/Jun/23 Tuesday
3
1
1
1
28/Jun/23 Wednesday
3
1
1
1
29/Jun/23 Thursday
3
1
1
1
30/Jun/23 Friday
1
3
1
1
1
1/Jul/23 Saturday
1
3
1
2
1
1
2/Jul/23 Sunday
1
3
1
2
1
1
3/Jul/23 Monday
1
3
1
2
1
1
4/Jul/23 Tuesday
1
3
1
2
1
1
5/Jul/23 Wednesday
1
3
1
2
1
1
6/Jul/23 Thursday
1
3
1
2
1
1
7/Jul/23 Friday
1
3
1
2
1
1
8/Jul/23 Saturday
1
3
1
2
1
1
9/Jul/23 Sunday
1
3
1
2
1
1
10/Jul/23 Monday
1
3
1
2
1
1
11/Jul/23 Tuesday
1
3
1
2
1
1
12/Jul/23 Wednesday
1
3
1
2
1
1
13/Jul/23 Thursday
1
3
1
2
1
1
14/Jul/23 Friday
1
3
1
2
1
1
15/Jul/23 Saturday
1
3
1
2
1
1
16/Jul/23 Sunday
1
3
1
2
1
1
17/Jul/23 Monday
1
3
1
2
1
1
18/Jul/23 Tuesday
1
3
1
2
1
1
19/Jul/23 Wednesday
1
3
1
2
1
1
20/Jul/23 Thursday
1
3
1
2
1
1
21/Jul/23 Friday
1
3
1
2
1
1
22/Jul/23 Saturday
1
3
1
2
1
1
23/Jul/23 Sunday
1
3
2
2
1
1
24/Jul/23 Monday
1
3
2
2
1
1
25/Jul/23 Tuesday
1
3
2
2
1
1
26/Jul/23 Wednesday
1
3
2
2
1
1
27/Jul/23 Thursday
1
3
2
2
1
1
28/Jul/23 Friday
1
3
2
2
1
1
29/Jul/23 Saturday
1
3
2
2
1
1
30/Jul/23 Sunday
1
3
2
2
1
1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Monday
11 11 11 11 10 10 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14
31/Jul/23
1
3
2
2
1
1
0
3
2
2
1/Aug/23 Tuesday
1
3
2
3
1
1
0
3
2
1
2/Aug/23 Wednesday
1
3
2
3
0
1
0
3
2
1
3/Aug/23 Thursday
1
2
2
3
0
1
0
3
2
1
4/Aug/23 Friday
1
2
2
3
0
1
0
3
2
1
5/Aug/23 Saturday
1
2
2
3
0
1
0
3
2
1
6/Aug/23 Sunday
1
2
2
3
0
1
0
3
2
1
7/Aug/23 Monday
1
2
2
3
0
1
0
3
2
1
8/Aug/23 Tuesday
1
2
2
3
0
1
0
3
2
1
9/Aug/23 Wednesday
1
4
2
3
0
1
0
3
2
2
10/Aug/23 Thursday
1
4
2
3
0
1
0
3
2
2
11/Aug/23 Friday
1
4
2
3
0
1
0
3
2
2
12/Aug/23 Saturday
1
4
2
3
0
1
0
3
2
2
13/Aug/23 Sunday
1
4
2
3
0
1
0
3
2
2
14/Aug/23 Monday
15/Aug/23 Tuesday
1
4
2
3
0
1
0
3
2
2
16/Aug/23 Wednesday
1
4
2
3
0
1
0
3
2
2
17/Aug/23 Thursday
1
4
2
3
0
1
0
3
2
2
18/Aug/23 Friday
1
4
2
3
0
1
0
3
2
2
19/Aug/23 Saturday
1
3
2
3
0
1
0
1
1
2
20/Aug/23 Sunday
1
4
2
3
0
1
0
3
2
2
21/Aug/23 Monday
1
4
2
3
0
1
0
3
2
2
22/Aug/23 Tuesday
1
4
2
3
0
1
0
3
2
2
23/Aug/23 Wednesday
1
4
2
3
0
1
0
3
2
2
24/Aug/23 Thursday
1
4
2
3
0
1
0
3
2
2
25/Aug/23 Friday
1
5
2
3
0
1
0
3
2
2 26/Aug/23 Saturday
1
5
2
3
0
1
0
3
2
2
27/Aug/23 Sunday
1
5
2
3
0
1
0
3
2
2
28/Aug/23 Monday
1
5
2
5
0
1
0
3
2
3
29/Aug/23 Tuesday
1
5
2
5
0
1
0
3
2
3
30/Aug/23 Wednesday
1
5
2
5
0
1
0
3
2
3
31/Aug/23 Thursday
1
5
2
5
0
1
0
3
2
3
1/Sep/23 Friday
1
5
2
5
0
1
0
3
2
3
2/Sep/23 Saturday
1
5
2
5
0
1
0
3
2
3
3/Sep/23 Sunday
1
5
2
5
0
1
0
3
2
3
4/Sep/23 Monday
1
5
2
5
1
1
0
3
2
3
5/Sep/23 Tuesday
1
5
2
5
1
1
0
3
2
3
6/Sep/23 Wednesday
1
5
2
5
1
1
0
3
2
3
7/Sep/23 Thursday
1
5
2
5
1
1
0
3
2
3
8/Sep/23 Friday
1
5
2
5
1
1
0
3
2
3
9/Sep/23 Saturday
1
5
2
5
1
1
0
3
2
3
10/Sep/23 Sunday
1
5
2
5
0
1
0
3
2
3
11/Sep/23 Monday
1
5
2
5
0
1
0
3
2
3
12/Sep/23 Tuesday
1
5
2
5
0
1
0
3
2
3
13/Sep/23 Wednesday
1
5
1
5
0
1
0
3
2
3
14/Sep/23 Thursday
1
5
1
5
0
1
0
3
2
3
15/Sep/23 Friday
1
5
1
5
0
1
0
3
2
3
16/Sep/23 Saturday
1
5
1
5
0
1
0
3
2
3
17/Sep/23 Sunday
1
5
1
5
0
1
0
3
2
3
18/Sep/23 Monday
1
5
1
5
0
1
0
3
2
3
19/Sep/23 Tuesday
1
3
1
5
0
1
0
3
2
2
20/Sep/23 Wednesday
1
3
1
5
0
1
0
3
2
2
21/Sep/23 Thursday
1
3
1
5
0
1
0
5
2
2
22/Sep/23 Friday
1
3
1
5
0
1
0
5
2
2
23/Sep/23 Saturday
1
3
1
5
0
1
0
5
2
2
24/Sep/23 Sunday
1
3
1
5
0
1
0
5
2
2
25/Sep/23 Monday
1
3
1
5
0
1
0
5
2
2
26/Sep/23 Tuesday
1
3
1
5
0
1
0
5
2
2
27/Sep/23 Wednesday
1
3
1
5
0
1
0
5
2
2
28/Sep/23 Thursday
1
3
1
5
0
1
0
5
2
2
29/Sep/23 Friday
1
3
1
5
0
1
0
5
2
2
30/Sep/23 Saturday
1
3
1
5
0
1
0
5
2
2
1/Oct/23 Sunday
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2/Oct/23 Monday
1
3
0
5
0
1
0
5
2
2
3/Oct/23 Tuesday
1
4
0
5
0
1
0
5
2
2
4/Oct/23 Wednesday
1
4
0
5
0
1
0
5
2
2
5/Oct/23 Thursday
1
4
0
5
0
1
0
5
2
2
6/Oct/23 Friday
1
4
0
5
0
1
0
5
2
2
7/Oct/23 Saturday
1
4
0
5
0
1
0
5
2
2
8/Oct/23 Sunday
1
4
0
5
0
1
0
5
2
2
9/Oct/23 Monday
1
4
0
5
0
1
0
5
2
2
10/Oct/23 Tuesday
1
4
0
5
0
1
0
5
2
2
11/Oct/23 Wednesday
1
4
0
5
0
1
0
5
2
2
12/Oct/23 Thursday
1
4
0
5
0
1
0
5
2
2
13/Oct/23 Friday
1
4
0
5
0
1
0
5
2
2
14/Oct/23 Saturday
1
4
0
5
0
1
0
5
2
2
15/Oct/23 Sunday
1
5
0
5
0
1
0
5
2
2
16/Oct/23 Monday
1
5
0
5
0
1
0
5
2
2
17/Oct/23 Tuesday
1
5
0
5
0
1
0
5
2
2
18/Oct/23 Wednesday
1
5
0
5
0
1
0
5
2
2
19/Oct/23 Thursday
1
5
0
5
0
1
0
5
2
2
20/Oct/23 Friday
1
5
0
5
0
1
0
5
2
2
21/Oct/23 Saturday
1
5
0
5
0
1
0
5
2
2
22/Oct/23 Sunday
1
5
0
5
0
1
0
5
2
2
23/Oct/23 Monday
25/Oct/23 Wednesday
1
5
0
5
0
1
0
5
2
2
26/Oct/23 Thursday
1
5
0
5
0
1
1
5
2
2
27/Oct/23 Friday
1
5
0
5
0
1
1
5
2
2
28/Oct/23 Saturday
1
5
0
5
0
1
1
5
2
2
29/Oct/23 Sunday
1
5
0
5
0
1
1
5
2
2
30/Oct/23 Monday
1
5
0
5
0
1
1
5
2
2
31/Oct/23 Tuesday
2/Nov/23 Thursday
1
5
0
5
0
1
1
5
2
2
3/Nov/23 Friday
1
5
0
5
0
1
1
5
2
2
4/Nov/23 Saturday
1
5
0
5
0
1
1
5
2
2
5/Nov/23 Sunday
1
5
0
5
0
1
1
5
2
2
6/Nov/23 Monday
1
5
0
5
0
1
1
5
2
2
7/Nov/23 Tuesday
1
5
0
5
0
1
1
5
2
2
8/Nov/23 Wednesday
1
5
0
5
0
1
1
5
2
2
9/Nov/23 Thursday
1
5
0
5
0
1
1
5
2
2
10/Nov/23 Friday
1
5
0
5
0
1
1
5
2
2
11/Nov/23 Saturday
Holiday 12/Nov/23 Sunday
1
5
0
5
0
1
1
5
2
2
13/Nov/23 Monday
1
5
0
5
0
1
5
2
2
14/Nov/23 Tuesday
1
5
0
5
0
1
5
2
2
15/Nov/23 Wednesday
1
5
0
5
0
1
5
2
2
16/Nov/23 Thursday
1
5
0
5
0
1
5
2
2
17/Nov/23 Friday
1
6
2
7
1
1
5
3
2
18/Nov/23 Saturday
1
6
2
7
1
1
5
3
2
19/Nov/23 Sunday
1
6
2
7
1
1
5
3
2
20/Nov/23 Monday
1
6
3
7
1
1
5
3
2
21/Nov/23 Tuesday
1
6
3
7
1
1
5
3
2
22/Nov/23 Wednesday
1
6
3
7
1
1
5
3
2
23/Nov/23 Thursday
1
6
3
7
1
1
5
3
2
24/Nov/23 Friday
1
6
3
7
1
1
5
3
2
25/Nov/23 Saturday
1
6
3
7
1
1
5
3
2
26/Nov/23 Sunday
1
6
3
7
1
1
5
3
2
27/Nov/23 Monday
1
6
3
7
1
1
5
3
2
28/Nov/23 Tuesday
1
6
3
7
1
1
5
3
2
29/Nov/23 Wednesday
1
6
3
7
1
1
5
3
2
30/Nov/23 Thursday
1
6
3
7
1
1
5
3
2
1/Dec/23 Friday
1
6
3
7
1
1
5
3
2
2/Dec/23 Saturday
1
6
3
7
1
1
5
3
2
3/Dec/23 Sunday
1
6
3
7
1
1
5
3
2
4/Dec/23 Monday
1
6
3
7
1
1
5
3
2
5/Dec/23 Tuesday
1
6
3
7
1
1
5
3
2
6/Dec/23 Wednesday
1
6
3
7
1
1
5
3
2
7/Dec/23 Thursday
1
6
3
7
1
1
5
3
2
8/Dec/23 Friday
1
6
3
7
1
1
5
3
2
9/Dec/23 Saturday
1
6
3
7
1
1
5
3
2
10/Dec/23 Sunday
1
6
3
7
1
1
5
3
2
11/Dec/23 Monday
1
6
3
7
1
1
5
3
2
12/Dec/23 Tuesday
1
6
3
7
1
1
5
3
2
13/Dec/23 Wednesday
1
6
3
7
1
1
5
3
2
14/Dec/23 Thursday
1
6
3
7
1
1
5
3
2
15/Dec/23 Friday
1
6
3
7
1
1
5
3
2
16/Dec/23 Saturday
1
6
3
7
1
1
5
3
2
17/Dec/23 Sunday
1
6
3
7
1
1
5
3
2
18/Dec/23 Monday
1
6
3
7
1
1
5
3
2
19/Dec/23 Tuesday
1
6
3
7
1
1
5
3
2
20/Dec/23 Wednesday
1
6
3
7
1
1
5
3
2
21/Dec/23 Thursday
1
4
2
7
1
1
5
3
2
22/Dec/23 Friday
1
4
2
7
1
1
5
3
2
23/Dec/23 Saturday
1
4
2
7
1
1
5
3
2
24/Dec/23 Sunday
1
4
2
7
1
1
5
3
2
25/Dec/23 Monday
1
4
2
7
1
1
5
3
2
26/Dec/23 Tuesday
1
4
2
7
1
1
5
3
2
27/Dec/23 Wednesday
1
4
2
7
1
1
5
3
2
28/Dec/23 Thursday
1
4
2
7
1
1
5
3
2
29/Dec/23 Friday
30/Dec/23 Saturday
31/Dec/23 Sunday
1/Jan/24 Monday
2/Jan/24 Tuesday
3/Jan/24 Wednesday
4/Jan/24 Thursday
5/Jan/24 Friday
6/Jan/24 Saturday
7/Jan/24 Sunday
8/Jan/24 Monday
9/Jan/24 Tuesday
10/Jan/24 Wednesday
11/Jan/24 Thursday
12/Jan/24 Friday
13/Jan/24 Saturday
14/Jan/24 Sunday
15/Jan/24 Monday
16/Jan/24 Tuesday
17/Jan/24 Wednesday
18/Jan/24 Thursday
19/Jan/24 Friday
20/Jan/24 Saturday
21/Jan/24 Sunday
22/Jan/24 Monday
23/Jan/24 Tuesday
24/Jan/24 Wednesday
25/Jan/24 Thursday
26/Jan/24 Friday
27/Jan/24 Saturday
28/Jan/24 Sunday
29/Jan/24 Monday
30/Jan/24 Tuesday
31/Jan/24 Wednesday
1/Feb/24 Thursday
2/Feb/24 Friday
3/Feb/24 Saturday
4/Feb/24 Sunday
5/Feb/24 Monday
6/Feb/24 Tuesday
7/Feb/24 Wednesday
8/Feb/24 Thursday
9/Feb/24 Friday
10/Feb/24 Saturday
11/Feb/24 Sunday
12/Feb/24 Monday
13/Feb/24 Tuesday
14/Feb/24 Wednesday
15/Feb/24 Thursday
16/Feb/24 Friday
17/Feb/24 Saturday
18/Feb/24 Sunday
19/Feb/24 Monday
20/Feb/24 Tuesday
21/Feb/24 Wednesday
22/Feb/24 Thursday
23/Feb/24 Friday
24/Feb/24 Saturday
25/Feb/24 Sunday
26/Feb/24 Monday
Sl. No Date Hindrances
1 5/22/2023 Support Required from Client
1 Alignment for entire works is pending
2 Decision is pending regarding change in Pile cut off level at EDS-01 area.
Awaiting
Clear
Clear
Clear
Clear
Awaiting
Awaiting
Awaiting
Awaiting
Awaiting
Awaiting
Awaiting
Awaiting
Awaiting
Project Quality Plan Submission & Approval Status
Description Letter No. Document No Revision Submission Date Result Status
Submission of Work Method Statement for Geo Technical Soil Investigation-Reg. BMRCL/2A/23-24/02 JKAICPL/BMRCL/2A/MS-001 0 20-Apr-23 Re-Submit
Request for Approval of mix design for precast cover blocks BMRCL/2A/23-24/21 0 16-May-23 Awaiting
JKAICPL/BMRCL/2A/MS-002 19-May-23 Approved
Submission of Method Statements-Bored Cast in-situ pile J.Kumar-AICPL JV/2A/23-24/MS/23 0
Submission of Soil Sample Test reports on OGL for Baiyappanahalli Metro Depot-reg J.Kumar-AICPL JV/2A/23-24/Soil Reports/33 0 1-Jun-23 Awaiting
Re-submission of work method statement for Geo-technical soil investigation after incorporating J.Kumar-AICPL JV/2A/23-24/Method Statement/39 JKAICPL/BMRCL/2A/MS-001 Awaiting
Engineer's Observations-Reg 1 6-Jun-23
Revised submission of method statement for bored cast in situ piles after incorporating Engineer's JKAICPL/BMRCL/2A/MS-002 Awaiting
comments J.Kumar-AICPL JV/2A/23-24/60 1 22-Jun-23
0 Resubmit
Submission of Method Statements for Excavation,Earthwork and Box Drain J.Kumar-AICPL JV/2A/23-24/Method Statement/74 4-Jul-23
0 Awaiting
Submission of Method Statement for Pile Cap J.Kumar-AICPL JV/2A/23-24/Method Statement/76 06.07.2023
0 Awaiting
Submission of method statement for test pile no.5 and 6 for both vertical and lateral load tests J.Kumar-AICPL JV/2A/23-24/Method Statement/78 06.07.2023
0 Awaiting
Submission of method statement for Diaphragm Wall J.Kumar-AICPL JV/2A/23-24/Method statement/79 07.07.2023
Submission of Revised Method Statements for Excavation,Earthwork and Box Drain J.Kumar-AICPL JV/2A/23-24/102 1 7/24/2023 Awaiting
Submission of revised anchor design for test pile no 6-800 mm dia J.Kumar-AICPL JV/2A/23-24/106 1 7/25/2023 Awaiting
Submission of Revised Method Statements for bored cast-in situ pile after incorporating RITES 1 Awaiting
comments J.Kumar-AICPL JV/2A/23-24/115 7/31/2023
Submission of certificate of Accreditation for Nexus test labs for vendor approval J.Kumar-AICPL JV/2A/23-24/121 0 8/5/2023 Awaiting
Submission of pre-approved BMRCL vendor approval letter for M/S SP Enterprises towards supply J.Kumar-AICPL JV/2A/23-24/122 0 8/5/2023 Awaiting
of Traffic marshalls
Submission of pre-approved BMRCL vendor approval letter for 3rd party examiner Md. Hilal Kizar J.Kumar-AICPL JV/2A/23-24/123 0 8/5/2023 Awaiting
Submission of credentials for approval of 3rd party examiner viz. M/s Automech Engineering India
J.Kumar-AICPL JV/2A/23-24/124 0 8/5/2023 Awaiting
Pvt. Ltd.
Submission of credentials of M/s Geo Dynamics as 3rd testing agency for pile integrity testing
J.Kumar-AICPL JV/2A/23-24/125 0 8/7/2023 Awaiting
works and submission of Method Statement of Low strain Integrity test on pile
Submission of mix design for anchor pile HT strand grouting & sonic tube grouting using C-bex
J.Kumar-AICPL JV/2A/23-24/134 0 8/19/2023 Awaiting
100
Submission of compliance of QA/QC related site observation report (SOR) no 1,2,3 and 4 of RITES J.Kumar-AICPL JV/2A/23-24/137 0 8/22/2023
Submission of Compliances for mix design report of M-35 grade concrete for piling & diaphragm
J.Kumar-AICPL JV/2A/23-24/141 0 8/25/2023
wall works
Submission of mix design report for M-35 grade concrete using waterproofing compund J.Kumar-AICPL JV/2A/23-24/143 0 8/25/2023
Submission of Compliances for mix design report of M-35 grade concrete for piling & diaphragm
J.Kumar-AICPL JV/2A/23-24/146 0
wall works 8/26/2023
Submission of mix design report for M-35 grade concrete for piling works considering 2-hour
J.Kumar-AICPL JV/2A/23-24/151 0
retention period (Trial mix no 10) 8/31/2023
Submission of mix design report for M-35 grade concrete for retaining wall works (Trial mix no 4) J.Kumar-AICPL JV/2A/23-24/152 0
8/31/2023
Submission of Method Statement for Retaining wall J.Kumar-AICPL JV/2A/23-24/150 0 8/31/2023 Awaiting
Submission of revised method statement for Pile Cap after incorporating Engineer's and
J.Kumar-AICPL JV/2A/23-24/176 0 Awaiting
Designated Engineer's comments 9/20/2023
Submission of mix design report for M50 grade concrete for column, beam, slab, portal frame and
J.Kumar-AICPL JV/2A/23-24/177 0 Awaiting
other structures (Trial mix no 14) 9/20/2023
Submission of revised method of statement for excavation after incorporating designated J.Kumar-AICPL JV/2A/23-24/181 0 Awaiting
engineer's comments 9/26/2023
Proposal to use mix design submitted for M-35 grade concrete for retaining wall works trial mix J.Kumar-AICPL JV/2A/23-24/183 0
no 4 for pile cap works as well 9/26/2023
Awaiting
Submission of credentials for supply of PVC water stoppers for vendor approval (Kanta Polymers) J.Kumar-AICPL JV/2A/23-24/110 0 7/27/2023
Submission of credentials for conducting pile related tests (Baroni pile creations) J.Kumar-AICPL JV/2A/23-24/113 0 7/27/2023 Awaiting
Submissionn of credential of M/s FOSROC for supply of water proofing compound viz Conplast
J.Kumar-AICPL JV/2A/23-24/142 Awaiting
WL-Xtra for approval 0 8/25/2023
Submission of credentials for supply of coarse and fine aggregates for vendor approval (Universal J.Kumar-AICPL JV/2A/23-24/195 Awaiting
Infra minerals pvt ltd) 0 10/4/2023
Firm/Agencies approval for Confirmatory Bore Hole Test-Reg BMRCL/2A/23-24/01 0 20-Apr-23 Awaiting
Request for approval of agency for coarse & fine aggregates BMRCL/2A/23-24/10 0 28-Apr-23 Approved
Request for approval of Testing Laboratory BMRCL/2A/23-24/13 0 28-Apr-23 Approved
Proposal for usage of Polymer Slurry-M/s Vidhya Enterprises & M/s Eco Drilling fluids Pvt Ltd. J.Kumar-AICPL JV/2A/23-24/Vendor Approval/26 0 24-May-23 Approved
Requesting for approval of Sonic Pipes-M/s Dextra India Pvt. Ltd & M/s Sanfield (India) Limited J.Kumar-AICPL JV/2A/23-24/Vendor Approval/27 0 24-May-23 Approved
Submission of Vendor Credentials-M/s Struct Geo Tech Research Laboratories Pvt. Ltd. J.Kumar-AICPL JV/2A/23-24/Vendor Approval/28 1 24-May-23 Awaiting
Request for Approval of Testing Laboratory-M/s Stedrant Technology Private Limited J.Kumar-AICPL JV/2A/23-24/Third Party Lab/34 0 1-Jun-23 Awaiting
Approval of Agencies for Third Party proof check-M/s Chetan Infratech Consultants Pvt. Ltd. J.Kumar-AICPL JV/2A/23-24/Design/35 0 1-Jun-23 Awaiting
Approval of Agency for deployment of traffic marshal-Reg J.Kumar-AICPL JV/2A/23-24/HSE/36 0 1-Jun-23 Approved
J.Kumar-AICPL JV/2A/23-24/QC 3rd Party Lab/43 0 Awaiting
Request for approval to conduct Third Party testing to M/s Stedrant Technoclinic Pvt Ltd. 12-Jun-23
Request for approval to conduct Third Party testing reinforcement steel sample to M/s Structwel J.Kumar-AICPL JV/2A/23-24/Steel testing/45 0 Awaiting
Designers & Consultants Pvt Ltd. 12-Jun-23
Submission of credentials for vendor approval for supply of rebar couplers (sanfield India Ltd) J.Kumar-AICPL JV/2A/23-24/Vendor Approval/71 0 Approved
including threading of rebars 30.06.2023
Submission of credentials for supply of Powergrout NS3 for vendor approval (Ultratech) J.Kumar-AICPL JV/2A/23-24/Vendor Approval/72 0 30.06.2023 Awaiting
J.Kumar-AICPL JV/2A/23-24/110 Awaiting
Submission of credentials for supply of PVC water stoppers for vendor approval (Kanta Polymers) 0 7/27/2023
Submission of credentials for conducting pile related tests (Baroni pile creations) J.Kumar-AICPL JV/2A/23-24/113 0 7/27/2023 Awaiting
Submission of Credentials of M/s Maruti techno Rubber Pvt Ltd for supply of PVC water stoppers J.Kumar-AICPL JV/2A/23-24/130 Awaiting
0 8/16/2023
Submission of credentials for conducting 3rd party material testing & confirmatory bore hole J.Kumar-AICPL JV/2A/23-24/162 Awaiting
testing for vendor approval-M/s Gooly Consultancy Services 0 9/13/2023
Code A- Approved
Code B- Approved with Comments
Code C- Revise and Resubmit
Code D- Rejected
Remarks
TATA steel, JSW, Jindal, Rastriya Ispat Nigam, SAIL
JSW Cement Limited
JSW Cement Limited
JSW Cement Limited
Nutave
M/s Fosroc Chemicals India Pvt. Ltd.
M/s ACC Ltd.
M/s Ultratech Ltd.
M/s ACC Ltd.
M/s Ultratech Ltd.
Note:
Code A- Approved
Code B- Approved with Comments
Code C- Revise and Resubmit
Code D- Rejected
EHS Approval Status
Document No Revision Company Name
J.Kumar-AICPL JV/2A/23-24/HSE
0 J.Kumar-AICPL JV
PLAN/001
J.Kumar-AICPL JV/2A/23-24/SHE-001 1 J.Kumar-AICPL JV
al Status
Submission Date Result Date Result Status
5/22/2023 Re-submit
6/6/2023 Approved
Remarks
Letter Submitted
Sr No Letter No
1 BMRCL/2A/23-24/01
2 BMRCL/2A/23-24/02
3 JKAICPL/23-24/11
4 JKAICPL/23-24/12
5 BMRCL/2A/23-24/03
6 BMRCL/2A/23-24/04
7 BMRCL/2A/23-24/05
8 BMRCL/2A/23-24/06
9 BMRCL/2A/23-24/07
10 BMRCL/2A/23-24/08
11 BMRCL/2A/23-24/09
12 BMRCL/2A/23-24/10
13 BMRCL/2A/23-24/11
14 BMRCL/2A/23-24/12
15 BMRCL/2A/23-24/13
16 BMRCL/2A/23-24/14
17 BMRCL/2A/23-24/15
18 BMRCL/2A/23-24/16
19 BMRCL/2A/23-24/17
20 BMRCL/2A/23-24/18
21 BMRCL/2A/23-24/19
22 BMRCL/2A/23-24/20
23 BMRCL/2A/23-24/21
24 J.Kumar-AICPL JV/2A/23-24/PQP/22
25 J.Kumar-AICPL JV/2A/23-24/MS/23
26 J.Kumar-AICPL JV/2A/23-24/MS/24
27
J.Kumar-AICPL JV/2A/23-24/HSE/25
28
J.Kumar-AICPL JV/2A/23-24/Vendor Approval/26
29
J.Kumar-AICPL JV/2A/23-24/Vendor Approval/27
30
J.Kumar-AICPL JV/2A/23-24/Vendor Approval/28
31 J.Kumar-AICPL JV/2A/23-24/29
32 J.Kumar-AICPL JV/2A/23-24/MOU/30
33 J.Kumar-AICPL JV/2A/23-24/Pile/31
34 J.Kumar-AICPL JV/2A/23-24/Site Clearance/32
35 J.Kumar-AICPL JV/2A/23-24/Soil Reports/33
37 J.Kumar-AICPL JV/2A/23-24/Design/35
38 J.Kumar-AICPL JV/2A/23-24/HSE/36
39 J.Kumar-AICPL JV/2A/23-24/Test Pile/37
40 J.Kumar-AICPL JV/2A/23-24/SHE/38
42 J.Kumar-AICPL JV/2A/23-24/BBS/40
43 J.Kumar-AICPL JV/2A/23-24/Insurance/41
53 J.Kumar-AICPL JV/2A/23-24/CLRA/51
56 J.Kumar-AICPL JV/2A/23-24/54
57
J.Kumar-AICPL JV/2A/23-24/Retaining wall EDS-01/55
58 J.Kumar-AICPL JV/2A/23-24/General/56
59 J.Kumar-AICPL JV/2A/23-24/Pile cap EDS-01/57
60 J.Kumar-AICPL JV/2A/23-24/BBS/58
61 J.Kumar-AICPL JV/2A/23-24/BBS/CBH Report/59
62
J.Kumar-AICPL JV/2A/23-24/BBS/60
63 J.Kumar-AICPL JV/2A/23-24/BBS/61
64
J.Kumar-AICPL JV/2A/23-24/NDT Test/62
65
J.Kumar-AICPL JV/2A/23-24/Design/63
66
J.Kumar-AICPL JV/2A/23-24/Drawing requirement/65
67
JKAICPL/23-24/22-1
68 J.Kumar-AICPL JV/2A/23-24/NDT Test/66
69 J.Kumar-AICPL JV/2A/23-24/Survey/67
70
J.Kumar-AICPL JV/2A/23-24/GFC Drawings/68
71
J.Kumar-AICPL JV/2A/23-24/General/69
72
J.Kumar-AICPL JV/2A/23-24/General/70
73
J.Kumar-AICPL JV/2A/23-24/Vendor Approval/71
74
J.Kumar-AICPL JV/2A/23-24/Vendor Approval/72
75
J.Kumar-AICPL JV/2A/23-24/General/73
76
J.Kumar-AICPL JV/2A/23-24/Method Statement/74
77
J.Kumar-AICPL JV/2A/23-24/Test Report/75
78 J.Kumar-AICPL JV/2A/23-24/Method Statement/76
79 J.Kumar-AICPL JV/2A/23-24/IPC/77
80
J.Kumar-AICPL JV/2A/23-24/Method Statement/78
81 J.Kumar-AICPL JV/2A/23-24/Method statement/79
82 J.Kumar-AICPL JV/2A/23-24/IPC/80
83
J.Kumar-AICPL JV/2A/23-24/IPC/81
84
J.Kumar-AICPL JV/2A/23-24/82
85 J.Kumar-AICPL JV/2A/23-24/83
86
J.Kumar-AICPL JV/2A/23-24/84
87 J.Kumar-AICPL JV/2A/23-24/85
88
J.Kumar-AICPL JV/2A/23-24/86
89 J.Kumar-AICPL JV/2A/23-24/87
90 J.Kumar-AICPL JV/2A/23-24/88
91
J.Kumar-AICPL JV/2A/23-24/89
92
J.Kumar-AICPL JV/2A/23-24/90
93
J.Kumar-AICPL JV/2A/23-24/91
94
J.Kumar-AICPL JV/2A/23-24/92
95
J.Kumar-AICPL JV/2A/23-24/93
96
J.Kumar-AICPL JV/2A/23-24/94
97
J.Kumar-AICPL JV/2A/23-24/95
98
J.Kumar-AICPL JV/2A/23-24/96
99
J.Kumar-AICPL JV/2A/23-24/97
100 J.Kumar-AICPL JV/2A/23-24/98
101
J.Kumar-AICPL JV/2A/23-24/99
102 J.Kumar-AICPL JV/2A/23-24/100
103 J.Kumar-AICPL JV/2A/23-24/101
104
J.Kumar-AICPL JV/2A/23-24/102
105 J.Kumar-AICPL JV/2A/23-24/103
106 J.Kumar-AICPL JV/2A/23-24/104
107
J.Kumar-AICPL JV/2A/23-24/105
108 J.Kumar-AICPL JV/2A/23-24/106
109
J.Kumar-AICPL JV/2A/23-24/107
110
J.Kumar-AICPL JV/2A/23-24/108
111
J.Kumar-AICPL JV/2A/23-24/109
112
J.Kumar-AICPL JV/2A/23-24/110
113
J.Kumar-AICPL JV/2A/23-24/111
114 J.Kumar-AICPL JV/2A/23-24/112
115
J.Kumar-AICPL JV/2A/23-24/113
116
J.Kumar-AICPL JV/2A/23-24/114
117
J.Kumar-AICPL JV/2A/23-24/115
118
J.Kumar-AICPL JV/2A/23-24/116
119
J.Kumar-AICPL JV/2A/23-24/117
120
J.Kumar-AICPL JV/2A/23-24/118
121 J.Kumar-AICPL JV/2A/23-24/119
Request for allocation of land near by Baiyappanahalli metro depot 0 Location of identified land
site
Permission for Entry to Baiyappanahalli Metro Depot for Work 0 List of Authorized Personnel
Execution
Request for approval of BMRCL staff office Layout 0 BMRCL staff office layout
Request for approval of Reinforcement 0 Vendor Credential documents
Request for approval of GGBS from M/s JSW Cement Limited 0 Vendor Credential documents
Request for approval of OPC Cement from M/s JSW Cement Limited 0 Vendor Credential documents
Request for approval of Portland slag Cement from M/s JSW Cement 0 Vendor Credential documents
Limited
Request for approval of source and agency for coarse & fine 0 Vendor Credential documents
aggregates
Request for approval of Admixtures from M/s Fosroc Chemicals India 0 Vendor Credential documents
Pvt Ltd
Request for approval of OPC Cement from M/s ACC Ltd. 0 Vendor Credential documents
Request for approval of Testing Laboratory 0 Vendor Credential documents
Request for approval of OPC Cement from M/s Ultratech Cement 0 Vendor Credential documents
Limited
Submission of Fencing working drawing 0 Fencing Working Drawing
Proposal for Confirmatory Bore Hole Location 0 Coordinate Drawing
0 Proposed location of entry gate
Seeking permission for access to site
and CBH 3 & 4
Proposal to lower Pile cut-off level to existing ground level 0 Details of Pile Cap Drawing
Request for Approval of source & agency of concrete-M/s ACC 0 Vendor Credential documents
Limited
Request for Approval of source & agency of concrete-M/s Ultratech 0 Vendor Credential documents
Limited
Request for Approval of mix design for precast cover blocks 0 Mix Design Proportion sheet
Submission of Project Quality Plan 0 Project Quality Plan
Submission of Method Statements-Bored Cast in-situ pile 0 Method Statements
Request for Approval of bar bending Schedule 0 BBS
0 SHE Plan, EM Plan, CDM Plan,
Submission of Health, Safety and Environment plan
TMP, Security plan
Proposal for usage of Polymer Slurry-M/s Vidhya Enterprises & M/s 0 Previous Approval Letters
Eco Drilling fluids Pvt Ltd.
Requesting for approval of Sonic Pipes-M/s Dextra India Pvt. Ltd & 0 Previous Approval Letters
M/s Sanfield (India) Limited
Submission of Vendor Credentials-M/s Struct Geo Tech Research 1
Laboratories Pvt. Ltd. Vendor Credential documents
Submission of Survey Drawings(Topography) and request for GAD 0 Survey Drawing (Topo)
drawings
Submission of Memorandum of Understanding(MOU) for Medical 0
Facilities MOU-3pages
Request for Pile Termination Criteria in Weathered Rock, Soft Rock, 0
Hard Rock & Friction pile-reg
Request for Site Clearance-reg 0 Photographs
Submission of Soil Sample Test reports on OGL for Baiyappanahalli 0 Soil Sample Test Reports-24
Metro Depot-reg pages
Request for Approval of Testing Laboratory-M/s Stedrant Technology 0 BMRCL Approved Vendor List-1
Private Limited page
Vendor Credenatials- M/s
Approval of Agencies for Third Party proof check-M/s Chetan 0 Chetan Infratech Consultants
Infratech Consultants Pvt. Ltd. Pvt Ltd
0 Vendor Credenatials- M/s S.P
Approval of Agency for deployment of traffic marshal-Reg Enterprises
Proposal for Test pile in entry deck-1 location-reg 0 EDS-01 Layout drawing
Re-submission of SHE plan after incorporating Engineer's 1
Observations-Reg SHE Plan-168 pages
Re-submission of work method statement for Geo-technical soil 1
investigation after incorporating Engineer's Observations-Reg Method Statement & HIRA
Submission of Bar Bending schedule for EDS-01 Pile PC1 to PC9- 0
Reg BBS
0
Request to shift vehicles seized & parked by Police at EDS2 Location
Reg- Variation in embankment or backfilling quantity for BOQ item 0
no A(6)
Submission of credentials for supply of PVC water stoppers for 0
vendor approval (Kanta Polymers)
Submission of ambient air quality & noise level monitoring reports 0
for EDS 1, SBL 2 & RMC batching plant locations for 2A site
Submissionof records of Minutes of meeting held at BMRCL Head Offi 0
Submission of credentials for conducting pile related tests (Baroni 0
pile creations)
Clarification required for discrepancies noticed for column sizes of 0
EDS 2
Submission of Revised Method Statements for bored cast-in situ pile 1
after incorporating RITES comments
Submission of rate analysis for supply of unskilled labour to BMRCL 0
for removal of test track
Request BMRCL's team presence for weekly review meeting at 2A 0
metro depot site every Tuesday at 11:00 AM
Submission of D-wal Shop Drawing & anchor design by third party 0
consultant
Submission of IPC no 2 for period 01-07-23 to 31-07-23 0
Submission of original & scanned copies of Quality control reports
0
for IPC no 2 for period 01.07.2023 to 31.07.2023
Submission of certificate of Accreditation for Nexus test labs for
0
vendor approval
Submission of pre-approved BMRCL vendor approval letter for M/S
0
SP Enterprises towards supply of Traffic marshalls
Submission of pre-approved BMRCL vendor approval letter for 3rd
0
party examiner Md. Hilal Kizar
Submission of credentials for approval of 3rd party examiner viz.
0
M/s Automech Engineering India Pvt. Ltd.
Submission of credentials of M/s Geo Dynamics as 3rd testing
agency for pile integrity testing works and submission of Method 0
Statement of Low strain Integrity test on pile
Regarding submission of revised initial work program incorporating
0
date of commencement as 03.05.2023
Submission of D-wall Design calculations 0
Submission of 2nd Monthly SHE Monthly Report for month of July-
0
2023
Submission of mix design report for M-35 grade concrete for piling
0
works considering 2-hour retention period (Trial mix no 10)
Submission of mix design report for M-35 grade concrete for
0
retaining wall works (Trial mix no 4)
Submission of revised rate analysis for supply of unskilled labour to
0
BMRCL for removal of test track
Submission of rate analysis for supply of mobile hydraulic crane of
0
15T capacity to BMRCL for removal of test track
Submission of closure report for QA&QC related site observation
0
report SOR no 13 issued by BMRCL
Submission of IPC-03 for period 1st August 2023 to 31st August 2023 0
Submission of D-wall shop drawing 0
Submission of quotation for removal of test track 0
Submission of original & scanned copies of Quality control reports
0
for IPC no 3 for period 01.08.2023 to 31.08.2023
Submission of Bar Bending Schedule for Diaphragm Wall 0
Proposal to conduct Initial vertical load test by Dynamic pile load
0
method in lieu of reaction load method
Submission of credentials for conducting 3rd party material testing
& confirmatory bore hole testing for vendor approval-M/s Gooly 0
Consultancy Services
Submission of 3rd Monthly SHE report for period of 01-08-23 to 31-
0
08-23
Submission of compliance for QA/QC related site observation report
0
SOR no 3 issued by BMRCL
Submission of compliance for QA/QC related site observation report
0
SOR no 11 issued by BMRCL
Submission of compliance for QA/QC related site observation report
0
SOR no 7 issued by BMRCL
Submission of 3rd monthly progress report for period of 26-07-23 to
0
25-08-23
Submission of ground anchor design for diaphragm wall at SBL-02
0
location
Submission of competency certificates for various staff working
0
during piling operations
Submission of compliance report for SHE related SOR no 8 & 46 0
Reg- Replacement of certain SHE personnel with new staff due to
0
intra transfer
Submission of BBS for typical column at EDS-01 location 0
Submission of design and drawings of Diaphragm wall reinforcement
0
cage & stop end lifting plan
Submission of revised method statement for Diaphragm wall after
0
incorporating Engineer's & Designated Engineer's comments
Submission of compliance for She related SOR no 67 to 79 0
Submission of revised method statement for Pile Cap after
0
incorporating Engineer's and Designated Engineer's comments
Submission of mix design report for M50 grade concrete for column,
0
beam, slab, portal frame and other structures (Trial mix no 14)
Submission of D-Wall Capping beam details & proposal for flood wall
Submission of Credentials of Banagalore Institute of Safety &
Technology for Training Related Matters
Submission of Quality Compliance for QA/QC SOR No. 21 Issued by
RITES
Submission of Quality Compliance for QA/QC SOR No. 14 Issued by
RITES
Submission of Quality Compliance for QA/QC SOR No. 12 Issued by
RITES
Regarding Balance Work Front Handover and Balance land
Acquisition form BMRCL
Submission of compliance for observations issued through SHE walk
No. 4 (SOR No. 30 to 39) by BMRCL dt 23-11-23 vide email.
Proposal to use mix design submitted for anchor pile HT strand
groutung using cebex 100 for Diaphragm wall anchor grouting as
well.
Submission of Compliance for SHE SOR No.65 to 76 issued by
RITES
Submission of Quality Compliance for QA/QC SOR No. 06 Issued by
BMRCL
Submission of Compliance for QA-QC SOR No. 22 issued by
BMRCL.
Submission of Quality Compliance for QA/QC SOR No. 15 Issued by
RITES
Submission of Quality Compliance for QA/QC SOR No. 11 Issued by
RITES
Submission of Quality Compliance for QA/QC SOR No. 26 Issued by
RITES
Submission of Pile Integrity Test Reports for 3 no's of piles PL-109,
PL-154, PL-173.
Submission of Initial Latral Load Test Report on test pile TP-05.
Submission of Routine Lateral Load Test Report on Working Piles
PL-112 & PL-174
Submission of Pile Integrity Test Reports for 3 no's of piles PL-161,
PL-168, PL-246.
Submission of IPC No-06 for the period 01-11-2023
Submission of Sixth Monthly SHE report for the period 01-11-2023 to
30-11-2023.
Subission of original and scanned copies of quality control reports
for IPC No. 6
Submission of 5th monthly progress report for period 26-09-2023 to
25-10-2023.
Submission of 5th monthly progress report for period 26-10-2023 to
25-11-2023.
Submission of Mix design for M-35 Grade concrete for piling
incorporating aggregate and M Sand from United Infra Minerals.
Submission of Mix design for M-50 Grade concrete for column,
beam, slab, portal frame and other structures trial mix no.17.
Submission of Compatibility report of using combination of super
plasticizer and water proffing compound for min design of M-35
grade concrete for Diaphragm Wall.
Submission of records of Minutes Of Meeting held at
Submission of Method Statement for Diaphragm Wall Anchoring
Submission of Method Statement for Column
Regarding Approval for PEB M/s Acetech PEB Systems Pvt Ltd.
Submission of Design and Drawing of D-Wall Reingorcement cage
Lift Sequence.
Submission of Pile Integrity Test Report in EDS-1 area
Submission of Original Advance Payment Security Bank Guarantees
Towards 2nd Instalement of Mobilization Advance.
Submission of Revised Method Statement for Bored Cast in Situ
Piles (R3) after Incorporating RITES Comments.
Submission Date Remarks
20-Apr-23
20-Apr-23
21-Apr-23
25-Apr-23
28-Apr-23
28-Apr-23
28-Apr-23
28-Apr-23
28-Apr-23
28-Apr-23
28-Apr-23
28-Apr-23
28-Apr-23
29-Apr-23
3-May-23
3-May-23
3-May-23
8-May-23
9-May-23
9-May-23
16-May-23
17-May-23
18-May-23
22-May-23
22-May-23
24-May-23
24-May-23
24-May-23
25-May-23
1-Jun-23
1-Jun-23
1-Jun-23
1-Jun-23
1-Jun-23
1-Jun-23
1-Jun-23
1-Jun-23
6-Jun-23
6-Jun-23
7-Jun-23
6-Jun-23
7-Jun-23
12-Jun-23
12-Jun-23
12-Jun-23
12-Jun-23
12-Jun-23
12-Jun-23
15-Jun-23
15-Jun-23
15-Jun-23
15-Jun-23
15-Jun-23
19-Jun-23
19-Jun-23
20-Jun-23
20-Jun-23
20-Jun-23
22-Jun-23
22-Jun-23
22-Jun-23
6/23/2023
6/23/2023
6/24/2023
6/26/2023
26-Jun-23
28.06.2023
27.06.2023
30.06.2023
30.06.2023
30.06.2023
30.06.2023
30.06.2023
04.07.2023
06.07.2023
06.07.2023
05.07.2023
06.07.2023
07.07.2023
08.07.2023
11.07.2023
11.07.2023
11.07.2023
12.07.2023
12.07.2023
12.07.2023
12.07.2023
12.07.2023
12.07.2023
13.07.2023
13.07.2023
7/14/2023
7/14/2023
7/14/2023
7/14/2023
7/15/2023
7/17/2023
7/19/2023
7/19/2023
7/24/2023
7/25/2023
7/25/2023
7/24/2023
7/25/2023
7/25/2023
7/25/2023
7/25/2023
7/27/2023
7/27/2023
7/27/2023
7/27/2023
7/27/2023
7/29/2023
7/31/2023
7/31/2023
8/1/2023
8/3/2023
8/5/2023
8/5/2023
8/5/2023
8/5/2023
8/5/2023
8/5/2023
8/7/2023
8/10/2023
8/11/2023
8/11/2023
8/13/2023
8/16/2023
8/16/2023
8/17/2023
8/19/2023
8/19/2023
8/21/2023
8/22/2023
8/22/2023
8/22/2023
8/22/2023
8/24/2023
8/25/2023
8/25/2023
8/25/2023
8/25/2023
8/25/2023
8/26/2023
8/31/2023
8/31/2023
8/31/2023
8/31/2023
8/31/2023
8/31/2023
8/31/2023
8/31/2023
9/4/2023
9/5/2023
9/8/2023
9/9/2023
9/9/2023
9/11/2023
9/13/2023
9/13/2023
9/13/2023
9/13/2023
9/13/2023
9/13/2023
9/13/2023
9/13/2023
9/13/2023
9/14/2023
9/14/2023
9/15/2023
9/15/2023
9/18/2023
9/18/2023
9/20/2023
9/20/2023
9/21/2023
9/22/2023
9/25/2023
9/26/2023
9/26/2023
9/26/2023
9/27/2023
9/27/2023
9/28/2023
9/28/2023
9/28/2023
9/29/2023
10/3/2023
10/3/2023
10/4/2023
10/4/2023
10/4/2023
10/4/2023
10/5/2023
10/7/2023
10/7/2023
10/7/2023
10/7/2023
10/7/2023
10/10/2023
10/11/2023
10/11/2023
10/17/2023
10/19/2023
10/20/2023
10/20/2023
10/21/2023
10/25/2023
10/27/2023
11/30/2023
10/30/2023
10/30/2023
10/30/2023
10/31/2023
10/31/2023
11/2/2023
11/3/2023
11/3/2023
11/4/2023
11/4/2023
11/4/2023
11/9/2023
11/9/2023
11/9/2023
11/9/2023
11/10/2023
11/11/2023
11/18/2023
11/18/2023
11/20/2023
11/20/2023
11/23/2023
11/24/2023
11/23/2023
11/24/2023
11/24/2023
11/24/2023
11/24/2023
11/27/2023
11/27/2023
11/29/2023
11/29/2023
12/1/2023
12/1/2023
12/1/2023
12/1/2023
12/2/2023
12/2/2023
12/2/2023
12/2/2023
12/2/2023
12/11/2023
12/11/2023
12/11/2023
12/11/2023
12/12/2023
12/12/2023
12/12/2023
12/12/2023
12/18/2023
12/19/2023
12/19/2023
12/19/2023
12/21/2023
12/26/2023
12/27/2023
Letter Received
Sr No Letter No
1 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2022-23/01/111
2 BMRC/ORR/PHASE 2A/BYP.DEPOT/2023-24/02/570
3 BMRC/ORR/PHASE 2A/BYP.DEPOT/2022-23/03/571
4 BMRC/ORR/PHASE 2A/BYP.DEPOT/2022-23/04/1276
5 BMRC/ORR/PHASE 2A/BYP.DEPOT/2022-23/05/1277
6 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/06/1627
7 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/07/1993
8 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/08/1994
9 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/09/1992
10 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/10/2047
11 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/11/2581
12 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/12/2582
13 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/13/2583
14 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/14/2765
15 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/15/2766
16 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/16/3001
17 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/17/3041
18 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/18/3061
19 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/19/3384
20 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/20/3385
21 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/21/3386
22 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/23
23 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/24/3771
24 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/25/4229
25 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/26/4347
26 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/28/4392
27 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/29/4394
28 BMRCL/ORR/Phase-2A/Pkg-2/BYP.DEPOT/2023/30/4736
29 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/29A
30 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/29B
31 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/31/4822
32
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/32/4824
33 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/33/5006
34 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/34/5026
35 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/35/5352
36
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/36/5413
37
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/37/5447
38 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/38/5488
39
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/39/5661
40
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/40/5660
41 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/41/5662
42
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/42/5664
43 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/43/5671
44 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/44/5672
45 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/45/5673
46 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/46/5924
47
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/47/6100
48 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/48/6164
49 BMRCL/PHASE 2A/ED/ORR/Package-2/BYP.DEPOT/2023-6067
50 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/49/6505
51 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/50
52
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/51
53 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/53
54 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/54
55 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/05
56 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/06
57 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/07
58 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/56/7617
59 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/57
60 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/08
61 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/58
62 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/59
63 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/60
64 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/61
65 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/62
66 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/63
67 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/64
68 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/65
69 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/66
70 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/09
71 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/10
72 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/67
73 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/68
74 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/69
75 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/10A
76 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/70
77 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/71
78 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/12
79 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/72
80 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/73
81 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/74
82 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/75
83 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/13
84 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/14
85 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/76
86 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/15
87 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/77
88 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/16
89 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/78
90 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/79
91 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/17
92 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/18
93 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/80
94 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/81
95 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/82
96 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/19
97 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/20
98 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/83
99 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/84
100 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/85
101 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/21
102 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/86
103 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/22
104 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/23
105 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/87
106 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/88
107 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/89
108
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/90
109
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/91
110 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/92
111
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/93
112 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/94
113
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/95
114 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/96
115 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/97
116 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/98
117
BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/28/12077
118 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-23/99
119 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/28/100
120 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/101/12375
121 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/102/12512
122 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/103/13119
123
BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/30/13107
124
BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/31/13108
125
BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/32/13109
126
BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/33/13479
127 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/104/13480
128 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/105/13539
129 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/106
130 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/107
131 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/108
132
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/109
133
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/110
134 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/111/14471
135 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/112
136 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/113
137 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/114
138 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/115
139 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/39
140 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/40
141 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/41
142 BMRCL/ORR/PHASE 2A/BYP.DEPOT/MTEST/2023-24/42
143 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/116
144
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/117
145 BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/118
146
BMRCL/ORR/PHASE 2A/BYP.DEPOT/2023-24/119
147
Letter Received
Description Enclosure Details
Handing Over of Land-Reg. Site Hand Over Drawing
Master Plan at Grade Level and Underground Level Issue of GFC drawings.-Reg
GFC drawings -27 nos Issue of GFC drawings.-Reg
Boundary Wall Plan, Section, Elevation Issue of GFC drawings.-Reg
GFC drawings -20 nos Issue of GFC drawings.-Reg
Approval of Reinforcement-Reg
Approval of OPC Cement from Ultratech Cement Limited-
Reg
Approval of GGBS from JSW Cement Limited-Reg
Approval of Source and Agency for Coarse and fine
Aggregates-Reg
Approval of usage of Admixture from source M/s Fosroc
Chemicals Pvt Ltd
Issue of GFC drawings of details of Twin Cell Culvert Issue of GFC drawings.-Reg
Submission of work Method Statement for Geo-Technical
Soil Investigation-reg
Approval of Third Party Testing laboratory
Approval for source of agency for supply of concrete-
Ultratech
General Procedure for approval of Vendor for materials and
products for use in BMRCL works
Observations on submitted SHE Plan-reg
RFI Format-reg RFI- Format
Allocation of BMRCL Land of 2.141 acre near
Baiyappanahalli on monthly rental basis-reg
Submission of Product Approval-M/s Vidhya Enterprises &
M/s Eco Drilling Fluids Pvt. Ltd. 0
Submission of Product Approval (Sonic Pipe)-M/s Dextra
India Pvt. Ltd. 0
Maintenance of site registers-reg 39
Contract Documents-Reg
Issue of GFC Drawings-Reg 6
Control of GFC Drawings 1
Observations on Method Statement 0
Issue of GFC Drawings-Reg 2
Issue of GFC Drawings-Reg 8
Authoised Representative for M/s J.Kumar/AICPL JV 0
Issue of GFC Drawings of details of Test pile 5&6 2
Approval of BBS for test pile 0
Approval of BBS for Working pile
NDT for Checking the integrity of concrete piles after
installation 0
Regarding discrepancies of pile cap sizes of EDS-01 area-
reg.
BMRC-PAD-BYPN-STR-STD-
Issue of GFC drawings of Pile Standard details-reg. 0001
Kick of meeting held on 09.06.2023
SHE Inspection Report No-1
Safety,Helth,and Environment SHE Inspection Report-reg SHER NO. 01 to 26
Permission to execute the works at Baiyappanahalli Metro
Depot. 0
Observations of Method Statement for Excavation-rg 0
Vendor Approval for supply of rebar couplers from M/s
Sanfield India Limited-reg. 0
Submission of Ultratec Trail Mix design for concrete grade
M20,M35, and M50 -reg
Date of Commencement-reg 0
BMRC-PAD-BYPN-STR-SBL02-
0001-SHEET 02,SHEET
13A,13B,13C,13D,13E,13F,13G,
Issue of GFC Drawing 13H
Comments on Initial Work Programme-reg 0
Prcessing of Contractor'bill for releasing of payments-reg 0
Royalty on minerals used in construction works-reg 0
Issue of GFC Drawings 0
Submission of mix design for sonic tube grout using Cebex
200 material 0
BMRCL Environment, Health and safety Requirement 0
Permission t=for movement of construction equipment to
carry out Metro Construction works at Baiyappanahalli 0
Metro Depot-reg
Revised Method Statement for Bored cast in situ piles(R1) 0
Approval of Bar Bending Schedule of Pile Cap-reg 0
Approval of Bar Bending Schedule for Working
Pile(1000mm)-reg 0
Issue of GFC Drawings 0
Submission of Quality work observations-Reg 0
Testing of Materials reg 0
Testing of Materials reg 0
Testing of Materials reg 0
Approval for conducting testing and examination of lifting
0
appliances/gears and pressure vessels/Plants-reg
Submission of Safety work observations 0
Testing of Materials reg 0
Pending SHE Observation 0
Submission of Method Statement for Diaphragm Wall 0
Issue of GFC Drawings 0
Submission of Mix design report for M-35 grade concrete
0
for piling & diaphragm wall
Submission of method statement for Pile cap 0
Approval of submitted SHE plan 0
Approval for deploying Traffic Marshall Agency 0
Reg: Submission of revised Initial work program
0
incorporating date of commencement as 03-05-23
Submission of Safety work observations 0
Testing of Materials reg 0
Testing of Materials reg 0
Submission of Mix design report for M-35 grade concrete
for piling & diaphragm wall 0
Issue of GFC Drawings 0
Approval of Trial mix-M35 Grade for Pile and Diaphragm
wall structures 0
Testing of Materials reg 0
Issue of GFC Drawings-reg 0
Issue of GFC Drawings-reg 0
Testing of Materials reg 0
Submission of Quality work observations-Reg 0
Submission of inspection & Test Plan for materials-ITP-reg 0
Submission of Project Quality plan (QAP)-ITP-reg 0
Submission of Method of statement for Excavation-R1-reg
0
Testing of Materials reg 0
Testing of Materials reg 0
Issue of GFC Drawings 0
Testing of Materials reg 0
Submission of mix design report for M-35 grade concrete
using water proofing compound for Diaphragm Wall-reg 0
Testing of Materials reg 0
Issue of GFC Drawings-reg 0
Issue of GFC Drawings-reg 0
Testing of Materials reg 0
Testing of Materials reg 0
Submission of Safety work observations 0
Work in progress certificate 0
Submission of Quality work observations 0
Testing of Materials reg 0
Testing of Materials reg 0
Submission of Quality work observations-reg 0
Observations on monthly progress report-reg 0
Issue of GFC Drawings 0
Testing of Materials reg 0
Submission of Quality work observations 0
Testing of Materials reg 0
Testing of Materials reg 0
Submission of Safety work observations 0
Issue of gfc drawing 0
Issue of gfc drawing 0
Submission of mix Design report for M35 grade concrete
using water proofing compound for DW 0
Submission of mix Design report for M50 grade concretefor
column beam, slab , portal frame and other structure trial
mix no 14 0
Obseation of method statement for dw R1 0
Obseation of revise method statement for bored cast in C2
piles (R2) 0
Obseation of revise method statement forpile cap (R1) 0
Submission of mix design report for M35 grade concretefor
retaining wall works trial mix no 4 0
Submission of revise method statement for Execution (R2) 0
Issue of IFC drawings 0
Ubmission of quality work observation 0
Testing of Materials
0
submit of quality works observations 0
submit of safety works observations 0
Revised bank guarantee formats 0
Submission of quality work observation 0
Submission of quality work observation 0
Testing of Materials
0
Testing of Materials
0
Testing of Materials
0
Testing of Materials
0
Submission of Safety work observations 0
Approval for Conduction SHE Trainings 0
Issue of GFC Drawings 0
Issue of GFC Drawings 0
Submission of Quality Work Observation 0
Submission of Mix Design for M-30 grade concrete D-Wall
using water proofing compound incorporating aggregates
and M-sand from untied infra. 0
Submission of Mix Design for M-35 grade concrete Pile Cap
using water proofing compound incorporating aggregates
and M-sand from untied infra. 0
Submission of Safety work observations 0
Submission of Safety work observations 0
Issue of GFC Drawings
Issue of GFC Drawings
Issue of GFC Drawings
Testing of Materials
Testing of Materials
Testing of Materials
Testing of Materials
Submissio of Quality Work Observation
Submission of mix design report for M-35 grade concrete
using water proofing compound for Diaphragm Wall-reg
Observation on Method Statement for Retaining Wall
Approval for Testing and Examination of Lifting Appliances
gears and Pressure Vessels
Received Date Remarks
3-Apr-23
13-Apr-23
13-Apr-23
25-Apr-23
25-Apr-23
3-May-23
8-May-23
8-May-23
8-May-23
8-May-23
19-May-23
19-May-23
19-May-23
22-May-23
22-May-23
25-May-23
25-May-23
26-May-23
1-Jun-23
1-Jun-23
1-Jun-23
7-Jun-23
8-Jun-23
15-Jun-23
16-Jun-23
17-Jun-23
17-Jun-23
6/23/2023
6/21/2023
6/21/2023
6/24/2023
6/24/2023
28-Jun-23
30-Jun-23
4-Jul-23
5-Jul-23
5-Jul-23
6-Jul-23
10-Jul-23
10-Jul-23
10-Jul-23
10-Jul-23
10-Jul-23
10-Jul-23
10-Jul-23
7/14/2023
7/15/2023
7/17/2023
7/14/2023
7/24/2023
7/24/2023
7/24/2023
7/25/2023
7/26/2023
7/28/2023
7/28/2023
8/3/2023
8/11/2023
8/12/2023
8/16/2023
8/17/2023
8/17/2023
8/18/2023
8/18/2023
8/18/2023
8/23/2023
8/23/2023
8/24/2023
8/24/2023
8/23/2023
8/23/2023
8/26/2023
8/28/2023
8/28/2023
8/28/2023
8/30/2023
8/30/2023
8/30/2023
9/1/2023
9/7/2023
9/7/2023
9/7/2023
9/5/2023
9/9/2023
9/14/2023
9/12/2023
9/15/2023
9/15/2023
9/19/2023
9/19/2023
9/20/2023
9/20/2023
9/21/2023
9/22/2023
9/23/2023
10/3/2023
10/3/2023
10/4/2023
10/4/2023
10/6/2023
10/9/2023
10/11/2023
10/12/2023
10/16/2023
10/16/2023
10/18/2023
10/18/2023
10/19/2023
10/19/2023
10/19/2023
10/19/2023
10/19/2023
10/19/2023
10/20/2023
10/25/2023
10/25/2023
11/2/2023
11/2/2023
11/4/2023
11/7/2023
11/8/2023
11/20/2023
11/20/2023
11/20/2023
11/20/2023
11/24/2023
11/24/2023
11/25/2023
12/2/2023
12/2/2023
12/2/2023
12/9/2023
12/9/2023
12/13/2023
12/16/2023
12/21/2023
12/21/2023
12/21/2023
12/20/2023
12/20/2023
12/20/2023
12/21/2023
12/23/2023
12/23/2023
12/23/2023
12/28/2023
Name of Project: Baiyyapanahalli Metro Depot
Rain Register
Rain Timings Site Condition
Sl. No Date Day
From To Disturbed Undisturbed
1 5/3/2023 Wednesday 10:00 12:00 Soil loading Survey Works
Soil loading &
2 5/5/2023 Friday 9:00 12:00
survey works
Soil loading &
3 5/6/2023 Saturday 14:00 17:00
survey works
Soil loading &
4 5/8/2023 Monday 16:30 18:00
survey works
5 11-May-23 Thursday 20:00 0:00
Soil loading &
6 20-May-23 Saturday 16:30 18:00
survey works
Soil loading &
7 21-May-23 Sunday 15:00 17:30
survey works
8 22-May-23 Monday 17:00 19:00
Soil loading &
9 30-May-23 Wednesday 13:00 18:00
survey works
10 1-Jun-23 Thursday 18:00 22:00
11 9-Jun-23 Friday 18:00 20:00
12 11-Jun-23 Sunday 17:00 18:30
Excavation &
13 6/12/2023 Monday 18:00 20:00
Backfilling works
14 6/14/2023 Wednesday 18:00 19:30
15 6/20/2023 Tuesday 9:00 14:00 All Activities
16 6/21/2023 Wednesday 10:00 14:00
17:00 20:00
Excavation &
17 6/25/2023 Sunday 09:00pm 10;00pm
Backfilling works
Excavation &
18 6/27/2023 Tuesday
05:00pm 06;30 Backfilling works
n Register
D-wall works
D-wall works
D-wall works
D-wall works
D-wall works, Excavation works
D-wall works, Excavation works
D-wall works, Excavation, pile cap works
D-wall works, Excavation works
D-wall works, Excavation works
D-wall works, Guide wall, Excavation works
D-wall works, Guide wall, Excavation works
D-wall works, Guide wall, Excavation works
D-wall works, Guide wall, Excavation works