Complex Engineering Problem:

Assessment of Hydropower Potential at a dam site and estimating water availability


for the given data considering;
(i) Storage Reservoir
(ii) Run of the river project
HYDROPOWER POTENTIAL AT A DAM SITE
1. Water Flow and Head:
 Flow Rate (Q): Measure the rate at which water flows past the dam site.
This is typically expressed in cubic meters per second (m³/s) or cubic feet
per second (cfs).
 Head (H): The vertical distance the water falls from the top of the dam to
the turbine. It is crucial for calculating the potential energy of the water.
2. Hydropower Equation:
 The basic hydropower equation is: Power (P) = Head (H) × Flow Rate (Q) ×
Gravity × Efficiency.
 Gravity is a constant (approximately 9.81 m/s²), and efficiency takes into
account losses in the system.
3. Efficiency:
 The efficiency of the hydropower system depends on various factors,
including turbine efficiency, generator efficiency, and transmission
efficiency.
4. Turbine Types:
 Different turbines have different efficiencies and are suitable for different
head and flow conditions. Common types include Pelton, Francis, and
Kaplan turbines.
5. Environmental Impact:
 Consider the environmental impact of the dam on the local ecosystem, fish
migration, and water quality. Some dams may have to incorporate fish
ladders or other mitigation measures.
6. Regulatory and Legal Considerations:
 Ensure compliance with local, national, and international regulations.
Obtain the necessary permits and approvals for the dam and hydropower
project.
7. Infrastructure:
 Assess the existing infrastructure and determine what modifications or
additions are needed for the hydropower project, including the dam
structure, penstock, powerhouse, and electrical grid connections.
8. Costs and Economic Viability:
 Evaluate the overall costs of construction, operation, and maintenance
against the expected revenue from hydropower generation. Consider the
payback period and return on investment.
9. Reservoir Capacity:
 Determine the reservoir's capacity and its impact on water storage, flood
control, and water release schedules.
10. Climate and Weather Patterns:
 Consider variations in water flow due to seasonal changes, precipitation
patterns, and climate conditions.
11. Geological and Geotechnical Studies:
 Conduct studies to assess the geological and geotechnical characteristics of
the site to ensure the stability and safety of the dam structure.

WATER AVAILABILITY

Water availability at a specific location can be influenced by various factors, and


understanding these factors is crucial for water resource management. Here are some key
considerations:
1. Precipitation:
 The amount and distribution of rainfall in the area significantly impact
water availability. Areas with higher annual rainfall generally have more
water resources.
2. Surface Water:
 Rivers, lakes, and other surface water bodies contribute to water
availability. Assessing the flow rates and seasonal variations in these water
sources is essential.
3. Groundwater:
 The availability of water in underground aquifers is critical. Conducting
groundwater studies, including aquifer recharge rates and water quality,
helps determine sustainable use.
4. Snowpack:
 In regions with seasonal snowfall, snowpack acts as a natural reservoir. The
rate of snowmelt can contribute to water availability during warmer months.
5. Topography:
 The landscape and topography of an area influence water flow and
accumulation. Mountainous regions may have more runoff, while valleys
may collect water.
6. Land Use and Vegetation:
 Urbanization and changes in land use can affect water runoff and
infiltration. Vegetation plays a role in water retention and can impact local
hydrology.
7. Climate and Evaporation:
 High temperatures and evaporation rates can reduce water availability.
Understanding the local climate is important for assessing water resources.
8. Water Storage:
 Reservoirs, dams, and other artificial storage systems can store water for
later use. However, it's crucial to consider the impact on ecosystems and
downstream users.
9. Climate Change:
 Changes in climate patterns can alter precipitation, temperature, and other
factors affecting water availability. Studying climate change projections is
essential for long-term planning.
10. Water Use and Demand:
 Understanding current and projected water use in the area is essential for
managing water resources effectively. This includes agricultural, industrial,
and domestic water demands.
Storage Reservoir Hydropower: Purpose and Considerations
Purpose: Storage Reservoir Hydropower involves the construction of dams to create
reservoirs that store water, releasing it as needed to generate electricity. The primary
purposes of this type of hydropower include:
1. Base-load Electricity Generation:
 Storage reservoir hydropower projects provide a stable and continuous
supply of electricity, making them suitable for meeting base-load demand
on the power grid.
2. Load Balancing:
 The stored water allows for flexible electricity generation, enabling the
adjustment of power output to match fluctuations in electricity demand,
thereby contributing to grid stability.
3. Energy Storage:
 Reservoirs act as large-scale energy storage systems, storing excess energy
during periods of low demand and releasing it during peak demand,
enhancing the overall efficiency of the power system.
4. Water Management:
 The construction of reservoirs facilitates water management, helping
regulate river flow, mitigate floods, and provide a controlled water supply
for downstream users, such as agriculture and municipalities.
5. Flood Control:
 Storage reservoirs can be used to control river flow and prevent flooding in
downstream areas, offering an additional benefit to local communities.
6. Recreation and Tourism:
 Reservoirs often create recreational opportunities, such as boating, fishing,
and water sports, contributing to local tourism and economic development.
Considerations: Several key considerations must be taken into account when planning and
implementing storage reservoir hydropower projects:
1. Environmental Impact:
 The construction of large dams and reservoirs can have significant
environmental consequences, including habitat disruption, altered river
ecosystems, and potential displacement of communities. Thorough
environmental impact assessments are essential.
2. Sedimentation:
 Over time, reservoirs may accumulate sediment, affecting their storage
capacity. Strategies for managing sedimentation must be considered in the
design and operation of the dam.
3. Climate Change Effects:
 Changing precipitation patterns and temperatures can impact water inflows
into reservoirs. Climate change considerations are crucial for assessing the
long-term viability of storage reservoir hydropower.
4. Reservoir Safety:
 Ensuring the safety of the dam and reservoir is paramount. Comprehensive
engineering and monitoring systems are necessary to prevent dam failures
and protect downstream areas.

Run-of-the-River Hydropower: Objectives and Evaluations


Objectives: Run-of-the-River Hydropower projects generate electricity without significant
water storage. The objectives of these projects include:
1. Continuous Power Generation:
 Run-of-the-River projects aim to harness the continuous flow of rivers for
electricity generation, providing a consistent power output.
2. Minimal Environmental Impact:
 Unlike storage reservoirs, Run-of-the-River projects generally have lower
environmental impact as they do not require large dams or create extensive
reservoirs. They aim to minimize disruption to river ecosystems.
3. Reduced Land Use:
 Run-of-the-River projects typically require less land compared to storage
reservoir projects, making them suitable for areas with limited available
space.
4. Hydraulic Potential Utilization:
 These projects focus on utilizing the natural head and flow of rivers to
generate power, maximizing the hydraulic potential without significant
alterations to the river's natural course.
Evaluations: When considering Run-of-the-River Hydropower, various factors must be
evaluated:
1. River Flow Analysis:
 Understanding the patterns of river flow throughout the year is crucial for
determining the project's viability.
2. Head and Flow Measurements:
 Accurate measurements of the head (height difference) and flow rate of the
river are essential for estimating power generation potential.
3. Environmental Impact Assessment:
 Assessments should focus on the impact of the diversion channel and power
station on aquatic ecosystems, fisheries, and local communities.
4. Economic Viability:
 Run-of-the-River projects require economic assessments to ensure they are
financially viable. Factors include construction costs, operation, and
maintenance expenses.
5. Regulatory and Permitting Considerations:
 Complying with environmental regulations and obtaining the necessary
permits are critical for the successful implementation of Run-of-the-River
projects.
6. Community Engagement:
 Engaging with local communities is crucial to addressing concerns,
obtaining support, and ensuring the project aligns with the needs and values
of the region.
Calculation and Observation:

Frequency
Discharge in
Area (71 Dischar Monthly of
Time Avg ppt Losses Rm Area Volume Net Inflow Descending
x 500) ge Discharge occurrenc
Sr. Months Order
e
Days t
(mm) (%) (mm) (m) (Km2) (m2) (m3) m3/s m3/s m3/s m3/s F.O.O
From To Duration Sec
1 10 10 864000 17 3.25 0.5525 0.016448 35500 35500000000 583886250 675.7943 675.794271
Jan 10 20 10 864000 19 3.25 0.6175 0.018383 35500 35500000000 652578750 755.2995 755.299479
1 20 31 11 950400 22 3.25 0.715 0.021285 35500 35500000000 755617500 795.0521 795.052083 2226.14583 21844.40132 8.33333333
1 10 10 864000 26 3.25 0.845 0.025155 35500 35500000000 893002500 1033.568 1033.56771
Feb 10 20 10 864000 32 3.25 1.04 0.03096 35500 35500000000 1099080000 1272.083 1272.08333
2 20 29 9 777600 41 3.25 1.3325 0.039668 35500 35500000000 1408196250 1810.952 1810.95197 4116.60301 19444.85382 16.6666667
1 10 10 864000 43 3.25 1.3975 0.041603 35500 35500000000 1476888750 1709.362 1709.36198
March 10 20 10 864000 52 3.25 1.69 0.05031 35500 35500000000 1786005000 2067.135 2067.13542
3 20 31 11 950400 57 3.25 1.8525 0.055148 35500 35500000000 1957736250 2059.908 2059.90767 5836.40507 15824.23482 25
1 10 10 864000 65 3.9 2.535 0.062465 35500 35500000000 2217507500 2566.56 2566.55961
Apiril 10 20 10 864000 74 3.9 2.886 0.071114 35500 35500000000 2524547000 2921.929 2921.9294
4 20 30 10 864000 85 3.9 3.315 0.081685 35500 35500000000 2899817500 3356.27 3356.27025 8844.75926 13812.62642 33.3333333
1 10 10 864000 89 3.9 3.471 0.085529 35500 35500000000 3036279500 3514.212 3514.21238
May 10 20 10 864000 96 3.9 3.744 0.092256 35500 35500000000 3275088000 3790.611 3790.61111
5 20 31 11 950400 103 3.9 4.017 0.098983 35500 35500000000 3513896500 3697.282 3697.28167 11002.1052 13492.8022 41.6666667
1 10 10 864000 106 3.9 4.134 0.101866 35500 35500000000 3616243000 4185.466 4185.46644
June 10 20 10 864000 114 3.9 4.446 0.109554 35500 35500000000 3889167000 4501.351 4501.35069
6 20 30 10 864000 123 3.9 4.797 0.118203 35500 35500000000 4196206500 4856.72 4856.72049 13543.5376 10960.8902 50
1 10 10 864000 131 4.55 5.9605 0.12504 35500 35500000000 4438902250 5137.618 5137.61834
July 10 20 10 864000 137 4.55 6.2335 0.130767 35500 35500000000 4642210750 5372.929 5372.92911
7 20 31 11 950400 151 4.55 6.8705 0.14413 35500 35500000000 5116597250 5383.625 5383.62505 15894.1725 8811.625926 58.3333333
1 10 10 864000 169 4.55 7.6895 0.161311 35500 35500000000 5726522750 6627.92 6627.91985
August 10 20 10 864000 195 4.55 8.8725 0.186128 35500 35500000000 6607526250 7647.6 7647.59983
8 20 31 11 950400 215 4.55 9.7825 0.205218 35500 35500000000 7285221250 7665.426 7665.4264 21940.9461 7886.238715 66.6666667
1 10 10 864000 181 4.55 8.2355 0.172765 35500 35500000000 6133139750 7098.541 7098.54138
September 10 20 10 864000 165 4.55 7.5075 0.157493 35500 35500000000 5590983750 6471.046 6471.04601
9 20 30 10 864000 152 4.55 6.916 0.145084 35500 35500000000 5150482000 5961.206 5961.20602 19530.7934 5818.307686 75
1 10 10 864000 135 3.25 4.3875 0.130613 35500 35500000000 4636743750 5366.602 5366.60156
October 10 20 10 864000 119 3.25 3.8675 0.115133 35500 35500000000 4087203750 4730.56 4730.5599
10 20 31 11 950400 104 3.25 3.38 0.10062 35500 35500000000 3572010000 3758.428 3758.42803 13855.5895 4103.838349 83.3333333
1 10 10 864000 83 3.25 2.6975 0.080303 35500 35500000000 2850738750 3299.466 3299.46615
November 10 20 10 864000 71 3.25 2.3075 0.068693 35500 35500000000 2438583750 2822.435 2822.4349
11 20 30 10 864000 45 3.25 1.4625 0.043538 35500 35500000000 1545581250 1788.867 1788.86719 7910.76823 2795.669823 91.6666667
1 10 10 864000 31 3.25 1.0075 0.029993 35500 35500000000 1064733750 1232.331 1232.33073
December 10 20 10 864000 25 3.25 0.8125 0.024188 35500 35500000000 858656250 993.8151 993.815104
12 20 31 11 950400 16 3.25 0.52 0.01548 35500 35500000000 549540000 578.2197 578.219697 2804.36553 2219.243056 100

R 65

losses 3.25
Discharge in
Coresspondin Available Firm Seconda
Serial # Month Net head Time Discharge descending F.O.O
g Head Power Power ry Power
order
m days m3/sec m3/sec m % kW kW kW
1 Jan 190 31 2226.14583 21844.40132 210 8.333333333 45001651.15 4267071.8 40734579
2 Feb 196 29 4116.60301 19444.85382 210 16.66666667 40058343.35 4267071.8 35791272
3 Mar 196 31 5836.40507 15824.23482 210 25 32599506.15 4702487.3 27897019
4 Apr 220 30 8844.75926 13812.62642 185 33.33333333 25067845.06 4702487.3 20365358
5 May 220 31 11002.1052 13492.8022 220 41.66666667 29120165.71 4702487.3 24417678
6 Jun 220 30 13543.5376 10960.8902 220 50 23655793.24 4702487.3 18953306
7 Jul 210 31 15894.1725 8811.625926 220 58.33333333 19017251.07 4702487.3 14314764
8 Aug 210 31 21940.9461 7886.238715 185 66.66666667 14312340.33 4702487.3 9609853
9 Sep 210 30 19530.7934 5818.307686 196 75 11187209.29 4702487.3 6484722
10 Oct 185 31 13855.5895 4103.838349 196 83.33333333 7890696.223 4702487.3 3188209
11 Nov 185 30 7910.76823 2795.669823 191 91.66666667 5238274.504 4702487.3 535787.2
12 Dec 185 31 2804.36553 2219.243056 196 100 4267071.778 4702487.3 -435415
Sum 257416147.9

Head M net head

125 65 190

155 65 220
145 65 210
120 65 185
Uniform
Cumulative Daily 10 days
Inflow
Cumulat Net Inflow Draw Cumulat Draw
Sr No. Month Days ive Days Inflow Off ive UDO off 30days Mothly Surplus Defficit
m3/sec MCM MCM MCM MCM MCM
1 Jan 31 31 2226.145833 5962.509 5962.509 5962.509 28041.33 28041.33 280413.3 841239.8 869281.2 -863319
2 Feb 29 60 4116.603009 10314.56 10314.56 16277.0695 28041.33 56082.66 280413.3 841239.8 813198.5 -802884
3 Mar 31 91 5836.405066 15632.23 15632.23 31909.29683 28041.33 84123.98 280413.3 841239.8 869281.2 -853649
4 Apr 30 121 8844.759259 22925.62 22925.62 54834.91283 28041.33 112165.3 280413.3 841239.8 841239.8 -818314
5 May 31 152 11002.10517 29468.04 29468.04 84302.95131 28041.33 140206.6 280413.3 841239.8 869281.2 -839813
6 Jun 30 182 13543.53762 35104.85 35104.85 119407.8008 28041.33 168248 280413.3 841239.8 841239.8 -806135
7 Jul 31 213 15894.17251 42570.95 42570.95 161978.7524 28041.33 196289.3 280413.3 841239.8 869281.2 -826710
8 Aug 31 244 21940.9461 58766.63 58766.63 220745.3824 28041.33 224330.6 280413.3 841239.8 869281.2 -810515
9 Sep 30 274 19530.7934 50623.82 50623.82 271369.1989 28041.33 252372 280413.3 841239.8 841239.8 -790616
10 Oct 31 305 13855.5895 37110.81 37110.81 308480.0098 28041.33 280413.3 280413.3 841239.8 869281.2 -832170
11 Nov 30 335 7910.76823 20504.71 20504.71 328984.7211 28041.33 308454.6 280413.3 841239.8 841239.8 -820735
12 Dec 31 366 2804.36553 7511.213 7511.213 336495.9337 28041.33 336495.9 280413.3 841239.8 869281.2 -861770
Sum -4905959 -5020671