Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

63'-9"

B B

V1 W2 W2 1V V1 W2 W2 V1 W2 W2 1V V1 W2 W2

TOILET TOILET TOILET TOILET TOILET TOILET


7'6"X5'0" 7'6"X5'0" 7'6"X5'0" 7'6"X5'0" 7'6"X5'0" 7'6"X5'0"
D2 D2 D2 D2 D2 D2 D2 D2

BEDROOM BEDROOM
BEDROOM BEDROOM BEDROOM BEDROOM
11'1021"X12'3" STAFF 11'1021"X12'3" STAFF
11'1021"X12'3" 11'1021"X12'3" 11'1021"X12'3" 11'1021"X12'3"
BEDROOM BEDROOM
16'421"X12'3" 16'421"X12'3"

D1 D1 D1 D1 D1 D1 D1
D1

4'0" WIDE CORRIDOR

A A' A A'
64'-3"

ENTRY

D1 D1 D1 D1 D1
DN UP DN UP
KITCHEN AND
DINING
BEDROOM BEDROOM CAPACITY-22 BEDROOM BEDROOM
11'1021"X12'3" 11'1021"X12'3" 22'3"X17'721" 11'1021"X12'3" 11'1021"X12'3"
OPEN BALCONY
16'421"X12'3"

ffl to ffl : 10'6" ffl to ffl : 10'6"


D2 D2 tread : 1'0"
D2 D2 tread : 1'0"
TOILET TOILET TOILET TOILET
gap : 0'6" gap : 0'6"
7'6"X5'0" 7'6"X5'0" step width : 2'9" 7'6"X5'0" 7'6"X5'0" step width : 2'9"
risers : 20equals risers : 20equals

V1 V1
D1 V1 V1
W2 W2 W2 W1 W1 W2 W2 W2

GROUND FLOOR PLAN FIRST FLOOR PLAN


B' B'

SILL LINTEL
SCHEDULE OF JOINERY LEVEL LEVEL SEAL AND SIGNATURE DRAWING TITLE BLOCK NAME
D1 DOOR 3'0" x 8'0" - 8'0"
D2 DOOR 2'6" x 8'0" - 8'0"
D3 DOOR 3'0" x 8'0" - 8'0" ARCHITECTURAL FLOOR PLAN GURUKULAM/HOSTEL REG.NO.
D4 DOOR 4'0" x 8'0" - 8'0"
O1 OPENING 4'0" x 8'0" - 8'0" 1 1 3 6 1 6 2 5 1 0 3 6
O2 OPENING 3'7" x 8'0" - 8'0" DATE DRAWN BY SCALE
1'0"
FW1 FRENCH WINDOW 6'0" x 7'0" 8'0" PROJECT
FW2 FRENCH WINDOW 4'0" x 7'0" 1'0" 8'0"
FW3 FRENCH WINDOW 2'0" x 7'0" 8'0" 23.07.2021 PAVITHRA.S TO FIT
FW4 FRENCH WINDOW 4'0" x 7'0"
1'0"
1'0" 8'0" THE CULTURAL HERITAGE
W1 WINDOW 4'0" x 5'0" 3'0" 8'0"
GRAPHICAL SCALE BATCH
W2 WINDOW 3'0" x 5'0" 3'0" 8'0" DANCE AND DRAMA
W3
V
WINDOW
VENTILATOR
2'0" x 5'0"
2'0" x 2'0"
3'0"
6'0"
8'0"
8'0" C E N T R E 1'0" 4'0"
2 0 1 6 - 2 0 2 1
0
FG FIXED GLASS - - - 2'0"

You might also like