other Nature has endowed East Coast region


with her bounty in the form of huge mineral
reserves of the country. Huge reserves of core
minerals of the country like iron ore, manganese ore,
bauxite, lime stone, dolomite, chrome ore, coal are located
in the region. In a bid to exploit the loading potential and to
meet the burgeoning demand of the upcoming industries
and also to fulfill the growing aspiration of the people of
this region, this railway has undertaken a host of projects.

Girder Launching in DKB Project 01--IMPORTANT RAIL PROJECTS COMPLETED IN


E.Co.R
(i) NEW LINES Projects
The 164 km long Koraput - Rayagada New BG line
commissioned in 1995 is a engineering marvel which
traverses through the Eastern Ghat mountain ranges
comprising 36 tunnels, 77 major bridges and 342 minor
bridges. The construction of further 174 Km long Talcher -
Sambalpur New BG Rail Link is also another feather in the
cap of this Railway which was commissioned in August
1998 connecting coastal Odisha with its Western part and
providing a shorter and alternative route. This Rail link is
an instrument for cultural assimilation of the people of
Odisha. Another major project connecting Daitari –
Tunnel of KR Project Keonjhar - Banspani (155 Km) long was completed
during the year 2007. This project facilitated the
transportation of iron ores from the hinterland to major
ports on the Eastern Coast i.e. Paradeep & Dhamara.
(ii) Gauge Conversion Projects
Under the “Project Uni-gauge” the Naupada-Gunupur line (90 Km) has been converted from
narrow gauge to broad gauge and passenger traffic commissioned on 21.8.2011.Now there is
more M.G. or N.G. line exist for conversion in E.Co.R

(iii)Doubling Projects
To exploit the full potential of coal loading, doubling of the 195 km Talcher-Paradeep section
has been completed. Doubling of 264 Km long Titilagarh – Vizianagaram line has also been
completed for traffic flow to VSKP Port. The doubling work between Khurda Road to Puri (43
kms) is in progress, out of which, the work upto Delang (15 kms) has been completed. The
doubling between Sambalpur-Rengali (22.7 Km) has been completed during the year 2011.

2-Details of ongoing Projects under ECoR Construction


Organisation
As on 30.09.2012
SL. Plan Name of Work Estima Year Cum. Outlay Status
No. Head ted of Exp for
Cost sancti upto 2012-
on Mar' 12 13
NEW LINES
1 New Lanjigarh -Junagarh 227.94 1993- 200.15 12.00 Part-I: Lanjigarh to
Line new B.G. line (56 94 Bhawanipatna (31.70 Km.)
km) has been completed &
opened for Passenger
trains on 11.08.2012.
Part-II: Bhawanipatna to
Junagarh (24.30 Km): 15
Km track linking
completed. . For forest
land all the conditions are
fulfilled by Railway. For
taking over 48.25 Ha of
Forest land from
DFO/Bhawanipatna,
pegging of boundary along
the alignment and
enumaration of trees in
progress.
Likely date of completion :
31.03.2013.

2 New Khurda-Bolangir 1100.0 1994- 206.41 40.000 Phase I: Khurda road to


Line new B.G. line (290 0 95 Begunia (Km.32): Track
km) linking and bridges
completed where land is
available. Court cases are
to be finalized for land
acquisition at few
locations.
Likely date of
Completion:31.03.2013.
Phase II: In progress.
Likely date of Completion:
31.12.2013.
Balangir - Sonepur (48
Km.):
In order to take up the
work from Balangir side,
detailed estimate of
Rs.466.43 Crores has been
sent to Railway Board.

3 New Talcher-Bimlagarh 810.78 2003- 106.09 30.00 Land acquistion & Major
Line new line (154 km) 04 Bridge works are in
progress. 136.86 Ac. of
land out of 258.93
Ac.taken over between
Km.0-25.Tender for Earth
work and minor bridge
between Km.10.5 to 18.5
awarded. Handing over of
Govt. & Forest land is still
awaited.
Likely date of completion
(Talcher to Sunakhani 20
Km) :31.12.2013 subject to
early availability of land.
GAUGE CONVERSIONS
4.00 G.C. Naupada- 168.88 1997- 182.30 2.00 The entire section from
Gunupur(90km) 98 Naupada to Gunpur
completed and opened for
passenger traffic on
21.08.2011.
DOUBLING PROJECTS
5 Doubli Jharsuguda - 201.17 2005- 153.69 40.00 Brundamal Yard (3 New
ng Rengali (25.6 Km) 06 lines) commissioned
doubling. .Temporary Diversion
between Lapanga-
Brundamal Block Section
opened for traffic on
11.4.2012. E/W, Bridges
and track linking woks are
in progress.
Likely date of completion:
30.06.2013.
6 Doubli Vizianagaram- 194.89 2006- 153.45 40.00 Kantakapalli - Kottavalasa
ng Kottavalasa-3rd line 07 (7.75 kms) & Vizianagaram
(34.70 km) - Korukonda (10.65 kms) :
Track linking completed
and Engine rolled on
28.3.2012 & 30.3.2012
respectively.
Temporary diversion line
between ALM-KPL
commissioned;Heavy
regrading in existing
Down line near
Kantakapalli Yard
completed.Remaining
bridge and track linking
works are in progress.
Likely date of completion :
31.05.2013.

7 Doubli Delang - Puri 165.16 2010- 1.30 12.00 Detailed estimate


ng Doubling (28.7 Km) 11 sanctioned by Railway
Board on 23.03.2012.
Tender for earthwork and
minor bridges between
Delang-Sakhigopal
awarded
Likely date of completion:
31.12.2013.
8 Doubli Simhachalam North 14.95 2011- 0.00 40.00 SCMN and GPT Yard plan
ng - Gopalpatnam 12 approved .Tender
Doubling of bypass dischaged and refloated to
line (2.07 Km) open on 25.10.2012.
Likely date of completion :
31.03.2013.
9 Doubli Sambalpur - Talcher 679.27 2010- 0.00 6.00 FLS completed. Detailed
ng Doubling (174.11 11 Yard and Bridge plans are
Km) under preparation.
Part detailed Estimate
from Talcher-Bamur (84
Km) sent to Railway Board
for sanction and further
under process.
Likely date of completion:
31.12.2013.
10 Doubli Brundamal- 38.44 2009- 0.00 6.00 Conceptual plan has been
ng Jharsuguda- Fly 10 prepared & sent to SECR &
over connection for SER for approval.
joining down line Likely date of completion :
Not Fixed.
12 Doubli Jagadalpur-Kirandul 862.60 2010- 0.00 2.50 Part detailed estimate for
ng Doubling (150 Km) 11 doubling from Jagdalpur
as Deposit work to Shilkajori (45.5 Kms) for
(PPP) of NMDC. an amount of Rs.346.15
Crores submitted to Rly.
Board on 04.06.2012 with
finance concurrence and
approval of GM/ECoR.
Likely date of completion :
Not Fixed.

10 Doubli Bhadrak-Nergundi 558.70 2012- 0.00 1.00 Estimate for Final


ng 3rd Line 13 Location Survey
Sanctioned. FLS is in
progress. Miniature yard
plans for all stations are
under approval.
Likely date of completion:
Not Fixed.
ROB/RUB
11 ROB/ Bobili- 10.850 2008- 1.5097 1.2698 Two outer spans
RUB Donikinavalasa 0 09 completed and CRS
Road Over bridge in sanction obtained for
liue of levelcrossing temporary staging
No:RV-306 arrangement for casting of
PSC girder on the central
span on 25.09.2012.
Likely date of completion :
31.01.2013
12 ROB/ Palasa-Pundi Road 13.230 2008- 0.4068 1.3500 Ty. Gate lodge & pile load
RUB Over bridge in lieu 0 09 test on test pile
of level crossing completed. Pile
No. ML-373 foundation work in
(Srikakulam district) progress. All six piles in P2
and CP2 completed.
Likely date of completion :
30.04.2013
13 ROB/ Korukonda- 20.600 2008- 0.5669 0.8010 Part detailed estimate for
RUB Almanda Road Over 0 09 Rly. Portion sanctioned.
bridge in liu of level Combined estimate under
crossing No:ML-470 vetting. Tender opened on
24.08.12 and under
finalisation.
Likely date of completion :
30.06.2014
14 ROB/ Palasa-Pundi Road 10.690 2008- 0.9946 1.5000 Piles for all four piers and
RUB Over bridge in liue 0 09 pile cap for CP1 & CP2
of levelcrossing completed. Substructure
No:ML-376 work in progress.
Likely date of completion :
31.05.2013
15 ROB/ Ponduru-Sigdam 13.180 2009- 1.0054 2.0064 Sub-structure for all Piers
RUB ROB in lieu of LC 0 10 completed. Bed block
No.ML-438 work in progress.
Likely date of completion:
31.12.2012.
16 ROB/ Komatipalli- 5.2026 2012- 0.0000 0.1000 Joint inspection done with
RUB Gajapathinagaram 13 State Govt. officials. Plan
ROB in lieu of LC under approval of
No.RV 324 CBE/ECoR.
Likely date of completion:
Not Fixed.
17 ROB/ Chainpal ROB at Ch. 11.550 1999- 3.2124 1.6500 Sub-structure
RUB 490.60 between 0 2000 completed.CRS sanction
Budhpank - Talcher obtained for temporary
on NH-23 in lieu of staging on 25.9.2012. OHE
LC No.CT-79 lowered and temporary
staging completed.
Likely date of completion
:31.03.2013.

18 ROB/ Dhenkanal - 15.170 2009- 0.1144 1.0000 Road diversion and all the
RUB Sadasibpur ROB in 0 10 12 Piles in foundation
lieu of LC No. CT-41 completed; Pile cap work
in progress.
Likely date of completion :
30.06.2013.
19 ROB/ Budhapank-Talcher 19.240 2009- 0.1057 1.2052 Earthwork for road
RUB ROB in lieu of LC 0 10 diversion completed.
No.CT-81 Likely date of completion :
30.09.2013
20 ROB/ At Sukinda Road 11.322 2009- 1.1404 2.1521 All piles including pile cap
RUB Yard /Man 5 10 in foundation completed;
Gobindapur - ROB All four piers and one bed
in lieu of LC No.16 block completed.
Likely date of completion
:28.02.2013

21 ROB/ Titlagarh-Muribahal 5.6035 2003- 0.2564 1.0300 Construction of Raiway


RUB -ROB in lieu of LC 04 portion of diversion road
No.159 at 201/14 completed.
Km One side approach road
for State Govt. portion
completed.
Likely date of completion
:30.06.2013
22 ROB/ Berhampur - 23.600 2003- 0.4093 2.0667 Combined detail estimate
RUB Gopalpur Rd. Road 0 04 sanctioned by Rly.
Over Bridge in lieu Board.Tender opened on
of LC No.306 30.10.2012.
Likely date of completion:
28.02.2014.
23 ROB/ Mancheswar- 21.537 2009- 1.1017 1.1700 Work of road diversion is
RUB Bhubaneswar ROB 8 10 under progress .
in lieu of LC No.ML- Likely date of completion :
187 (VSS 30.09.2013
Nagar,Near Royal
College)
24 ROB/ Mancheswar- 14.722 2009- 0.5058 1.1800 Work of road diversion
RUB Bhubaneswar ROB 4 10 nearing completion and
in lieu of LC No.188 bridge proper work will
(Saheed Nagar) start after commission of
diversion road.
Likely date of completion
:31.12.2013

25 ROB/ Bhubaneswar- 14.908 2009- 0.6816 1.2000 Work of road diversion


RUB Retang ROB in lieu 2 10 nearing completion and
of LC No.ML- bridge proper work will
190(Lingraj temple start after commission of
sattion) diversion road.
Likely date of completion :
28.02.2013
26 ROB/ Gangadharpur- 17.190 2009- 0.6769 1.0500 Combined estimate
RUB Balugaon ROB in 0 10 sanctioned.
lieu of LC No.ML- Soil exploration
254 done.Widening of road,
tower wagon shed
extension work in
progress.
Likely date of completion :
31.12.2013

27 ROB/ Mancheswar- 22.235 2009- 0.1426 0.1252 Local people represented


RUB Bhubaneswar ROB 6 10 for sifting of ROB location.
in lieu of LC No.ML- Joint Inspection done with
186 State Govt. official. LHS is
also not feasible at this
location. Sate Govt .has
asked to pend the
execution of the work till
commissioning of nearby
ROB in lieu of LC No:187.
Likely date of completion
:Not Fixed.
28 ROB/ Jagannathpur- 15.669 2009- 0.0000 1.0500 All (24 nos) piles in
RUB Berhampur ROB in 3 10 foundation completed.
lieu of LC No.ML- Pile cap casting under
309 progress
Likely date of completion :
31.08.2013

29 ROB/ Berhampur- 16.286 2009- 0.1336 2.1000 Earthwork of Road


RUB Golanthra ROB in 2 10 diversion work in progress.
lieu of LC No. ML- Likely date of completion :
312 31.12.2013
Traffic Facility
30 Traffic Kaniha - 27.882 2010- 0.1693 5.0000 Tender re-floated to open
Facility Electrification of 2 11 on 12.10.2012 Materials
National Thermal under procurement.
Power Likely date of completion :
Corporation/Kaniha 31.12.2013
siding at Talcher
31 Traffic Korai: Conversion of 9.1300 2011- 0.0000 0.8000 Plan approved by Division.
Facility C - class station to 12 The work is proposed to
B-class with one be executed along with
common loop Bhadrak - Nergundi 3rd
adjacent to down line.
main line Likely date of completion :
Not Fixed
32 Traffic Nayagarh - 4.2314 2008- 1.0000 0.0001 Circulating area, approach
Facility Development of 09 road & P.way linking
circulating area, completed and
approach road with commissioned on
concrete pavement 6.3.2012. Balance work
to facilitate smooth between Route No.3 & 4
handling of iron ore to be taken up.
traffic between R3 Likely date of completion :
& R4 31.03.2013
33 Traffic Chhatrapur - 3.2820 2010- 0.2291 1.0000 Contract for OHE works
Facility Electrification of 11 terminated and re-
Indian Rare Earth tendering under process.
Ltd. Siding (15 Km) Likely date of completion :
30.06.2013
34 Traffic Khurda Road - Yard 24.720 2000- 17.5878 2.0000 Yard remodeling along
Facility Remodeling 0 01 with RRI working
completed and
commissioned on
14.6.2012.
Likely date of completion :
Completed.
35 Traffic Simhachalam North 13.942 2009- 3.6796 3.0000 Relay Room at
Facility and Gopalapatnam 3 10 Simhachalam North
- yard remodelling completed. EI Building at
for removal of Gopalpatnam completed.
diamond crossing. 3 Nos S&T goomties
completed. Balance work
in progress.
Likely date of completion
:30.06.2013
36 Traffic Sukinda Road- 53.423 2008- 13.5464 0.0001 Earthwork & ballast supply
Facility Jajpur Keonjhar 5 09 are in progress. 16 Nos.
Road - Line by bridges out of 27 Nos.
passing Jakhapura completed. Major
(10.508 Km) Br.No.434 (8X12.2m PSC)
over river Jodabar is in
progress.
S&T: Telecom tender
awarded on24.8.2012.
Elect: Tender awarded on
05.06.2012.
Likely date of completion :
30.06.2013
37 Traffic Nergundi - 9.5705 2010- 2.4767 1.3400 11000 Cum of earth work
Facility Augmentation of 11 completed. Basement Slab
R/6 & R/7 with of S&T goomty completed.
common loop Foundation for Relay room
facility and completed and ground
extension of floor work in progress.
platform & Elect: L.T cable laying
pathway at Cuttack completed. Electrical
end. wiring for building and
OHE works in progress.
Likely date of completion :
31.12.2012
38 Traffic Mancheswar: 5.1800 2009- 0.0128 0.8609 Tender awarded on
Facility Development of 10 20.4.2012 and earthwork
goods shed with in progress.
infrastructure & Elect: Tender awarded on
lighting facility 26.7.2012.
Likely date of completion :
31.03.2013
39 Traffic Lanjigarh Road - 5.1350 2012- 0.0000 0.2000 New work sanctioned in
Facility Add loop line with 13 Pink Book 2012-13.Survey
common loop completed and yard plan is
facility under approval of Division.
Likely date of completion :
Not Fixed
40 Traffic Provision of 1.7812 2009- 0.3959 0.1000 Earthwork and ballast
Facility shunting neck 686m 10 supply completed.
length at Extension of minor bridges
Mandirhasaud and track linking works are
(MNDH) station in progress.Elect: All work
completed except high
mast erection.S&T: Tender
awarded and work is in
progress.
Likely date of completion:
31.03.2013.