SHARP ENGINEERING
A-31 MIDC WALUJ, AURANGABAD.
PART NAME. NUT PISTON
PART NO
Order Qty
RAW MATERIAL COST
R\M asper Drawing EN8M
R\M Considered EN8M
Bar Dia / A/F MM A/F 16
R\M Rate /Kg ( Landed ) (Rs) 84.00
Component Length (mm) 13.90
Cutting Allow (mm) 3.50
End piece Allow (mm) 0.50
Comp Blank Length (mm) 17.90
Comp Input Wt. ( KG) 0.031
RM Cost (mm) 2.61
Net Wt ( KG) 0.011
Scrap wt 0.020
Scrap Rate per Kg. (Rs) 26.00
Scrap Cost (Rs) 0.44
Net RM Cost INR 2.17
CONVERSION COST
No. Operations MPR PPH Eff Cost
1 PARTING & DRILING 70 98 90% 0.79
2 CNC--1 180 100 90% 0.00
3 CNC--2 180 90 90% 0.00
4 Tapping 60 100 90% 0.67
5 SURFACE GRINDING 60 60 90% 1.11
6 Inspection 0.10
7 OILING 0.10
TOTAL MACHINING INR INR INR 2.77 ###