Sl No ACTIVITY HAZARDS/RISK CONSEQUENCES PROBABILITY SEVERITY RISK PRESENT PROBABILITYSEVERI RISK CONTROLLED FINAL RESPONSIBILITY
(JOB STEPS IN SEQUENCE) CONTROL RISK ASSESSMENT
MEASURE RATING
3 Extremely Where there Partial Permanent disablement can take place .or there could be reverssible health effect
Harmful :
occupational cancer, other severely life threatening diseases can occur.
5 Slightly Harmful: Superficial injuries minor cuts,eye irritation temporary discomfort. For property damage it is
PROBABILITY/LIKELY HOOD
Sr No Likelyhood. Scale
1 Certain or imminent 5
2 Probable 4
3 Likely 3
4 Very Unlikely 2
5 Almost Impossible 1
1 Almot impossible:-
2 Very unlikely:- Never happened till date, but still felt that it could be possible
3 Likely:- Infrequent impact (Typically once in a year), Has been observed in similar circumstances. 10% to 50%
chance of occurrence
4 Probable : Repeated impact (at least once in a quarter) More then 50% chance of occurrence.
5 Certain : Accident is sure to occur
SEVERITY
Extremely
Scale
For property damage it is more then 10 thousand but less then one lac.
ce.
SEVERITY
Slightly No Effect/
Harmful
Harmful Trivial
3 2 1
15 10 5
12 8 4
9 6 3
6 4 2
3 2 1
objectives and
ce the risk level to
control measure or
mulated. Work should
has been reduced to
COASTAL GUJARAT POWER LIMITED,MUNDRA IVRCL INFRASTRUCTURES & PROJECTS LTD.
COASTAL GUJARAT POWER LIMITED,MUNDRA
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
JOB TITLE : Foundation work for BCN 28 FORMAT NO:
TEAM MEMBER: REV: IVRCL/CGPL/002
NAME OF THE AREATatasite PACKAGE OWNER: MOBILE NO.:
CONTRACTOR :
TEAM LEADER: MOBILE NO.: PROJECT MANAGER:Mr. M.K.Bera MOBILE NO.:
Sl No ACTIVITY HAZARDS/RISK CONSEQUENCES PROBABILITY SEVERITY RISK PRESENT PROBABILITYSEVERI RISK CONTROLLED FINAL RESPONSIBILITY
(JOB STEPS IN SEQUENCE) CONTROL RISK ASSESSMENT
MEASURE RATING
Sl No ACTIVITY HAZARDS/RISK CONSEQUENCES PROBABILITY SEVERITY RISK PRESENT PROBABILITYSEVERI RISK CONTROLLED FINAL RESPONSIBILITY
(JOB STEPS IN SEQUENCE) CONTROL RISK ASSESSMENT
MEASURE RATING
Sl No ACTIVITY HAZARDS/RISK CONSEQUENCES PROBABILITY SEVERITY RISK PRESENT PROBABILITYSEVERI RISK CONTROLLED FINAL RESPONSIBILITY
(JOB STEPS IN SEQUENCE) CONTROL RISK ASSESSMENT
MEASURE RATING
Sl No ACTIVITY HAZARDS/RISK CONSEQUENCES PROBABILITY SEVERITY RISK PRESENT PROBABILITYSEVERI RISK CONTROLLED FINAL RESPONSIBILITY
(JOB STEPS IN SEQUENCE) CONTROL RISK ASSESSMENT
MEASURE RATING
Sl No ACTIVITY HAZARDS/RISK CONSEQUENCES PROBABILITY SEVERITY RISK PRESENT PROBABILITYSEVERI RISK CONTROLLED FINAL RESPONSIBILITY
(JOB STEPS IN SEQUENCE) CONTROL RISK ASSESSMENT
MEASURE RATING
Sl No ACTIVITY HAZARDS/RISK CONSEQUENCES PROBABILITY SEVERITY RISK PRESENT PROBABILITYSEVERI RISK CONTROLLED FINAL RESPONSIBILITY
(JOB STEPS IN SEQUENCE) CONTROL RISK ASSESSMENT
MEASURE RATING
Sl No ACTIVITY HAZARDS/RISK CONSEQUENCES PROBABILITY SEVERITY RISK PRESENT PROBABILIT SEVERIRISK CONTROLLED FINAL RESPONSIBILITY
(JOB STEPS IN SEQUENCE) CONTROL RISK ASSESSMENT
MEASURE RATING
Designation Dy. Manager Sr.Project Manager Associate Group Head Associate Group Head Project Manager
COASTAL GUJARAT POWER LIMITED,MUNDRA IVRCL INFRASTRUCTURES & PROJECTS LTD.
COASTAL GUJARAT POWER LIMITED,MUNDRA
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
JOB TITLE : Foundation work for BCN 22A FORMAT NO:
TEAM MEMBER: REV: IVRCL/CGPL/002
NAME OF THE AREATatasite PACKAGE OWNER: MOBILE NO.:
CONTRACTOR :
TEAM LEADER: MOBILE NO.: PROJECT MANAGER:Mr. M.K.Bera MOBILE NO.:
Sl No ACTIVITY HAZARDS/RISK CONSEQUENCES PROBABILITY SEVERITY RISK PRESENT PROBABILITYSEVERI RISK CONTROLLED FINAL RESPONSIBILITY
(JOB STEPS IN SEQUENCE) CONTROL RISK ASSESSMENT
MEASURE RATING