This document outlines the milestone billing for a construction project with 11 milestones. It lists each billing milestone, the associated percentage of the project cost, a description of the work completed, and any additional billing requirements. The milestones include initial mobilization and down payment, work on the foundation, ground floor, suspended slab, second floor walls, roofing, bare interior, finishes, and a 10% retention to be released after 3 months. Pictures of completed work must be sent by messenger before each billing or no payment will be issued, and billing cut-off is every Friday until 6pm with a 1 week processing time.
This document outlines the milestone billing for a construction project with 11 milestones. It lists each billing milestone, the associated percentage of the project cost, a description of the work completed, and any additional billing requirements. The milestones include initial mobilization and down payment, work on the foundation, ground floor, suspended slab, second floor walls, roofing, bare interior, finishes, and a 10% retention to be released after 3 months. Pictures of completed work must be sent by messenger before each billing or no payment will be issued, and billing cut-off is every Friday until 6pm with a 1 week processing time.
This document outlines the milestone billing for a construction project with 11 milestones. It lists each billing milestone, the associated percentage of the project cost, a description of the work completed, and any additional billing requirements. The milestones include initial mobilization and down payment, work on the foundation, ground floor, suspended slab, second floor walls, roofing, bare interior, finishes, and a 10% retention to be released after 3 months. Pictures of completed work must be sent by messenger before each billing or no payment will be issued, and billing cut-off is every Friday until 6pm with a 1 week processing time.
This document outlines the milestone billing for a construction project with 11 milestones. It lists each billing milestone, the associated percentage of the project cost, a description of the work completed, and any additional billing requirements. The milestones include initial mobilization and down payment, work on the foundation, ground floor, suspended slab, second floor walls, roofing, bare interior, finishes, and a 10% retention to be released after 3 months. Pictures of completed work must be sent by messenger before each billing or no payment will be issued, and billing cut-off is every Friday until 6pm with a 1 week processing time.
FRONT WALL EXTERIOR PAINTED DONE GROUND FLOOR SLAB POURED CR WITH TILE AND FIXTURES DONE GROUND FLOOR PLUMBING ROUGH-INS INSTALLED ELECTRICAL WORKS COMPLETED DONE SEPTIC VAULT COMPLETED PLUMBING WORKS COMPLETED DONE SANITARY PIPES INSTALLED CEILING GROUND FLOOR AND CR COMPLETED DONE WATER PIPES INSTALLED BALCONY RAILING INSTALLED PLASTERING OF INTERIOR AND EXTERIOR WALL COMPLETED 4.0 5% GROUND FLOOR WALL HYDROTESTING FOR WATERLINE
9.0 15% FINISH
WALL FOOTING COMPLETED GROUND FLOOR WALLS COMPLETED PARTITON SECOND FLOOR COMPLETED TILES AT GROUND AND SECOND FLOOR INSTALLED 5.0 15% SUSPENDED SLAB CEILING AT GROUND FLOOR INSTALLED STAIR RAILINGS INSTALLED SECOND FLOOR BEAMS POURED PAINTING INTERIOR AND EXTERIOR WALLS COMPLETED SECOND FLOOR PLUMBING ROUGH-INS INSTALLED CEILING AT SECOND FLOOR AND CR COMPLETED SECOND FLOOR SLAB POURED 11.0 10% RETENTION TO BE RELEASED AFTER 3 MONTHS 6.0 5% SECOND FLOOR WALLS BILLING REQUIREMENTS SECOND FLOOR WALLS COMPLETED A. PICTURES ELECTRICAL ROUGH-INS INSTALLED -must send using messenger NO PICTURE NO BILLING B. CUT-OFF BILLING - every FRIDAY until 6pm only C. 1 WEEK - PROCESSING OF BILLING