Professional Documents
Culture Documents
Baraya Hospital Calculation Note
Baraya Hospital Calculation Note
AUGUST 2023 01
BARAYA EXTENDED CARE HOSPITAL
Table of Contents
1. Introduction..................................................................................................................................................... 4
2. Scope of Work ................................................................................................................................................ 4
3. Design Codes & Standards ............................................................................................................................ 4
1. Introduction
BARAYA EXTENDED CARE HOSPITALProject located in ABHA-KSA. The Project consist of eleven stories
ground, mezzanine, first, seven typical stories and roof. The structural system will be cast in-situ reinforced
concrete construction; the floor system will be flat slabs with drops.
The Structure consultant has been invited to carry out the structural design for the project in order to achieve the
most efficient structural system that achieves economy and better structural performance.
Analytical models will be carried out in order to study the performance of the foundations or concrete building (if
any) to ensure that it can resist the applied vertical and lateral loads.
2. Scope of Work
An optimum structural concept has been developed in order to reach to the most efficient solution that reduce the
floor slab cycle and hence minimize the overall construction cost and time. Various schemes have been
investigated with priority given to the following factors:
Sound engineering solution reflecting the client’s objectives and regulatory standards.
Economical solution.
Added Value product that exceed the client expectations.
Build ability.
Speed of construction.
Accommodation of architectural requirements.
Adaptability for the provision of service.
Based on the current state of knowledge and experience of reinforced concrete structures, it is anticipated that a
dense concrete could achieve a design life of approximately 50 years.
*NOTE: The main codes used are the SBC codes unless the design is not covered, so relevant
international codes could be used.
Code/Standard Description
SBC 304 &ACI 318M-19 Building Code Requirements for Structural Concrete and Commentary.
ACI 315 Details and Detailing of Concrete Reinforcement.
SBC 301 & ASCE7-16 Design loads for gravity loads, seismic, wind, …etc.
SBC 303 CR Building code for soils and Foundation
ACI 224R-01 For foundations Design
ACI 224-R Control of Cracking Concrete Structure
ACI 350-01 Environmental Engineering Concrete Structures
ACI 504-R Guide to Sealing Joints in Concrete Structures
4. Materials
4.1 Material Density
4.2.1 Concrete
Concrete characteristic compressive cylinder strength after 28 days should be as follows:
Where:
fc' = compressive cylinder strength after 28 days
E (for concrete strength fc'=40) = 29725 MPa
4.2.3 Cement
Ordinary Portland cement for concrete elements above ground is used in the concrete mix shall comply with the
requirements of ASTM C150, the type of cement will comply with SBC 304-CR, CH 19. Type of cement for
underground structures should comply with geotechnical report recommendations.
4.2.4 Aggregate
4.2.5 Water
5. Durability
Normally, concrete member sizes that are necessary for structural requirements will usually satisfy the minimum
requirements for fire resistance as well. In addition, the cover requirements specified in ACI 7.7 will provide at
least a 2-hour fire-resistance rating for restrained floor members. Concrete clear cover will be specified to
achieve the required fire rating for different reinforced concrete elements as follows:
7. Loads
7.1 Risk Category
Based on the intended occupancy and according to SBC 301, Table 1-2, the building is classified into different
Risk Categories IV according to building nature of occupancy:
The Importance Factor, I, is set according to SBC 301, Table 1-3, according to the risk category of building as
follows:
All Live Loads refer to SBC 301 Standard (Table 4-1 Uniform and Concentrated Loads) except otherwise
indicated.
Operating Rooms, Laboratories Examination and Outpatient Rooms Conference Rooms, Dental Rooms
Gymnasium Room Sterilization Rooms and Cart Wash Computer Server, Janitor Close, Xray Rooms.
Staircase
Offices case
In-accessible Roof
In Etabs model, the ASCE7-10 code is the nearest to SBC-301 code for loads.
Site Class B
Ss (%g) 12
S1 (%g) 3.5
Ie 1.5 Risk Category (IV)
Fa (Table 11.1) 0.9
Fv 0.8
TL 6
S1 the mapped max. considered earthquake spectral response acceleration at a period 1 sec.
Fa acceleration-based site coefficient (at 0.2-sec period).
Fv velocity-based site coefficient (at 1.0-sec period).
According to SBC-301 table (11-3) -(11-4) the seismic design category to be determined after final Geo. Report.
All the factors above are derived from the SBC-301 code for loads as shown below:
Ta = Ct hnx (12-18)
Where:
hn is the height in (m) above the base to highest level of the structure the coefficients 𝐶𝑡 and 𝑥 are determined
from Table 12-7.
Structure Type Ct x
Moment-resisting frame systems in which the frames resist 100% of the required seismic force
and are not enclosed or adjoined by components that are more rigid and will prevent the frames
from deflecting where subjected to seismic forces:
In the case of regular structures, the elastic response parameters may be reduced such that the corresponding
design base shear is not less than 85 percent of the base shear determined from static procedure.
According to SBC 301 Table 12-1: Design coefficients and factors for seismic force-resisting systems is
determined as following:
"At least 90 percent of the participating mass of the structure is included in the calculation of response for each
principal horizontal direction".
(SBC-301, 12.8.4.5)
The analysis shall account for torsional effects, including accidental torsion.
The accidental torsion shall be determined by assuming the mass is displaced by 0.50 as required.
When the torsional irregularity exists; the effects shall be accounted for by
Increasing the accidental torsion by the amplification factor Ax, determine from equation, as
Ax = (δmax / 1.2 δave) 2 (Eq. 12-25)
Where
δmax = the maximum displacement at Level x (mm).
δavg = the average of the displacements at the extreme points of the structure at Level x (mm).
The torsional amplification factor (Ax) is not required to exceed 3.0.
(SCB-301, 12.12.3)
Earthquake separations are provided at the specified locations between different areas almost at positions of
maximum premising length of building due to temperature effect (Expansion joint).
Where:
𝛿𝑀1 and 𝛿𝑀2 = the maximum inelastic response displacements of the adjacent structures at their adjacent edges.
δM = Cd δmax / Ie
where:
δ𝑚𝑎𝑥= maximum elastic displacement at the critical location.
P-delta effects on story shears and moments, the resulting member forces and moments, and the story drifts
induced by these effects are not required to be considered where the stability coefficient (𝜃) as determined by the
following equation:
8. Load Combinations
Load combinations will be generated based on relevant design codes. (SCB-301) Chapter 2
Deflection
Member Condition Deflection to be considered
limitation
Immediate deflection due to
Flat roofs Not supporting or attached to nonstructural 𝑙/180[1]
maximum of 𝐿𝑟 and 𝑅
elements likely to be damaged by large
Floors deflections Immediate deflection due to 𝐿 𝑙/360
[1] Limit not intended to safeguard against ponding. Ponding shall be checked by calculations of deflection,
including added deflections due to ponded water, and considering time dependent effects of sustained loads,
camber, construction tolerances, and reliability of provisions for drainage.
[2] Time-dependent deflection shall be calculated in accordance with 24.2.4 but shall be permitted to be reduced
by amount of deflection calculated to occur before attachment of nonstructural elements. This amount shall
be calculated on basis of accepted engineering data relating to time-deflection characteristics of members
similar to those being considered.
[3] Limit shall be permitted to be exceeded if measures are taken to prevent damage to supported or attached
elements.
[4] Limit shall not exceed tolerance provided for nonstructural elements.
The output straining actions are used in the design of structural elements
Check the lateral stability of the structure due to earthquake.
According to the results from Model (B), the element deflection based on the gross section properties shall be
extracted. The following formula shall be used to calculate the exact short term deflection considering the
element section cracking:
Software Usage
CHECK PUNCHING
CHECK DEFLECTION
MOMENT M-1
MOMENT M-2
S40
OPEN
W300
OPEN Drop 40
W300
W300
0
10
B2
0x
0x
B2
10
0
Drop 40 B2 Drop 40
OPEN Y
0x OPEN
Drop 40 OPEN
10
00
0
x1
0
B2
X
Drop 40 Drop 40 Drop 40 Drop 40
OPEN OPEN
B20x100 B20x100
W300 W400 W400W400 W300
W400
B20x100
B20x100
B20x100
OPEN OPEN OPEN
B20x100
B20x100
OPENW400
W300 OPEN W400 S 28 OPEN W300
Drop 40 W400 W400 OPEN Drop 40
W200
B20x100
W400
B20x100
W300 W300
W400OPEN
0 W200 W400W400
10 W200
B20x100
B20x100
0x
B20x100
OPEN
B2
B20x100
W400OPEN
W200 W200OPENW400
Drop 40 Drop 40 W400 Drop 40 Drop 40
B20x100
B20x100
Drop 40 Drop 40
W400
B20x100
B20x100
B20x100
OPEN B20x100
W400 W400
W400 W400
OPEN
Drop 40 Drop 40 Drop 40 Drop 40 Drop 40 Drop 40 Drop 40 Drop 40 D50 Drop 40
Drop 40 Drop 40
Drop 40
Drop 40
Drop 40 Drop 40 Drop 40 Drop 40 Drop 40 D50
3.0
BARAYA HOSPITAL-Ultimate.EDB Plan View - G - Z = 6.55 (m) Uniform Loads Gravity (LLT)
ETABS 19.1.0 8/22/2023
2.5
2.5
BARAYA HOSPITAL-Ultimate.EDB Plan View - G - Z = 6.55 (m) Uniform Loads Gravity (SDL)
ETABS 19.1.0 8/22/2023
4.0
BARAYA HOSPITAL-Ultimate.EDB Plan View - G - Z = 6.55 (m) Uniform Loads Gravity (WL)
ETABS 19.1.0 8/22/2023
20 20
20
20 20
20
20 20 20
20
20
20
2020
20
20
20
20 20 20
2020 20 20 20 20
20 20 20
20 Y 20 20
2020 20 20 20 20
20
20 20
20
2020
20 X 20
2020 20
20 20
2020 20 20
20
20
20
20 20 20 20 20
20 2020 20 20 2020 2020 20 20 20 20 20
20 20 20 20 20
20
20 20 20 20 20 20
20 20 20 20
20 20 20 20
2020 20 20 20 20 20 20 20 20
20 20 20
20 20 20 20 20
20 20 20
20 20 20 20 20 20 20 20 20 20 20 20 2020
20 20 20
20 20 20 20 20 20 20 20 20 20 20 20
20 20 20 20
20 20 20 20
20 20
20
20
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 2020
20
20 20 20 20 20
20 20
20 20 2020 2020 20 20 20 20
20 20 20 20 20 20 20 20 20 20
20 20 20 20 20 20 20 20 2020 2020 20 20 20 20 20 20 20 20
20 20
20
2020 2020 2020
20
20 2020
20
20 20 2020
20 20 20 20 20 20
2020 20
2020 20 20 20 20 20 20 20
20 20 20 20 20 20 20 20 20 20 20 20
0.0 1.5 3.1 4.6 6.2 7.7 9.2 10.8 12.3 13.8 15.4 16.9 18.5 20.0
BARAYA HOSPITAL-TEMP..EDB Plan View - G - Z = 6.55 (m) Area Temperature (T)
Ground Ceiling 2/13/2018 11:22 PM
E-3
5.0
2.5
0.0
-2.5
Y
-5.0
X
-7.5
-10.0
-12.5
-15.0
-17.5
-20.0
-22.5
-25.0
-27.5
-1.18 -0.98 -0.78 -0.59 -0.39 -0.20 0.00 0.20 0.39 0.59 0.78 0.98 1.18 1.37 E+3
BARAYA HOSPITAL-TEMP..EDB Plan View - G - Z = 6.55 (m) Resultant M11 Diagram (ENV. ULT.) [kN-m/m]
ETABS 19.1.0 8/21/2023
-1.18 -1.03 -0.88 -0.74 -0.59 -0.44 -0.29 -0.15 0.00 0.15 0.29 0.44 0.59 0.74 E+3
BARAYA HOSPITAL-TEMP..EDB Plan View - G - Z = 6.55 (m) Resultant M22 Diagram (ENV. ULT.) [kN-m/m]
ETABS 19.1.0 8/21/2023
-1.57 -1.37 -1.18 -0.98 -0.78 -0.59 -0.39 -0.20 0.00 0.20 0.39 0.59 0.78 0.98 E+3
BARAYA HOSPITAL-TEMP..EDB Plan View - G - Z = 6.55 (m) Resultant F11 Diagram (ENV. ULT.) [kN/m]
ETABS 19.1.0 8/21/2023
-2.65 -2.35 -2.06 -1.77 -1.47 -1.18 -0.88 -0.59 -0.29 0.00 0.29 0.59 0.88 1.18 E+3
BARAYA HOSPITAL-TEMP..EDB Plan View - G - Z = 6.55 (m) Resultant F22 Diagram (ENV. ULT.) [kN/m]
ETABS 19.1.0 8/22/2023
0.34
0.42
0.27
0.5
0.62
0.5 0.43
0.62 0.6 0.62
0.5 0.5
0.55 0.63 0.76 0.86 0.66 0.71
0.75 0.63 N/C 0.33 0.7 0.59 0.38 0.34 0.52 0.5 0.47 0.67 0.64 0.64
0.23 0.68 0.78 0.81 0.8 0.78 N/C N/C N/C N/C 0.85 0.82 0.71 0.61 0.68 0.25
0.7 0.65
0.68 N/C N/C N/C N/C 0.83
0.78 0.75 0.78 0.79 0.72 0.59
BARAYA HOSPITAL-Ultimate.EDB Plan View - G - Z = 6.55 (m) Punching Shear D/C Ratios/Shear Reinforcement
ETABS 19.1.0 8/22/2023
33 -7
.4 7.
1 1 9
Y9 83.2
21
5
1
6
.5
.1
.0
.0
9
83
22
7
-8
- 1
X
-8
2 .7
3
64.31
16.72
-89.06
-51.59
-122.2
77.32 62.86 -55.79 -83.17
-81.19 -175.38 -102.25
100.66
97.98 33.54 44.6
79.71 -66.85 -122.5
-78.471
-160.42
-2
79
66.61 71.21
14
.2
1
-121.86 46.76
39.63
-110.34
6
5.25
70.5 65.2 -70.1
70.24 -96.66
-47.66
-163.74
BARAYA HOSPITAL-Ultimate.EDB Plan View - G - Z = 6.55 (m) Moment 3-3 Diagram (ENV. ULT.) [kN-m]
ETABS 19.1.0 8/22/2023
92
-2 4.
7.
91 -8
4
63Y
.6
.7
9
7
-7
-4
39
0.
8.
27
10 X
.8
85
97
.7
3
-222.47
-39.2
-113.79
36.25
-66.3 -60.42
115.39 75.12 50.12 74.18
74.62
75.57 130.47
-58.07
-62.99 107.46 107.92 -85.15
-145.46
97.62 101.21
-70.2 -42.04
74
-101.84 84.6
-19.21
-24.69
-121.26
.3
3
10.22
154.69
BARAYA HOSPITAL-Ultimate.EDB Plan View - G - Z = 6.55 (m) Shear Force 2-2 Diagram (ENV. ULT.) [kN]
BARAYA EXTENDED CARE HOSPITAL
OPEN
W300
OPEN Drop 40
W300
W300
0
10
B2
0x
0x
B2
10
0
Drop 40 Drop 40 Drop 40
OPEN B2 Y OPEN
0x OPEN
10
00
0
x1
0
B2
X
Drop 40 Drop 40 Drop 40
Drop 40
OPEN OPEN
B20x100 B20x100
W300 W400 W400W400 W300
W400
B20x100
B20x100
B20x100
OPEN OPEN OPEN
B20x100
B20x100
OPENW400
W300 OPEN W400 OPEN W300
Drop 40 W400 W400 OPEN Drop 40
W200
B20x100
W400
B20x100
W300 W300
W400OPEN
W200 W400W400
W200
B20x100
B20x100
B20x100
OPEN
B20x100
W400OPEN
W200 W200OPENW400
Drop 40 Drop 40 D50 W400 D50 Drop 40
B20x100
B20x100
Drop 40 Drop 40 Drop 40
W400
B20x100
B20x100
B20x100
OPEN B20x100
S 28 W400 W400
W400 W400
S 28
Drop 40 Drop 40 Drop 40 Drop 40 Droop60 Droop60 Droop60 Droop60 Droop60 Droop60 Drop 40 Drop 40 Drop 40 Drop 40
S 28 S 28
Drop 40
S40 Drop 40
Droop60 Droop60 Droop60 Droop60 Droop60 Droop60
Drop 40 Drop 40 Drop 40 Drop 40 Drop 40 Drop 40
Droop60 Droop60
2.5
2.5
2.5
2.5 2.5
2.5
BARAYA HOSPITAL-Ultimate.EDB Plan View - MEZ - Z = 11 (m) Uniform Loads Gravity (SDL)
ETABS 19.1.0 8/22/2023
4
4
4 4
4
BARAYA HOSPITAL-Ultimate.EDB Plan View - MEZ - Z = 11 (m) Uniform Loads Gravity (WL)
ETABS 19.1.0 8/22/2023
3
3
3 3
3
BARAYA HOSPITAL-Ultimate.EDB Plan View - MEZ - Z = 11 (m) Uniform Loads Gravity (LLT)
ETABS 19.1.0 8/22/2023
20 20
20
20 20
20
20 20
2020
20 20
20 20
20 20
2020 2020 2020
20 20
20
20
20 Y 20
20 2020 20 2020
2020
20 20 20 20
20
20 20 20
2020
20 X 20 20 2020
20 20 20
20 20
20
20 20
20 20 20 20
20 20 20 20 20 20 20 20 20 20 20 20 20 20
20 20 20 20
20 20
20 20 20 20 20 20
20 20 20 20
20 20 20 20
2020 20 20 20 20 20 20 20 20
20 20 20
20 20 20 20 20
20 20 20
20 20 20 20 20 20 20 20 20 20 20 20 20 20 2020
20 20 20 20 20
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
20 20 20 20
20 20 20 20
20 20
20 20
20
20
20 20 20 20 20 20 20 20 20 20 20 20 20
202020 20 20 20 20 20 20 20 20 20 20 20 20 2020
20
20 20 20
20 20 20
20 20
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
20 20 20 20
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
20 20
20
2020 20
20 20 20 20 20 20 20 20 20 20 20 20 20 2020
20
20 20 20 20 20 20 2020 20 2020
20
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
2020 20 20 20 20 20 20 20 20
20 20 20 20 20 20 20 20 20 20
20 20 20 20 20 20 20 20
20 20 20 20 20 20 20 20
20 20 20 20 20
20
20
2020
20 20 20
20
0.0 1.5 3.1 4.6 6.2 7.7 9.2 10.8 12.3 13.8 15.4 16.9 18.5 20.0
BARAYA HOSPITAL-TEMP..EDB Plan View - MEZ - Z = 11 (m) Area Temperature (T)
MEZZ. Ceiling 2/13/2018 11:24 PM
E-3
7.5
5.0
2.5
Y
0.0
X
-2.5
-5.0
-7.5
-10.0
-12.5
-15.0
-17.5
-20.0
-22.5
-25.0
-1.06 -0.94 -0.82 -0.71 -0.59 -0.47 -0.35 -0.24 -0.12 0.00 0.12 0.24 0.35 0.47 E+3
BARAYA HOSPITAL-TEMP..EDB Plan View - MEZ - Z = 11 (m) Resultant M11 Diagram (ENV. ULT.) [kN-m/m]
ETABS 19.1.0 8/21/2023
-1.18 -1.03 -0.88 -0.74 -0.59 -0.44 -0.29 -0.15 0.00 0.15 0.29 0.44 0.59 0.74 E+3
BARAYA HOSPITAL-TEMP..EDB Plan View - MEZ - Z = 11 (m) Resultant M22 Diagram (ENV. ULT.) [kN-m/m]
ETABS 19.1.0 8/21/2023
-588 -471 -353 -235 -118 0 118 235 353 471 588 706 824 941
BARAYA HOSPITAL-TEMP..EDB Plan View - MEZ - Z = 11 (m) Resultant F11 Diagram (ENV. ULT.) [kN/m]
ETABS 19.1.0 8/21/2023
-2.21 -1.96 -1.72 -1.47 -1.23 -0.98 -0.74 -0.49 -0.25 0.00 0.25 0.49 0.74 0.98 E+3
BARAYA HOSPITAL-TEMP..EDB Plan View - MEZ - Z = 11 (m) Resultant F22 Diagram (ENV. ULT.) [kN/m]
ETABS 19.1.0 8/22/2023
0.36
0.47
0.33
0.52
0.65
0.5 0.48
0.6 0.6 0.62
0.48 0.48
0.55 0.65 0.81 0.92 0.64 0.74
0.54
0.78
0.84 0.4 0.39 0.65 0.61 0.40.78
0.23 0.66 0.78 0.79 0.78 0.79 0.43 0.42 0.82
0.79 0.39 0.85 0.73 0.81 0.69 0.24
BARAYA HOSPITAL-Ultimate.EDB Plan View - MEZ - Z = 11 (m) Punching Shear D/C Ratios/Shear Reinforcement
ETABS 19.1.0 8/22/2023
58 -1
08
.7
5 Y.054.62
8
53
3
8
.9
.1
6.
31
83
37
-8
.
-1
46
X
-6
1 .7
4
63.73
20.06
-78.73 -60.86
-109.91 45.39 55.83
-130.3
-50.26
71.65 53.11
-67.81 -162.99 -99.48
96.55 113 -150.5 -192.23
68.51 -58.77 -73.18 6
61.48 -69.11 63.3 66.22
78.04
-171.4 -148.4106.49
1
7.69
67.47 56.08 -59.17
52.97 -74.07
72.71
-30.78
-217.46
BARAYA HOSPITAL-Ultimate.EDB Plan View - MEZ - Z = 11 (m) Moment 3-3 Diagram (ENV. ULT.) [kN-m]
ETABS 19.1.0 8/22/2023
73
7.
-1
8. -6
44 87Y
.6
.6
8
6
-7
-3
03
3.
9.
29
10 X
72
10
2.
0.
10
1
-232.96
-53.2
-129.77
38.58
-53.27 -56.18
103.7 81.87 55.45
99.73
37.98
111.59 127.84
-45.52
-44.44 91.77 103.28 -94.95
-132.16
-31.59
-179.37
-4.47
-75.31 13 -109.91 -79 45.23
-55.23 53.93
8.49
62.81
24.4
227.72
BARAYA HOSPITAL-Ultimate.EDB Plan View - MEZ - Z = 11 (m) Shear Force 2-2 Diagram (ENV. ULT.) [kN]
BARAYA EXTENDED CARE HOSPITAL
OPEN
W300
OPEN Drop 40
W300
W300
0
10
B2
0x
0x
B2
10
0
Drop 40 Drop 40
B2 Drop 40
OPEN 0x Y
OPEN OPEN
10
00
0
x1
0
B2
X
Drop 40 Drop 40 Drop 40
Drop 40
OPEN OPEN
B20x100
B20x100
OPEN
B20x100
OPEN OPEN
B20x100
B20x100
OPENW400
W300 OPEN W400 OPEN
W400 W400 OPEN W300
W200
B20x100
W400
B20x100
W300 W300
W400OPEN
W200 W400
W400
B20x100
B
W200
B20x100
B20x100
OPEN
B20x100
W400OPEN
x100
W200 W200OPENW400
Drop 40 Drop 40 D50 W400 D50 Drop 40 Drop 40
B20x100
B20x100
W400
B20x100
B20x100
0x100
B20x100
OPEN B20x1 00
W400 W400
W400 W400
Drop 40 Drop 40
Drop 40 Drop 40 Drop 40 Drop 40
S 28
Drop 40 Drop 40
D44 D44
Drop 40
Drop 40
D44
2.5
3.5
BARAYA HOSPITAL-Ultimate.EDB Plan View - 1ST - Z = 15.45 (m) Uniform Loads Gravity (SDL)
ETABS 19.1.0 8/22/2023
BARAYA HOSPITAL-Ultimate.EDB Plan View - 1ST - Z = 15.45 (m) Uniform Loads Gravity (WL)
ETABS 19.1.0 8/22/2023
7.5
BARAYA HOSPITAL-Ultimate.EDB Plan View - 1ST - Z = 15.45 (m) Uniform Loads Gravity (LLT)
ETABS 19.1.0 8/21/2023
20 20
20 20
20 20
202020
20 20
20 20
20 20
2020 2020 2020
20 20
20
20 Y 20
2020 20 2020
2020
20 20 20
20 20 20
2020
20 X 20 20 2020
20 20 20
20 20
20
20 20
20 20 20 20
20 20 20 20 20 20 20 20 20 20 20 20 20 20
20 20 20 20
20 20
20 20 20
20 20 20 20
20 20 20
20 20 20 20 20
20 20 20 20 20
20
20 20
20 20 20 20 20
20 20 20 20
20
20 20 20 20 20 20
20 20 20 20 20 20 20 20 20 20 20
20 20 20 20 20 20 20 20 20 20
2020
20 20 20 20 20 20 20
20 20 20 20 20
20 2020 20
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
20
20 20 20 20 20 20 20 20
20 20 20 20
20 20 20 20 20 20 20 20 20 20 20 20
20
2020 20 20
20 20 20 20
20 20 20 20
20 20 20 20
2020
2020 2020
2020 20
20 20
20
20
20 20 20
0.0 1.5 3.1 4.6 6.2 7.7 9.2 10.8 12.3 13.8 15.4 16.9 18.5 20.0
BARAYA HOSPITAL-TEMP..EDB Plan View - 1ST - Z = 15.45 (m) Area Temperature (T)
First Ceiling 2/13/2018 11:06 PM
E-3
7.5
5.0
Y 2.5
X 0.0
-2.5
-5.0
-7.5
-10.0
-12.5
-15.0
-17.5
-20.0
-22.5
-25.0
-1.06 -0.94 -0.82 -0.71 -0.59 -0.47 -0.35 -0.24 -0.12 0.00 0.12 0.24 0.35 0.47 E+3
BARAYA HOSPITAL-TEMP..EDB Plan View - 1ST - Z = 15.45 (m) Resultant M11 Diagram (ENV. ULT.) [kN-m/m]
ETABS 19.1.0 8/21/2023
-1.18 -1.03 -0.88 -0.74 -0.59 -0.44 -0.29 -0.15 0.00 0.15 0.29 0.44 0.59 0.74 E+3
BARAYA HOSPITAL-TEMP..EDB Plan View - 1ST - Z = 15.45 (m) Resultant M22 Diagram (ENV. ULT.) [kN-m/m]
ETABS 19.1.0 8/21/2023
0.0 4.9 9.8 14.7 19.6 24.5 29.4 34.3 39.2 44.1 49.0 53.9 58.8 63.7 E+3
BARAYA HOSPITAL-TEMP..EDB Plan View - 1ST - Z = 15.45 (m) Resultant F11 Diagram (ENV. ULT.) [kN/m]
ETABS 19.1.0 8/21/2023
-64.7 -58.8 -53.0 -47.1 -41.2 -35.3 -29.4 -23.5 -17.7 -11.8 -5.9 0.0 5.9 11.8 E+3
BARAYA HOSPITAL-TEMP..EDB Plan View - 1ST - Z = 15.45 (m) Resultant F22 Diagram (ENV. ULT.) [kN/m]
ETABS 19.1.0 8/22/2023
0.42
0.57
BARAYA HOSPITAL-Ultimate.EDB Plan View - 1ST - Z = 15.45 (m) Punching Shear D/C Ratios/Shear Reinforcement
ETABS 19.1.0 8/22/2023
79 -1Y
.2 29 21
4 .6 4 .
82
6
31
.8
0.
62 82
38
-7
5
0.
.3
-1
3
X
5
3.
-8
24.55
68.1
-84.04-63.77
75.72 54.17 -126.76 63.7 175.58
-54.86
-135.5
-64.8 -166.04 -107.14
118.85
64.33 103.14 -179.07
-225.07
-56.85-74.03
58.49 66.76
77.05 -85.5
-264.75 89.23
-184.78 -164106.34
.03
4.62
72.83 -86.51-68.12
51.95 64.68
76 .9 4
-37.27
BARAYA HOSPITAL-Ultimate.EDB Plan View - 1ST - Z = 15.45 (m) Moment 3-3 Diagram (ENV. ULT.) [kN-m]
ETABS 19.1.0 8/22/2023
4 9
-1 0.
5. -8
53 Y
.5
10
0
0.
-7
02
-3
3.
8
5.
95
11 X
14
10
9.
5.
10
1
-234.01
-53.44
-135.57
-56.25-64.14
111.5282.91 42.9662.9
36.34
108.06
126 .55-106136.78
-43.83
-54.72 87.17 102.24 .21 -158.7
-109.5 50.7 -58.73 -26.73
84.95 95.48
-29.57
-192.02
-78.17 -110.81 -63 -90.32
54.83 43.97
15 0.37
60.45
20.16
243.69
BARAYA HOSPITAL-Ultimate.EDB Plan View - 1ST - Z = 15.45 (m) Shear Force 2-2 Diagram (ENV. ULT.) [kN]
BARAYA EXTENDED CARE HOSPITAL
00
0 x1
B2
OPEN
W300
OPEN Drop 40
W300
W300
0
10
0x
B2
B2
0 x1
00
Drop 40 Drop 40
Drop 40
OPEN OPEN
B2 OPEN
0x
10 Y
0
0
10
0x
B2
X
B2
0
10
0
0x
x1
B2
00
B20x100 B20x100
W300 W400 W400 W300
W400 W400
B20x100
S 28
B20x100
B20x100
B20x100
B20x100
OPEN W400
W400
W300 OPEN W400 OPEN OPEN W300
W200 W400
B20x100
W400
B20x100
W300 W300
W400 OPEN
W200 W400
W400
W200
B20x100
B20x100
B20x100
OPEN
B20x100
W400 OPEN
W200 W200
OPEN W400
Drop 40 W400
B20x100
B20x100
Drop 40 D50 D50 Drop 40 Drop 40
0x 0
W400
B20x100
B20x100
OPEN
B20x100 B20x100
W400 W400
W400 W400
Drop 40
Drop 40 Drop 40 Drop 40 Drop 40 Drop 40
2.5
2.5
BARAYA HOSPITAL-Ultimate.EDB Plan View - 2ND - Z = 19.9 (m) Uniform Loads Gravity (SDL)
ETABS 19.1.0 8/22/2023
4.0
BARAYA HOSPITAL-Ultimate.EDB Plan View - 2ND - Z = 19.9 (m) Uniform Loads Gravity (WL)
ETABS 19.1.0 8/22/2023
3.0
BARAYA HOSPITAL-Ultimate.EDB Plan View - 2ND - Z = 19.9 (m) Uniform Loads Gravity (LLT)
ETABS 19.1.0 8/21/2023
20
20 20
20 20
20 20
20 20
20 20
20
20
20 20
20 20 20 20 20 20
20 20
20
20 20
20
20 20 Y 20 20 20 20
20
20 20
20 20
20 X 20
20 20
20 20 20 20 20 20
20 20
20 20
20 20
20 20 20 20
20 20 20 20 20 20 20 20 20 20 20 20
20 20 20 20
20 20
20 20 20
20 20 20
20
20 20 20 20
20 20
20 20 20 20 20
20 20 20 20
20 20 20
20
20 20 20 20 20
20 20
20 20
20 20 20 20 20 20
20 20 20 20 20 20 20 20 20 20 20
20
20 20 20
20 20 20 20 20 20 20 20 20 20 20 20
20 20 20 20
20 20 20 20
20 20
20 20 20
20 20 20 20 20 20 20 20 20 20 20
20
20
20 20
20 20 20 20 20 20 20 20 20
0.0 1.5 3.1 4.6 6.2 7.7 9.2 10.8 12.3 13.8 15.4 16.9 18.5 20.0
BARAYA HOSPITAL-TEMP..EDB Plan View - 2ND - Z = 19.9 (m) Area Temperature (T)
Second Ceiling 2/13/2018 11:41 PM
E-3
3.0
1.5
0.0
-1.5
-3.0
Y -4.5
X -6.0
-7.5
-9.0
-10.5
-12.0
-13.5
-15.0
-16.5
-1.18 -1.06 -0.94 -0.82 -0.71 -0.59 -0.47 -0.35 -0.24 -0.12 0.00 0.12 0.24 0.35 E+3
BARAYA HOSPITAL-TEMP..EDB Plan View - 2ND - Z = 19.9 (m) Resultant M11 Diagram (ENV. ULT.) [kN-m/m]
ETABS 19.1.0 8/21/2023
-1.18 -1.03 -0.88 -0.74 -0.59 -0.44 -0.29 -0.15 0.00 0.15 0.29 0.44 0.59 0.74 E+3
BARAYA HOSPITAL-TEMP..EDB Plan View - 2ND - Z = 19.9 (m) Resultant M22 Diagram (ENV. ULT.) [kN-m/m]
ETABS 19.1.0 8/21/2023
0.0 4.9 9.8 14.7 19.6 24.5 29.4 34.3 39.2 44.1 49.0 53.9 58.8 63.7 E+3
BARAYA HOSPITAL-TEMP..EDB Plan View - 2ND - Z = 19.9 (m) Resultant F11 Diagram (ENV. ULT.) [kN/m]
ETABS 19.1.0 8/21/2023
-64.7 -58.8 -53.0 -47.1 -41.2 -35.3 -29.4 -23.5 -17.7 -11.8 -5.9 0.0 5.9 11.8 E+3
BARAYA HOSPITAL-TEMP..EDB Plan View - 2ND - Z = 19.9 (m) Resultant F22 Diagram (ENV. ULT.) [kN/m]
ETABS 19.1.0 8/22/2023
0.42
0.56
N/C
N/C
0.58 0.65 X 0.51 0.56
BARAYA HOSPITAL-Ultimate.EDB Plan View - 2ND - Z = 19.9 (m) Punching Shear D/C Ratios/Shear Reinforcement
ETABS 19.1.0 8/22/2023
6.
52
-1
25
.4
6
93 -1
.0 38 5
2 Y.9281.4
2
3
.9
.8
. 2 79
163
47
-
.7
3
X
5
-1
04
16
-1
. 17
91
0.
76.54
30.63
-8
8. -83.89 -61.6 48
64 78.43 96.81 5.
-59.97
9
-147.19
75.56 53.65 -139.38 -
-66.32 -160.33 -107.76
109.4
103.97 -197. -250.2
67.12 -56.47 -76.5213
74.62 -84.23 99.98 59.77 68.83
95.61
-189.43 -171.38
67.56 -72.07
4.08
-286.96
BARAYA HOSPITAL-Ultimate.EDB Plan View - 2ND - Z = 19.9 (m) Moment 3-3 Diagram (ENV. ULT.) [kN-m]
ETABS 19.1.0 8/22/2023
-5
3.
8.
13
23
64
8 7.
-1 -
0.
3 2 93
73
.Y
11
4.
-7
-1
30
15
2.
.0
57
5
11
.0
X
7
6
.2
83
15
5.
-234.62
-3 -1
9.
-57.09
86 18
.4
5
-126.56
9
.5
35.1
-58.18 111.31
-66.8 80.45 39.8 57.66
114.29
42
139.42 137.69
-40.37 -112.62-168.58
99.27
-59.33 89.92
-28.02 98.42
-58.52 85.57
-107.12 51.51
-27.59
-194.1
-80.34 153. -108.46 -68.97 55.47
-94.72 43.95
59
57.77
20.28
287.46
BARAYA HOSPITAL-Ultimate.EDB Plan View - 2ND - Z = 19.9 (m) Shear Force 2-2 Diagram (ENV. ULT.) [kN]
BARAYA EXTENDED CARE HOSPITAL
Displacement (Spec X)
Displacement (Spec Y)
Drift (Spec X)
Drift (Spec Y)
0
C 50X5
50
C50X
50
C50X 0
C50X5 C50X50
50
50
C50X C50X
C50X50
C50X50
C50X50 0 C50X50 C50X50
C50X5 C50X50
C50X50 0
C50X50 50 C50X5
C5 0X50 X50 C C50X50
C50X50
C50X50
C50X50 C50X50 * 0X50 TED
0 PLAN
C80X80 C50X50 C90C5 PLANTED
C90*
PLANTED
C 40X40
PLAN TED
C 40X40
C 40X4
C70X70 C80X80 PLANT ED
PLANTED
C 40X40
PLANTED C 40X40
C 40X40
C6 0
C70X70
C70X70
C80X80
C70X70
C80X80
C70X70
C80X80 C80X80 C 40X40
PLANTED
C 40X40
C90* C90* C90*
C70X70 C80X80
0X70 C80X80
C70X70 C7 C80X80 80
C50X50 C70X70
C70X70 C5 C80X
C90*
C70X70 0X50 ED ED
C90*C90
*
C 40X40 PLANT
PLANTED
C 40X40
PLANTED
C 40X40
C70X70 C 40X40 PLANT C 40X40 PLANT ED
C80X80 C70X70
C80X80 C70X70 X70
C90*
C70X70 C70 X80
C70X70 X80 C80X80 C80
C70X70 X80 C60
C80 C80 X70
C70X70 X80C70C80X80
C80
ED C90*
ED
C 40X40 PLANTC 40X40 PLANT
C90* C90*
C80X80
C80X80
C90* C90*
C100X100
C100X100
C 40X40 PLANTED C60 C90* D D
C70X70 C70X70 C70X 70 C70X70
C100X100 C100X100 C100X100
C100X100
C90* C 40X40 PLANTE C 40X40 PLANTE
C70X 70 C70X70 X70 C100X100 C100X100
C70X70 C100X100 C100X
100
C70X70C70X7C70X70 70C70
C70X70
70 C70X70 0 0 C70X C90*
C70X70 C70X C90X90C50X50C90X9C50X5
0
C70X70 C90*
C70X70
C 40X40 PLANTED C 40X40 PLANTED
C90* C90* C 40X40 PLANTED
C60 C90* C90*
C70X70 C70X70 C70X70 C70X70 C70X70 C70X70
C100X100 C90X90 C70X70 C70X70
C100X100 C90X90
C90X90 C90X90
C100X100
C 40X40 PLANTED C70X70 C70X70 C 40X40 PLANTED
C90X90
C100X100 C90X90
C100X100
C90X9 C50X5
C100X100
0 C50X50
C90X90
0C100X100 C100X100 C90X90
C90X90 C100X100
C100X100
C 40X40 PLANTED C90* C90*
C70X70 C 40X40 PLANTED
C90* C90*
C70X70 C70X70 C70X70 C70X70 C70X70 C70X70 C70X70 C70X70 C70X70
C90* C90*
C60X60 C60X60 C60X60 C60X60 C60X60 C60X60 C60X60 C60X60 C60X60 C60X60
C 40X40 PLANTED
C 40X40 PLANTED
C70X70 C60X60
C70X70 C60X60
C70X70 C60X60 C70X70C60X60 C60X60
C70X70 C60X60
3-D View
C60X60 C70X70
C60X60 C70X70
C60X60 C70X70
C60X60 C70X70 C60X60
C70X70
C80X80 C80X80 C80X80 C80X80 C80X80 C80X80
C50X50 C50X50C80X80 C80X80 C80X80 C80X80 C 40X40 PLANTED
C90X90 C90X90 C90X90 C90X90 C90X90 C90X90 C90X90 C90X90 C90X90 C90X90
C90*
C 40X40 PLANTED
C 40X40 PLANTED
C100X100
C70X70
C60X60 C60X60C70X70 C70X70 C70X70 C70X70 C70X70
C60X60 C100X100 C100X100 C100X100 C100X100
C100X100
C100X100 C100X100 C60X60 C60X60 C70X70
C100X100
C60X60
C70X70
C70X70C100X100
C60X60 C60X60
C70X70
C60X60 C60X60 C60X60 C90* C90* C90*
C60X60
X
BARAYA HOSPITAL-Ultimate.EDB
ETABS 19.1.0
8/22/2023
(0.01) )
(0.01
(0.01)
(0.01) 1) (0.01)
(0.0 (0.01)
(0.01)
(0.01)
(0.01) (0.01).01) (0.01)
(0 (0.01)
(0.01)
(0.01) 1) 1)
(0.0(0
(0.01)
.0 (0.01)
(0.01)
(0.01)
(0.01) (0.01) .01) (0.01) .01) (0.01.0 ) 01)
(0.01) ) (0.0(01) (0.0(0
1) .01) (0 1) (0.
(0.01) .01) (0.01 (0.01) (0 (0.01) (0.01)
(0.01)
) (0.01)
(0.01) (0 .01) (0.01)
(0 1) (0.01)
(0. 01) (0.0 (0.01)
(0.01) (0.01 ) (0.01) (0.01) 01)
01) (0. (0.01) (0.01
(0.01) (0. 01)
(0.01) (0..0 1) (0.01)
(0.01) 01 ) 1) (0.01)
01.0
(0 ) (0 ) (0.01)
(0. (0.) (0. 01 (0.01)(0.01) 01) (0.01
(0.01) (0.01) (0.
01) (0.01
) (0.01)
1) (0.01) (0.01)(0.01)
1) (0.01) (0. (0.01)
(0.01 ) (0.01) (0.0(0.
(0.01) (0.01)
01) (0.0
(0.01)
(0.01
(0. ) 01)
01)(0.
(0.01) (0.01)
3-D View Longitudinal Reinforcing (ACI 318-19)
(0.01)
(0.01) (0.01)
(0.03) (0.03) (0.01) (0.01) (0.01) (0.01)
(0.01) (0.03) (0.03) (0.01) (0.03) (0.1)
(0.0 01)
(0.01)) (0.01) (0.01) (0.01) (0.03) (0.03)
(0.03) (0.03) 1) (0.01)
(0.01 (0.0 1) ) (0.0
1) (0.01) (0.01) (0.03)
(0.01) (0.01)(0.0 2)1) 1)
(0.0
(0.0 ) (0.0
(0.02(0.01
(0.01) (0.01)
(0.01) (0.01)
(0.01) (0.01) (0.01) (0.01)
(0.01)
(0.01) (0.01) (0.01)
(0.01) (0.01) (0.01) (0.01) (0.01) (0.01) (0.01) (0.01)
(0.03) (0.02) (0.02)
(0.02) (0.03)
(0.02) (0.03)
(0.03) (0.02)
(0.03) (0.02) (0.02)
(0.01) (0.01) (0.01) (0.01) (0.01)
(0.01)
(0.03) (0.02)
(0.03) (0.03) (0.01)
(0.02) (0.02) (0.03)
(0.03) (0.01)
(0.01) (0.01) (0.01) (0.01)
(0.01) (0.01) (0.01)
(0.01) (0.01) (0.01) (0.01) (0.01) (0.01)
(0.01)
(0.01) (0.01)
(0.01) (0.01) (0.01) (0.01) (0.01) (0.01) (0.01) (0.01) (0.01) (0.01) (0.01) (0.01)
(0.01) (0.01)
(0.01) (0.01) (0.01) (0.01)(0.01) (0.01)
(0.01) (0.01)
(0.01) (0.01)
(0.01) (0.01) (0.01)
(0.01) (0.01) (0.01)
(0.01)
(0.01) (0.01) (0.01) (0.01) (0.01)
(0.01) (0.01) (0.01) (0.01) (0.01) (0.01)
(0.02) (0.02) (0.02) (0.02) (0.02) (0.02) (0.02) (0.02) (0.02) (0.01) (0.01)
(0.01)
(0.02) (0.01)
(0.01)
(0.01)(0.01) (0.01) (0.01)
(0.01)(0.03) (0.01)
(0.01) (0.03)
(0.01) (0.03) (0.01) (0.01) (0.01) (0.01) (0.01) (0.01)
(0.01) (0.01) (0.01) (0.03) (0.01) (0.03)
(0.01) (0.03)
(0.01) (0.03)
(0.01) (0.03)
(0.01) (0.03) (0.03) (0.01) (0.01)
(0.01)
X
BARAYA HOSPITAL-Ultimate.EDB
ETABS 19.1.0
ETABS 19.1.0 License #*1PQ8Q6TRGEPAVCF
Level Element Unique Name Section ID Combo ID Station Loc Length (m) LLRF Type
G C101 279 C100X100 U12(1.2D+1.6L-T) 0 6.55 0.4 Sway Intermediate
Section Properties
Material Properties
Level Element Unique Name Section ID Combo ID Station Loc Length (m) LLRF Type
G C124 301 C90X90 U12(1.2D+1.6L-T) 0 6.55 0.4 Sway Intermediate
Section Properties
Material Properties
Level Element Unique Name Section ID Combo ID Station Loc Length (m) LLRF Type
G C126 303 C70X70 U12(1.2D+1.6L-T) 0 6.55 0.4 Sway Intermediate
Section Properties
Material Properties
Level Element Unique Name Section ID Combo ID Station Loc Length (m) LLRF Type
G C134 311 C60X60 U12(1.2D+1.6L-T) 0 6.55 0.42 Sway Intermediate
Section Properties
Material Properties
Level Element Unique Name Section ID Combo ID Station Loc Length (m) LLRF Type
G C35 35 C50X50 U12(1.2D+1.6L-T) 0 6.55 0.61 Sway Intermediate
Section Properties
Material Properties
Level Element Unique Name Section ID Combo ID Station Loc Length (m) LLRF Type
G C139 273 C50X230 U12(1.2D+1.6L-T) 0 6.55 0.4 Sway Intermediate
Section Properties
Material Properties
W30
W30
0
0
0
W300 W300
W30
W300
W300
W30
0
0
W300 W300
W3 0
W300
W300
W30
0
W300
W300 W W300
W4 400 400
W30 W300
W300 0W W 00
W4
04
00W4 W4 W4 W400 W40
0W 0
0
0 0W
0 0 20 00W 0 20
W 300
W300 4 0 0 20W W
04 00 W300
W 02
W
0
W 0 4 W4 02 00W4
W300 W4 W 0 0W44 0 00 W 0 0
W
4 W 40
W4 0
0 0W 0 4 000 40
W4 0 W4 40040000 W40
4000W W04W
W0 0
W300 W300
W300 W300
000W020 W W 000W 02 20W
40
0
W300 W300
W 4 4 0 04
W300 0W2 W W0 0
W4 W4 0W
W 0 400 400 W 20W 0 0 W
0W
0 W 0 4400 40 0 4 W4 404000 40
W300 W400 0000W W4 00 0W W00 0 W300
000W W4 20W
W300 W300
W300 000W 02 W4 W 4 02 04 40
0
0
W300 4 0W W 0W0 0
W3 0
W 0
W420 40 00 0 4 2 00W 00 W W
0
W4 0W W 04 W
0 W 40 W4 W 44
0W
W300 W300
W300 W300
40 400 W300
40 0W 400W0 0W00000
W300 W300
W400 000 4 20W
W300 0 0W 4 0 0 02 W 0 0
0 0 20 W W 4 0W 40 4 0
W300 W4 0 2 400400 W W 02
0W 0W
0
W
W 0W 0 W300
W30
W300 4 W
0 W 0 4W0 4 4
044 400 W 400
W300 W300
W4 0W0W 40W 00
W300 W300 W400 000W 0 400W 00200
0 00W 0 4 0W0 W40 020W 0 W4 0W 04 40
0
2 0
W4 0W04 W 400400 00W40W
W300 W300
W300 W 20 W300
W300
W300 W W 0
W 4
0
2 W 00
0W
00W044 400 W44000 404W W0
W 30
W300 W
W440 0020
00W 0W
W300 00
00W 000 40 0 20W W4 0W 04 00
W300 0 20W W440 40 0W W 0 0 0 W4 W300
W4 2W0W 40 W400
W300
W300
W04 W 00 W W 0
4 W
W300 20W 4400 04W 0
W300 00W0404 W40 0020
0
W 30 WW40 000W 02 0
400W00 00
W W4 0W W 40 0W 04 40
0
0 0 0 0
W300
W300 0 20W 0 4 2W 0 40W W W300
W300 4 W 4 0 0 W 0 W
0404W 4 00
W 0420WW 00 W440000 W
W300 00W 0020
W300 WW4 0400 W4 40 W 02 0 0W 00
W 300
4W 4 04
0
Z400W0 20W 4000400 WW
0 W 0W0 2WW 40 W00W4 0
0W4
0 W 40
W300 W W
0420WW 00 4400W
0
04W002 0
Y W
W X00W 04040WW4 40 0020W 000W 0 40
0
W300 4400W 0 2 W4 4
W300 W300
W
4 0 02 W 4
0
0 0
0
0 4 0 0 0 0 0W 00W
W 0W0 420W W40 00 W 40 W W
W0 4 4
40WW0 40
0
W300
WW4 0W
04
0 040 W
W
4 4 0
00W 02
00
4020W 0
400W0 4 W 0 40 W40
W300 0 0 20W
W0 0
0 4 W 0W
0
4 20 0
W 042 W440 00 0 W
W W
0
W300 W 0W
0W
0404 W40
0W 40
0
40
0
W4 40
W300 4000 00
W300
0W0 W
40 20W 40
W 0 W
W300 20
W W
0
W300 40 40
W300 W300
0 00
40
W300 W
W300
W300
W300
W300
W300
P7
P7
P7
P1 P2 P2 P3 P3 P6
P3 P4 P4
P1 P2 P3 P3 P6
P1 P2 P6
P4 P5 P5
P2
P4
P4 P5 P5
P2
P2
P4 P4 P5 P5
1.561E-03
0.01 0.02 0.03 0.05 0.05 0.07
0.08 0.09 0.10 0.11 0.12
0.14 0.14 0.16 0.17 0.18 0.19 0.20 0.22
0.22 0.30
0.02 0.02 0.04 0.04 0.06 0.07 0.08 0.09 0.11 0.11 0.13 0.13 0.15 0.16 0.17 0.18 0.19 0.20 0.21 0.23
0.09 0.09 0.11 0.11 0.13 0.13 0.15 0.15 0.17 0.17 0.19 0.19 0.20 0.22
0.01 0.01 0.03 0.03 0.04 0.05 0.06 0.07
0.22 0.22 0.27
0.16 0.18 0.19 0.20
0.14 0.14 0.16
0.08 0.09 0.10 0.11 0.12
0.05 0.07
0.01 0.02 0.03 0.05
0.01
Z
0.12 0.13
0.14 0.15
0.16 0.17 0.19
0.20 0.22 0.22 0.28
Y
0.10 0.11
0.07 0.09
0.05 0.07
0.03 0.04
0.01 0.02
1.568E-03
0.27
0.21
0.22
0.20
0.18
0.18
0.16 0.16
0.14
0.12 0.13
0.10 0.11
0.08 0.09
0.07
0.05 0.05
0.03
0.02
0.01
1.554E-03
BARAYA HOSPITAL-Ultimate.EDB
ETABS 19.1.0
ETABS 19.1.0 License #*1PQ8Q6TRGEPAVCF
Story ID Pier ID Centroid X (m) Centroid Y (m) Length (m) Thickness (m) LLRF
G P2 -9.85 -14.97 19.31 0.38 0.4
Material Properties
Shear Design
Stress
Station ID Edge Governing Pu Mu Stress Limit C Depth C Limit
Comp
Location Length (m) Combo kN kN-m kN/m² m m
kN/m²
Top–Left Leg 1 0.04 U10(1.2D+aL+SPECXY) 1209.11 -63.13 8290.31 8000 0.08 0.13
Top–Right Leg 1 0.05 U10(1.2D+aL+SPECXY) 1209.11 90.27 9559.86 8000 0.09 0.13
Not
Top–Left Leg 2 U10(1.2D+aL+SPECXY) 7001.08 922.7 3793.61 8000
Required
Not
Top–Right Leg 2 U10(1.2D+aL+SPECXY) 7001.08 922.7 5928.98 8000
Required
Not
Top–Left Leg 3 U10(1.2D+aL+SPECXY) 14239.08 3111.08 3584.63 8000
Required
Not
Top–Right Leg 3 U10(1.2D+aL+SPECXY) 14239.08 3111.08 4914.8 8000
Required
Not
Top–Left Leg 4 U10(1.2D+aL+SPECXY) 6501.28 1011.98 3350.87 8000
Required
Not
Top–Right Leg 4 U10(1.2D+aL+SPECXY) 6501.28 1011.98 5709.35 8000
Required
Top–Left Leg 5 0.08 U10(1.2D+aL+SPECXY) 2061.07 -289.35 8299.8 8000 0.15 0.24
Not
Top–Right Leg 5 U10(1.2D+aL+SPECXY) 2061.07 38.43 5174.26 8000
Required
Top–Left Leg 6 0.07 U10(1.2D+aL+SPECXY) 978.1 -133.86 8706.3 8000 0.15 0.23
Top–Right Leg 6 0.07 U10(1.2D+aL+SPECXY) 978.1 84.89 7282.71 8000 0.13 0.23
Top–Left Leg 7 0.07 U10(1.2D+aL+SPECXY) 1066.88 -84.01 7232.73 8000 0.14 0.24
Top–Right Leg 7 0.08 U10(1.2D+aL+SPECXY) 1066.88 128.59 8412.2 8000 0.15 0.24
Bottom–Left Leg 1 0.05 U10(1.2D+aL+SPECXY) 1253.62 -92.79 9873.83 8000 0.09 0.13
Botttom–Right Leg 1 0.04 U10(1.2D+aL+SPECXY) 1253.62 65.8 8611.78 8000 0.09 0.13
Bottom–Left Leg 2 0.24 U10(1.2D+aL+SPECXY) 7284.07 -1696.16 7020.48 8000 0.48 0.8
Botttom–Right Leg 2 0.24 U10(1.2D+aL+SPECXY) 7284.07 1884.57 7238.5 8000 0.49 0.8
Bottom–Left Leg 3 0.49 U10(1.2D+aL+SPECXY) 14897.47 -8486.89 6260.53 8000 0.99 1.86
Botttom–Right Leg 3 0.48 U10(1.2D+aL+SPECXY) 14897.47 7292.11 6005.11 8000 0.97 1.86
Stress
Station ID Edge Governing Pu Mu Stress Limit C Depth C Limit
Comp
Location Length (m) Combo kN kN-m kN/m² m m
kN/m²
Bottom–Left Leg 4 0.22 U10(1.2D+aL+SPECXY) 6783.28 -1651.24 6650.78 8000 0.45 0.8
Botttom–Right Leg 4 0.22 U10(1.2D+aL+SPECXY) 6783.28 1654.86 6654.99 8000 0.45 0.8
Not
Bottom–Left Leg 5 U10(1.2D+aL+SPECXY) 2147.32 312.01 1005.56 8000
Required
Botttom–Right Leg 5 0.08 U10(1.2D+aL+SPECXY) 2147.32 312.01 8778.45 8000 0.16 0.24
Bottom–Left Leg 6 0.07 U10(1.2D+aL+SPECXY) 1018.02 -92.53 7701.18 8000 0.14 0.23
Botttom–Right Leg 6 0.08 U10(1.2D+aL+SPECXY) 1018.02 143.1 9171.45 8000 0.16 0.23
Bottom–Left Leg 7 0.08 U10(1.2D+aL+SPECXY) 1108.72 -136.23 8810.94 8000 0.16 0.24
Botttom–Right Leg 7 0.08 U10(1.2D+aL+SPECXY) 1108.72 95.3 7727.94 8000 0.15 0.24
Story ID Pier ID Centroid X (m) Centroid Y (m) Length (m) Thickness (m) LLRF
G P1 -30.54 -12.22 18.81 0.3 0.4
Material Properties
Shear Design
Stress
Station ID Edge Governing Pu Mu Stress Limit C Depth C Limit
Comp
Location Length (m) Combo kN kN-m kN/m² m m
kN/m²
Not
Top–Left Leg 1 U10(1.2D+aL+SPECXY) 10378.8 2990.78 3468.11 8000
Required
Not
Top–Right Leg 1 U10(1.2D+aL+SPECXY) 10378.8 2990.78 5459.89 8000
Required
Top–Left Leg 2 0.2 U10(1.2D+aL+SPECXY) 4839.37 -759.06 6523.55 8000 0.41 0.71
Stress
Station ID Edge Governing Pu Mu Stress Limit C Depth C Limit
Comp
Location Length (m) Combo kN kN-m kN/m² m m
kN/m²
Top–Right Leg 2 0.22 U10(1.2D+aL+SPECXY) 4839.37 1352.39 7682.41 8000 0.44 0.71
Not
Top–Left Leg 3 U10(1.2D+aL+SPECXY) 10652.24 3965.95 3234.43 8000
Required
Not
Top–Right Leg 3 U10(1.2D+aL+SPECXY) 10652.24 3965.95 5804.47 8000
Required
Bottom–Left Leg 1 0.49 U10(1.2D+aL+SPECXY) 10835.66 -6952.74 6975.66 8000 0.99 1.72
Botttom–Right Leg 1 0.49 U10(1.2D+aL+SPECXY) 10835.66 6782.21 6918.88 8000 0.98 1.72
Bottom–Left Leg 2 0.25 U10(1.2D+aL+SPECXY) 5028.01 -1944.87 9036.1 8000 0.49 0.71
Botttom–Right Leg 2 0.23 U10(1.2D+aL+SPECXY) 5028.01 1532.77 8231.21 8000 0.47 0.71
Botttom–Right Leg 3 0.49 U10(1.2D+aL+SPECXY) 11115.38 6166.81 6714.08 8000 0.99 1.75
18. Foundation
RAFT1200
RAFT 600
ETABS 19.1.0 8/22/2023
34
Fx = -1.46 33
Fy = 0.32 Fx = -0.87
208
Fz = 640.09 Fy = -2.06
636 Fx = 7.29
Mx = -0.72 Fz = 689.7
Fy = -11.39
Fx = 432.49 43
My = -3.61 Mx = 4.44
Fz = 3527.74
Fy = -421.12 Fx = 2.7
My = -2.33
633Fz = 4194.25 Mx = 24.67 Fy = -3.32
Fx = 354.32
Mx = 53.15 My = 14.54 Fz = 721.59
Fy = -401.77 192
My = 76.08 Mx = 7.22
Fz = 4282.86 Fx = -1.2
My = 5.44
Mx = 95.98 635 Fy = -28.28
My = 4.36 Fx = -767.96 Fz = 9025.75
38 Mx = 61.7 42
Fy = -23.95
Fx = 1.73 634Fz = 6228.61 My = -6.03 Fx = 0.12
Fy = 1.93 Fx = -71.73 Fy = -0.28
Mx = -70.49
Fz = 874.37 Fy = 835.3My = -62.11 Fz = 846.41
205 216 191
Mx = -4.19 Fz = 6283.38 Mx = 0.49
Fx = 25.36 Fx = 27.49 Fx = -26.87
My = 3.43 Mx = -84.24 My = -0.3
Fy = -27.56 Fy = -9.81 Fy = -18.63
My = -144.13
Fz = 10759.67 Fz = 5758.03 Fz = 10779.79
199
37 Mx = 60.87 Mx = 20.73 Mx = 39.33 41
Fx = -3.66
Fx = 0.24 My = 51.42 My = 58.63 My = -64.47 Fx = -0.22
Fy = 1.37
Fy = -0.51 Fy = -0.76
Fz = 4025.25
Fz = 828.4 Fz = 845.64
206 649 Mx = -3.75 190
Mx = 1.22 202 Mx = 1.47
Fx = 25.35 Fx = -20.52 My = -9.7 Fx = -22.69
My = 0.23 Fx = 15.34 My = -1.04
Fy = -21.6 Fy = -6.94 Y 178 Fy = -21.71
Fy = 4.19
Fz = 10536.23 Fz = 7132.68 Fx = 5.13 Fz = 10544.24
Fz = 11787.93
36 Fy = 3.57 40
Mx = 47.87 Mx = 14.89 Mx = 45.33
Mx = -11.54
Fx = 0.64 My = 52.51 Fz = 4620.12 My = -55.23 Fx = -0.26
My = -47.09 My = 25.18
179 X
Mx = -8.71
Fy = -1.12 Fy = -0.53
Fx = 0.16
Fz = 845.29 My = 7.88 Fz = 861.55
Fy = -42.53 201 189
207 186
Mx = 2.57 Mx = 0.89
Fx = 17.8 Fz = 9164.51 Fx = -5.26 Fx = -19.05
Fx = 11.31
My = 1.2 My = -1.11
Fy = -22.09 Mx = 70.25 Fy = 4.33 Fy = -21.54
Fy = 20.71
Fz = 10535.74 My = -26.2 Fz = 13429.89 Fz = 10779.25
Fz = 13881.45
35 Mx = -12.32 Mx = 44.07 39
Mx = 48.99 Mx = -44.81
Fx = 3.02 My = -19.22 My = -47.13 Fx = -2.64
My = 37.22 My = 20.58
Fy = 4.02 Fy = 4.16
Fz = 730.92 Fz = 737.29
180 185 193 194 215
Mx632
= -8.52 200 Mx = -9.28
628
Fx = 34.71 Fx = -36.32 Fx = 13.37 Fx = -18.52 Fx = -33.64
Fx =My
469.82
= 6.62 Fx = 37.16 MyFx
= -6.37
= -470.02
Fy = 8.45 Fy = -20.12 Fy = 40.01 Fy = 44.27 Fy = 14.39
Fy = -464.43 Fy = -25.51 Fy = -468.18
Fz = 6898.03 Fz = 8676.1 Fz = 9991.2 Fz = 7049.46
629Fz = 4323.66 Fz = 16679.19 Fz = 17561.08
Fz = 4224.11 625
Mx = -17.32 621 620 Mx = -88.36608 609 Mx = -98.54 198 218 Mx = -34.54
Fx = 392.84 Mx = 44.23 183 Mx = 51.31 Fx = -426.98
Mx = 92.55 619 607 Mx = 80.03
My = 76.03 My = -81.05 Fx = 650.6 Fx = -642.24My = 27.5
Fx = 582.7 Fx = -603.95 My = -43.73Fx = 0.18 Fx = 10.05 My = -79.67
Fy = -416.29
My = 99.83 Fx = -3.83 My = 73.35 Fy = -448.93
My = -89.94
Fx==-609.29
-24.02 Fx = 13.11
Fy = -688.73 Fy Fy = -541.69 Fy = -507.81 Fy = 3.39 Fy = 8.6
Fz = 4266.64 612 603 Fy = 6.58
602 Fz = 4467.06
Fy = 611.59
640 Fy = 561.52 46
44 Fz = 8444.91 Fz = 2972.44 Fz = 2586.99 Fz = 4403.09 Fz
Mx = 107.63 631 Fx = 3.39 Fx Fx = 427.6 Fx==1992.86
601
-323.83 Fz = 2490.68 Fz = 4142.51 627 Mx = 113.39
Fz = 426.48
639 Fz==4.54
433.39
611 610 Fx = -7.2
Fx = 11.41 Mx = 168.97 Mx = -1.15 Mx = -6.78 Mx = -29.88 Fx =-14.54
Mx -7.33
My = 58.24 Fx = -686.48 Fy Fy = -533.88 Fy =
= -445.15 Mx = -7.95 Mx = -19.55 Fx = 636.94 My = -73.18
Mx===-374.32
Fx -0.51
-1.35
Fy
Fx
Mx===555.3
-548.37
-4.59 Fx = -624.77 Fy = -21.28
Fy = -5.93 701 My = -12.28 My = -1.05 My = -2.06 My = -14.75 Fy =-9.8
My 432.71
699 My = -0.41 My = 20.36
Fy = -1.32 Fz Fz = 687.64 Fz = 5807.85 Fz =
= 2001.19 Fy = -25.23
My===431.49
Fy -5.32
638
368.36
My==537.83
Fy 3.95 Fy = 585.16 617 616 Fz = 1457.12
Fz = 1151.08 630Fz = 6031.04 Fx = -3.5 Fx
Fz==0.89
227.19
698 Fz = 5842.7 626
Mx==3.340.76 Mx = 1.17 Mx = 156.96 Mx = 4.48 618
Fx = 572.46 Fx = -559.23 Mx = 47.02
Fx
Fz = 403.01 Fz = 3008.71 Fz = 4644.95 Fy
Mx = 13.33 Fx = -5.67Mx = -80.71 Fy = 27.44 637 My = 34.99 Mx===-266.13
My
Fx 4.03
30.14
1.15 Fx = 11.68 Fx = -22.1
Mx = -50.62
My My
Mx =
= 2.64
My = 25.22 Fy = 784.61 Mx==
Fy
Fx
2.95
==-360.52
2.72
0.03
3.97 Mx = -20.52
Fz
My==337.56
-9.46
Fy = -559.61 Fy = -647.59
Fy = 831.67
My = -16.5
My = -40.65 Fz = 559.33 697
Fy = 258.39 Fy = 562.9
671 My = -26.56
Fz
My===386.72
1.38 My = -17.79 My = -32.33 Fz = 2709.81 Fz = 6349.98
Fz = 6077.67 Mx = -60.07 Fy 367.4
624 Mx
Fx = 1.4
0.72 Fx = 2.05 Fz = 6307.94
Fz = 300.73
696 Fz = 403.57
670
27 197 187 Mx = -3.1 Mx = -1.97 Mx = 33.6 188 213
Mx = -81.07212 My = -7.82 622
Fx
Fz==-0.15
423.65
623 My
Fy = 2.27
-270.4 Fy = -320.57
214
Mx = -83.15 53
Fx ==1.27
Mx 3.15 Mx=
Fx
My ==-8.5
-3.76
-0.78 My = 7.3
Fx = -3.57 Fx = -7.23 Fx = 31.72 My =-584.84
4.23 Fx = -4.89 Fx = -19.43 Fx = 23.56
My =Fx = -14.28
-84.8 Fx = 644.36
Fy
Mx=
Fx ==-635.01
-1.07 Fz = 306.04
My==281.41
2.17
606 Fz My = 50.37 Fx = -20.37
Fy My===314.38
Fy 613
325.12
10.98
Fy = -3.87 Fy = -2.57 Fy = -4.66 Fy = 5.54 Fz
My==701 3.14 Fy = 36.93 Fy = -8 Fy = 1.16 Fy = -7.99
Fy = 829.52 Fy = 622.91 184 Mx==-7.78
Fx -4.41 Mx
Fx
Fz = 14739.96 181 182 217 604 Fz = 359.82
605 Fz==
=-3.78
-2.12
341.45
614 615
Fz = 1732.54 Fz = 6120.7 Fz = 5818.37 Mx = -12.91 Fz = 15513.96 Fz = 6219.97 Fz = 6303.72 Fz = 1470.66
Fz My
Mx== 2.08
Mx = 6.11 Mx = -14.75 Fx==8594.62
-11.19 FxFz==4.76
3446.99 Fx = -2.63 Fx = -4.95
Fx = 531.79
Fy =-455.34
-3.29
Fx = -431.97
Fy
My
Mx===-581.55
-1.47
-0.6
Fx = 644.41 Fx = -651.2
Mx = 8.91 Mx = 9.41 My = -6.32 Mx = -88.18 Mx = 15.62 Mx = -3.66 Mx = 17.63
Mx
Fy = -268.23
-4.96 Mx
Fy = =-5.51
-11.29 Fy = 2.94 Fy = 2.98
Fy = 342.07 Fz
My=
Fy ==541.63
2.26
469.51 Fz
My==755.73
-2.24
My = -7.82 My = -15.7 My = -31.74 My = 69.54 Fy = 582.74 Fy = 723.44 My = -16.81 My = -44.63 My = 50.2
My My = -45.81
Fz =
= -10.7 My
2714.91 Fz = =2150.28
20.86 Fz = 3245.87 Fz = 1734.48
Fz = 6061.6
Mx = -6.08
Fz = 2509.6
Mx = -2.28
Fz = 3259.29 Fz = 6690.24
Mx = 8.76 Mx = 11.27 Mx = -7.46 Mx = -7.6 My = -3.29 My = 2.99
Mx = -83.53 Mx = -4 Mx = 0.48 Mx = -94.9
55 My = -10.74 54
28 50 195 203 My =196
-23.95 My = 10.46 My = -5.87
209 My = 31.12 My = 210
25.79 My = -10.52 My = -4.94
211 259 204 26
47
Fx = 20.18 Fx = -1.05 Fx = -14.43
Fx = -4.92 Fx = 6.23 Fx = 30.42 Fx = -10.02 Fx = 2.45 Fx = -1.42 Fx = 7.17 Fx = -7.38 Fx = -14.98 Fx = -5.58
Fx = 6.56
Fy = -3.63 Fy = 0.51 Fy = -9.06
Fy = 0.4 Fy = -27.26 Fy = -18.79 Fy = 3.48 Fy = 2.91 Fy = 0.04 Fy = 1.45 Fy = -7.9 Fy = 4.76 Fy = 12.64
Fy = 4.51
Fz = 1488.37 Fz = 1974.39 Fz = 1232.27
Fz = 1708.2 Fz = 6025.45 Fz = 6520.56 Fz = 5219.17 Fz = 4462.87 Fz = 4120 Fz = 4842.48 Fz = 6653.62 Fz = 6624.38 Fz = 1736.14 Fz = 2278.25
Mx = 8.58 Mx = 20.06
Mx = -0.86 Mx = -0.83 Mx = 58.44 Mx = 39.21 Mx = -9.3 Mx = -8.18 Mx = -1.67 Mx = -5.23 Mx = 13.56 Mx = -13.44 Mx = -28.53
Mx = -10.36
My = 45.16 My = -32.67
My = -2.01 My = -10.63 My = 15.91 My = 68.37 My = -21.44 My = 5.44 My = -3.5 My = 14.58 My = -19.34 My = -36.66 My = -13.27
My = 13.94
32 31 30 51 19 12 11 10 9 8 7 22 48 25 24 45
Fx = -0.03 Fx = 14.17 Fx = 0.86 Fx = -8.31 Fx = 8.59 Fx = -53.98 Fx = 15.95 Fx = -14.54 Fx = 13.79 Fx = -10.95 Fx = 60.08 Fx = -7.95 Fx = 1.85 Fx = -13.76 Fx = -0.18
Fx = 2.64
Fy = 0.58 Fy = 1.81 Fy = -6.23 Fy = -7.05 Fy = -7.59 Fy = 10.58 Fy = 17 Fy = 12.79 Fy = 14.53 Fy = 17.17 Fy = 13.72 Fy = -9.22 Fy = -11.25 Fy = 2.05 Fy = 0.23
Fy = -7.28
Fz = 400.16 Fz = 1613.59 Fz = 2309.79 Fz = 1994.36 Fz = 2164.75 Fz = 2982.02 Fz = 2507.43 Fz = 2552.67 Fz = 2562.22 Fz = 2491.61 Fz = 2960.39 Fz = 2118.23 Fz = 1866.46 Fz = 2306.25 Fz = 1611.57 Fz = 401.62
Mx = -0.67 Mx = -3.5 Mx = 14.26 Mx = 15.76 Mx = 16.8 Mx = -25.32 Mx = -63.76 Mx = -48.5 Mx = -55.16 Mx = -65.15 Mx = -33.9 Mx = 20.12 Mx = 15.9 Mx = 25.08 Mx = -4.54 Mx = -0.42
My = 19.8 My = -18.6 My = -31.51 My = -1.27
My = 0.51 My = 32.12 My = 2.53 My = -18.02 My = -113.65 My = 58.62 My = -54.45 My = 50.52 My = -41.24 My = 125.46 My = 5.05 My = 3.26
56
57
6 4 3 2 1 5 Fx = -17.35
Fx = 18.8
Fx = -43.02 Fx = -7.4 Fx = -9.19 Fx = 7.98 Fx = 9.34 Fx = 56.56 Fy = 6.17
Fy = 9.91 29 52 20 21 49 23
Fy = -0.62 Fy = 22.31 Fy = 15.31 Fy = 11.94 Fy = 21.53 Fy = -1.1 Fz = 1097.5
Fz = 1095.5 Fx = 1.78 Fx = -5.3 Fx = 9.83 Fx = -9.6 Fx = 2.8 Fx = 2.85
Fy = 20.36 Fz = 1974.99 Fz = 2064.13 Fz = 2119.28 Fz = 2067.81 Fz = 2080.79 Fz = 2006.88 Mx = -13.62
Mx = -21.38 Fy = 23.34 Fy = 22.99 Fy = 22.23 Fy = 21.63 Fy = 27.08
Fz = 1386.91 Mx = -1.74 Mx = -83.22 Mx = -57.67 Mx = -45.43 Mx = -81.08 Mx = -2.62 My = -39.34
My = 42.29 Fz = 1511.39 Fz = 1307.37 Fz = 1328.78 Fz = 1297.01 Fz = 1589.13
Mx = -45.15 My = -88.54 My = -27.56 My = -34.29 My = 29.1 My = 34.06 My = 116.25
Mx = -51.59 Mx = -51.12 Mx = -49.73 Mx = -48.26 Mx = -60.39
My = 4.77 My = -10.95 My = 22.54 13 18 17 16 My = -22.28 My = 5.19 My = 5.29
Fx = 23.37 Fx = -17.77 Fx = -3.59 Fx = -20.66
Fy = -33.74 Fy = -61.54 Fy = -53.95 Fy = -26.29
Fz = 1889.43 Fz = 2360.59 Fz = 2556.96 Fz = 1880.54
Mx = 123.82 Mx = 226.81 Mx = 198.69 Mx = 95.55
My = 86.24 My = -65.96 My = -13.55 My = -76.57
15 14
Fx = -6.18 Fx = 4.43
Fy = 54.94 Fy = 48.21
Fz = 2285.89 Fz = 2299.98
Mx = -204.47 Mx = -179.85
My = -22.82 My = 16.41
BARAYA HOSPITAL-Ultimate.EDB Plan View - Base - Z = 0 (m) Restraint Reactions (S02 (D+L)) [kN, kN-m]
Raft Foundation 2/13/2018 11:30 PM
E-3
0.0
-1.5
-3.0
Y
-4.5
X
-6.0
-7.5
-9.0
-10.5
-12.0
-13.5
-15.0
-16.5
-18.0
-19.5
E+3
18.0
16.5
15.0
Y
13.5
X
12.0
10.5
9.0
7.5
6.0
4.5
3.0
1.5
0.0
-1.5
SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (ENVLOPE) Max [kN-m/m] kN - m
Raft Foundation 2/13/2018 11:29 PM
E+3
5.00
4.50
4.00
Y
3.50
X
3.00
2.50
2.00
1.50
1.00
0.50
0.00
-0.50
-1.00
-1.50
SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (ENVLOPE) Min [kN-m/m] kN - m
Raft Foundation 2/13/2018 11:23 PM
E+3
11.0
10.0
9.0
Y
8.0
X
7.0
6.0
5.0
4.0
3.0
2.0
1.0
0.0
-1.0
-2.0
SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ENVLOPE) Max [kN-m/m] kN - m
Raft Foundation 2/13/2018 11:26 PM
E+3
10.0
9.0
8.0
Y
7.0
X
6.0
5.0
4.0
3.0
2.0
1.0
0.0
-1.0
-2.0
-3.0
SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (ENVLOPE) Min [kN-m/m] kN - m
Raft Foundation 2/13/2018 11:41 PM
0.1358 0.0538
0.2781
0.058
0.7546
0.074 0.0709
0.0498 0.0498
0.1536 0.13120.3164
0.1042 0.1431
0.0236
0.4799 0.632 0.5364 0.499 0.555 0.4651 0.3951 0.3485 0.4293 0.5617 0.5606 0.5562 0.7463 0.3819
0.12580.5333 0.7507 0.6557 0.7143 0.7936 0.6747 0.6842 0.6604 0.6665 0.7929 0.7002 0.6075 0.7562 0.51860.1227
0.3699 0.3559
0.5095 0.5505 0.5629 0.5256 0.5558 0.5246
0.5 0.4589 0.4426 0.4501 0.4308 0.5313
0.6337 0.6115
-19
-38
Y
-58
X
-77
-96
-115
-135
-154
-173
-192
-212
-231
-250