OM B 0403 DP Footprint Plot - Rev 01 28.01.24
OM B 0403 DP Footprint Plot - Rev 01 28.01.24
Operations OM-B-0403 01 1 of 2
This checklist is to be completed for familiarization carried out for each new personnel.
Vessel: Date:
subdivision
28. Understanding of functions operation and limitations of the vessel, including vessel’s
capability plots
29. Use and understanding of the consequence analysis, both for present operation and for
planning purposes
30. Features of DP control programme unique to the vessel (if applicable)
31. Operational limits for all DP equipment (weather, power, rotation, etc)
32. Effects of environment and operations on operating limits in conjunction with
machinery set-up
33. Switchboard configuration, including operation of bus section switches and bus ties and
reconfiguring electrical supply arrangements in the event of equipment failures
34. Personnel management system
35. Procedure to set Gyro on auto/manual, speed and latitude input
36. Being conversant with all vessel’s engine room standing instructions concerning normal
and emergency operations
37. Correct configuration of equipment in the normal mode of operations – as described in
CAMO
38. Location and means of operating fuel, lubricant, cooling water compressed air and other
essential services isolation and changeover valves and actions required on loss of
essential services
39. Correct configuration of equipment to allow changed operation to auxiliary units on any
single failure
40. Switchboard configuration, including operation of bus section switches and bus ties and
reconfiguring electrical supply arrangements in the event of equipment failures
41. Understand the potential consequences of electrical faults such as short circuits and
earth leakage
42. Experienced blackout & power distribution failure test
Date: Time: