Heat-Treatment and Hardness Test for Piping 6148-E1-QA-NU-04005 Rev 0 Page 36 of 36

Attachment 5 – Post-Weld Heat-Treatment Report

INSPECTION & TEST REPORT

POST-WELD HEAT-TREATMENT
RUWAIS REFINERY WEST
UNITS RESTORATION PROJECT REPORT
AGREEMENT NO. 17-6148-E-1

Report No. : Test Date :

PWHT Method : [ ] Local [ ] Furnace Unit No. :

PWHT
Requirements Equipments

Holding Temp. (°C ) : Record No. :

Holding Time (Hr) : Calibration Expired Date :

Heating Rate (°C/hr ) : Cooling Rate (°C/hr ) :

No. Drawing No. Joint Size Thick Mat'l H_Temp H_Time H_Rate C_Rate
1
2
3
4
5
6
HARDNESS
Required Value Equipments

Calibration Expired Date : Recorder No.:

Test Value (HB)


No. Drawing No. Joint Size Thick Mat'l
Weld Haz Base
1
2
3
4
5
6
Attachment : PWHT charter ( No. )

Remarks

SIGNATURE REGISTER PWHT OPERATOR PWHT SUPERVISOR CONTRACTOR COMPANY


Name
Signature
Date
Legend : H_Temp : Holding Temp., H_Time : Holding Time, H_Rate : Heating Rate, C_Rate : Cooling Rate
Form No.: QNI-005 Rev. 0