Presentasi Plant HO Januari 21 ' 2024
Presentasi Plant HO Januari 21 ' 2024
PLANT DEPARTMENT
Dewatering Divison
ABN Project
Sangasanga Site
ABN Site - Dewatering Plan Plan Start January 2024
ABN Site - Dewatering Plan Plan Option January 2024
ABN Site - Dewatering Plan Time Frame Dewatering
ABN Site - Dewatering Plan Finally Plan Dewatering
Line 1 KPLS001
rL 30 Line 2 KPLS005
Line 3 KP15010
Line 4 MP38003
rL -70
Line 4 MP21001
PIT
North West
ABN Site - Dewatering Plan
Plan Dewatering Pit NW
rL 37
Line 1 MP48012
Line 2 MP38003
Line 1 MP48001
rL 0
rL -53
ABN Site - Dewatering Plan
Plan Dewatering Pit NW
rL 37
rL 0
ABN Site - Dewatering Plan Dewatering Pumps unit
ABN Site - Dewatering Plan
Pumps Allocation
Water Fill & Support Pumps
PIT 4 Water fill SP19 - TP02005
Line 1 KPLS006 - KPLS001 Water
Sump fill Water fill SP21 - EP15011
Line 2 MP21002 - KP15010
19 Line 3 MP21001 - KPLS005 Washing Pumps - WPSC007
North Line 4 -
Transfer Pump - TP02011
DEWATERING IMPROVEMENT
PROGRAM 2024
DEWATERING IMPROVEMENT
PROGRAM 2024
Daily Inspection
Daily inspection pump unit
Engine
side
Panel priming Clamp Turbocharger
Controller leaking LH side
KPLS001
Good Condition
Recommended
replacement parts
Pumps
side
Pump set group Oil bareshaft leaking
of impro seal
Suction hose
discolation
Note :
Pump recommended running, temperorry parts order to replacement
Recommended :
Please, order parts as required & reposition pump unit
...............................................................................................................
Create by,
Arief Kurniawan
PT RPP Contractors Indonesia
Plant Department
Engine
side
Radiator Middle Blanket Elbow
side dirty muffler not installed
KPLS005
Installed blanket Rewiring harness
Pumps
side
Pump set group Oil bareshaft leaking
of impro seal
Good condition
Note :
Pump recommended running, temperorry parts order to replacement
Recommended :
Please, order parts as required & reposition pump unit
...............................................................................................................
Create by,
Arief Kurniawan
PT RPP Contractors Indonesia
Plant Department
Engine
side
Engine LH side Radiator RH side
KPLS006
Good condition Good condition
Pumps
side
Pump set group Suction boom Group
Pump position at
Sump
Good condition
Note :
Pump recommended running.
Recommended :
Please, order parts as required
...............................................................................................................
Create by,
Arief Kurniawan
PT RPP Contractors Indonesia
Plant Department
Dewatering Division
INSPECTION PUMPS UNIT
ID Unit :
MP38003
Foto SN Unit :
-
SN Engine :
RRA12686
HM Unit :
10463
Engine Application :
side Main Pump
Engine Position
RH side : Engine LH side
Pit NW
Foto Foto
Condition : Condition :
Good condition Good condition
Foto Foto
Type MF-385 HP
Condition : Condition :
Good condition Good condition
MP38003
Condition :
Condition : Good function
good condition
Pumps
side
Pump set group Vacuum Pump set
Foto Foto
Condition : Condition :
SN Bareshaft Good function
Note :
Pump recommended running, pump good condition
Recommended :
...............................................................................................................
...............................................................................................................
..............................................................................................................
Create by,
...............................
..
ABN Site - Dewatering Plan
Summary Meeting Evaluasi