Professional Documents
Culture Documents
Daily Progress Report Diaphragm Wall Pilling BMRCL 29-12-2023
Daily Progress Report Diaphragm Wall Pilling BMRCL 29-12-2023
NOTE:
A. Resources available at Site like D Wall Rig B-200/ Pilling Rig, Crane 100T, Crane75T Crane40T, JCB, Compressor, DG etc.
B. Requirement of Manpower:
C. Manpower: Steel fabrication Manpower 65 Nos. Concrete Manpower 17 Nos & Anchor works Man Power 0 Nos. Total Manpower 82 Nos. Skilled 64 Nos & 18 Nos Unskilled.