Caixas de Passagem para Rede Drenagem
Caixas de Passagem para Rede Drenagem
PVF-120 NO SCALE
MEP & Architectural Design
1759 Vergueiro Street - 11º Floor
São Paulo - SP
+55 (11) 5594-0367
www.deerns.com
GENERAL SHEET NOTES
1.
2.
MEASUMERENTS IN CENTIMETERS
CHECK THE TECHNICAL SPECIFICATIONS AND CONSTRUCTIVE FOR
MARQUEZIN
PROJETOS ESTRUTURAIS E CONSULTORIA
marquezin@marquezin.com.br
DRAINAGE DESIGN. www.marquezin.com.br
+55 (43) 3029-1970
3. THE MANSORY LINTELS MUST BE EXECUTED EVERY 3 BRICK ROWS MAXIMUM. Londrina - Paraná
20
San Francisco, CA
STRUCTURAL BRICK FILL
94111
20
19 121 19 WITH CONCRETE fck >=30 MPa AND STILTS:
(510) 337 2800
VAR. 15
4 Ø 12,5 mm (SEE NOTE 05) FILLED BRICKS
CONCRETE FILLING www.teecom.com
15
WITH CONCRETE II
I
I
I
MAXIMUM THICKNESS 19cm fck >= 30 MPa AND
I
I
SLAB
VAR.
4 Ø12,5mm (SEE NOTE 05) 4700 SE International Way
SLAB PRE-MOLDED
19
CONCRETE FILLING Milwaukie, Oregon 97222
PRE CAST T: 503-659-1240
THICKNESS MAXIMA 19cm
WIRELESS SYSTEMS www.daywireless.com
HYPERLINK
"tel:+15036591240"
E
D
U SHAPED BRICKS:
A
R
GUTTER BRICK
G
N
H
O
FILLED WITH
B
Hb
LA
CONCRETE
S
fck >= 30 MPa
121
Hb
WITH 2 Ø12,5mm
A A (SEE NOTE 03)
2815 Eastlake Ave. East Ste. 300, Seattle, Washington, 98102
T: 425-830-1164
CONCRETE BRICK
39 x 19 x 19 cm
1 World Wide Way
STILTS: Maryland Heights
STRUCTURAL BRICK FILL
C.F. 10 10 Missouri 63146
19
WITH CONCRETE fck >=30 MPa AND United States
2 Ø 12,5 mm (SEE NOTE 05) T: 314-569-7000
World WideTechnology www.wwt.com
15
15
B
5
CONCRETE BRICK HDPE PIPE
350 João XXIII Av. 65 - Mogi das Cruzes - SP
5
39 x 19 x 19 cm
BOX PLAN
LEAN CONCRETE imper T: +55 (11) 96310-0945
fck >= 15 MPa
TYPICAL MASONRY DETAIL SOLUTIONS http://www.impersolutions.com.br
LEAN CONCRETE SEXTION B-B PRE CAST SLAB PROJETOS, PESQUISA E CONSULTORIA
maressa.menezes@impersolutions.com.br
SECTION A-A fck >= 30 MPa
C
P P
CPQ07
DATA CENTER
1995 PEDRINA GUILHERME
MUNICIPAL ROAD
Design Team
Project No.
RBR400.00016.00
SLAB
Security Engineering Lead
39 x 19 x 19 cm BACKGROUND m3 -- TAYLOR OLDHAM / TEECOM
N4 10.0 8 1.04 8.32 Civil Engineering Lead
SLABS AND LID MARÍLIA FRANÇA / DEERNS
FLOOR SLAB
VARIABLE
Structural Engineering Lead
0 to 19
MATERIALS UNIT TOTAL MARÍLIA FRANÇA / DEERNS
POSITION DIAMETER (mm) QUANT. LENGHT UNIT (m) LENGHT TOTAL (m) Architectural Lead
FORMS m2 4,15 GRAZIELLE BERANGER / DEERNS
N5 10.0 48 1.89 90.72 FRAME kg 134,21
LEAN CONCRETE BALLAST fck >= 15 MPa m3 0,16
MICROSOFT
N6 12.5 24 0.90 21.60 Design Manager
CONCRETE fck >= 30 MPa m3 0,72 CAROLINA ESPINOZA
19
FILLING (MORTAR 1:3) m3 0,16 Civil, Site Survey, Landscaping Technical Lead
SONDWIP DHAR
Structural Technical Lead
WALLS DAVID SWANSON
Architectural Technical Lead
MATERIAIS UNIT TOTAL PETE MAGOULIK / TODOR NIKOLOV
2 Ø12,5mm SUMMARY - STEEL CA-50 Mech, Plumbing & Fire Protection Technical Lead
(SEE NOTE 03) FRAME (PILAR AND STRAPS) kg/ml 46,40
STEVEN TOUPIN
STRUCTURAL CONCRETE BLOCK m2/ml 5,60 Building Automation Systems (BAS) Technical Lead
DETAIL - MANSORY LINTELS Ø (mm)
LENGHT. WEIGHT WEIGHT
CONCRETE FOR FILLING m3/ml 0,42
BILL GEMBINSKI
VIEW HDPE PIPE
TOTAL(m) UNIT.(kg) TOTAL(kg) Electrical Technical Lead
GUILHERME FERNANDES
NO SCALE COATING (MORTAR 1:3) m3//ml 0,10
10.0 178.74 0,63 112.61 Electrical Power Management Systems (EPMS) Technical Lead
-- -- --
PERSPECTIVE SERGIO FRANCO
-- -- -- Telecommunications / Network Technical Lead
NO SCALE 12.5 21.60 1,00 21.60 ALEX CARDIASMENOS
Security Design Manager
ANDREA VILLEGAS
TOTAL WEIGHT 134.21
Registration
GENERAL
THISCONTRACTOR
RECORD DRAWING NOTE - THE
IS A LEVEL OF
DETAIL COMPILATION
INDICATED ONOFTHE PLANS IS TO CONVEY
INFORMATION
NOT FOR
THE DESIGN INTENT.
RECEIVED
IS RESPONSIBLE
CONTRACTOR(S)
DESIGN THE
DETAIL
THE GENERAL CONTRACTOR
FROM
TO PRODUCE
NECESSARY
ANY ADDITIONAL
/ SUPPLIER(S).
FOR CONSTRUCTION
INFORMATION SHOWN ON
CONSTRUCTION
INCLUDING
REQUIRED.
ADDITIONAL
THE DRAWING ENGINEERING
HAS NOT
ADDITIONAL
BEEN
ENGINEERING
VERIFIED FOR ACCURACY OR
AS
DETAILS
SHALL BE SUBMITTED TO THE ENGINEER OF
COMPLETENESS.
RECORD FOR REVIEW TO CONFIRM THAT THE
ORIGINAL DESIGN INTENT WAS MET.
159
2x2Ø12,5mm
L=VARIABLE 179 47 Ø65 47
4 N6+N7 2 N6+N7 4 N6+N7 2x6 N2 Key Plan
8
8
LOCATION
N2
2x4 N1
d*
N1
47
POINT
N.5 2x24 Ø10.0mm c/15cm C=189cm
N1
N1
N7 Ø12.5mm c=Variable
N7
PLAN TRUE
N
4
d*
N
N2
2 N6+N7
2 N6+N7
A
133
20
2x6 N2
2x6 N2
104
Ø65
159
N3 50 A COLO 1 COLO 2
40
173
N2
N6
N5
h = 15cm F
179
40
d* N
4
4
N
N1
LID F°F°
2x4 N1
4 N6+N7
N2
PATTERN C250.
47
d*
fck >= 30 MPa Public Disclosure Act and Uniform Trade Secrets Act.
2x2Ø12,5mm FOUNDED ON THE SLAB
BACKGROUND OR LOWER BLOCKS h = 15cm DETAIL - REINFORCEMENT OF THE STARTER BAR
LID PLAN
8
INTERMEDIATE LID SLAB - REINFORCEMENT LID SLAB - REINFORCEMENT PLAN Sheet Title/Number
DRAINAGE DETAILS
MANHOLE WITH
STEEL LID
CPQ07-C-F-04-0