Building 10 Second Floor Façade Walls and FHC Location need to shift as per first
Subject
floor, to match with Plumbing layout.
Drawings(s): Specification(s):
Reference(s) Location(s)
Cluster 1
Other (specify)
Description FLS
Attachment(s)
Contractor’s authorized
Muthu Vijendran Date 25/04/2023
signatory
Signature
Narrative
Second Floor FHC Box is coinciding with Plumbing Pipes. Request for revision in Insulation Walls Layout in
Second Floor.
Classification | Internal
Classification | Internal
Classification | Internal
Classification | Internal
Classification | Internal
Classification | Internal
Classification | Internal
Classification | Internal
Second Floor FHC Box is coinciding with Plumbing Pipes. Request for revision in Insulation Walls Layout in
Second Floor.
The FHC box at first floor is on the right side at First and Ground Floor. So Pipes are moving on left corner of Lift
Shaft. But in second floor, the FHC box is located on the left side.
Attachment(s)
Signature
Attachment(s)
Information Provided
Status
Request Incomplete, returned
Classification | Internal
Classification | Internal
Signature
Received by Contractor
Name Date
Signature
Disclaimer: The above information is in no way a directive to execute work contrary to the Contract documents. If
the Contractor feels that the above noted REPLY to the RFI conflicts with the Drawings/Specifications or other
Contract Documents or not within the scope of his Contractual obligations, DO NOT PROCEED and notify PMC