RPP Contractors Indonesia

PLANT DEPARTMENT
Dewatering Divison

ABN Project
Sangasanga Site
ABN Site - Dewatering Plan Plan Start January 2024
ABN Site - Dewatering Plan Plan Option January 2024
ABN Site - Dewatering Plan Time Frame Dewatering
ABN Site - Dewatering Plan Finally Plan Dewatering

Line 1 KPLS001
rL 30 Line 2 KPLS005
Line 3 KP15010
Line 4 MP38003

rL -70

Line 4 MP21001

rL -154 to -180 Line 1 KPLS006


Line 2 KSB-Backup
Line 3 MP21002
ABN Site - Dewatering Plan Duty Point Booster Elv.-70
ABN Site - Dewatering Plan Duty Point Booster Elv.-70
ABN Site - Dewatering Plan Plan Dewatering

PIT
North West
ABN Site - Dewatering Plan
Plan Dewatering Pit NW

rL 37
Line 1 MP48012

Line 2 MP38003
Line 1 MP48001
rL 0
rL -53
ABN Site - Dewatering Plan
Plan Dewatering Pit NW

rL 37

rL 0
ABN Site - Dewatering Plan Dewatering Pumps unit
ABN Site - Dewatering Plan

Pumps Allocation
Water Fill & Support Pumps
PIT 4 Water fill SP19 - TP02005
Line 1 KPLS006 - KPLS001 Water
Sump fill Water fill SP21 - EP15011
Line 2 MP21002 - KP15010
19 Line 3 MP21001 - KPLS005 Washing Pumps - WPSC007
North Line 4 -
Transfer Pump - TP02011

Pumps Under Repair


PIT North West KP29001 - Plan Engine overhoul
Line 1 MP48001 - MP48012 KP29002 - Plan Engine overhoul
Line 2 MP38003 Direct Breakdown KPLS002 - Plan Engine recondition
Sump
South Transfer Pump - TP02008 KPLS003 - Plan Engine overhoul
MP48010 - Bareshaft overhoul
ABN Site - Dewatering Plan

DEWATERING IMPROVEMENT
PROGRAM 2024

Training Program Knowledge Pump unit


Prosedur Operasional pompa
Program Maintenance unit Pompa
ABN Site - Dewatering Plan

DEWATERING IMPROVEMENT
PROGRAM 2024

Daily Inspection
Daily inspection pump unit

Summary report & follow up parts


recommended
PT RPP Contractors Indonesia
Plant Department

INSPECTION PUMPS UNIT


ID Unit : KPLS001 Date:
SN Unit : 049-1806068-001 30 Dec’
SN Engine : TWM06346 2023
HM Unit : 17244 hours
Application : Booster pump
Position : Booster Borneo Pit 4

Engine
side
Panel priming Clamp Turbocharger
Controller leaking LH side

Good Condition Replacement parts

O-ring oil return Radiator RH bottom


pipe leaking side dirty

Type LSA - 6/8


ReO-ring Washing component

Cap radiator worn Radiator LH Middle


out side Clean

KPLS001
Good Condition
Recommended
replacement parts
Pumps
side
Pump set group Oil bareshaft leaking
of impro seal

Good Condition Reposition pump


skid at Booster

Suction hose
discolation

Supply water not


maximal

Note :
Pump recommended running, temperorry parts order to replacement

Recommended :
Please, order parts as required & reposition pump unit
...............................................................................................................

Create by,

Arief Kurniawan
PT RPP Contractors Indonesia
Plant Department

INSPECTION PUMPS UNIT


ID Unit : KPLS005 Date:
SN Unit : 049-1806068-003 30 Dec’
SN Engine : TWM06368 2023
HM Unit : 17063 hours
Application : Booster pump
Position : Booster Borneo Pit 4

Engine
side
Radiator Middle Blanket Elbow
side dirty muffler not installed

Washing Install blanket


component muffler

Pre cleaner worn Panel priming


out controller

Type LSA - 6/8


Good condition
Replacement pre
cleaner
Blanket Pipe muffler Terminal cable work
not installed lamp worn out

KPLS005
Installed blanket Rewiring harness

Pumps
side
Pump set group Oil bareshaft leaking
of impro seal

Good Condition Reposition pump


skid pad Booster

Suction hose &


booster tank

Good condition

Note :
Pump recommended running, temperorry parts order to replacement

Recommended :
Please, order parts as required & reposition pump unit
...............................................................................................................

Create by,

Arief Kurniawan
PT RPP Contractors Indonesia
Plant Department

INSPECTION PUMPS UNIT


ID Unit : KPLS006 Date:
SN Unit : 049-1806069-003 30 Dec’
SN Engine : TWM06351 2023
HM Unit : 14951 hours
Application : Main pump
Position : Sump 19 North

Engine
side
Engine LH side Radiator RH side

Good Condition Good condition

Panel controller Ducting condition

Type LSA - 6/8


Good condition Good condition

Engine RH side Radiator RH side

KPLS006
Good condition Good condition

Pumps
side
Pump set group Suction boom Group

Good Condition Good condition

Pump position at
Sump

Good condition

Note :
Pump recommended running.

Recommended :
Please, order parts as required
...............................................................................................................

Create by,

Arief Kurniawan
PT RPP Contractors Indonesia
Plant Department
Dewatering Division
INSPECTION PUMPS UNIT

ID Unit :
MP38003
Foto SN Unit :
-
SN Engine :
RRA12686
HM Unit :
10463
Engine Application :
side Main Pump
Engine Position
RH side : Engine LH side
Pit NW
Foto Foto
Condition : Condition :
Good condition Good condition

Exhaust & muffler Radiator Condition

Foto Foto

Type MF-385 HP
Condition : Condition :
Good condition Good condition

Panel Box Work light &


Controller Electrical system
Foto Foto

MP38003
Condition :
Condition : Good function
good condition
Pumps
side
Pump set group Vacuum Pump set

Foto Foto
Condition : Condition :
SN Bareshaft Good function

Suction hose & Vacuum tank


Strainer
Foto Foto
Condition : Condition :
Good condition Good condition

Note :
Pump recommended running, pump good condition

Recommended :
...............................................................................................................
...............................................................................................................
..............................................................................................................

Create by,

...............................
..
ABN Site - Dewatering Plan
Summary Meeting Evaluasi

MOM Evaluasi Dewatering Pumps


TERIMA KASIH