NORTHERN RAILWAY

ELECTRICAL BRANCH
HQ Office, New Delhi
Dated: 25.10.2023
No. 230-Elect/TRD/264

Chief Project Director,


Railway Electrification,
Ambala Cantt.
SUB: 2 x 25 KV upgradation sanctioned works of NR

REF: (i)Railway board letter no. 2023/GS (Elect)/161/152 dated 25.07.2023


letter no. 2023/GS (Elect)/161/31/2023 dated 11.09.2023
(i) Railway board
of up
Vide letter under reference (), Railway Board has sanctioned following works under PH
gradation of electric traction over Indian Railways (Umbrella 2023-24) (PB no. 191)
35 Electrification Projects in Railway electrification of NR department. Details of the sanctioned
Work is as under:

SNo Alloc Cost (in


Description
Rs. Cr.)
1 NR Upgradation of electric traction system Delhi -Panipat-Ambala (197 CAP 474.16
rkm/394tkm) (PB#190/CORE/2023-24)
2 NR Upgradation of electric traction system Sanewal -Jalandhar-Amritsar CAP 313.41
(164 rkm/328 tkm) (PB#190/COREI2023-24)
NR Upgradation of electric traction system Jalandhar Cantt-Jammutavi CAP 377.65
(188.65 rkm/377.30tkm) (PB#190/COREI2023-24)
NR Upgradation of electric traction system Saharanpur-Moradabad (135 CAP 419.91
rkm/270tkm) (PB#190/CORE/2023-24)
5 NR Upgradation of electric traction system Ghaziabad-Moradabad | CAP 255.45
(152.52 rkm/305.04tkm) (PB#190/CORE/2023-24)
6 NR Upgradation of electric traction system Delhi - Rosa Lucknow (197 CAP 296.27
rkm/394tkm) (PB#190/CORE/2023-24)
NR Upgradation of electric traction system Utratia-Maharani Paschim (184 CAP 365.40
rkm/368tkm) (PB#190/COREI2023-24)

Further, vide letter under reference (ii), Railway Board has also informed that 2X25 KV
up aradation work electrification works shall be executed by Zonal Railways through
CEE/Projects. It is also elaborated that SAG Officer, i.e., CPD/RE/UMB shall report to
PCEE/NR for execution of 2x 25 KV upgradation works along with left over 1 x 25 KV
electrification works.

Item (e ) of the letter further elaborates that 75% of the Gazetted as well as Non
Gazetted manpower of the units proposed for transfer to Zonal Railways shall report to PCEE
of the concerned Zonal Railway for execution of the targeted 2 X 25 KV electrictraction
ungradation work as per sanctioned Umbrella work, left over works/ drawing completion report/
nnst contractual issues of 1x 25 KV electrification works of RE projects and maintenance and
upkeep of newly created electric traction infrastructure assets.
In view of the above, PCEE/NR has directed for following preliminary works for the
execution of 2 x 25KV up-gradation work in above sections:
.Riy.

() Feasibility for 3-phase supply from CTU/STUfor drawl of power for 2x 25KV TSS
including associated works.
(ü) Site- Survey for 2 X 25 TSS, SP and SSP.
(ii) Preparation of General Power Supply diagram, Wiring diagram and Sectioning
diagram of the respective sections.
(iv) Preparation of detailed estimate for OHE 2x25 modification & PSI/SP/SSP
installation.

Further, listof staf/officer alongwith duty list of RE/UMB unit shall be provided to this
office and no staff from RE/UMB unit shall be transferred to any other unit.
This is issued with the approval of PCEE/NR.

Arpan kumar
(For Principal Chief Electrical Engineer/NR)

Copy to :
(i)CÁOICORE,Prayagraj, Utar Pradesh 211001 :for kind information please.
(ii)EDIGati Shakti/Rail Bhawan ,New Delhi :for kind information please.
(ii)Sr.DEETRDIDLI,LKO,FZR,UMB,MB : for kind information andproviding necessary
assistance regarding location planning and land identification .