Professional Documents
Culture Documents
Lab-Report - 1-201902075
Lab-Report - 1-201902075
Lab-Report - 1-201902075
Lab Report NO # 01
Course Title:
Course Code: CSE 454 Section: D1
Lab Experiment Name: Describe the process for setup of Software Test
Environment of ATM system.
Student Details
Name ID
2. OBJECTIVES/AIM
The objective of this lab is to establish a controlled environment for testing the software of an
ATM system. The aim is to ensure the reliability and security of the ATM software by creating a
dedicated testing environment.
Acquire a dedicated testing server with the required hardware specifications.Install a clean
operating system on the testing server.Set up a secure network with firewalls to isolate the
testing environment from the production network.we will define and describe the steps required
for hardware and software configuration, network setup, security measures, testing tool
installation, test data generation, test case development, environment validation, version control
implementation, and continuous monitoring.
4. IMPLEMENTATION
we will execute the planned design for the ATM system's Software Test Environment. This
includes procuring and configuring hardware, installing necessary software, setting up databases,
establishing network connections, implementing security measures, deploying testing tools,
generating test data, creating test cases, validating the environment, integrating version control,
and initiating continuous monitoring to ensure a fully operational and controlled testing
environment.
Setting up a software test environment for an ATM system is a crucial process with the primary
objective. we will critically evaluate the Setup in the Test Environment for the ATM system. We
will discuss the process of configuring hardware, software, network infrastructure, security
measures, testing tools, test data, and test cases. We will assess the effectiveness and readiness of
the Software Test Environment, highlighting strengths and potential areas for improvement to
ensure its suitability for comprehensive testing and validation of the ATM system.
7. SUMMARY: The process involves creating a controlled environment for testing, developing
test scripts, executing tests, and reporting results. The ultimate goal is to identify and address
issues before deploying the ATM software in a production environment, ensuring a safe,
efficient, and user-friendly experience for ATM users.