660 D
498
18
45 17 1 9 7 8 6
11
84
110
12
DETAIL D
100 F
19 DETAIL F
200
(NOMINAL
GAP)
150
M16 16 13 14 15 10
Type Longitudinal Movement [mm] Weight [Kg/pcs]
20 AGFLEXJ 160 ±80 177
400
*On Request The Joint Could Be Produced According To Different Standard And Different Compound
19 Concrete - -
125 250 250 250 250 250 250 250 125 18 Asphalt - -
17 Bolt Hole Sealer - K SB SPC
A 16 Thixotropic Epoxide Bonding System - K KB EpoBond
15 Two-Component Epoxide Primer (on request) K KB EpoPrimer
14 Anchor Bar Grouting - K KB EpoPrimer
13 Waterproof Strip - DT 550
12 Drain Pipe (on request) PVC Øi16 Øe22 mm
11 Transition Strip (on request) K KB A
10 Bedding Mortar (on request) K KB C
498
9 Anchor Bar EN 20898 Cl. 8.8 Zinc Plated Steel
8 Washer EN 20898 Cl. 8.8 Zinc Plated Steel
7 Thick Washer EN 20898 Cl. 8.8 Zinc Plated Steel
6 Nuts EN 20898 Cl. 8.8 Zinc Plated Steel
45
20