This is to notify that the components as described hereunder have been inspected:
Client: National Iranian Oil Company IRN No.: N/A
Reference No.: CP-PL20061-MF-23-O-004 Date / Period of Inspection: Sep 20 to Sep 23, 2023
Lift Piston, AISI 410, AISI 410, A105, SW, CHECK, VALVE, 1’’
7 17 9 9
800#
BB OS&Y, Handwheel, AISI 410, AISI 410, AISI 410, A105,
8 22 6 6
SW, GLOBE VALVE, 1’’ 800#
AS PER NACE MR0175, BB OS&Y, Handwheel, AISI
9 24 6 6 316L+Stellite, AISI 316L+Stellite, AISI 316L+Stellite, A216
WCB, RF, GLOBE VALVE, 2’’ 150#
BB OS&Y, Handwheel, AISI 410, AISI 410, AISI 410, A216
10 25 3 3
WCB, RF, GLOBE VALVE, 2’’ 150#
FULL BORE WRENCH OPERATED, Lever, AISI 410,
11 28 3 3
RPTFE+ENP, AISI 410, A105, RF, BALL VALVE, 1’’ 300#
FULL BORE WRENCH OPERATED, the specifications of the
valve actuator shall be followed as per attached data sheet,
12 29 3 3
Pneumatic, AISI 410, RPTFE+ENP, AISI 410, A105, RF, BALL
VALVE, 1’’ 150#
FULL BORE WRENCH OPERATED, Lever, UNS S31803,
13 30 24 24
RPTFE, UNS S31803, A182 F51, RF, BALL VALVE, 1’’ 300#
FULL BORE WRENCH OPERATED, WITH100mm EACH SIDE
14 31 6 6 NIPPLE, Lever, UNS S31803, RPTFE, UNS S31803, A182
F51, POE x TOE (FIXED NIPPLE), BALL VALVE, 3/4’’ 800#
1 Serial No. and trademark were not marked on valves, please confirm whether it is necessary. PPI
The thread of item 31 was not checked due to BEIER could not provide suitable thread gauge
2 BEIER
on site.
3 Calibration certificates of pressure gauges were not provided by the manufacturer on site. BEIER
Inspection document:
Scope of Inspection:
According to CP-AFI-PL20061-ABZ-0067-00, 2R inspector visited BEIER from Sep 20 to 23, 2023 and
witnessed 100% hydro test, 10% visual & dimension inspection and MTC review for above offered valves
(138pcs in total), details were as below:
● Visual and dimension Inspection (10%)
2R inspector randomly performed 10% visual inspection per item for offered valves and no obvious casted
and forged defects were observed, the result was satisfactory.
Remark: Serial No. and trademark were not marked on valves, please confirm whether it is necessary.
Inspection Report
Dimension inspection was randomly performed 10% per item for offered valves with calibrated measurement
tools and the result was acceptable as per manufacture drawings and ASME B16.10 & B16.5 & B16.11. But
the remarks shall be noted. Refer to the table below for details.
Item Qty checked / L L1 D D1
Result
/ / Drawing 335 100 24 34
1 1 Checked 336.1 100.1 23.8 34 ACC.
2 1 Checked 335.9 100.2 23.7 34.1 ACC.
3 1 Checked 335.8 100 23.9 34 ACC.
/ / Drawing 320 100 18 27 /
10 1 Checked 320.8 100 17.8 27 ACC.
11 1 Checked 321 100.2 17.8 27.2 ACC.
12 5 Checked 320.1~320.5 100~100.2 17.8~18 26.7~27 ACC.
31 1 Checked 320.7 100 17.9 27 ACC.
Remark: The thread of item 31 was not checked due to BEIER could not provide suitable thread gauge on
site.
Qty
Item / L DN D D1 D2 b f n-Φd Result
checked
/ / Drawing 203 50 150 120.5 92 14.3 2 4-19 /
24 1 Checked 203.5 50.6 148.3 120.8 91.5 19.5 2.0 4-19.5 ACC.
25 1 Checked 203.5 50.5 148.6 121.0 91.1 20.1 2.0 4-19.5 ACC.
/ / Drawing 165 25 125 88.9 50.8 15.9 2 4-19 /
28 1 Checked 165.5 25 125.4 89 50.8 17 1.8 4-19 ACC.
165.2~1 124.8~1 50.9~51 16.8~17
30 3 Checked 25~25.1 89~89.2 1.7~1.9 4-19 ACC.
65.8 25 .1 .3
/ / Drawing 127 25 110 79.4 50.8 9.6 2 4-16 /
29 1 Checked 126.3 25 109.2 79.5 51.1 13 1.7 4-16.1 ACC.
Note: Flange thickness “b” for item 24, 25, 29 is acceptable as per ASME B16.5 table 8.
Item Qty checked / L D J Result
/ / Drawing 111 34.5 13 /
17 1 Checked 111.2 34.8 13.3 ACC.
22 1 Checked 111.2 34.8 13.0 ACC.
Instrument used
Conclusion:
Complete
Not complete
Status of Items (acc. to P.O.):
Released for export packing
Ready for shipment
Further Inspections: Yes No
M.O.M
Certificate
The documents which shall be attached to this report based on
NCR
Scope of Inspection: MTC
Release Note
Other:
Place: 261021, East Side of Second Industrial Road, Wenzhou City,
Name of Inspector: Li jin peng
Zhejiang Province, China
(Printed /signature /stamp)
Date: Sep 23, 2023
No leakage for hydro shell test No leakage for hydro shell test
No leakage for pneumatic seat test No leakage for hydro seat test