Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PURCHASE REQUISITION

(Royal Walk)
PR Type (Please select one):
Material Manpower Hire Equipment Hire Subcontract Work (Supply & Apply) Subcontract Work (Apply) Other

Discipline (Please select one):


Architectural Structural Electrical HVAC Plumbing Fire Fighting Infrastructure Transport Other

Supporting Documents Attached:


BoQ Section Ref. Approved Drawing Specs. Sheet Material Submittal Other (Please Specify)

SITE PR NO: PR-RW-72 REQUEST DATE: 30/Nov/23

DRAWING NO: REQUIRED DATE:

PROJECT: Royal Walk REQUESTER DEPT: 101-Civil

LOCATION
SL # DESCRIPTION UNIT QTY REQUIRED Remarks
WITHIN SITE
Excavator (Plate No.5971) With Operator Without Fuel
For the Month of Oct-2023
1 Hrs 138 Month of Oct - Day
Supplier : Super Sonic
1 Ton Pick Up (Plate No.65513) With Driver Without
Fuel For the Month of Oct-2023
2 Hrs 324 Month of Oct - Day
Supplier : Kartar Genral Contracting
Darb Charges - Double Cabin Pick up
(Plate No.65513) Nos
3 Hrs 2 Month of Oct - Day
Supplier : Kartar Genral Contracting
Coaster (Plate No.72332) With Driver Without Fuel For
the Month of Oct-2023
4 Hrs 323 Month of Oct - Day
Supplier : Mars Passenger Transport

Tyre Bobcat (Plate No.57946)


5 Hrs 273 Month of Oct - Day
Royal Walk

Supplier : Super Gold

Boom Loader (Plate No.97698)


6 Hrs 54 Month of Oct - Day
Supplier : Super Gold

Boom Loader (Plate No.76143)


7 Hrs 262 Month of Oct - Day
Supplier : Super Gold

Boom Loader (Plate No.76143)


8 Hrs 240 Month of Oct - Night
Supplier : Super Gold

Tyre Bobcat (Plate No.58086)


9 Hrs 210 Month of Oct - Day
Supplier : Super Gold

10

SITE/QS REMARKS:
REQUESTED BY:

Signature Over Printed Name/Designation/Date

APPROVED BY: RECEIVED BY:


(CM/MEP PM) (PROCUREMENT DC)

Signature Over Printed Name/Date Signature Over Printed Name/Date

APPROVED BY: PROCUREMENT REMARKS:


(PM/MEP Manager
/Dept. Manager)

Signature Over Printed Name/Date

ATTENTION PM: Please tick any of the following (if required):


1) Subcontract Agreement: Required Not Required

2) Payment Certificate: Required Not Required

Malaih/PR/19/F3, VER4.0 - 16-Mar-2019 1 of 1