Contractor:

Project Name: Zealex Hotel Project


Package :

Company :

REQUEST FOR INSPECTION (RIN)


ACMV Work (Equipment Type : Fan Coil Unit)
Date Requested : RIN No :

Discipline :

Type of Work :

Approved Shop Dwg. No. & Method Of Statement :

Inspection Date : Inspection Time : Model :

Location of Inspection Requested S/No. :


Building / Zone : Equipment Tag No :

Item Inspection Sub- Con Main Con QA/QC


Items for Inspection TOC
No Method
ROI Comment ROI Comment ROI Comment
A General
1 Check for fouling, damage, corrosion and secure mounting.
2 Clean drain pan, check drainage, clear choke and flush drain pipe.
3 Check & Clean / replace air filters.
4 Check for any water leak.
5 Check all Joints for tightness.
6 Check and comb all dented fins of coil if necessary.
7 Check and clean equipment generally.
B Electrical Parts
8 Check fuse (s) / replace if require.
9 Check and clean starter contacts.
10 Check thermostat.
C Evaporators (Cooling Water)
11 Clean heat exchanger coil and fin and flush with water.
12 Check and comb all dented fins of coil if necessary.
13 Check authorized valves.
14 Check and clean water strainer.
D Fan and Motor
15 Check and clean water strainer.
16 Check bearing for noise.
17 Check and clean motor terminal points and contact fingers of starter.
18 Check and clean blower fan.

TOC : Type Of control , ROI : Rate of Inspection


Remarks:

Sub-Con Main Contractor QA/QC


Request for inspection
Pass Fail Pass Fail Pass Fail
Name :
Position :
Signature :
Date :
STD-E&C-B-ZLP-FM-004 Rev-0
Contractor:
Project Name: Zealex Hotel Project
Package :

Company :

REQUEST FOR INSPECTION (RIN)


ACMV Work (Equipment Type : Air Handling Unit)
Date Requested: RIN No :

Discipline:

Type of Work :

Approved Shop Dwg. No. & Method Of Statement:

Inspection Date : Inspection Time : Model :

Location of Inspection Requested S/No. :


Building / Zone : Equipment Tag No :

Item Inspection Sub- Con Main Con QA/QC


Items for Inspection TOC
No Method
ROI Comment ROI Comment ROI Comment
A General
1 Check equipment generally.
2 Clean drain pan, check drainage, clear choke and flush drain pipe.
3 Check return & supply duct connection and insulation.
4 Check chilled water pipe in/out.
5 Check & Clean air filters.
6 Check for any water / pressure leakage.
7 Check unit for damage (external).
B Electrical Parts
8 Check connection for power panel, control panel and theromostat.
9 Check starter contacts.
10 Check incoming voltage.
11 Check motor kW & HP.
C Fan and Motor
12 Check for deterioration of blower fan wheel.
13 check and adjust belt tension.
14 Inspect for abnormal noise and vibration.
15 Check and record air flow.
16 Check and record water flow.
17 Check and record air temperature. Inlet [ ], Outlet [ ]
18 Check and record water temperature. Inlet [ ], Outlet [ ]
19 Check and record motor running ampere. Inlet [ ], Outlet [ ]

20 Compare Data Sheet with installed device. Note all corrections on Data Sheet.

TOC : Type Of control , ROI : Rate of Inspection


Remarks:

Sub-Con Main Contractor QA/QC


Request for inspection
Pass Fail Pass Fail Pass Fail
Name :
Position :
Signature :
Date :
STD-E&C-B-ZLP-FM-004 Rev-0
Contractor:
Project Name: Zealex Hotel Project
Package :

Company :

REQUEST FOR INSPECTION (RIN)


ACMV Work (Equipment Type : Ventilation Fan)
Date Requested: RIN No :

Discipline:

Type of Work :

Approved Shop Dwg. No. & Method Of Statement:

Inspection Date : Inspection Time : Model :

Location of Inspection Requested S/No. :


Building / Zone : Equipment Tag No :

Item Inspection Sub- Con Main Con QA/QC


Items for Inspection TOC
No Method
ROI Comment ROI Comment ROI Comment
A General
1 Check equipment generally.
2 Check unit for damage and corrosion.
3 Check return & supply duct connection and insulation.
4 Check for any water / pressure leakage.
5 Check unit for damage (external).
B Electrical Parts
6 Check connection for power panel, control panel and theromostat.
7 Check starter contacts.
8 Check incoming voltage.
9 Check motor kW & HP.
C Fan and Motor
10 Check for deterioration of blower fan wheel.
11 check and adjust belt tension.
12 Inspect for abnormal noise and vibration.
13 Check and record air flow.
14 Check and record air temperature. Inlet [ ], Outlet [ ]
15 Check and record motor running ampere. Inlet [ ], Outlet [ ]

16 Compare Data Sheet with installed device. Note all corrections on Data Sheet.

TOC : Type Of control , ROI : Rate of Inspection


Remarks:

Sub-Con Main Contractor QA/QC


Request for inspection
Pass Fail Pass Fail Pass Fail
Name :
Position :
Signature :
Date :
STD-E&C-B-ZLP-FM-004 Rev-0
Contractor:
Project Name: Zealex Hotel Project
Package :

Company :

REQUEST FOR INSPECTION (RIN)


ACMV Work (Equipment Type : Chiller)
Date Requested: RIN No :

Discipline:

Type of Work :

Approved Shop Dwg. No. & Method Of Statement:

Inspection Date : Inspection Time : Model :

Location of Inspection Requested S/No. :


Building / Zone : Equipment Tag No :

Item Inspection Sub- Con Main Con QA/QC


Items for Inspection TOC
No Method
ROI Comment ROI Comment ROI Comment
A General
1 General Information
2 Application Data
2.1 Chiller
2.2 Heat Exchanger
2.3 Compressor Motor
3 Machine Nameplate Supply Data
4 Machine Electrical Data
5 Control, Oil Pump and Heater Data
6 Variable Frequency Drive Data
7 Start_up Data
7.1 Refrigeration
7.2 Lubrication
8 Water System
9 Electrical
10 Motor
11 Check Fan Motor Operating Condition
12 Operator Instructed
13 Data Log Enclosed
B System Final Test
1 Operating Voltage [ V ]
2 Check Outlet Water Temperature [ C ]
3 Condenser Refrigerant Temperature [ C ]
4 Record Compressor Oil Pressure [ RPA ]
5 Oil Temperature [ C ]
6 Line Ampere
7 Cooling Tower Water Checking

TOC : Type Of control , ROI : Rate of Inspection


Remarks:

Sub-Con Main Contractor QA/QC


Request for inspection
Pass Fail Pass Fail Pass Fail
Name :
Position :
Signature :
Date :
STD-E&C-B-ZLP-FM-004 Rev-0
Contractor:
Project Name: Zealex Hotel Project
Package :

Company :

REQUEST FOR INSPECTION (RIN)


ACMV Work (Equipment Type : Water Pump System)
Date Requested: RIN No :

Discipline:

Type of Work :

Approved Shop Dwg. No. & Method Of Statement:

Inspection Date : Inspection Time : Model :

Location of Inspection Requested S/No. :


Building / Zone : Equipment Tag No :

Item Inspection Sub- Con Main Con QA/QC


Items for Inspection TOC
No Method
ROI Comment ROI Comment ROI Comment
A General
1 Check unt for damage and corrosion
2 Check water pump mechanical seal
3 Check for any water leak
4 Check and clean strainer filter
5 Check of function manual hand valve
6 Check for operation of control wiring
7 Check and clean equipment generally
B Visual Check
8 Piping connection
9 Free rotating of Pump
10 Component visual check
C Final Testing of System
11 Suction Pressure (Bar)
12 Discharge Pressure (Bar)
13 Motor Power input (kW)
14 Motor Speed (RPM)
15 Operating Voltage
16 Operating Current (Amp)

TOC : Type Of control , ROI : Rate of Inspection


Remarks:

Sub-Con Main Contractor QA/QC


Request for inspection
Pass Fail Pass Fail Pass Fail
Name :
Position :
Signature :
Date :
STD-E&C-B-ZLP-FM-004 Rev-0
Contractor:
Project Name: Zealex Hotel Project
Package :

Company :

REQUEST FOR INSPECTION (RIN)


ACMV Work (Equipment Type : DX Type)
Date Requested: RIN No :

Discipline:
Type of Work :

Approved Shop Dwg. No. & Method Of Statement:

Inspection Date : Inspection Time : Model :


Location of Inspection Requested S/No. :
Building / Zone : Equipment Tag No :

Item Inspection Sub- Con Main Con QA/QC


Items for Inspection TOC
No Method
ROI Comment ROI Comment ROI Comment
A Outdoor Unit
1 Is there any shipping damage?
2 If so, where.
3 Will this damage prevent unit start-up?
4 Has the group wire been connected?
5 Has the circuit protection been sized and installed properly?
6 Are the power wires to the unit sized and installed properly?
B Controls

1 Are thermostat and indoor Fan Control wiring connections made and checked?

2 Are all wiring Terminals (including main power supply) Tight?


3 Has crankcase heater been Energized for 24hours?
C Indoor Unit
1 Has water been placed in drain pan to comfirm proper drainage?
2 Are proper air filters in place?
3 Have fan and motor pulleys been checked for proper aligment?
4 Has correct fan rotation been confirmed?
D Piping
1 Have leak check been made at compressor Outdoor and Indoor coils?
TXVs (Thermostatic Expansion Valves), Solenoid Valves, Filter Driers and
2
Fusible Plugs with A Leak Detector?
3 Locate, repair and report any leaks.
4 Have all compressor service valves been fully opened (BACKSEATED)?
5 Have liquid line service valves been opened?
Is the oil level in each compressor crankcase visible in the compressor sight
6
glasses?
E Check Voltage Imbalance
1 Line - to - line volts
2 (AB + AC + BC) /3 = Average Voltage =
3 Maximum Deviation form Average Voltage =
4 Voltage Imbalance = 100 x (Max Deviation)/(Average Voltage) =

TOC : Type Of control , ROI : Rate of Inspection


Remarks:

Sub-Con Main Contractor QA/QC


Request for inspection
Pass Fail Pass Fail Pass Fail
Name :
Position :
Signature :
Date :

STD-E&C-B-ZLP-FM-004 Rev-0
Contractor:
Project Name: Zealex Hotel Project
Package :

Company :

REQUEST FOR INSPECTION (RIN)


ACMV Work
Date Requested: RIN No :

Discipline:

Type of Work :

Approved Shop Dwg. No. & Method Of Statement:

Inspection Date : Inspection Time : Weather :

Location of Inspection Requested Level :


Building / Zone : Part :

Item Inspection Sub- Con Main Con QA/QC


Items for Inspection TOC
No Method
ROI Comment ROI Comment ROI Comment

A Room By Room

1 Location of CHWS/R Pipes are installed as per approved shop drawing.


Location of Ducts are installed as per approved shop drawing. (AC, FAD, EAD,
2
KEAD)
Location of Condensate drain pipes are installed as per approved shop
3
drawing and porper slope outlet water get ( )%.
4 No Visible damage.

5 Firmly secured and joints properly sealed and pointed.

6 No leakage at all joints.

7 Check pipe support/hanger is properly installed.


Location of Fire Dampers are installed as per approved shop drawing and open
8
position. (FA, EA, KEA)
Location of each VCDs are installed as per approved shop drawing and open
9
position. (FA, EA, KEA)
Gate Valves, Strainer, Balancing Valves, Actuator Valves, Air Release Valves,
10
Flexible Pipes are installed as per approved shop drawing.

11 Electrical Conduit Pipe, wiring, joint box, flexible pipe are proper installation.

12 Drain Pans are water tight and proper installation.

13 Fire seal and rock wool are seal every pipe and duct.

14 Labling are right direction, colour and proper painting.

TOC : Type Of control , ROI : Rate of Inspection


Remarks:

Sub-Con Main Contractor QA/QC


Request for inspection
Pass Fail Pass Fail Pass Fail
Name :
Position :
Signature :
Date :
STD-E&C-B-ZLP-FM-004 Rev-0
Contractor:
Project Name: Zealex Hotel Project
Package :

Company :

REQUEST FOR INSPECTION (RIN)


ACMV Work
Date Requested: RIN No :

Discipline:

Type of Work :

Approved Shop Dwg. No. & Method Of Statement:

Inspection Date : Inspection Time : Weather :

Location of Inspection Requested Level :


Building / Zone : Part :

Item Inspection Sub- Con Main Con QA/QC


Items for Inspection TOC
No Method
ROI Comment ROI Comment ROI Comment

A Riser Pipe

1 Location and pipe size, reducer are installed as per approved shop drawing.

2 Pipe fitting and joint are water tight and no water leakage.

3 Material used are approved types.

4 No Visible damage.
Pipe support are firmly secured and adequately spaced. (Wall plug, Bolt, Nut,
5
Washer, Long Thread, etc.)
6 Pipe jacketing are fully cover and proper installation for pipe and support.

7 Labling are right direction, colour and proper painting.

8 Riser door installation fininsh.

9 Pressure Testing are finish.

Condensate drain pipe are location, size, fitting, joint, gradient, insulation,
10 support are approved shop drawing and no visible damage, proper joint
connection, slop, no leakage, support firmly secured.
Air release valve, ( )Valve size, location are approved shop drawing and
11
proper installation.

TOC : Type Of control , ROI : Rate of Inspection


Remarks:

Sub-Con Main Contractor QA/QC


Request for inspection
Pass Fail Pass Fail Pass Fail
Name :
Position :
Signature :
Date :
STD-E&C-B-ZLP-FM-004 Rev-0
Contractor:
Project Name: Zealex Hotel Project
Package :

Company :

REQUEST FOR INSPECTION (RIN)


ACMV Work
Date Requested: RIN No :

Discipline:

Type of Work :

Approved Shop Dwg. No. & Method Of Statement:

Inspection Date : Inspection Time : Weather :

Location of Inspection Requested Level :


Building / Zone : Part :

Item Inspection Sub- Con Main Con QA/QC


Items for Inspection TOC
No Method
ROI Comment ROI Comment ROI Comment

A Riser Duct
Location and Duct size, reducer, Offset and other duct fitting are as per
1
approved shop drawing.
Duct fitting and joint are proper connection and duct flang, CS joint are firmly
2
installation.
3 Material used are approved types.

4 No Visible damage.
Duct support are firmly secured and adequately spaced. (Wall plug, Bolt, Nut,
5
Washer, Long Thread, etc.)
Duct insulation (Thermobreak), Gaskets, Silicon are fully cover and proper
6
installation.
7 Labling are right direction, colour and proper painting.

8 Riser door installation fininsh.

9 Testing are finish.


Fire Damper, Non Return Damper, Motorized Damper, VCD Size and location
10
are approved shop drawing,
11 Dampers are right position and proper installation.

(FD ), (NRD ), (MD ), (VCD )

TOC : Type Of control , ROI : Rate of Inspection


Remarks:

Sub-Con Main Contractor QA/QC


Request for inspection
Pass Fail Pass Fail Pass Fail
Name :
Position :
Signature :
Date :
STD-E&C-B-ZLP-FM-004 Rev-0
Contractor:
Project Name: Zealex Hotel Project
Package :

Company :

REQUEST FOR INSPECTION (RIN)


ACMV Work
Date Requested: RIN No :

Discipline:

Type of Work :

Approved Shop Dwg. No. & Method Of Statement:

Inspection Date : Inspection Time : Weather :

Location of Inspection Requested Level :


Building / Zone : Part :

Item Inspection Sub- Con Main Con QA/QC


Items for Inspection TOC
No Method
ROI Comment ROI Comment ROI Comment

A MV DUCTING
Location and Duct size, reducer, Offset and other duct fitting are as per
1
approved shop drawing.
Duct fitting and joint are proper connection and duct flang, CS joint are firmly
2
installation.
3 Material used are approved types.

4 No Visible damage.
Duct support are firmly secured and adequately spaced. (Wall plug, Bolt, Nut,
5
Washer, Long Thread, etc.)
Duct insulation (Thermobreak), Gaskets, Silicon are fully cover and proper
6
installation.
7 Labling are right direction, colour and proper painting.
Fan are installed approved specification. Silincer are installaed as per
8
approved specification and shop drawing.
9 Testing are finish. Air Flow ( )CMH, Noise Level ( )Db.

10 Grilles are installed as per approved size, colour and specification.


Fire Damper, Non Return Damper, Motorized Damper, VCD Size and location
11
are approved shop drawing,
12 Dampers are right position and proper installation.

(FD ), (NRD ), (MD ), (VCD )

TOC : Type Of control , ROI : Rate of Inspection


Remarks:

Sub-Con Main Contractor QA/QC


Request for inspection
Pass Fail Pass Fail Pass Fail
Name :
Position :
Signature :
Date :
STD-E&C-B-ZLP-FM-004 Rev-0
Contractor:
Project Name: Zealex Hotel Project
Package :

Company :

REQUEST FOR INSPECTION (RIN)


ACMV Work
Date Requested: RIN No :

Discipline:

Type of Work :

Approved Shop Dwg. No. & Method Of Statement:

Inspection Date : Inspection Time : Weather :

Location of Inspection Requested Level :


Building / Zone : Part :

Item Inspection Sub- Con Main Con QA/QC


Items for Inspection TOC
No Method
ROI Comment ROI Comment ROI Comment
A Roof Make up Water Tank & Pipe Line
1 Tank Location and size as per approved drawing.
2 Material used are approved specification.
3 Every water tank is complte with the following fittings:
3.1 Inlet pipe with c/w float valve.
3.2 Outlet pipe with c/w isolated valve.
3.3 Drain pipe with c/w drain valve and mosquito-proof netting.
3.4 Overflow pipe with c/w mosquito-proof netting.
3.5 Air Vent with c/w mosquito-proof netting.
3.6 Manhole Cover
3.7 Internal Ladder
3.8 EXternal Ladder
3.9 Water Level sight galss
3.10 Water Level electrodes
4 The manhole cover is provided with rubber gasket and Lock arm.
Accessible for maintenance,minimum clearance of 600mm all round the water
4.1
tank.
The mosquito-proof netting of the vent,drain and overflows pipes have opening
5
not exceeding ( )mm.
6 Inlet, outlet, drain pipe size are approved shop drawing.
The overflow pipe should have an internal diameter not less than that of the
7
inlet pipe.
Inlet, outlet, drain pipe all joints and fitting connection are water tight and no
8
leakage.
All Gate Valves and valve accessories are installed properly with bolt,
9
nut,washer, gasket and watertight.
10 Labling are right direction, colour and proper painting.
Pipe support are firmly secured and adequately spaced. (Wall plug, Bolt, Nut,
11
Washer, Long Thread, etc.)
12 All pipes and supports are painted red oxide, and approved final paint.
13 No Visible damage.

TOC : Type Of control , ROI : Rate of Inspection


Remarks:

Sub-Con Main Contractor QA/QC


Request for inspection
Pass Fail Pass Fail Pass Fail
Name :
Position :
Signature :
Date :

STD-E&C-B-ZLP-FM-004 Rev-0