Professional Documents
Culture Documents
Caixas de Passagem
Caixas de Passagem
NO SCALE
MEP & Architectural Design
1759 Vergueiro Street - 11º Floor
São Paulo - SP
+55 (11) 5594-0367
ESC 1:50 1.
2.
MEASUMERENTS IN CENTIMETERS
CHECK THE TECHNICAL SPECIFICATIONS AND CONSTRUCTIVE FOR
MARQUEZIN
PROJETOS ESTRUTURAIS E CONSULTORIA
marquezin@marquezin.com.br
DRAINAGE DESIGN. www.marquezin.com.br
+55 (43) 3029-1970
B
5. THE STILTS REINFORCEMENT MUST BE ANCHORED ON THE BOTTOM SLAB.
6. INTERNAL COATING (e=2,0cm) OF THE BOX WITH MORTAR OF SAND AND
60 Werner Sack Street
A+150 CEMENT 1:3 RATIO.
São Paulo - SP
7. STEEL CA-50. +55 (11) 3877-0728
VAR 120 VAR 8. REINFORCEMENT COATING = 3,0 cm (MIMINUM). www.ceg.eng.br
20 20
52.5 65 VAR 9. STRUCTURAL CONCRETE fck ≥ 30 MPa.
ENGENHARIA
20 20
20 20 VAR 80 VAR 10. LEAN CONCRETE fck ≥ 15 MPa.
80
50
50 California Street
Suite 1500
7
TEECOM San Francisco, CA
20
30
30
VAR
6 6 94111
20
20
(510) 337 2800
www.teecom.com
20
III
I
I
I
B+150
105
4700 SE International Way
65
H
Milwaukie, Oregon 97222
T: 503-659-1240
hb
hb
www.daywireless.com
6
HYPERLINK
20
WIRELESS SYSTEMS
"tel:+15036591240"
A A
VAR
20
25
25
50
50 A 50
50 B 50
50 A 50 2815 Eastlake Ave. East Ste. 300, Seattle, Washington, 98102
20 A+150 20 T: 425-830-1164
20 B+150 20
20 20
B
1 World Wide Way
Maryland Heights
Missouri 63146
United States
T: 314-569-7000
World WideTechnology www.wwt.com
PEDRO PORTELA
ARQUITETURA E LUMINOTÉCNICA
C
P P
13
13
50 VAR 50
14
14
N1 ø8.0 c/12 C=VAR
14
14
13
13
14 14 VAR
50
50
N25 ø12.5 C=VAR
14
14
14
14
CPQ07
14
14
50 N1 ø8.0 c/12 C=VAR 50
VAR
50
50
14 14
A
14
N14 c/12
N6 c/12 14
DATA CENTER
N9 ø8.0 c/12 C=147 VAR
85
N9 ø8.0 c/12 C=147
1995 PEDRINA GUILHERME
B 19
MUNICIPAL ROAD
25 N17 ø8.0 c/15 C=VAR
N16 ø8.0 c/12 C=115
19
N24 N24
Design
TOP LID REINFORCEMENT Maurício Leite / Marquezin
14 14
2 N8 ø8.0 C=425 Drawn Kamila Okada / Marquezin
N7 ø8.0 c/12
VAR
VAR
VAR
VAR
N10 c/12
B
6 14
Civil Engineering Lead
MARÍLIA FRANÇA / DEERNS
N16 ø8.0 c/12 C=115
N12 c/12
N13 c/12
N12 c/12
N13 c/12
Architectural Lead
210
210
N24 GRAZIELLE BERANGER / DEERNS
65
N24
50
MICROSOFT
Design Manager
19
CAROLINA ESPINOZA
14 6
Civil, Site Survey, Landscaping Technical Lead
N9 ø8.0 c/12 C=147 B N3 ø8.0 c/12 C=142 SCHEDULE
Structural Technical Lead
SONDWIP DHAR
14 14 N DIAM QUANT UNIT TOTAL
STEEL DAVID SWANSON
2x4 N19 ø12.5 (mm) (cm) (cm) Architectural Technical Lead
CA50 1 8.0 112 VAR VAR PETE MAGOULIK / TODOR NIKOLOV
VAR
N2 ø8.0 c/12 C=123
14 14
50
50
CA50 2 8.0 58 123 7134 Mech, Plumbing & Fire Protection Technical Lead
CA50 3 8.0 14 142 1988 STEVEN TOUPIN
50 N7 ø8.0 c/12 45 Building Automation Systems (BAS) Technical Lead
14
14
14
14
50
14
50 51 50 N10 c/12 CA50 7 8.0 111 VAR VAR Electrical Power Management Systems (EPMS) Technical Lead
N4 ø8.0 c/12 C=117 N11 c/12
N7 ø8.0 c/12 CA50 8 8.0 2 425 850 SERGIO FRANCO
VAR CA50 9 8.0 43 147 6321 Telecommunications / Network Technical Lead
CA50 10 8.0 38 VAR VAR ALEX CARDIASMENOS
14
15
15
8 14 8
TOTAL
37
37
12 12
44
44
15
15
14
14
12
37
12 VAR VAR
44
44
14
14
VAR VAR (mm) (m) (kg)
14
14
50
50
VAR
14 14
14
14
50
N11 ø8.0 c/12 C=VAR 10.0 7.7 4.7
VAR
VAR
N22 N22
PLAN TRUE
N1 N1
0 1 2 3
N5 c/12
N24 ø12.5 c/18 C=VAR
A
25 120 25
A COLO 1 COLO 2
N1 N1
VAR
VAR
VAR
VAR
VAR
VAR
50 A 50 50 B 50
6 N7 c/12 N7 c/12 6 N7 c/12 6 N7 c/12 N7 c/12 6 N7 c/12
17 17 12 12 12 12
50 N19 A N19 50 50 N19 B N19 50 Sheet Title/Number
6 N7 c/12 N7 c/12 6 N7 c/12 6 N7 c/12 N7 c/12 6 N7 c/12
12 12 12 12 12 12 12 12
VAR
VAR
VAR
VAR
DRAINAGE DETAILS
50
50
50
50
63 63 63 63 63 63 68 63
19
19
19
19
19
19
19
19
19
19
19
19
19
19
19
19
12
N5 ø8.0 c/12 C=VAR
12
N5 ø8.0 c/12 C=VAR
12
N5 ø8.0 c/12 C=VAR
12
N5 ø8.0 c/12 C=VAR
12
N14 ø8.0 c/12 C=166
12
N14 ø8.0 c/12 C=166
12
N15 ø8.0 c/12 C=171
12
N14 ø8.0 c/12 C=166
MANHOLE WITH
SECTION A-A SECTION B-B STEEL LID
1:25 1:25
CPQ07-C-F-07-0
MICROSOFT CONFIDENTIAL