1. Gerwerol Notes 3
2. General Conditions / Requirements for Approvol of Subsioiion [Supply provided of LV (0.4 kV)]:
4. Annexure--
GENERAL NOTES
3)For any additional query on your project, you may send e-moil to
DSD@dewa.gov.ae.
6) No expansion joints ore allowed in RmU/Substotion room and os well os above the
substation room.
¢,_p:1 oL.5.og .=L!J..M.é61.5:
(=£}'a"ERt~MEI\'T UF DU BA; Dubai Emtrsdryusnaznr n1_u-,ating
i - i ) 32.56m2 for IxI000/1500 VA transformer (with minimum width of 4.57m towdrds door
side)
1-2) 53.95m2 for 2 xI000/1500 VA ironsformers (with minimum width of 6.1 m towdrds door
side)
** For S/S having four and more transformers, an additional space of (10 m2) shall be
required.
2-3) In case substation is located on Sikko, the sikko should hove o minimum cleorwidth of
6.1 m. However if the proposed sulostotion Iocotion is less thon I 2m away from The main
road then the sikko con be accepted with minimum clear width of 3.05 m.
2-4) Must hove minimum two-side ventildtion with dIuminum louver doors and fixed
aluminum louvers window. Fixed aluminum louver window(s) should be Iocdted of
0.30m above outside level.
o) In cdse of coble trench drrdngemeni, cledr depth of 0.95m from FFL (finished floor
level) of the Substdtion is to be provided.
b) In case of cable troy orrdngement, clear depth of 0.95m from FFL of the substation
up to bed of the coble troy with minimum cledronce of 0.45m is to be maintained
in between bottom of the slob and the bed of the coble troy. For coble
maintenance minimum of i.2m free space is to be provided towards of the coble
troy (ot Impost one side). The coble troy should poss through public/open Oreo and
not through any closed died / room (there shdll be no services, pipes, etc, below
the cobble troy).
2-6) Opening of 0.95m depth from outside level (iowdrds rodd/sikkd) should be provided for
HV coble entry (subject to DEWA design).
\€-3>ll~v< '
/."
x
4/
f
- r
2-7) Finish Floor Level (FFL) of the subslotion is to be moinloined 0.15m to 0.30m higher thon
The outside adjacent ground level (lowords door side).
2-8) LV electrical room should be adjacent/near to the substation, if main panel is private
(os per circular for LV room attached Annex-4). Separate approval for location and size
of LV room to be obtained from Consumer Services Department.
2-9) Wet areas (i.e. kitchen, both, toilet etc.) oloove substation ore not acceptable. Only in
exceptional unavoidable coses, this may be accepted ot the discretion of DEWA
subject to complying with the following: -
o) For Chillers/Motors with copociiies more thon (100kW), follow the CircUlar of
Chiller/Motor Ioods proposed to be connected to DEWA Tronsformer [os per
Annex-5].
3-2) One copy of valid affection /site plan issued by DM or ony competent authority.
3-3) One copy of site setting out plan showing the Iocotion & size of the proposed and
existing (if any) subst(Jtion(s).
3-4) Three copies of Archiieciurdl plan drdwing indicdiing the Iocotion & size of the
proposed substotion(s) in Ground Floor (existing substd'rion(s) To be shown also, if ony)
and LV Room.
3-7) One copy of SUbstation Room details drawing plan showing sections (x-x & y-y). LV
route and LV opening ore to be indicoied.
3-8) One copy of Lood Summory Sheet indicating Totol Connected Load (TCL), Mox
Demond (MD) and KWH metering for each transformer along with O realistic Power
ReqUirement Dote.
3-9) Chiller/Lood checklist to be duly filled and submitted by the consultant, if applicable
(refer to Annex- 6).
3-10) One copy of Schemotic Diogrom showing Iood intake & metering orrongemeni.
*.,._;:| oL_5og &llJ._M.;': 6..i..& H
L.c;vE1ar~¢~1Er<r UF DUBAI Dubai Elactricity8ILUatnf 9ut.l°\oritl;
General Conditions / Requirements for Approval of Location & Size of Split Room Substation(s) -
RMU & Transformer Rooms in Ground Floor within Buildinq (only Dedicated)
I . Area Requirement:
o) 2im2 for lxI000/1500 VA transformer (with minimum width of 4.57m towdrds door
side)
b) 42m2 for 2 xI000/1500 KVA trdnsformers (with minimum width of 6.1 m towdrds door
side)
o) 9.3m2 Oreo (with minimum width of 3.05m'rrs iowords door side) for one see of RMU
(controlling up Io two ironsformers)
(For each additional RMU set, approximately 7m2 additional Spocex* is required)
** For S/S having four and more Transformers an additional space of (10 m2) shall be
required with minimum width of 5m Towards roadside]
2-3) In case RMU room is iocdted on Sikko, the sikkim should hove o minimum cledr width of
6.1 m. However if the proposed RMU room locdtion is less thon I2m owdy from The
main rood then the sikkim con be dccepted with minimum clear width of 3.05 m.
2-4) Opening of 0.95 m depth from outside level (towdrds rodd/sikkd) shoUld be provided
for HV coble entry (sub]e<:t to DEWA design).
2-5) Level difference (FFL) of the RMU room is to be maintained 0.15m to 0.30m higher
than the outside adjacent Qround Ievel.(towords door side).
2-6) RMU room aluminum louver door(s) clear height - 2.75m (it) & clear width - 2.44m
(W) os per door details ref. drawing nos. P-DS/DOOR/01/96 (Rev.'A') and P-
DS/DOOR/0.2/96 (as per Annex-7 ). The RMU room must hove minimum one side
ventilation through the louvered door in ony case.
¢,_9n 0L-5-09 ll;mL <'i..l1..ii U
Dubai Emntrinityswatpr Qhltlworitg
LUVERNMENT or num;
o) In cdse of coble trench drrdngement, ciedr depth of 0.95m from FFL (finished floor
level) of the Substdtion is to be provided.
b) In case of coble troy orrdngement, clear depth of 0.95m from FFL of the substation
Up to bed of the coble troy with minimum clearance of 0.45mtrs is to be maintained
in between bottom of the slob and the bed of the coble troy. For coble
mointendnce minimum of 1.2m free spdces is to be provided towards of the coble
troy (of Impost one side). The coble troy should poss through public/open Oreo and
not through ony closed Oreo / room (there shdll be no services, pipes, etc, below
the coble troy).
i ) Cleor direct unhindered access (of minimum 3.05m width & minimum 3.05m clear
height) from RTA/Public rood or sikko.
3-3) Must hove minimum two-side ventildtion with aluminum louver doors and fixed
aluminum louvers window. Fixed dIUminum louver window(s) should be Iocoied of
0.30 m dbove out side level.
3-4) Transformer Room oIUminum louver door(s) clear height - 2.75m & clear width - 3.05m
(2.44m in excepiionol coses) as per door details ref. drawing nos. P-DS/DOOR/Ol /96
(Rev.'A') and P-DS/DOOR/02/96 (as per Annex-7).
3-5) Finish Floor Level (FFL) of the transformer room is to be maintained 0.l5m to 0.30m
higher than the outside adjacent ground level (towards door side).
o) In cdse of coble trench drrdngemeni, ciedr depth of 0.50m from FFL (finished floor
level) of the Substdtion is to be provided.
b) In case of coble troy arrangement, minimum clear depth of 0.5m from FFL of the
substation up to bed of the coble troy with minimum clearance of 0.45m is 'to be
maintained in between bottom of the slob and the bed of the cable troy. For coble
maintenance minimum of 1.2m free spdce is to be provided towards of the coble
troy (ot Impost one side). The coble troy should boss through public/open Oreo and
not through ony closed Oreo / room (there shall be no services, pipes, etc, below
the cdbte troy).
l
9.43 0L.1-10g _,,|_*|__m_¢ l'i.i.»}n
r,<>i»~'eRnm£1\'T UF 13LIHA! Dubai Electricity# UJetor nutharity
4. Common Conditions
4-1) Tronsportotion of Tronsformer(s) from the main rood up to and from the transformer
room is Owner's responsibility
b) In case of coble troy arrangement, clear depth of 0.95m from FFL of the substation
up to bed of the coble troy with minimum clearance of 0.45m is to be mdintdined
in between bottom of the slab and the bed of the coble troy. For coble
maintenance minimum of 1.2m free space is to be provided towards of the coble
troy (dt Impost one side). The coble troy should poss through public/open ored and
not through ony closed dreg / room (there shall be no services, pipes, etc, below
the coble troy).
c) The coble route from RMU room in ground floor to trdnsforrner room (of bdsement)
is preferred to be strdighr (Without turns / bends), in cdse of bending the bending
rddius to be considered R : 0.95m.
4-3) Wet areas (i.e. kitchen, both, toilet etc.) above substation ore not acceptable. Only
in exceptional unavoidable coses, this may be accepted of the discretion of DEWA
subject to complying with the following:-
4-4) LV electrical room should be adjacent/near lo the substation, if main panel is private
(as per circular for LV room attached Annex-4). Separate approval for location and
size of LV room to be obtained from Consumer Services Deportment.
o) For Chillers/Motors with capacities more thon (100kW), follow The Circulor of
Chiller/Motor Ioods proposed to be connected to DEWA Tronsformer [os per
Annex-5)
5-2) One copy of valid offeciion /site plan issued by DM or ony compelent authority.
5-3) One copy of site setting out plan, showing the Iocotion & size of the proposed
and existing (if ony) subsio'rion(s).
5-4) Three copies of Architecturdl pldn drdwing indicating the Iocotion & size of the
proposed RMU and Trdnsformer rooms in Ground Floor (existing substdtion(s) to be
shown dlso, if ony) dnd LV room.
5-7) One copy of RMU & Transformer Room details drawing plan showing sections (x-x
& y-y). LV route and LV opening ore to be indicated.
5-8) One copy of Lood Summary Sheet indicating Totol Connected Lood (TCL), Max
Demond (MD) and KWH metering for each transformer along with ci realistic
Power Requirement Dote.
5-9) Chiller/Lood checklist to be duly filled and submitted by the consultant (refer to
Anex- 6)
5-l 0) One copy of Schemotic Diagram showing Iood intake & metering
orrcxngement.
5-1 l ) One copy of Architectural plan indicating HV cable route between RMU
room & Transformer room, along with its sectional details showing the typical
horizontal/verticol clearances available for the route.
5-12) Underidkings in prescribed form duly signed by the owner of the plot
(officially stomped if owner is d company) for Ground Floor Split Substdtion (refer
to Anex-I 0). Signdture should mdtch The owner's pdssport copy. In cdse owner is
d compdny, undertdking lefter should show the company's officidl sidmp.
9-3:10L-L09 ==LaJ-n-66-ia--B LI
(J}5»"ERI\ M ENT UE 1) L.l HA! Dubai ebcnicitya Mawr Fluthorih;
1. Area Requirement:
O) 2i m2 for ixiooo/i 500 VA transformer (with minimum width of 4.57m towards door
side)
bl 42m2 for 2 xl000/1500 KVA transformers (with minimum width of 6.1 m towards
door side)
(For every cidditionol Transformer, approximately 21m2 additional space is required)
0) 9.3m2 Oreo (with minimum width of 3.05mtrs towards door side) for one set of RMU
(controlling up to two transformers)
(For each additional RMU set, opproximoiely 7m2 additional space** is required)
** For S/S having four and more Transformers an additional space of (10 m2) shall be
required with minimum width of 5m towards roadside]
2-3) In case RMU room is located on Sikko, the sikko should hove o minimum cleorwidth of
6.1 m. However if the proposed RMU room Iocotion is less thon i 2m away from the
main rodd then the sikko can be accepted with minimum clear width of 3.05 m.
2-4) Opening of 0.95 m depth from outside level (towdrds rodd/sikkd) should be provided
for HV coble entry (subject to DEWA design).
2-5) Level difference (FFL) of the RMU room is Io be mdinldined 0.l5m to 0.30m higher
thorn the outside odjocenl ground level (lowords door side).
2-6) RMU room aluminum louver door(s) clear height - 2.75m (it) & cleorwidth - 2.44m
(W) as per door details ref. drawing nos. P-DS/DOOR/Oi/96 (Rev.'A') and p-
DS/DOOR/02/96 (as per Annex-7 ). The RMU room must hove minimum one side
veniiloiion through The louvered door in ony case.
9,p3 oL-1-.a»9 .=l_;U;.M.$ ELi-;.-31
Dubai ewatridtga lxlatnf mau-daring
CJ) In cdse of coble trench drrdngemeni, cledr depth of 0.95m from FFL (finished floor
level) of the Subsidtion is to be provided.
b) In case of coble troy drrdngement, cledr depth of 0.95m from FFL of the substdtion
up to bed of the coble troy with minimum clearance of 0.45mtrs is to be mdintoined
in between bottom of the slob end the bed of the coble troy. For coble
mdintenonce minimum of i.2m free space is to be provided towdrds of the coble
troy (of Iedst one side). The coble troy should poss through public/open Oreo and
not through ony closed Oreo / room (there shdll be no services, pipes, etc, below
the coble troy.
3-i) Cleor direct unhindered access (of minimum 3.05m width & minimum 3.05m clear
height) from RTA/public rood or sikko.
3-3) Must hove minimum two sides ventildtion with aluminum louver doors and fixed
aluminum louvers window. Fixed aluminum louver window(s) should be Iocdted ot
0.3m dbove outside level.
[Toiol minimum Grill Oreo is 14.9 my for I 000kVA ironsformer and i8.6m2 for l 500kvA
ironsformer (os per DEWA Drg. No. PTD/MESH/01/02)](refer To Annex-l I).
**If two and more transformers ore proposed, then calculations supporting the
adequacy of ndturol ventilation for mdintdining the ambient temperature inside
substdlion it mdximum 55 degree centigrdde, Posed on outside dir ambient
temperdrure of 48 degree centigrdde to be furnished (refer to Arrnex- l2). Otherwise,
forced ventildtion is to be proposed along with calculation.
3-4) Level difference (FFL) of the transformer room is to be maintained 0.075m to 0.15m
higher thon the outside adjacent ground level (towards door side).
3-5) Transformer room aluminum louver door(s) clear height - 2.75m & clear width - 3.05m
(2.44m in exceptional coses) os per door details ref. drawing nos. P-DS/DOOR/01 /96
(Rev.'A') and P-DS/DOOR/02/96 (as per Annex-7).
1..?,4:1 ol_wg .¢l_§11;..m.$ &5-g,N
Dubai EioctricityNkletor Mathorkg
o) In cdse of coble trench drrdngemeni, clear depth of 0.50m from FFL (finished floor
level) of the Subsidiion is to be provided.
b) In cdse of coble troy drrdngement, clear depth of 0.95m from FFL of the substation
up to bed of the coble troy with minimum cledronce of 0.45mtrs is to be mdintdined
in between bottom of the slob and the bed of the coble troy. For coble
mointendnce minimum of i.2m free space is to be provided towards of the coble
troy (ot Impost one side). The coble troy should boss through public/open ored and
not through ony closed Oreo / room (there shall be no services, pipes, etc, below
the coble troy.
d-l) The romp up to the transformer room should be strdight with 3.05m (minimum)
width and clear height from main rood up to the trdnsformer room.
o-2) Slope of the romp to be maintained l : l 0 (l0%) (Mdximum) and should be
straight without sloped curves and speed breakers (bumps).
b-l) The cut out size to be 3 m x 3 m and to be ddiacent to the mdin RTA/PUbliC
roddside.
lo-2) The Oreo below the cut out of lodsement must be designated is loading /
unlodding boy.
b-3) The Oreo above the cut out is to be open to sky. If dbove-floor exists, then the
clear height is to be maintained 7m (for the boom of the crone to transport the
trdnsformer, etc.).
b-4) If the cut out slob is directly located dbove the trdnsformer room, then the slob
cut out cover is to be wedther proof type with remoyolole covering
orrdngernent.
4. Common Conditions
4-l) Tronsporiotion of Tronsformeris) from the main rood up To and from the transformer
room is Owner's responsibility
o) In cdse of coble troy arrangement, cledr depth of 0.95m from FFL of the substation
up to bed of the coble tray with minimum cledronce of 0.45mtrs is to be mdintdined
in between bottom of the slob and the bed of the coble troy. For coble
maintenance minimum of i.2m free space is to be provided towdrds of the coble
tray (dt least one side). The coble troy should pdss through public/open dreg and
not through ony closed died / room (there shall be no services, pipes, etc, below
the coble troy.
9,43 oL$.og ;I_!'ls1_a:Li'» (ii-1..ii
Dubai Euntridtgnuewf 9utl'\4:rity
b) The coble route from RMU room in ground floor to trdnsformer room (of basement)
is preferred to be straight (Without turns / bends); in case of bending the bending
roding to be considered R : 0.95rn.
4-3) Wet areas (i.e. kitchen, both, toilet etc.) above substation ore not acceptable. Only
in exceptional unavoidable cases, this may be accepted at the discretion of DEWA
subject to complying with the following:-
4-6) LV electrical room should be adjacent/near lo the substation, if main panel is private
(as per circular for LV room attached Annex-4). Seporale approval for location and
size of LV room to be obtained from Consumer Services Deportment.
o) For Chillers/Motors with capacities more than (100kW), follow the Circular of
Chiller/Motor Ioods proposed to be connected To DEWA Tronsformer [os per Annex-
5].
b) For Chillers/Motors with capacities between [50kW 100kW] The Totol connected
Iood shoUld not exceed the following:
5-2) One copy of valid affection /site plan issued by DM or ony competent authority
58) One copy of site setting out plan, showing the Iocotion & size of the proposed
and existing (if ony) substotion(s).
5-4) Three copies of Architecturol plan drawing indicating the Iocotion & size of the
proposed RMU room in GroUnd Floor (existing substotion(s) to be shown also, if
ony).
9_9 ol_5.og .=LnJ-.aL:5 &-'1.N1
Dubai EFoctricity&LLletof Fhathoeitg
1,u\=4e1<r~<m£nT UE l}U3A§
5-5) Three copies of Architecturoi plan drawing indicating the Iocotion & size of the
proposed transformer room in Bosemeni Floor (existing substotion(s) to be shown
also, if ony) .
5-8) One copy of RMU & Transformer Room details drawing plan showing sections (x-x
& y-y). LV roule and LV opening ore to be indicated.
5-9) One copy of sectional deioils for Rcump showing the access width and height
from the romp up to transformer room in basement floor (if applicable).
5-i0) One copy of Load Sumrnory Sheet indicating Totol Connected Load (TCL),
Max Demand (MD) and KWH metering for each transformer along with o realistic
Power Requirement Dote.
5-1 i ) One copy of Schemoiic Diagram showing Iood intake & metering
arrangement.
5-l 2) One copy of Architectural plan indicating HV cable route between RMU
room & Transformer room, along with its sectional details showing the typical
horizontal/vertical clearances available for the route and indicating the
entry/turning points aetails.
5-131 Undertakings in prescribed form duly signed by the owner of the plot for
Bdsement Floor Split Sulostotion (refer to Anex~l3). Signature should mdtch the
owner's pdssport copy. In cdse owner is o company, undertaking letter should
show the company's officidl stomp.
1. Area Requirement:
cl) 6.1 m X 6.1m (Open to sky) for 1x1 000/1500l<vA and 1 RMU {Substation with extra
Iorgo kiosk}
2. Area/space conditions:
2-2) In case substation is located on Sikkim, the sikko should hove d minimum cleorwidth of
6.1 m. However if the proposed substdtion Iocdtion is less thon i2m away from the
main rood then the sikko con be accepted with minimum clear width of 3.05 m.
2-3) The height of the compound well Ground the substation should not be more thon
2.13m (7ft)
2-6) LV electrical room should be adjacent/near lo the substation, if main panel is private
(as per circular for LV room attached Annex-4). Separate approval for location and
size of LV room to be obtained from Consumer Services Department.
o) For Chillers/Motors with capacities more than (I00kW) follow the Circular of
Chiller/Motor Ioods proposed to be connected to DEWA Tronsformer [refer to
Annex-5].
b) For Chillers/Motors with capacities between [50kW 100kW] The total connected
Iood should not exceed the following:
3-2) One copy of valid affection /site plan issued by DM or ony competent authority
3-3) Three copies of site setting out pion, showing the Iocotion & size of the proposed and
existing (if ony) substotion(s) and LV room.
3-4) One copy of Load Sumrnan/ Sheet indicating Total Connected Lood (TCL), Max
Demand (MD) and KWH metering for each transformer along with o realistic Power
Requirement Date.
3-5) One copy of Schemotic Diogrom showing Iood intake & metering arrangement.
¢,_;:l 0L-1..09 4L_!J..m.;'\ &i.i.al» l
{J.3\:EKNMENT UE uusAa Dubai Eb&lctridl3;llLu~BlDr QuM1nrity
General Conditions / Requirements for Approval of Location & Size of Pocket Subsioiion
outside Building (Open to skvi - Shored/Dedicoied
1.Area Requirement:
2-2) In cdse sUbstation is located on sikkim, the sikkim should hove o minimum clear width of
6.1m. However if the proposed substation Iocdtion is less thon i 2m away from the
main road Then the sikkim con be accepted with minimum cledr width of 3.05 m.
2-3) Substation's side of size 4.57m or 6.1 m should be along the RTA/PUbliC rood or sikkcn.
2-4) The height of the compound will Ground the substoiion should not be more thon
2.13m (7ft)
2-7) Substation is suitable for releasing supply through individual feeders, each of 400A
(maximum rclting) .
3-2) One copy of valid affection /site plan issued by DM or ony competent oufhority
3-3) Three copies of site setting out plan, showing the location & size of the proposed and
existing (if ony) substotion(s) .
3-4) One copy of Load Surnmory Sheet indicating Total Connected Lood (TCL), Max
Demond (MD) and KWH metering for each transformer along with o realistic Power
Requirement Dote.
3-5) One copy of Schematic Diagram showing Iood intake & metering arrangement.
3-7) Undertdkings in prescribed form duly signed by the owner of the plot for shored
substdtion [refer to Annex-I4]. Signature should mdtch the owner's pdssport copy. In
cdse owner is o compdny, undertdking letter should show the compdny's offtcidl
stomp.
¢=,_g:| oL-L09 ¢|-!-Ipm.is ii-5-a I
L;r.;WERf~,M£NT UF DUBAI Dubai Ebctridty So LLletnr FllJth<Drit§
General Conditions / Requirements for Approval of Location & Size of Temporary pocket
substation Outside Building (Open to sky) Plot
1.Arec1 Requirement:
2.Area/space conditions:
2-2) In case substation is located on sikko, the sikko should hove o minimum clear width of
6.1 m. However if The proposed subslotion location is less thon 12m away from the
main rood then the sikko con be accepted with minimum clear width of 3.05 m.
2-3) Subs'totion's side of size 4.57m or 6.1 m should be along the RTA/PUbliC rood or sikkca.
2-4) If the proposed IocdTion of the subsTdTion is outside your plot limiT, approval to be
obTained from The owner of The plot where The such>sTdTion is proposed or Duk>di
MunicipaliTy/CompeTenT AuThoriTy (in case if The locaTion lies in Dubdi MunicipaliTy/
compeTenT AUThoriTy dreg).
2-7) Substation is suitable for releasing supply through individual feeders, each of 400A
(maximum roting).
3-l) Copy of full set of valid DEWA Building NOC (exclusively issued for lemporory supply
only).
3-2) One copy of valid affection /site plan issued by DM or ony competent authority
3-3) Two copies of site setting out plan, showing the Iocoiion & size of the proposed and
existing (if ony) substoiion(s).
3-4) One copy of Load Sumrnory Sheet indicating Totol Connected Lood (TCL), Mox
Demand (MD) and KWH metering for each transformer.
3-5) One copy of Schemotic Diogrom showing load intake & metering arrangement.
3-6) Date of power requirement and the duration of the temporary supply requirement.
9-!J OL-L09 -LJJ--1ii Gia-E i
LUVERNMENT UF 0U§lA§ Dubai Et=»¢nidtgzLud~m www
PART-I
Proposal should be submilfed along with the following documents for approval of private
equipments substation.
1 Copy of DEWA Building NOC along with affection / side plan from DM/Competent
2. Copy (3 Nos.) of setting out plan irwdicoting DEWA Control/Metering room. Porty's
circuit Breoker room should be adjacent to Metering/Control room.
3. Soft copy of setting out plan in Microstotion (J) with DLTM coordinates.
5. Copy (4 Nos.) of single line diagram (schematic) showing Iood intake arrangement
with details of protection scheme os following: -
c) Bus section details along with interlocking arrangement for more thon 1 feeder
f) Metering arrangement
6. Copy of Iood schedule including TCL & moxirnum dernond Iood with kwh Meter
(metering arrangement of DEWA 's Meter/Control room).
7. A checklist for the protection scheme is to be filled and signed by consulront (refer
to Annex-20). Also o guideline attached for the reference of the some (Annex-I 9).
9-12 aL-wsu -=l-1+-n-é 1
£»Cl\vfERNMENT or !.lU8A! Dubs El9ctridty&l.l.lalmr Ruthoritxg
8. YOU ore requested to obtain written acceptance from the owner of the project to
the effect that, maintenance/replocement of breaker, fuse switch and transformers,
cobles which will be procured by you shall be done by the owner in future and
forward the some to us. We will require this before commencement of works for the
project.
9. (0) Cglculotion of voltage drop & (b) Harmonics Qt DEWA source ensuring that these
ore within limits specified by DEWA (planning voltage guideline gttoched Anex-i 9).
l0.Oper<:1tion philosophy
Note: Generally, review of the above documents shall be done within one month
PART-Il
2. Step by step relay setting calculations. The relay co-ordinotion shoal be mode based
on maximum fault current Gnd the grading margin shall be kept of 0.300 seconds
between DEWA's end to private party's panel end. (submission should be at least
one month before the power requirement for the project)
3. Owner's undertaking stating " OUr equipment ore suitable for energisotion in line
with DEWA network system' '& confirm that relay's ore set os per DEWA approved
settings.
5. Names and telephone numbers of contact person for the project who should be
available 24 hours day & night
6. Nome of competent technical staff, who know the switchgear operation and
copobie of issuing work permit stating that coble is safe for works and also ensure no
one will operate during testing & repairing time.
9. Formol application form for the supply to DEWA is to be filled and submitted to the
Consumer Services Deportment (CSD).
12. YOU ore requested to obtain written occebtonce from the owner of the project to the
effect that, maintenance of breaker, fuse switch and transformers, which will be
procured by you shall be done by the owner in future and forward the some to us. This
will be required before commencement of works for the project.
NOTE:
Pleose note that under normal circumstances we shall require o period of 16 weeks for
commissioning the substation ofter the comply of all the requiremenl os stated in PART-III
I
PART-I
2. Beyond DEWA point of supply ell the equipments (like switchgear, transformer coble
owner.
3. DEWA will not supply, operate or maintain ony equipment to be installed above
ground level.
4. All equipment (Circuit Breoker, Transformer etc) procured by party should be dual
ratio (6.6/I 1/22 KV) unless clearly advised by DEWA that it is 11/22Kv.
6. Totol losses of transformer should not exceed 1.5% of roted capacity due to
conservation reasons.
8. Porty's incomer should be Switchgear with CB, E/F & O/C protection and should be
Technical Justification should be submitted for availing direct 6.6/11/22 KV supply to the
high-rise building for locating transformers above ground level/s. This depends on the
height of the building, size of load, type of load, etc. Normally, buildings of height 200m or
above shall be considered for direct 6.6/11/22 KV supply.
PART-Il
Proposal should be submitted along with the following documents for DEWA review.
1. Copy of DEWA Building NOC along with affection / site plan from DM/Competent.
2. Copy (3 Nos.) of setting out plan indicating DEWA Control/Metering room (soft copy
of setting out plan in Microstotion (J) with DLTM coordinates). Porty's circuit Breaker
room should be adjacent to Metering/Control room.
4. Copy (4 nos.) of single line dioigrom (schematic) showing Iood invoke orrongemenl
with deloils of protection scheme os following: -
c) Bus section detdils along with Interlocking drrdngement for more thon I feeder
f) Metering arrangement
5. Copy of load schedule including TCL & maximum demand Iood with kwh Meier,
(metering crrongemeni of DEWA Meter/Control room)
6. A checklist for the protection scheme is to be filled and signed by consultant (refer
to Annex-20). Also o guideline otioched for the reference of the some (Annex-19).
7. You ore requested to obtain written occeptolnce from the owner of the project to
the effect that, maintenance/replocement of breaker, fuse switch and transformers,
cobles which will be procured by you shall be done by the owner in future and
forward the some to us. We will require this before commencement of works for the
project.
8. (a) Colculotion of voltage drop & (b) Hormonics of DEWA source ensuring that
these ore within limits specified by DEWA (planning voltage guideline attached
(Anex-l 9)
Note: Generolly, review of the above documents shall be done within one month
PART-III
2. Step by step reldy setting cdlculotions. The relay co-ordinotion shall be mode based
on mdximum fault current and the grading margin shdll be kept ot 0.300 seconds
between DEWA end to privdte pdrty's panel end. The cdlculdtion should be
submitted minimum one month before the dctudl power requirement for the
project.
3. Owner's undertaking stating " Our equipment ore suitable for energisotion in line
with DEWA network system' ' & confirm that relay's ore set is per DEWA approved
settings.
5. Nomes and telephone numbers of contact person for the project who should be
available 24 hours doy & night.
6. Nome of competent technical staff, who know the switchgear operation and
capable of issuing work permit stating That cable is safe for works and also ensure no
one will operate during testing & repairing time.
9. Formal application form for the supply to DEWA is to be filled and submitted to the
Consumer Services Deportment (CSD).
i2. YOU ore requested to obtdin written dcceptdnce from the owner of the project to the
effect that, maintenance of breaker, fuse switch and trdnsformers, which will be
procured by you shall be done by the owner in future and forward the some to us. This
will be required before commencement of works for the project.
NOTE!
Pieose note hoi under normal circumstornces we shall require O period of 16 weeks for
commissioning the substation ofter the comply of all the requirement os stated in PART-III
l
N
F
9-!D 0L4=°9 =l-!J-$1-5654-B
\;.ovERt~;m£nr UF DUBAI Dubai sucrmwg In Lllatnr mu-\0riy
nn
,._g:l oL_yog ¢l_!J_m_»56..'L1-E I
!Civll!lr~nl1sIn 0? BusAa Dubai Eloctririty &L£letnr l:u_m-,0nh;
Annexure.4
In principle there shall not be any wet facilities above the substation/Ring Main
Unit Room. Only in exceptional unavoidable cases this may be allowed at the
discretion of the Authority and the following requirements must be fulfilled
1. A Reinforced Concrete Attic slab above the entire substation/Ring Main Unit
Room shall be provided.
2. The entire attic slab and floor slab above including the vertical sides above attic
slab shall be waterproofed by an approved system.
4. A11 pipes, joints, trap, etc. running in wet areas shall be wrapped with approved
Waterproofing membrane.
5. The void between floor and attic slab shall be minimum 60cms clear height.
Access to the void above attic slab shall be l20cm X 60cm fitted with aluminum
louvered door. The void shall not be used for any other purpose and shall have
permanent lighting arrangement. Drain pipe to be provided for the attic slab to
drain out any water leakage through floor slab. Tiles are not compulsory above
attic slab.
6. The consultant shall forward complete floor plans showing location of Wet Area
and Substation/ Ring Main Unit Room. Extent of attic slab shall be clearly marked
in the plans. Typical cross sections through the Wet Area/Substation/Ring Main
Unit Room and Attic Slab shall be shown in the drawings including waterproofing
arrangement/ systems/materials. The drawings shall be forwarded to Dubai
Electricity and Water Authority Civil Engineering Department for Wet Area
Approval.
Guarantee letter
To:
DUBAI,
Dear Sirs,
Location:
We hereby undertake that we are fully responsible for any leakages due to any defect in the
waterproofing system and/or construction method adopted, and in such an event we shall
immediately repair the leakages at our cost.
We also undertake that if any damages are caused to DEWA's equipments due to the leakages
and/or while any repair works are carried out we shall compensate such damages, failing which
DEWA reserves the right to take any appropriate measures deemed fit.
TEL. NO.:
DATE:
TEL No.
' /
/
Annexure.5
Checklist
2 A clear depth (void) of 600mm between attic slab and floor slab.
7 Water proofing of all pipe joints, traps etc running in wet areas
10 Guarantee letter
11 No high pressure and vertical pipes are to pass in the void area
12 PVC tray to be provided and slope is 1:100 towards the drain pipe
Submission should be duly filled and signed with tick mark is must.
Annex-4
DUBIQF EL£€,3TF%lI"$lT'l' & *J¥'»@.3'EFZ nlsTes0.F2.§Tv Q no a L . ; 3 ¢L4.§S "1
é" -_-
18
=
l){*2lj° (ju~5i»€Jltler.
In c1*'d£=r Lo avoid delays during drawings approval and in5pE:ctir_1n, the following
requirements for locating the Main I..f;W Voltage* Switch Room is clarified betowf-
- The Main Electrical Service Room. with mzbtimum dime nsiorlfli layout as
spec fied under section-3 and appendix-7 of DBWA Regulations for
ETectn'caI Installations shall be provided in the ground Jfloor area close to
the entrance to the building from the access road.
For buildings with dedicate-d substations and private LL' panels, the Maire
LV room shall be provided adjacent to the Transj'br'mer Room.
In order to minimize the space for the Main L-V room In ground floor areas,
provision of additional Electrical Service Rooms shall be permitted at other
locations, subject to provision of main. inoorm-ar panel with check metering
in the Main LV room. adjacent to the transformer room.
All ConsMlants and Contractors arc: reques*e8d to make provI_sion for the above in
the'r projects at the drawings approval stage of project itself.
Your5 faithiuilwf.
For Dubai Electricity _&._Wia3Lar.Authority
-~" r ' _ ' ?
n.
s o p n - - l - »
l
i'£} T L H L -1 H * I »_;l \ . I » ._ I
I
I {_
. * If' ,of/WA' I'
1 - I nI :S~L:5 I I * 7J", - NV c z i -c iLn € . L ¢ . - . . = #" . i..
.7 g -.i ¢ *' v
_.s-¢
l, ,*!oh g Q"
3 I b L b l..r
- .
I
___
_
,_.-..:~" " 8"14¢.. -f f
*
¢ -
,r =,'l"-:vin
-l-5
`
_. »,,\ _*_
\1
1 . *¢.-"'*L....
'un \
J nr f' * ."al
...
,¢ '
/5
r'
.f
r e 0L499 :L-sJ-n1.6
l
_
*N
ter Fiudhoriq
Du bai Ebctfidby & Wa
|"
the* -
c;csv£ur~.msn1 OF
DU EMC
Annex-5
Q
um ii
K
a.
* - 1 # 9 _ 1 L " l l 1 1
.c
l
-
A.
To 9
Dear Customer,
Please be infouucd that, in order to improve the so"ety and relinbillty of power supply within cousin.,.
preuzises. the following requirement shall be implemented -while proposing, Claillerllvfotor Lands to l'
~ounect'.:d to DEWA Transtbrmcr through consumers' Private Le w Voltage Prmclfs.
I. All Chillers above 100 kW power requirement, proposed to be connected to LV supply shall have annul.
Stags; compressors and designed for sequential start with a time delay of l lo 3 minutes.
Follovéng guidelines are to be considered at the design stage, xo include Chiller / Motor Lnazb, .-
f*l
1
-,5
. _,r."l'-"
_ . , '-'Ji . . *::\¥:»-1
: A -_, l..~,..,:* . . m . . WW §5%'\'lIe":'°""§'-"§l~.1.0Q0 k w.I -5)3§='»'»;,j;u ,1'€";,\.l1! Q-..-»1snu~lev,1&-'»'=-'="~1'=
<;:f.i8l{11§9~4;~Y,@'§§1LI="s""
_ . .Dcscrspliun.-'-f r
.1
.Vf. .\
~N0..1l. .\ ~""3.-=., b..§§+iw ;¥'W'?au5f¢»¢%n1u'rf(3,*'\7=~. -x law
r *`¥'*5"*A'- I"rausforlhEn'k"' .| HL.g;.'. |
l _ l Qaly en: compressor ball scar: at one Only enc corapnesanr shall start at
3. S8qL1ctNéai~ Starr of chillers time with a time n'=lay of I 10 3 sninuzes one h'mc with a time delay of 1 to 3
comvfcssuri Mlillilta'
£1
| Iisquirnrnin t of Sianere
Soil slnrlcrs for similar type xo limit Soft warren/similar type to limit
starting current as indiczud in lim: 2 sxa.-dug CUTTER! as 'mdicsced in hem
I
e
above 2 above.
i _ In
"71e Cor.su'mnls shall consider permissible Vollagc Flicker limits, £-cquuncy of :waning of the chillers, etc., (=
.sure safety of :he consumers' equipment and iustalintions and quality of supply, in lhcir respective projeclia.
All Consultants are requested lo incurpnracc lh's pquiremem in tbcir Drawings and Load Disaribmic
Schedules and submit along with Chiller C`cmlrol Scheznatics, Single Line Diagram, details of starter a'\:l :::h~' -
technical speciiicatiors to the Consumer Services Department in DEWA For approval. before carmncncemunt TX
the project.
Should you require any clarification OH the above, bleaase do nm l1¢sitat== so contact us.
Yours faith.llu?15f'.
For DUBAIELECTRICITY & WATER AUTHORITY
z.
an
-In
i'
--=§:1 m Consumer Sci \ inis)
F
. I f _ _ _ * Q _ - '1\.,_|i!
0 1 - 1 »
I l
L/"
<":
J - 3- ,\ J
I 5 .l._ ,,. ' 'l 2 af.~'#. L.""
.vl-
I I O l i : o u n i -
/" i
I-
I
. *J*
a
r . 5 i i - r s - a a n ...\.IL\
I
i rl gk).I
| \._
i s
.II
...J
to
I
£- 'r
J- I
1 r..=\ r° .
1 g In
.JL. ;.J`\I
4
. § . " TO
»r
;'.
-
45338 K.-'U'!883\ |1l.1 . ii-"
.a
Jim
1 h r ,
up. 11
l'J`. °`d£Ir. L ;\"
\ O 'I
;
' a
1:.'1` le>
C
*P go h. n
J - l . .
xv* . . ; " |.»_u.,
s
-;.lin'.:3@ a r:-.'.'u go ".' Si 11 i
3 #
0 Le
1.
l*l I.
"i ,A
,f
J i I
I
ul\2
<2
W
v
>\
-.\ l
\
9
K
s
Q
1* 1,-!= 0Ls»°9 -=l-:J--6Li £41
L§()\rERNMENT UF DUBAI gubaj E l:kri4.'.il£\_/18l LLletor F*'-&1*0f7G:Jl
Annex-6
Chiller / Motor Loads Proposed Io be Connected to DEWA Transformer
Tel No.:
Fax No.:
Mob No.:
Address :
9~.
r'
1;-u: OLLY -=l-!.--#Li 6i-sr
($U\AjERNM£NT (JF Dumb mm El9cEridbg&LEJalQf man-»ority
Anrwex-7
v
'P
| II. l I I I 11 l . n o Ill
_lhl*l I i L H I I l d Ur r - »
<.~>
I
*'- Q* 1`
r°-
.
J
ill-
n'
.I s
• |
e
_°
I
f ".*
M
.1
_I
l.
u
al
_J *~s._.,»J
,>'
"\\
s
1._1
z
,n
iIi ,of 3
:lI
I
I
I -S
T -JH an I
:Ii-u.-ur
I
1
| G -
la
Iv_ no | I
I
1 -s..r I
-.*
L
L
'*i -~7 I "=
*I
I /1*
I
~. i 1 LQLNQQS 0
I 4.'u-
I!s: I
.I _
1
I
I
go
1.
- -v-
I
I
I
ru I l l
I
I
1,-¢~
I
I
/'£;°"* 1
"T
|,
; I
ism; 'N` 1" '9
\J Iv'
r
W- ' I
%
w .f/
A
.
E
."°""
NE)
.
`T'{3'*12&1 Simon go me so :I 4
HEFw l v
M*U.,H?NBEE Nina;
i
= 1,
e * Q .|
L
.|.
~a
l
I
i
|
.
I
»|
-.L
I
E
In-~--~
i n
r,
h|!\.
P l ! !
I
1
I
A .0
1
r
- a
! l
I,
:
I: I I
I -"\
I
~
F
I
I
I
(l a
o
• 1; *
$1
.-
v
p u
I
,
"S
I! 5;g L '.P"
|
I
I9 -*-*-~'-l*\
11
e I
h..- i 1 - r - 1
l
N* L... . 1 -
:
.:*'a.Fl. F
I
; la i J
IN
!
.
.I new
A I
I
|-
II . - .
L
_Ax J
I nzwa. r4..1;:- usia uh Qluwmq uc2-$1@.1.§3.1i
|
I
I .| o
I '°_"°'°"'i
F. _
paI 'N
.L_
4
~+*'+ .
J
1f\=.1'i,-'£twa F:z=:3n@¢
OEM S'*§T~25 F 'N
l'u
I
.
I H* 4 9 =<-<,-»> (EES
.in-uni -;» I »II l__l~
1../ r
~'JETf3.§§. '1'
I
J ` ~-»; !I lI '.
-*.
r
DUBAI
ll*ll.QlȢ1\.
E.EG'1*F¢|crr'r a v.'ATa Arr-<<wz=Ty
| | | q - I las' Q -II.
1-ln
•. U:Ml
I
re: Ci" "Ugh
J 4 3n=:'1*8 Gun:
- l
J -r ,. I \
n am \L b;.m'il I 5=!.§_8i5I?Z{'€ 33-1-54 E'TAlLb
I
TZI-s.-12 u
3%.I:.:L I1' G£1'.L M' }we-»? vs-I l
-
I T .:l.¢' I
(. -4l.p 11
Page 1 o f 2
I
-!= 0L-.wg =l-u-11--5 l `
Annex-8
1'
'L
s
I
as rmtnzmumeaaamfw
f:
l
I
F
"I Q
n
I
\
|t a 'I
I
v
"'**'l\*1¥lnlulQmnmnmulu!lmmmu
in
ll°l\»!c1:nmno
\ \ r 1
- ""-_-u-_--
I
1........-1
I
II MmmwMU-quummln"lllQwwnpuQnu1
'iv
r I
wI-u-
-v
-"! v 1 |
I J .::. ' L
i
Q MiM"1""iW~i."M'"Ii|.lN|\lnm*||m*l
L f gnuuMmwqum
I
'|".a I
\
\
\ '-7 I . -', I I
I
s
\ WmmImJnInI-nnnnenfenaus Luna-
1... l! 'To
1 I I I
\
I¢
z
#M\»`p-ilitnnvi nuwramm I :nua\uii¢...\1mln 4'!"t
iiiihhubnmalnmumam
` _
I
\
-__3 I
l--
lL
i
f
f
.ll~ L_ _ .v .° l l'l¢1lll\lLl¢4lll.Yi~l==Imn'1\za:»m\\~:.sr.»l».~».».n.la»»al
I
F:1 ./*
/ n .
9
Si
I
-' r v':"4 *9}
-E »"i"§
Ill il\l:l.Il!!ilTl'HL1I~lBI3l\lfl\l In i n #1SVI I
rwxnfmnls Nina. 'nuns lw.-»¢-el.:15l lnllull;l»:¢.llat
mum .gggg
I".
I
r ?
I
IE 23
'Q
' • I
¢
l: I y 1.o g | A
I I
Ur
1
Li V
»~=;
. I
I
I
- - - - ~ ; E »-=,*1 \ V
III I ". 1 L ::rnn..uu¢n/
'i
U
'of-.
I
4'-H|, .u
i It \
l L uui:uu\aa§a¢i.u»q1!»5
'S
-f-.;..
L;
' r *in' _.I
l _-al.
x
IE.;-l
II I w
I _,
1"
in
'»
in-1=+»ln15
n
I. E..."im2|'1H
i 1
I L www
s HP. so:
;
I
q
ir.-'5; 5i1E'EEéh1'x Q;
5
3,
I I
no
.1
a
=,:> so 5-iat;
D
*
:i
1 - .
* * -
.e
c
H H H - """" D - l a c
_ I
-0 I l a - - - * Q * _ `_.]"-»
4 .. 4
¥fln'»'ll '£E'|V- Eai"a| *h %=~='~.'»£
' - _ _ \ _ _ _ _ * _
*\~ s
1 n
-
-.-5*
l
i ' " "
11
a l ,
.ha
l
¢. * =
r
|»
r l 1 - v
-
I
We
_- -.:_. ..» *
r'
I
nr:
. - |
1
Lily' l 1 H \lr*_' h.°""'*__
s.
l . s. lQ
'V":\'»"l
ah.*~`\ go Vu.
I
.turd 8'é
u-° , I -
5; in v-if , M '%I.'.'rlrJI=s i:IiJ3>E Pl
F!
1:
I
N .m G I
*'L. . I I i
1 \\of*J¥§'.' V " .
U. !'
'
I \.
D l l 1 . .
11 l'\i
I a
I
.- r
" - I I l i
I v , .
a-- D 1'\.'-.-'§*h\'- U | 0 .
\ » 1 » - ' ; | ¢ I I Q
¢¢¢ll
I I
Page 2 o f 2
|=,_}:1ol_g.og A|_g_.|..m.$ t`i.i-£-.51 I
Gow ERNM ENT OF 1) U HAD we Ebctridtzg &LlJat9r I-luthority
Annex-9
\
imp >lHl..9
PCJLYTHEH
I
I
'n
r
w
O.
'U ?~-x
tn- I
"I
ra
-0
a.
l
O
A
SECTION
Lnpw I auuELI5
Q.
l
l
g _ I
I
-I
I
I
o
I
I
I
¢.JaoLI..oo¢l_ll..dLA6~i.5..&
no _ ~ *I l * - *
my
i 11
as 15
15
l
I .65
E
CD E 'in
.
m >
Ir
ii
Q \ 1I
b *x
| l . 5
H
LE
1 c
-I I
:- 'al
1
s
r
'rl
I"
Q
U G)
z
Ln
D >
T *
u
1
*1
1* J
A
A
W
I
II
..'1-
UP
-
4 IPENIMC
-» l - -
,S v
/,"':/
..¢,§;
»° "4
,I
I
/.
I
9-!2 0L;-09 -I-JJ--£L-5
C.OV'ERM.1£NT OF D USA! Dubai Ebckritity aLllalor nm-.gfilg
UNDERTAKING
(Ground Floor Split Substation)
To
Dear Sirs,
1. I shall be fully responsible for transportation of transformers and other equipment from
DEWA's truck and placing it on the foundations in the substation room (or vice versa), as
required by DEWA.
2. I shall arrange adequate insurance to cover the damage to DEWA equipment while handling by
our personnel as mentioned in (1) above. [The cost of one transformer is Dhs.240, 000/-
(approx.) and weight is about 6.5 Ton].
3. I shall not modify any parts of the building that affect the access to DEWA equipments. I shall
not make any alteration I modification in substation without the prior approval of DEWA.
4. DEWA will not be held responsible for any delay in restoring power caused due to non-
availability of the equipment transportation arrangement. The responsibility for such delay will
be mine.
6. In the event that I transfer or lease the property to any other party, the above conditions will be
made known to that party.
7. All future maintenance of substation (civil works) including repairs I replacement of the door
will be carried out by me.
- - : n u n - a l a n - - » ¢ ¢ ¢ ¢ n ¢
Signature
Name:
p.o. Box.
Telephone No.
Telefax No.
Place:
Annex-I 1
- l
- I - - »
a
1
I
up U
- - ¢ 1 ¢ - l - l
3
:
I
3 I
I
|
WN ALUMI'Nlll.l ANSI
#WISE 561152) mm
I
- lmEnnaL »%Li.Fl§IN!.M anew
s
iii FRMAE 35 x25 I1II1§
L- II
..- ° 1 '
gETA4L iIIESi4.n'{3RiLL
z a : pa x i
i I,
'i
I
I y\g;Hi|~,|I|"[§II1§-HIE
FWLME
L ALUI'\1l?\!UHI
i s
s"` '
.-.....
|
. ~I
I.
I
- l n 1 - 11-
§_. -;7_ /it
0 •
I I I " I
I
I 2 in »"|
.II
+
T
I
I
I
'i g
| l
I II I
»` ` _LZ
I
~\ _______ _
-_q¢-- ,_;;: . Q - 1
f
Ii
u p _ n u
:
he.
-_.J. -Ib-J
|-_.L-
1- ..1 __,
: _
" " --
'"
--
l - - - " - l
4-
Rev | _ _ _ _ _ _-°ua;%, ---- 01E. '.°1l5m~-;
8. ~;-3° of Ra '*J--$$ ~* 1-v°)
. nuaal £¢£crHlc=1y6 wma Au11+0nny
pong sag up-l.U»\£ uxtlwmul
i ---. I IIRF
_ 'II3*]?!'32U444
11-6.6!D.4kV sfsru Fwbz1g~ for
mrs:
,re»»=. _ _ 22-1c»20n2
Sprwr
'MENT°'
|
eI oeTAIL OF |&'_-Efm-'m
WIRE MESH
L t IT
I
I
6 - l - _ n - - »
*
- L
)
SHEET~N0.- PTD/MESHl01l02 I
/ , f .s .
.>,8'
.'
l
9.3:oL_5.og £L!J-.51.56j-1-a*
L.(JV£Rr-M ENT (JP DU HAD Dubai Ebctridtghllator Qut.I"u::rib,l
I
I
2
1 r u
.J-l.=-Q"
'g ':' a.r.' .P
,. jg£¥'%=,
|
.r-
i.
.l"§:.'.'..
mm
men.
in
me _ |
I
Ill I
1 u
I
17 11 11 'I
|
II
I
I
|
II
|
no
|
»
IIw . 1 1
" _ I
I
AS l -
I 1
\ AMW YM
n-
I
T alTII
I I
-. Q
_
tg-
.-s
|
p_ $1 i
'1 al '1 1 u
.- ..._.~_-__.-
~ a
nvmm of ms runcm vnnaunou
slI1§1guFQgwqn1<.1:;|l'gx»ApLg
Q-
-a
l
3-
um( EUIIIFLE
l I
<mg iI$T»*II£ATDN euuvnm -
gg-
4 Innsronusns G moo WE urn
1
wnu ossa :
Dlf! » in, - 4 v lM * _ so#
"I
mwwmnamnunmuuiwmnualunuuuis paI=
M luartnhsuks misuse! GA91- In
: B
I .
l u
II-Ina1mufqiwlpu
I
I I* Iu I
Ra
I
rr:
.
I auI I I
B u s I I *u
THE ruuJJ~ar4n \<N.L.B As! BNIB men 'Itll NUM
OOOLIIG M MW me :s.a¢am°¢1~
her C8658 SECIIQH (law
W a-r*u!\l¢l¢1»ull"
-I -I .; .. .. Q. 0 I| II \| IJ
A! V§1I££IIIY 1011JI
AR so cams Emma mm?
*»,II*I I I II
I
1 u
I I
I
I
U
I
I
I
M
unmmlm
elwvdlmnmfukl
*
1
Annex-I3 UNDERTAKING
Transformer Room in Basement
To
Dubai Electricity & Water Authority
P.O. Box 564
DUBAI
Dear Sirs,
Sub: Electric Supply to my Residential/Commercial Building
on Plot No. at .
I, (full address given under) the owner of the above building agree to
the following conditions:
1. I shall be fully responsible for transportation of transformers and other equipment from DEWA's truck and placing
it on the foundations in the substation at the basement (or vice vel'sa), as required by DEWA.
2. When RMU is located in the ground floor, I shall make the arrangement to lay the HV cable from the transformer
located at the basement to the RMU in the ground floor. Facility for supporting the cables will be provided through out
the HV cable route and we shall not allow any other services underneath.
3. I shall make the arrangement to lay the LV single core cable from the transformer located at the basement to our
LVDBs in the LV room and we shall terminate those cables in our LVDB's end.
4. In the eventuality of cable fault, I shall make arrangement similar to that provided at the time of initial installation
as given in (2 and 3) above.
5. I shall arrange adequate insurance to cover the damage to DEWA equipment while handling by our personnel as
mentioned in (1) above. l.'l'he cost of one transformer is Dhs.240, 000/- (approx.) and weight is about 6.5 Ton].
6. I shall not modify any parts of the building that affect the access to DEWA equipments. I shall not make any
alteration I modification in substation without the prior approval of DEWA.
7. DEWA will not be held responsible for any delay in restoring power caused due to non-availability of the
equipment transportation arrangement. The responsibility for such delay will be mine.
8. My contact address/telephone number (of an authorized representative) will always be available at the project site.
9. In the event that I transfer or lease the property to any other party, the above conditions will be made known to that
party.
10.AII future maintenance of substation including repairs I replacement of the door will be carried out by me.
11. I shall agree that minimum 3.05 M wide & 3.05 height clear access from Municipal road up to
substation (Transformer) room should be maintained and available.
- - - I D a s - - _ _ ¢ - - : z h _ -
Signature
Name:
P.O. Box.
Telephone No.
Telefax No.
Place:
Contact Person NB: Owner's Passport Copy To Be Attached
Name: ¢uL.JI Jo# 511+ 3JJ"' L55Ja
P.O. Box
Telephone No. NK:IA/08.04.02
Telefax No.
9-13 0L-1LJ°9 AL-!J-41116-ia-12 'l
l \
Annex-l4
Undertaldng For Shared Substations .1 g 1 'Z
T0.° .-,v
Dubai Electricity & Water Authority @,-'. ->l=-'J flax-*'
p. 0. Box 564 4,44 $64 .+'.u¢
(Full address given under) the owner of the \m =a.n,(°uJ use ..,Jul= C P U )
above, building agree to the following aJ1:J11=,,_.:Al,,_1=v9l,I ~A l ,,_s;*M
conditions:- I
. . . . . . . . .. . . . " ' * ' : \ i ) - I 8 - L ; 4 *_. *u_L°L.3J°\J}.1
;_\;..A°\~\8_.LaJJ\JlZ..Ja;_¢.1l_1L.¢__1..L$JJ
cooperation as and when required.
L , 1 . . ; 0 ; - 1 L 0 L 1 J \ \ . ; l
. J * + i s J
Signature
. . . . . . . . ... . 1. ~a,;n
(Address) .....................
P. O. Box: . . . . . . . . .. .. . . .. . .. . . . . . . . ... . . . . (o1_»1~J\)
Telephone No.: . . . . . . . . . . . . . . . . . . . . . . .. . . .
........... ................. ......................... .*-=.u==
l
(Contact Person)
Name: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ("~J=lL=° e Qi' ` ') a-
Annex-15
DUBAI ELECTRICITY g WATIH auwnalw II Q-3* of no ¢L.JJ.....,.'LS I
4
Gui
. LQ
CONFIRMATI ON BY CONSULTANT/CONTRACTOR
.as
•
• I
I
Project Name:
1. The site has been dezmarcated as per the settingout drawing approved by DEWA Mk
ready for construction.
2. NOC's from all the concerned local authorities have been obtained and there are no
services passing through the area mark for the construction Of the pocket substation
o
n
Name'
\
.n !
Q 9
I I
I I .
,a
~Design:1tion i'* Q
ON BehaI§lofM!S
-:iIoL-1-°9 =l-!J--G-it '85-1n I
C,LWERNM£Nr UE DUHA! we E:loctridty%Lu§lur 9*-1U"\Df5l2\5
Annex-I6
DEWA point of supply/responsibility.
DEWA Metering /control
room
Party's HV switchgear
Annex-11 Circular
Page 1 of 2
Dislributimp Network Desist Requirements
& Guidelines for MV (11-22kV) Supply
In line with DEWA's power distribution network design, the following guidelines shall
be followed strictly:
1. Ring Supply consisting of two feeders (two-feed ring) is mainly granted for power
supply as nom ml feeding arrangement. Three-Feed ring arrangement may be
adopted br cases where all MV switchgeard RMIUs are installed in one location
to ensure the specific supply reliability.
3. DEWA standard I t kV cable sizes are 3/C 300mm2 Copper XLPE, 3/C 240mm`
CopperXLPE, and 3/C 240mm2Aluminum XLPE.
11. Standby generators are not allowed to operate in parallel with DEWA network.
Therefore, proper interloeldng shall be provided where rcquired.
,_;:| of;ng =L4J-1°-5 <1-i-s-3
r
Dubai eloertidty s uaam mJu~.ufiv-3
n.uvenr~.m£r~:T or ULISAI
Page 2 of 2
12. Voltage drop shall not exceed 5% during normal operation at medium voltage
level. For H`V motors operating at 38kV, 6.6 kv, .1 lkv voltage. voltage dip
I: - rotor starting must be WCP
I'
• I
along with motor
g characteristics, Lumber of L _ _ w j a c r day, drawings,
Lcomments and approval at design stage.
I
<1l 11-17
n
17~23 ..23-35 :=-35 (%)
I
14. Maximum allowable number of cables per trench for l 1kv cables is 20 arranged
in maximum two layers. (2.5 to 3-meter trench width on both sides of the road,
swmimi
'"'- Q2/llkv S/S and 2.0/L5 meters elsewhere depending on load
15. Maximum allowable number of cables per trench for 22kV cables is 10 arranged
in maximum one lay-er. (2.5 to 3-meter trench width close to 132/22kV S/S and
2.0 meter elsewhere).
17. Horizontal spacing between MV cables is 150mm (edge: to edge for MV cables)
and vertical spacing between layers is 100mm (edge to edge applicable for l 1kv
cables).
18. Separate corridor shall be allocated for MV cable laying within party's premises
along the road to ensure avoiding crossing between 132kV and MV cables.
19. Special backfilling to be used for MV cables with soil resistivity below 1.6 "c-
m/W.
20. Single line diagram illustrating the protection schemes along with relay setting
calculation shall be submitted for DEWA's comments and approval at design
stage.
9-42 DL-109 -=l-!J-1-6 I
a.o\Enr~4m&nT QF UUSM Dubai Elaccridtysunacar mldrwwbu
Annex-I8
(DEWA Meter/Control room)
1 . Size of the Control/Metering room (DEWA RMU room) shall be approximately 5.4 X 5.4
mtrs.(29.16 sqm) for regular type RMU room made of block work and RCC slab. This is
for 2 Nos. 11KV feeders
2. For additional feeder (3rd) additional space required approx 10 sqm( i.e. for each
additional panel 10 sq mtr is required). Please note that the area of the
Control/Metering, shall be decided only after approving the 11kV feeder arrangement
(HV SLD)
4. Control/Metering room door clear height should be 2.75 mfrs or 9' and clear width of
2.44 mfrs or 8'.
5. Control/Metering room must have cross ventilation (2 sides) with aluminum louvers /
doors
6. 95cm of clear depth from finished floor level (FFL) to be provided for trench and for
cable entry to the Control/Metering room.
7. FFL of the Control/Metering room should be higher (15cm to 30cm) with respect to
adjacent ground level (on the other side of substation door).
Note
Sikka / road should have a minimum clear width of 6.1m. However if the proposed substation
space is less than 12m away from the main road then the sikka should have minimum clear
width of 3.05m.
¢,_;:.\ oL-;.og ¢=l_gJ-.¢ILé a ; I
ld r»P£Rr~.M LN T UE DL*EAI Dubai EE9ctricity&LF.latQr F¥1.,\thorit:43
Annex-l9
I
L,-u oL-1-09 »=l-aJ-#Li 65+-R
it suppl' Check List 1413.135
Annex-20
Cheiikiist for Private Substations
01-Aug-0?
'low No.
LIM.
n . iDescription
a I i a i e o Ronwlcr n
Submission should be duly filled and signed with lick marked is must
Annex-2I
Annex-Q2
PART-I (Space open to so)
1. Size of the RMU foundation shall be 6.1 X 6.1 mtrs.(37.2l sqm) with FGRP Kiosk (to be supplied by
DEWA). This is for 2 Nos. l IKV feeders.
3. The height of the boundary wall (3 sides) around the RMU foundation
substation shall be not more than 7'-0"
10. Size of the RMU room shall be approximately 5.4 x 5.4 mtrs.(29.16 sqm) for regular type RMU room
made of block work and RCC slab. This is for 2 Nos. 1 IKV feeders
1 l. For additional feeder (3"*) additional space required approx 3.3 sqm( i.e. total 6.9 X 5.4 mfrs.).
4. For additional feeder(4"') additional space is required approx 8 sqm(i.e. 7.5 X 5.4 Mtrs).
5. RMU room clear height shall be 12' (for regular type RMU room made of block work and RCC slab).
6. RMU room door clear height should be 9' and clear width of 8'.
7. RMU room must have cross ventilation (2 sides) with aluminum louvers / doors
8. 3'-2" of clear depth from finished floor level (FFL) to be provided for trench and for cable entry to the
RMU room.
9. FFL of the RMU room should be higher (6" to l 2") with respect to adjacent ground level (on the other
side of substation door).
Note : If RMU space/room is located on sikka, sikka should have a minimum clear width of 3.05 m as long as
proposed substation is not more than 12m away from the main road. Otherwise, the sikka should have minimum