TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES

938 Aurora Boulevard, Cubao, Quezon City

COLLEGE OF ENGINEERING AND ARCHITECTURE


MECHANICAL ENGINEERING DEPARTMENT

ENERGY AUDIT OF BUILDING 3


TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES –
QUEZON CITY

ENERGY MANAGEMENT IN INDUSTRIAL PLANTS AND BUILDINGS


ME515

AUDIT BY:

Basa, Christopher E.
Cabiles, Brett Cates E.
Comia, John Angelo D.
Comedero, Rafael Luis M.
Dela Cruz, Joshua Philip F.
Delas Alas, Mark Raegel C.
Edquiba Alex S.
Macalalay, Martin C.
Mojico, Lloyd A.
Obias, Ian Christopher C.
ME52FB1

Engr. Armando C. Emata, PME


PROFESSOR

MARCH 2018
ENERGY AUDIT OF BUILDING 3
ii
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

TABLE OF CONTENTS

I. Introduction ----------------------------------------------------------------------------------------------- 1
Cost Saving ----------------------------------------------------------------------------------------------- 1
Energy Audit ----------------------------------------------------------------------------------------------- 2
Objective of the Audit ------------------------------------------------------------------------------------ 2
Energy Audit Process ------------------------------------------------------------------------------------ 2
Energy management ------------------------------------------------------------------------------------ 4
Scope of the Audit ------------------------------------------------------------------------------------ 5

II. Facility Description ----------------------------------------------------------------------------------------------- 5

III. Equipment, Product and Materials Flow -------------------------------------------------------------- 5

IV. Facility layout ----------------------------------------------------------------------------------------------- 9

V. Hours of Operation ---------------------------------------------------------------------------------------------- 49

VI. Energy Bill Analysis ---------------------------------------------------------------------------------------------- 49


1st Floor ---------------------------------------------------------------------------------------------- 49
2nd Floor ---------------------------------------------------------------------------------------------- 56
3rd Floor ---------------------------------------------------------------------------------------------- 65
4th Floor ---------------------------------------------------------------------------------------------- 71
5th Floor ---------------------------------------------------------------------------------------------- 75
Summary ---------------------------------------------------------------------------------------------- 79

VII. Action Plan --------------------------------------------------------------------------------------------------------- 80

VIII. Appendices ---------------------------------------------------------------------------------------------- 82


Appendix A: Investment Cost Saving ------------------------------------------------------------- 82
Appendix B: LED Catalog ------------------------------------------------------------------------ 86
Appendix C: Power Rate ------------------------------------------------------------------------90

Page | ii
ENERGY AUDIT OF BUILDING 3
1
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

I. INTRODUCTION

In any institutions electricity is the major source of power. This enables them to do things they are
intended to. Electricity helps people a lot in many ways. Electricity is not free hence people using it
need to pay an equal amount to what they are consuming and since cost-saving is one of the priorities
of the people, this energy audit is intended to teach and give people wider horizon on how to save
energy.

Technological Institute of the Philippines, a well-known institution for engineering and other
disciplines, consumes great energy. Air-conditioned rooms, various kinds of equipment and
laboratories are inside the institution; computer laboratories, chemical laboratories, physics
laboratories, ice plant, steam power laboratories, machine shops and other engineering related
facilities contribute to the power consumption of TIP.

Innovation for the betterment of learning needs to be done to ensure the quality of education TIP
produces and with that, installation of new equipment and facilities equates to greater amount of power
consumption. If this problem is not solved right away, the management can have a problem with the
cost of their electric bill and can affect the budget allotted for other things.

The auditors have chosen Building 3 of TIP-QC since this building is mainly composed of
laboratories like computer laboratories, physics laboratories and the ice plant to see and study the
power consumption of the said building and help on the power saving by making recommendations to
minimize the power consumption.

COST SAVINGS

This is the amount of money saved as the result of the energy audit. This could be done by
rigorous study and analysis of the gathered data that will help on planning the ways on how to save
energy. Also, this is a big help to a certain institution like TIP to increase their profit and put the
saved budget to other projects that can benefit their students and other activities.

Page | 1
ENERGY AUDIT OF BUILDING 3
2
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

ENERGY AUDIT

Energy Audit is one of the ways that people use today to make their company and
institution more energy efficient. This s an assessment of the energy needs and efficiency of a
building or buildings. This is done to give long-term solution and learn how to lessen their energy
expenditures and spend it to a more important thing. Therefore, an energy audit is an energy
assessment. This evaluation analyses energy flows in a building, process or system to reduce the
amount of energy input into the system whilst maintaining or improving human comfort, health and
safety. The level of detail of this evaluation determines the type of audit.

OBJECTIVE OF THE AUDIT

The general objective of this energy audit is to determine the total power consumption of
Building 3 and assess the gathered data whether the energy consumption is already costly. After
gathering the data, the auditors will be making recommendations to save more money and energy
by doing this, the company will be more efficient and could save more thus lessening their energy
expenses.

BENEFITS

 Monitor the power consumption


 Optimize the usage of power
 Save money
 Organization of schedule of equipment.
 Providing steps to conserve energy in the long run

ENERGY AUDIT PROCESS

An energy audit consists of 5 main steps that can be performed at the auditor’s office or at
the organization’s facilities:

Page | 2
ENERGY AUDIT OF BUILDING 3
3
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

Data collection: the auditor starts collecting some preliminary information on the energy
consumption of the facilities and some technical details such as process diagrams, drawings and
equipment inventory - usually provided by the organization.

Field work: at least one on-site visit is required, with the aim of gathering all the information
needed for the study depending on the defined scope. This information includes collecting details
of the energy consuming equipment such as brand, model, power and hours of operation. Some
interviews with staff will also be required. Depending on the type of energy audit, some metering
devices will be used.

Analysis of energy consumption and performance of energy accounting: all the operations
of the organization must be analyzed, as well as the equipment consuming higher energy.

The processes which have higher energy consumption must be identified in order to
determine the potential for reducing it and to define the energy saving measures to improve global
energy performance.

All information collected is used to evaluate the different uses of energy within the process
and to establish a breakdown of the energy consumed. This energy accounting is also called
Energy Balance.

Analysis and development of energy saving measures: once all the data collected has
been analyzed, energy saving measures can be identified. The information collected and analyzed
enables the auditor to detect energy saving measures to reduce energy consumption. Energy and
cost savings of these measures will be assessed, together with investment needed and payback.

Energy audit report: following the energy audit, an energy audit report must be issued,
which should include at least the following information:

Technical scope: this point includes facilities, services and included areas and level of
depth in the analysis and detail required.

Methodology: this point includes the analysis of the state of art of the facilities (energy
inputs, technologies and services), measurement results and energy balance.

Page | 3
ENERGY AUDIT OF BUILDING 3
4
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

Suggested energy saving measures: this point includes a description of each energy
saving measure, including potential energy savings, economic savings, investment needed and
payback.

Conclusions: this point includes the recommended measures, total energy savings, total
economic savings, total investment and payback.

ENERGY MANAGEMENT

Energy management is the art and science of optimum use of energy to maximize profits
(minimize costs) and thereby improve the economic competiveness. The energy should be used
efficiently, economically and optimally.

Energy management can also be defined as the science involving planning, directing,
con-trolling the supply and consumption of energy to maximize productivity and comforts and
minimize the energy costs and pollution with conscious, judicious and effective use of energy.

The energy management involves strategy, policy, organizational changes, energy audit,
energy conservation measures, administrative actions, training and awareness programs,
monitoring of energy conservation efforts etc.

Energy management is an important management function of every organization (like


production, finance, marketing, planning, and design). Energy organization must have a written
energy management policy document and the top management must be committed to implement
the energy policy. The energy objectives must be known to energy executive and supervisor. The
energy must be monitored vis-a-vis the production.

SCOPE OF THE AUDIT

This is the covered areas of the audit. This will serve as the guideline in performing the
energy audit. This also states the coverage and limitations of the energy audit.

Page | 4
ENERGY AUDIT OF BUILDING 3
5
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

This energy audit will only be performed in Building 3 of TIP-QC. The equipment, facilities,
laboratories, fixtures and other power consuming appliances. The computation will involve the
energy consumption of the whole building and summarization per floor for greater comprehension.
The recommendation that will be done will only be good for Building 3 only.

II. FACILITY DESCRIPTION

TIP-Quezon City is composed of 10 buildings. Each building houses different functions and
facilities. Building 3, the building to be audited is generally composed of air-conditioned rooms,
Chemistry and Physics Laboratories, ENSE Laboratory, Computer Laboratories and Ice Plant.

III. EQUIPMENT PRODUCT AND MATERIALS FLOW

This section covers the list of equipment and materials used in every room and facility of
Building 3.

 Equipment used in Classrooms


o Lightings
o Computers
o Air-Conditioners
o Ceiling Fans
o Projectors

 Equipment used in Offices


o Lightings
o Computers
o Air-Conditioners
o Printers

Page | 5
ENERGY AUDIT OF BUILDING 3
6
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

 Equipment used in Hallways


o Lightings
o CCTV
o Drinking Fountain

 Equipment used for Laboratories/Stockrooms


o Lightings
o Ceiling Fans
o Air-Conditioners
o CCTV
Specifically for Ice Plant
 Compressor
 Cooling Tower
 Pump
 Brine Agitator

Specifically for Physics Laboratory

 Laptop
 Laboratory Apparatus

 Equipment used in Comfort Rooms


o Lightings

Number of appliances

1st Floor

APLIANCES QTY
LIGHTINGS 141
CEILING FAN 27
CCTV 6
COMPUTER 9

Page | 6
ENERGY AUDIT OF BUILDING 3
7
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

PUMP 1
BRINE AGITATOR 1
CT FAN 1
COMPRESSOR 1
AC UNIT 8
PROJECTOR 2

2nd Floor

APLIANCES QTY
LIGHTINGS 122
COMPUTER 520
CCTV 14
PROJECTOR 12
AC UNIT 35
PRINTER 5

3rd Floor

APLIANCES QTY
LIGHTINGS 142
AC UNIT 27
COMPUTER 39
PRINTER 6
PROJECTOR 3
CCTV 1
CEILING FAN 18

4th Floor

APLIANCES QTY
LIGHTINGS 75
AC UNIT 10
CCTV 1
DRINKING
1
FOUNTAIN

Page | 7
ENERGY AUDIT OF BUILDING 3
8
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

5th Floor

APLIANCES QTY
LIGHTINGS 55
AC UNIT 10
CEILING FAN 13
PROJECTOR 1
CCTV 1
DRINKING
1
FOUNTAIN

Number of appliances in building 3

APPLIANCES QTY
LIGHTINGS 535
COMPUTER 568
AC UNIT 90
CEILING FAN 58
CCTV 23
PROJECTOR 18
DRINKING FOUNTAIN 2
PRINTER 11
PUMP 1
BRINE AGITATOR 1
CT FAN 1
COMPRESSOR 1

Page | 8
ENERGY AUDIT OF BUILDING 3
9
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

IV. FACILITY LAYOUT

GROUND FLOOR – FLOOR PLAN

Page | 9
ENERGY AUDIT OF BUILDING 3
10
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

GROUND FLOOR – CEILING PLAN

Page | 10
ENERGY AUDIT OF BUILDING 3
11
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

GROUND FLOOR – ISOMETRIC 3D VIEW FROM UPPER LEFT

Page | 11
ENERGY AUDIT OF BUILDING 3
12
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

GROUND FLOOR – ISOMETRIC 3D VIEW FROM UPPER LEFT (RENDERED)

Page | 12
ENERGY AUDIT OF BUILDING 3
13
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

GROUND FLOOR – ISOMETRIC 3D VIEW FROM UPPER RIGHT

Page | 13
ENERGY AUDIT OF BUILDING 3
14
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

GROUND FLOOR – ISOMETRIC 3D VIEW FROM UPPER RIGHT (RENDERED)

Page | 14
ENERGY AUDIT OF BUILDING 3
15
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

GROUND FLOOR – ISOMETRIC 3D TOP VIEW

Page | 15
ENERGY AUDIT OF BUILDING 3
16
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

GROUND FLOOR – ISOMETRIC 3D TOP VIEW (RENDERED)

Page | 16
ENERGY AUDIT OF BUILDING 3
17
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

2ND FLOOR – FLOOR PLAN

Page | 17
ENERGY AUDIT OF BUILDING 3
18
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

2ND FLOOR – CEILING PLAN

Page | 18
ENERGY AUDIT OF BUILDING 3
19
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

2ND FLOOR – ISOMETRIC 3D VIEW FROM UPPER LEFT

Page | 19
ENERGY AUDIT OF BUILDING 3
20
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

2ND FLOOR – ISOMETRIC 3D VIEW FROM UPPER LEFT (RENDERED)

Page | 20
ENERGY AUDIT OF BUILDING 3
21
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

2ND FLOOR – ISOMETRIC 3D VIEW FROM UPPER RIGHT

Page | 21
ENERGY AUDIT OF BUILDING 3
22
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

2ND FLOOR – ISOMETRIC 3D VIEW FROM UPPER RIGHT (RENDERED)

Page | 22
ENERGY AUDIT OF BUILDING 3
23
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

2ND FLOOR – ISOMETRIC 3D TOP VIEW

Page | 23
ENERGY AUDIT OF BUILDING 3
24
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

2ND FLOOR – ISOMETRIC 3D TOP VIEW (RENDERED)

Page | 24
ENERGY AUDIT OF BUILDING 3
25
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

3RD FLOOR – FLOOR PLAN

Page | 25
ENERGY AUDIT OF BUILDING 3
26
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

3RD FLOOR – CEILING PLAN

Page | 26
ENERGY AUDIT OF BUILDING 3
27
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

3RD FLOOR – ISOMETRIC 3D VIEW FROM UPPER LEFT

Page | 27
ENERGY AUDIT OF BUILDING 3
28
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

3RD FLOOR – ISOMETRIC 3D VIEW FROM UPPER LEFT (RENDERED)

Page | 28
ENERGY AUDIT OF BUILDING 3
29
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

3RD FLOOR – ISOMETRIC 3D VIEW FROM UPPER RIGHT

Page | 29
ENERGY AUDIT OF BUILDING 3
30
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

3RD FLOOR – ISOMETRIC 3D VIEW FROM UPPER RIGHT (RENDERED)

Page | 30
ENERGY AUDIT OF BUILDING 3
31
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

3RD FLOOR – ISOMETRIC 3D TOP VIEW

Page | 31
ENERGY AUDIT OF BUILDING 3
32
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

3RD FLOOR – ISOMETRIC 3D TOP VIEW (RENDERED)

Page | 32
ENERGY AUDIT OF BUILDING 3
33
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

4TH FLOOR – FLOOR PLAN

Page | 33
ENERGY AUDIT OF BUILDING 3
34
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

4TH FLOOR – CEILING PLAN

Page | 34
ENERGY AUDIT OF BUILDING 3
35
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

4TH FLOOR – ISOMETRIC 3D VIEW FROM UPPER LEFT

Page | 35
ENERGY AUDIT OF BUILDING 3
36
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

4TH FLOOR – ISOMETRIC 3D VIEW FROM UPPER LEFT (RENDERED)

Page | 36
ENERGY AUDIT OF BUILDING 3
37
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

4TH FLOOR – ISOMETRIC 3D VIEW FROM UPPER RIGHT

Page | 37
ENERGY AUDIT OF BUILDING 3
38
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

4TH FLOOR – ISOMETRIC 3D VIEW FROM UPPER RIGHT (RENDERED)

Page | 38
ENERGY AUDIT OF BUILDING 3
39
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

4TH FLOOR – ISOMETRIC 3D TOP VIEW

Page | 39
ENERGY AUDIT OF BUILDING 3
40
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

4TH FLOOR – ISOMETRIC 3D TOP VIEW (RENDERED)

Page | 40
ENERGY AUDIT OF BUILDING 3
41
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

5TH FLOOR – FLOOR PLAN

Page | 41
ENERGY AUDIT OF BUILDING 3
42
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

5TH FLOOR – CEILING PLAN

Page | 42
ENERGY AUDIT OF BUILDING 3
43
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

5TH FLOOR – ISOMETRIC 3D VIEW FROM UPPER LEFT

Page | 43
ENERGY AUDIT OF BUILDING 3
44
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

5TH FLOOR – ISOMETRIC 3D VIEW FROM UPPER LEFT (RENDERED)


Page | 44
ENERGY AUDIT OF BUILDING 3
45
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

5TH FLOOR – ISOMETRIC 3D VIEW FROM UPPER RIGHT

Page | 45
ENERGY AUDIT OF BUILDING 3
46
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

5TH FLOOR – ISOMETRIC 3D VIEW FROM UPPER RIGHT (RENDERED)

Page | 46
ENERGY AUDIT OF BUILDING 3
47
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

5TH FLOOR – ISOMETRIC 3D TOP VIEW

Page | 47
ENERGY AUDIT OF BUILDING 3
48
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

5TH FLOOR – ISOMETRIC 3D TOP VIEW (RENDERED

Page | 48
ENERGY AUDIT OF BUILDING 3
49
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

V. HOURS OF OPERATION

The hours of operation of Building 3 varies on weekdays and weekend. The operation varies with
the type of room; classroom, laboratories, and offices.

 For all classrooms and laboratories- the operation will be: Weekdays: (7:30am –
9:30pm); Weekend (7:30am – 9:00pm).
 For all offices- Assume all offices will be operating from 6:00am – 8:00pm for a total of
14 hours for weekdays and 7:30am – 7:30pm.

VI. ENERGY BILL ANALYSIS

1ST FLOOR

Q-3101
OPERATING HOURS HOURS MONTHLY
KW-
APLIANCES QTY WATT PER
MON TUE WED THUR FRI SAT SUN HR KW-HR
WEEK
LIGHTINGS 8 40 14 13.5 14 13.5 14 12 81 25.92 103.68
CEILING FAN 2 75 14 13.5 14 13.5 14 12 81 12.15 48.6
CCTV 1 60 24 24 24 24 24 24 24 168 10.08 40.32
COMPUTER 2 130 14 13.5 14 13.5 14 12 81 21.06 84.24
276.84

Q-3102A
OPERATING HOURS HOURS MONTHLY
KW-
APLIANCES QTY WATT PER
MON TUE WED THUR FRI SAT SUN HR KW-HR
WEEK
LIGHTINGS 8 40 6 6 9 4 3 3 31 9.92 39.68
CEILING FAN 1 75 6 6 9 4 3 3 31 2.325 9.3
PUMP 1 1119 6 6 9 4 3 3 31 34.689 138.756
BRINE
AGITATOR 1 746 6 6 9 4 3 3 31 23.126 92.504
CT FAN 1 120 6 6 9 4 3 3 31 3.72 14.88
COMPRESSOR 1 1492 6 6 9 4 3 3 31 46.252 185.008
480.128

Page | 49
ENERGY AUDIT OF BUILDING 3
50
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

Q-3102B
OPERATING HOURS HOURS MONTHLY
KW-
APLIANCES QTY WATT PER
MON TUE WED THUR FRI SAT SUN HR KW-HR
WEEK
LIGHTINGS 6 40 14 13.5 14 13.5 14 12 81 19.44 77.76
CEILING FAN 2 75 6 6 9 4 3 3 31 4.65 18.6
96.36

Q-3103
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 8 40 12 12 6 12 6 48 15.36 61.44
AC UNIT 2 1492 12 12 6 12 6 48 143.232 572.928
CEILING FAN 2 75 12 12 6 12 6 48 7.2 28.8
663.168

Q-3104
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 10 40 14 13.5 14 13.5 14 12 81 32.4 129.6
AC UNIT 1 1492 14 13.5 14 13.5 14 12 81 120.852 483.408
COMPUTER 2 130 14 13.5 14 13.5 14 12 81 21.06 84.24
697.248

Q-3105
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 11 40 1 12 10 8 3 34 14.96 59.84
AC UNIT 2 1492 1 12 10 8 3 34 101.456 405.824
CEILING FAN 2 75 1 12 10 8 3 34 5.1 20.4
CCTV 1 60 24 24 24 24 24 24 24 168 10.08 40.32
PROJECTOR 1 215 1 12 10 8 3 34 7.31 29.24
555.624

Page | 50
ENERGY AUDIT OF BUILDING 3
51
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

Q-3106
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT KW-HR
PER
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK

LIGHTINGS 9 40 14 13.5 14 13.5 14 12 81 29.16 116.64

AC UNIT 1 1492 14 13.5 14 13.5 14 12 81 120.852 483.408

COMPUTER 2 130 14 13.5 14 13.5 14 12 81 21.06 84.24

684.288

Q-3107
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 13 40 9 9 3 12 6 9 48 24.96 99.84
AC UNIT 2 1492 9 9 3 12 6 9 48 143.232 572.928
CEILING FAN 2 75 9 9 3 12 6 9 48 7.2 28.8
CCTV 1 60 24 24 24 24 24 24 24 168 10.08 40.32
PROJECTOR 1 215 9 9 3 12 6 9 48 10.32 41.28
783.168

Q-3108
OPERATING HOURS HOURS MONTHLY
KW-
APLIANCES QTY WATT PER
MON TUE WED THUR FRI SAT SUN HR KW-HR
WEEK
LIGHTINGS 11 40 9 9 3 12 6 9 48 21.12 84.48
CEILING FAN 2 75 9 9 3 12 6 9 48 7.2 28.8
CCTV 1 60 24 24 24 24 24 24 24 168 10.08 40.32
153.6

Page | 51
ENERGY AUDIT OF BUILDING 3
52
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

Q-3109
OPERATING HOURS HOURS MONTHLY
KW-
APLIANCES QTY WATT PER
MON TUE WED THUR FRI SAT SUN HR KW-HR
WEEK
LIGHTINGS 6 40 14 13.5 14 13.5 14 12 81 19.44 77.76
CEILING FAN 2 75 14 13.5 14 13.5 14 12 81 12.15 48.6
COMPUTER 3 130 14 13.5 14 13.5 14 12 81 31.59 126.36
252.72

Q-3110
OPERATING HOURS HOURS MONTHLY
KW-
APLIANCES QTY WATT PER
MON TUE WED THUR FRI SAT SUN HR KW-HR
WEEK
LIGHTINGS 12 40 2 2 3 5 6 18 8.64 34.56
CEILING FAN 4 75 2 2 3 5 6 18 5.4 21.6
CCTV 1 60 24 24 24 24 24 24 24 168 10.08 40.32
96.48

Q-3111
OPERATING HOURS HOURS MONTHLY
KW-
APLIANCES QTY WATT PER
MON TUE WED THUR FRI SAT SUN HR KW-HR
WEEK
LIGHTINGS 10 40 2 11 12 9 2 36 14.4 57.6
CEILING FAN 4 75 2 11 12 9 2 36 10.8 43.2
100.8

Q-3112
OPERATING HOURS HOURS MONTHLY
KW-
APLIANCES QTY WATT PER
MON TUE WED THUR FRI SAT SUN HR KW-HR
WEEK
LIGHTINGS 12 40 3 3 3 9 4.32 17.28
CEILING FAN 4 75 3 3 3 9 2.7 10.8
CCTV 1 60 24 24 24 24 24 24 24 168 10.08 40.32
68.4

Page | 52
ENERGY AUDIT OF BUILDING 3
53
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

HALLWAY
OPERATING HOURS HOURS MONTHLY
KW-
APLIANCES QTY WATT PER
MON TUE WED THUR FRI SAT SUN HR KW-HR
WEEK
LIGHTINGS 10 40 14 13.5 14 13.5 14 12 81 32.4 129.6
129.6

COMFORT ROOM
OPERATING HOURS HOURS MONTHLY
KW-
APLIANCES QTY WATT PER
MON TUE WED THUR FRI SAT SUN HR KW-HR
WEEK
LIGHTINGS 7 40 14 13.5 14 13.5 14 12 81 22.68 90.72
90.72

SUMMARY

FACILITIES MONTHLY KW - HR
Q-3101 276.84
Q-3102A 480.128
Q-3102B 96.36
Q-3103 663.168
Q-3104 697.248
Q-3105 555.624
Q-3106 684.288
Q-3107 783.168
Q-3108 153.6
Q-3109 252.72
Q-3110 96.48
Q-3111 100.8
Q-3112 68.4
HALLWAY 129.6
COMFORT ROOM 90.72
TOTAL 5129.144

Page | 53
ENERGY AUDIT OF BUILDING 3
54
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

MONTHLY KW - HR
900
800
700
600
500
400
300
MONTHLY KW - HR
200
100
0

APLIANCES MONTHLY KW – HR
LIGHTINGS 1180.48
CEILING FAN 307.5
CCTV 241.92
COMPUTER 379.08
PUMP 138.756
BRINE AGITATOR 92.504
CT FAN 14.88
COMPRESSOR 185.008
AC UNIT 2518.496
PROJECTOR 70.52
TOTAL 5129.144

Page | 54
ENERGY AUDIT OF BUILDING 3
55
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

MONTHLY KW - HR
3000

2500

2000

1500

1000
MONTHLY KW - HR
500

Page | 55
ENERGY AUDIT OF BUILDING 3
56
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

2ND FLOOR

Q-3201
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 8 40 3 6 6 12 6 9 42 13.44 53.76
COMPUTER 31 130 3 6 6 12 6 9 42 169.26 677.04
CCTV 1 60 24 24 24 24 24 24 24 168 10.08 40.32
PROJECTOR 1 215 3 6 6 12 6 9 42 9.03 36.12
AC UNIT 3 1492 3 6 6 12 6 9 42 187.992 751.968
TOTAL 1559.208

Q-3202A
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 12 40 11 10 11 7 8 6 53 25.44 101.76
COMPUTER 41 130 11 10 11 7 8 6 53 282.49 1129.96
CCTV 1 60 24 24 24 24 24 24 24 168 10.08 40.32
PROJECTOR 1 215 11 10 11 7 8 6 53 11.395 45.58
AC UNIT 2 1492 11 10 11 7 8 6 53 158.152 632.608
TOTAL 1950.228

Q-3202B
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 8 40 10 7 8 8 10 43 13.76 55.04
COMPUTER 51 130 10 7 8 8 10 43 285.09 1140.36
CCTV 1 60 24 24 24 24 24 24 24 168 10.08 40.32
PROJECTOR 1 215 10 7 8 8 10 43 9.245 36.98
AC UNIT 3 1492 10 7 8 8 10 43 192.468 769.872
TOTAL 2042.572

Page | 56
ENERGY AUDIT OF BUILDING 3
57
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

Q-3203
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 8 40 11 6 9 3 6 35 11.2 44.8
COMPUTER 31 130 11 6 9 3 6 35 141.05 564.2
CCTV 1 60 24 24 24 24 24 24 24 168 10.08 40.32
PROJECTOR 1 215 11 6 9 3 6 35 7.525 30.1
AC UNIT 3 1492 11 6 9 3 6 35 156.66 626.64
TOTAL 1306.06

Q-3204
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 8 40 8 6 6 4 6 30 9.6 38.4
COMPUTER 51 130 8 6 6 4 6 30 198.9 795.6
CCTV 1 60 24 24 24 24 24 24 24 168 10.08 40.32
PROJECTOR 1 215 8 6 6 4 6 30 6.45 25.8
AC UNIT 3 1492 8 6 6 4 6 30 134.28 537.12
TOTAL 1437.24

Q-3205
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 8 40 12 8 12 11 9 6 58 18.56 74.24
COMPUTER 31 130 12 8 12 11 9 6 58 233.74 934.96
CCTV 1 60 24 24 24 24 24 24 24 168 10.08 40.32
PROJECTOR 1 215 12 8 12 11 9 6 58 12.47 49.88
AC UNIT 3 1492 12 8 12 11 9 6 58 259.608 1038.432
TOTAL 2137.832

Page | 57
ENERGY AUDIT OF BUILDING 3
58
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

Q-3206
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 8 40 6 9 3 6 6 30 9.6 38.4
COMPUTER 51 130 6 9 3 6 6 30 198.9 795.6
CCTV 1 60 24 24 24 24 24 24 24 168 10.08 40.32
PROJECTOR 1 215 6 9 3 6 6 30 6.45 25.8
AC UNIT 3 1492 6 9 3 6 6 30 134.28 537.12
TOTAL 1437.24

Q-3207
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 8 40 6 13.5 12 13.5 12 9 66 21.12 84.48
COMPUTER 33 130 6 13.5 12 13.5 12 9 66 283.14 1132.56
CCTV 1 60 24 24 24 24 24 24 24 168 10.08 40.32
PROJECTOR 1 215 6 13.5 12 13.5 12 9 66 14.19 56.76
AC UNIT 3 1492 6 13.5 12 13.5 12 9 66 295.416 1181.664
TOTAL 2495.784

Q-3208
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 8 40 8 5 11 6 12 6 48 15.36 61.44
COMPUTER 51 130 8 5 11 6 12 6 48 318.24 1272.96
CCTV 1 60 24 24 24 24 24 24 24 168 10.08 40.32
PROJECTOR 1 215 8 5 11 6 12 6 48 10.32 41.28
AC UNIT 3 1492 8 5 11 6 12 6 48 214.848 859.392
TOTAL 2275.392

Page | 58
ENERGY AUDIT OF BUILDING 3
59
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

Q-3209
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 6 40 14 13.5 14 13.5 14 12 81 19.44 77.76
COMPUTER 16 130 14 13.5 14 13.5 14 12 81 168.48 673.92
PRINTER 5 120 14 13.5 14 13.5 14 12 81 48.6 194.4
CCTV 1 60 24 24 24 24 24 24 24 168 10.08 40.32
AC UNIT 2 1492 14 13.5 14 13.5 14 12 81 241.704 966.816
TOTAL 1953.216

Q-3210
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 8 40 3 12 3 9 10 4 41 13.12 52.48
COMPUTER 51 130 3 12 3 9 10 4 41 271.83 1087.32
CCTV 1 60 24 24 24 24 24 24 24 168 10.08 40.32
PROJECTOR 1 215 3 12 3 9 10 4 41 8.815 35.26
AC UNIT 3 1492 3 12 3 9 10 4 41 183.516 734.064
TOTAL 1949.444

Q-3211
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 8 40 3 8 11 22 7.04 28.16
COMPUTER 41 130 3 8 11 22 117.26 469.04
CCTV 1 60 24 24 24 24 24 24 24 168 10.08 40.32
PROJECTOR 1 215 3 8 11 22 4.73 18.92
AC UNIT 2 1492 3 8 11 22 65.648 262.592
TOTAL 819.032

Page | 59
ENERGY AUDIT OF BUILDING 3
60
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

Q-3212
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 8 40 3 8 11 22 7.04 28.16
COMPUTER 41 130 3 8 11 22 117.26 469.04
CCTV 1 60 24 24 24 24 24 24 24 168 10.08 40.32
PROJECTOR 1 215 3 8 11 22 4.73 18.92
AC UNIT 2 1492 3 8 11 22 65.648 262.592
TOTAL 819.032

HALLWAY
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 16 40 3 8 11 22 14.08 56.32
CCTV 1 60 24 24 24 24 24 24 24 168 10.08 40.32
TOTAL 96.64

Page | 60
ENERGY AUDIT OF BUILDING 3
61
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

SUMMARY

FACILITIES MONTHLY KW-H


Q-3201 1559.208
Q-3202A 1950.228
Q-3202B 2042.572
Q-3203 1306.06
Q-3204 1437.24
Q-3205 2137.832
Q-3206 1437.24
Q-3207 2495.784
Q-3208 2275.392
Q-3209 1953.216
Q-3210 1949.444
Q-3211 819.032
Q-3212 819.032
HALLWAY 96.64
TOTAL 22278.92

MONTHLY KW-H
3000

2500

2000

1500
MONTHLY KW-H
1000

500

Page | 61
ENERGY AUDIT OF BUILDING 3
62
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

APLIANCES MONTHLY KW-H


LIGHTINGS 795.2
COMPUTER 11142.56
CCTV 564.48
PROJECTOR 421.4
AC UNIT 9160.88
PRINTER 194.4
TOTAL 22278.92

MONTHLY KW-H
12000

10000

8000

6000
MONTHLY KW-H

4000

2000

0
LIGHTINGS COMPUTER CCTV PROJECTOR AC UNIT PRINTER

Page | 62
ENERGY AUDIT OF BUILDING 3
63
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

SUMMARY

FACILITIES MONTHLY KW - HR
Q-3101 276.84
Q-3102A 480.128
Q-3102B 96.36
Q-3103 663.168
Q-3104 697.248
Q-3105 555.624
Q-3106 684.288
Q-3107 783.168
Q-3108 153.6
Q-3109 252.72
Q-3110 96.48
Q-3111 100.8
Q-3112 68.4
HALLWAY 129.6
COMFORT ROOM 90.72
TOTAL 5129.144

MONTHLY KW - HR
900
800
700
600
500
400
300
MONTHLY KW - HR
200
100
0

Page | 63
ENERGY AUDIT OF BUILDING 3
64
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

APLIANCES MONTHLY KW – HR
LIGHTINGS 1180.48
CEILING FAN 307.5
CCTV 241.92
COMPUTER 379.08
PUMP 138.756
BRINE AGITATOR 92.504
CT FAN 14.88
COMPRESSOR 185.008
AC UNIT 2518.496
PROJECTOR 70.52
TOTAL 5129.144

MONTHLY KW - HR
3000

2500

2000

1500

1000
MONTHLY KW - HR
500

Page | 64
ENERGY AUDIT OF BUILDING 3
65
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

3RD FLOOR

Q-3301
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 8 40 12 13.5 14 13.5 14 67 21.44 85.76
COMPUTER 32 130 12 13.5 14 13.5 14 67 278.72 1114.88
PRINTER 1 120 12 13.5 14 13.5 14 67 8.04 32.16
CCTV 1 60 24 24 24 24 24 24 24 168 10.08 40.32
PROJECTOR 1 215 12 13.5 14 13.5 14 67 14.405 57.62
AIRCONDITIONING
UNIT 2 1492 12 13.5 14 13.5 14 67 199.928 799.712
2130.452

Q-3302A
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 15 40 12 11 13 13 14 10 73 43.8 175.2
AIRCONDITIONING
UNIT 2 1492 12 11 13 13 14 10 73 217.832 871.328
1046.528

Q-3302B
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 8 40 10 10.5 11 13.5 8 3 56 17.92 71.68
AIRCONDITIONING
UNIT 2 1492 10 10.5 11 13.5 8 3 56 167.104 668.416
CEILING FAN 3 75 10 10.5 11 13.5 8 3 56 12.6 50.4
790.496

Page | 65
ENERGY AUDIT OF BUILDING 3
66
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

Q-3303
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 20 40 9 9 9 9 9 45 36 144
COMPUTER 1 130 9 9 9 9 9 45 5.85 23.4
PRINTER 1 120 9 9 9 9 9 45 5.4 21.6
AIRCONDITIONING
UNIT 3 1492 9 9 9 9 9 45 201.42 805.68
CEILING FAN 2 75 9 9 9 9 9 45 6.75 27
1021.68

Q-3304
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 8 40 10 11.5 12 11 12 5 61.5 19.68 78.72
AIRCONDITIONING
2 1492 10 11.5 12 11 12 5 61.5 183.516 734.064
UNIT
CEILING FAN 3 75 10 11.5 12 11 12 5 61.5 13.8375 55.35
868.134

Q-3305
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 8 40 10 11.5 12 11 12 5 61.5 19.68 78.72
COMPUTER 1 130 10 11.5 12 11 12 5 61.5 7.995 31.98
PROJECTOR 1 215 10 11.5 12 11 12 5 61.5 13.2225 52.89
AIRCONDITIONING
UNIT 2 1492 10 11.5 12 11 12 5 61.5 183.516 734.064
CEILING FAN 4 75 10 11.5 12 11 12 5 61.5 18.45 73.8
971.454

Page | 66
ENERGY AUDIT OF BUILDING 3
67
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

Q-3306
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 8 40 12 12 12 12 11 9 68 21.76 87.04
AIRCONDITIONING
UNIT 2 1492 12 12 12 12 11 9 68 202.912 811.648
CEILING FAN 3 75 12 12 12 12 11 9 68 15.3 61.2
959.888

Q-3307
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 9 40 14 13.5 14 13.5 14 12 81 29.16 116.64
COMPUTER 4 130 14 13.5 14 13.5 14 12 81 42.12 168.48
PRINTER 4 120 14 13.5 14 13.5 14 12 81 38.88 155.52
AIRCONDITIONING
UNIT 4 1492 14 13.5 14 13.5 14 12 81 483.408 1933.632
2374.272

Q-3308
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 8 40 10 11.5 12 11 12 5 61.5 19.68 78.72
AIRCONDITIONING
UNIT 2 1492 10 11.5 12 11 12 5 61.5 183.516 734.064
CEILING FAN 3 75 10 11.5 12 11 12 5 61.5 13.8375 55.35
868.134

Q-3309
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 10 40 10 12 11 12 10 3 58 23.2 92.8
AIRCONDITIONING
UNIT 2 1492 10 12 11 12 10 3 58 173.072 692.288
785.088

Page | 67
ENERGY AUDIT OF BUILDING 3
68
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

Q-3310
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 12 40 10 13.5 10 13.5 10 57 27.36 109.44
COMPUTER 1 130 10 13.5 10 13.5 10 57 7.41 29.64
PROJECTOR 1 215 10 13.5 10 13.5 10 57 12.255 49.02
AIRCONDITIONING
UNIT 2 1492 10 13.5 10 13.5 10 57 170.088 680.352
868.452

Q-3311
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 10 40 13 10.5 13 7.5 13 3 60 24 96
AIRCONDITIONING
UNIT 2 1492 13 10.5 13 7.5 13 3 60 179.04 716.16
812.16

HALLWAY
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 14 40 14 13.5 14 13.5 14 12 81 45.36 181.44
181.44

COMFORT ROOM
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 4 40 14 13.5 14 13.5 14 12 81 12.96 51.84
51.84

Page | 68
ENERGY AUDIT OF BUILDING 3
69
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

SUMMARY

FACILITIES MONTHLY KW - HR
Q-3301 2130.452
Q-3302A 1046.528
Q-3302B 790.496
Q-3303 1021.68
Q-3304 868.134
Q-3305 971.454
Q-3306 959.888
Q-3307 2374.272
Q-3308 868.134
Q-3309 785.088
Q-3310 868.452
Q-3311 812.16
HALLWAY 181.44
COMFORT ROOM 51.84
TOTAL 13730.018

MONTHLY KW - HR
2500

2000

1500

1000
MONTHLY KW - HR
500

Page | 69
ENERGY AUDIT OF BUILDING 3
70
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

APLIANCES MONTHLY KW - HR
LIGHTINGS 1448
AIRCONDITIONING
10181.408
UNIT
COMPUTER 1368.38
PRINTER 209.28
PROJECTOR 159.53
CCTV 40.32
CEILING FAN 323.1
TOTAL 13730.018

MONTHLY KW - HR
12000
10000
8000
6000
4000
2000 MONTHLY KW - HR
0

Page | 70
ENERGY AUDIT OF BUILDING 3
71
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

4TH FLOOR

Q-3401
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 12 40 14 13 14 13 14 9 77 36.96 147.84
AC UNIT 2 1492 14 13 14 13 14 9 77 229.768 919.072
TOTAL 1066.912

Q-3402
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 12 40 13 13.5 14 13.5 14 8 76 36.48 145.92
AC UNIT 2 1492 13 13.5 14 13.5 14 8 76 226.784 907.136
TOTAL 1053.056

Q-3403
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 12 40 14 13 14 13 14 9 77 36.96 147.84
AC UNIT 2 1492 14 13 14 13 14 9 77 229.768 919.072
TOTAL 1066.912

Q-3404
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 12 40 13 13.5 14 13.5 14 8 76 36.48 145.92
AC UNIT 2 1492 13 13.5 14 13.5 14 8 76 226.784 907.136
TOTAL 1053.056

Page | 71
ENERGY AUDIT OF BUILDING 3
72
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

Q-3405
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 12 40 13 13.5 14 13.5 14 8 76 36.48 145.92
AC UNIT 2 1492 13 13.5 14 13.5 14 8 76 226.784 907.136
TOTAL 1053.056

HALLWAY
OPERATING HOURS HOURS MONTHLY
APLIANCES QTY WATT PER KW-HR
MON TUE WED THUR FRI SAT SUN KW-HR
WEEK
LIGHTINGS 11 40 14 13.5 14 13.5 14 12 81 35.64 142.56
CCTV 1 60 24 24 24 24 24 24 24 168 10.08 40.32
DRINKING
FOUNTAIN 1 130 14 13.5 14 13.5 14 12 81 10.53 42.12
TOTAL 225

COMFORT ROOM
OPERATING HOURS HOURS KW- MONTHLY
APLIANCES QTY WATT
MON TUE WED THUR FRI SAT SUN PER WEEK HR KW-HR
LIGHTINGS 4 40 14 13.5 14 13.5 14 12 81 12.96 51.84
TOTAL 51.84

Page | 72
ENERGY AUDIT OF BUILDING 3
73
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

SUMMARY

FACILITIES MONTHLY KW - HR
Q-3401 1066.912
Q-3402 1053.056
Q-3403 1066.912
Q-3404 1053.056
Q-3405 1053.056
HALLWAY 225
COMFORT ROOM 51.84
TOTAL 5569.832

MONTHLY KW - HR
1200

1000

800

600

400
MONTHLY KW - HR
200

Page | 73
ENERGY AUDIT OF BUILDING 3
74
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

APLIANCES MONTHLY KW - HR
LIGHTINGS 927.84
AC UNIT 4559.552
CCTV 40.32
DRINKING
FOUNTAIN 42.12
TOTAL 5569.832

MONTHLY KW - HR
5000
4500
4000
3500
3000
2500
2000 MONTHLY KW - HR

1500
1000
500
0
LIGHTINGS AC UNIT CCTV DRINKING
FOUNTAIN

Page | 74
ENERGY AUDIT OF BUILDING 3
75
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

5TH FLOOR

Q-3501
OPERATING HOURS HOURS MONTHLY
KW-
APLIANCES QTY WATT PER
MON TUE WED THUR FRI SAT SUN HR KW-HR
WEEK
LIGHTINGS 8 40 9.5 9 7 9 5.5 8 48 15.36 61.44
AC UNIT 2 1492 9.5 9 7 9 5.5 8 48 143.23 572.928
CEILING FAN 2 75 9.5 9 7 9 5.5 8 48 7.2 28.8
TOTAL 663.168

Q-3502
OPERATING HOURS HOURS MONTHLY
KW-
APLIANCES QTY WATT PER
MON TUE WED THUR FRI SAT SUN HR KW-HR
WEEK
LIGHTINGS 8 40 9.5 9 7 9 5.5 6 46 14.72 58.88
AC UNIT 2 1492 9.5 9 7 9 5.5 6 46 137.26 549.056
CEILING FAN 2 75 9.5 9 7 9 5.5 6 46 6.9 27.6
TOTAL 635.536

Q-3503
OPERATING HOURS HOURS MONTHLY
KW-
APLIANCES QTY WATT PER
MON TUE WED THUR FRI SAT SUN HR KW-HR
WEEK
LIGHTINGS 8 40 12 12 3.84 15.36
PROJECTOR 1 215 12 12 2.58 10.32
AC UNIT 2 1492 12 12 35.808 143.232
CEILING FAN 4 75 12 12 3.6 14.4
183.312

Page | 75
ENERGY AUDIT OF BUILDING 3
76
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

Q-3504
OPERATING HOURS HOURS MONTHLY
KW-
APLIANCES QTY WATT PER
MON TUE WED THUR FRI SAT SUN HR KW-HR
WEEK
LIGHTINGS 8 40 13 12 12 12 11 60 19.2 76.8
AC UNIT 2 1492 13 12 12 12 11 60 179.04 716.16
CEILING FAN 5 75 13 12 12 12 11 60 22.5 90
882.96

Q-3505
OPERATING HOURS HOURS MONTHLY
KW-
APLIANCES QTY WATT PER
MON TUE WED THUR FRI SAT SUN HR KW-HR
WEEK
LIGHTINGS 8 40 14 13.5 14 13.5 14 12 81 25.92 103.68
AC UNIT 2 1492 14 13.5 14 13.5 14 12 81 241.7 966.816
1070.496

HALLWAY
OPERATING HOURS HOURS MONTHLY
KW-
APLIANCES QTY WATT PER
MON TUE WED THUR FRI SAT SUN HR KW-HR
WEEK
LIGHTINGS 8 40 14 13.5 14 13.5 14 12 81 25.92 103.68
CCTV 1 60 24 24 24 24 24 24 24 168 10.08 40.32
DRINKING
1 130 14 13.5 14 13.5 14 12 81 10.53 42.12
FOUNTAIN
186.12

COMFORT
ROOM
OPERATING HOURS HOURS MONTHLY
KW-
APLIANCES QTY WATT PER
MON TUE WED THUR FRI SAT SUN HR KW-HR
WEEK
LIGHTINGS 7 40 14 13.5 14 13.5 14 12 81 22.68 90.72
90.72

Page | 76
ENERGY AUDIT OF BUILDING 3
77
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

SUMMARY

FACILITIES MONTHLY KW - HR
Q-3501 663.168
Q-3502 635.536
Q-3503 183.312
Q-3504 882.96
Q-3505 1070.496
HALLWAY 186.12
COMFORT ROOM 90.72
TOTAL 3712.312

MONTHLY KW - HR
1200

1000

800

600

400
MONTHLY KW - HR
200

Page | 77
ENERGY AUDIT OF BUILDING 3
78
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

APLIANCES MONTHLY KW - HR
LIGHTINGS 510.56
AC UNIT 2948.192
CEILING FAN 160.8
PROJECTOR 10.32
CCTV 40.32
DRINKING FOUNTAIN 42.12
TOTAL 3712.312

MONTHLY KW - HR
3500
3000
2500
2000
1500
1000
MONTHLY KW - HR
500
0

Page | 78
ENERGY AUDIT OF BUILDING 3
79
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

SUMMARY

FLOOR MONTHLY KW – HR
1ST 5129.144
2ND 22278.92
3RD 13730.018
4TH 5569.832
5TH 3712.312
TOTAL 50420.226

MONTHLY KW – HR
25000

20000

15000

MONTHLY KW – HR
10000

5000

0
1ST 2ND 3RD 4TH 5TH

Page | 79
ENERGY AUDIT OF BUILDING 3
80
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

VII. ACTION PLAN

 For ITSO staff, all the rooms must monitor the usage of the room thoroughly for them
to know the trend for their energy consumption and they must strict and make an
action for it. Also, the staff must always ensure that the all equipment and devices in a
computer/laboratory room is always shut off when not in use.
 For the administration of the institution, they must make a campaign about energy
savings in the whole institution. All the employees and staff, students, faculty
members, guards and even guest/visitors must be oriented and encourage joining in
this campaign. In order to do that, the institution must provide some insight on about
the campaign. By doing so, this can have a big impact to the school since each and
everyone will know how to save energy.
 For rooms with air conditioners, proper maintenance must be observed. Maintaining
the cleanliness of the air conditioners can lessen the work of the compressor thus
lower consumption of power. Also, if the air conditioner is already working, the ceiling
fans must be turned off because this can shoot up the power consumption.
 Notice or reminder should be posted on every room regarding on energy saving so
that everybody will be reminded to conserve power.
 For the Ice Plant Laboratory, the usual procedure is generally composed of checking
the water temperature from time to time. Due to the opening and closing of the lid,
Infiltration of Heat is happening, increasing the power consumption for the
compressor. The auditors suggest that the management should put a submersible
built-in thermometer wherein the temperature reading can be seen immediately without
opening the lid. In this way, the work of the compressor will lessen, decreasing the
power consumption.
 Lightings used by Building 3 is fluorescent lamps which is usually consuming 40W of
energy so the auditors suggest to use LED Lights instead. By using LED lights, energy
saving can be accounted up to 30% which is already a big percentage for power
saving.

Page | 80
ENERGY AUDIT OF BUILDING 3
81
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

 Conventional Window Type Air Conditioners are still being used inside the rooms. The
auditors suggest to use Inverter Type Air Conditioner to save more energy since all
rooms are all air conditioned. The effect will be seen immediately since the efficiency
of the inverter type air conditioners is very reasonable.

Page | 81
ENERGY AUDIT OF BUILDING 3
82
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

VIII APPENDICES

APPENDIX A: INVESTMENT COST SAVING

Cost saving

Switching to LED lights

Currently installed lamps

40Watts Fluorescent lamps (GE brand)

2050 Lumens

6500K (daylight)

LED lamps

20Watts LED light (Philips)

2100 Lumens

6500K (daylight)

RATE OF RETURN

HOURS
QTY WATTAGE PER WEEKLY MONTHLY YEARLY PHP YEARLY
WEEK KW-HR KW-HR KW-HR KW-HR BILL
FUORESCENT
LAMP 535 40 60 1284 5136 61632 7.5 462240
LED LAMP 535 20 60 642 2568 30816 7.5 231120
SAVINGS PER YEAR 231120

Page | 82
ENERGY AUDIT OF BUILDING 3
83
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

CAPITAL INVESTED

𝑁𝑈𝑀𝐵𝐸𝑅 𝑂𝐹 𝐿𝐴𝑀𝑃𝑆 = 535

𝐶𝑂𝑆𝑇 𝑂𝐹 𝐿𝐴𝑀𝑃 𝑃𝐸𝑅 𝑃𝐼𝐸𝐶𝐸 = 800𝑃𝐻𝑃

𝑃𝐻𝑃
𝐶𝐴𝑃𝐼𝑇𝐴𝐿 𝐼𝑁𝑉𝐸𝑆𝑇𝐸𝐷 = 535 𝐿𝐴𝑀𝑃𝑆 𝑋 800
𝐿𝐴𝑀𝑃
𝐶𝐴𝑃𝐼𝑇𝐴𝐿 𝐼𝑁𝑉𝐸𝑆𝑇𝐸𝐷 = 428 000 𝑃𝐻𝑃

𝑁𝐸𝑇 𝐴𝑁𝑈𝐴𝐿 𝑃𝑅𝑂𝐹𝐼𝑇


𝑅𝐴𝑇𝐸 𝑂𝐹 𝑅𝐸𝑇𝑈𝑅𝑁 =
𝐶𝐴𝑃𝐼𝑇𝐴𝐿 𝐼𝑁𝑉𝐸𝑆𝑇𝐸𝐷
𝐴𝑁𝑈𝐴𝐿 𝑆𝐴𝑉𝐼𝑁𝐺
𝑅𝐴𝑇𝐸 𝑂𝐹 𝑅𝐸𝑇𝑈𝑅𝑁 =
𝐶𝐴𝑃𝐼𝑇𝐴𝐿 𝐼𝑁𝑉𝐸𝑆𝑇𝐸𝐷
231 120
𝑅𝐴𝑇𝐸 𝑂𝐹 𝑅𝐸𝑇𝑈𝑅𝑁 = 𝑋 100%
428 000
𝑅𝐴𝑇𝐸 𝑂𝐹 𝑅𝐸𝑇𝑈𝑅𝑁 = 54%

PAY BACK PERIOD

𝑆𝐴𝐿𝑉𝐴𝐺𝐸 𝑉𝐴𝐿𝑈𝐸 = 0𝑃𝐻𝑃

𝐼𝑁𝑉𝐸𝑆𝑇𝑀𝐸𝑁𝑇 − 𝑆𝐴𝐿𝑉𝐴𝐺𝐸 𝑉𝐴𝐿𝑈𝐸


𝑃𝐴𝑌 𝐵𝐴𝐶𝐾 𝑃𝐸𝑅𝐼𝑂𝐷 =
𝑁𝐸𝑇 𝐴𝑁𝑁𝑈𝐴𝐿 𝐶𝐴𝑆𝐻 𝐹𝐿𝑂𝑊
428 000𝑃𝐻𝑃 − 0 𝑃𝐻𝑃
𝑃𝐴𝑌 𝐵𝐴𝐶𝐾 𝑃𝐸𝑅𝐼𝑂𝐷 =
231 120 𝑃𝐻𝑃
𝑃𝐴𝑌 𝐵𝐴𝐶𝐾 𝑃𝐸𝑅𝐼𝑂𝐷 = 1.8118 𝑌𝐸𝐴𝑅𝑆

𝑃𝐴𝑌 𝐵𝐴𝐶𝐾 𝑃𝐸𝑅𝐼𝑂𝐷 = 1 𝑌𝐸𝐴𝑅 𝐴𝑁𝐷 10 𝑀𝑂𝑁𝑇𝐻𝑆

Page | 83
ENERGY AUDIT OF BUILDING 3
84
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

Switching to energy saving Air conditioning unit

Currently installed

2HP non-inverter

Power saving air conditioner

2HP inverter type, 30% power saving

RATE OF RETURN

HOURS
QTY WATTAGE PER WEEKLY MONTHLY YEARLY PHP YEARLY
WEEK KW-HR KW-HR KW-HR KW-HR BILL
FUORESCENT
LAMP 90 1492 58 7788.24 31152.96 373835.52 7.5 2803766.4
LED LAMP 90 1044.4 58 5451.768 21807.072 261684.86 7.5 1962636.48
SAVINGS PER YEAR 841129.92

CAPITAL INVESTED

𝑁𝑈𝑀𝐵𝐸𝑅 𝑂𝐹 𝐴𝐼𝑅 𝐶𝑂𝑁𝐷𝐼𝑇𝐼𝑂𝑁𝐼𝑁𝐺 𝑈𝑁𝐼𝑇 = 90

𝐶𝑂𝑆𝑇 𝑂𝐹 𝐿𝐴𝑀𝑃 𝑃𝐸𝑅 𝑃𝐼𝐸𝐶𝐸 = 43 500𝑃𝐻𝑃

(Source: https://www.lazada.com.ph/carrier-wcarh019ee-2hp-remote-air-conditioner-
51874775.html?offer_id=205&affiliate_id=4463&offer_name=PH+Data-
feed_0&affiliate_name=MY+-
+iPrice+Group+Sdn+Bhd&transaction_id=10203bd92a73554a38a858382fa6e2&aff_source=ig102
5deec72b550b34f3bea19e95b85d96a937db000vS002)

𝑃𝐻𝑃
𝐶𝐴𝑃𝐼𝑇𝐴𝐿 𝐼𝑁𝑉𝐸𝑆𝑇𝐸𝐷 = 90 𝑈𝑁𝐼𝑇𝑆 𝑋 43 500
𝑈𝑁𝐼𝑇
𝐶𝐴𝑃𝐼𝑇𝐴𝐿 𝐼𝑁𝑉𝐸𝑆𝑇𝐸𝐷 = 3 915 000 𝑃𝐻𝑃

𝑁𝐸𝑇 𝐴𝑁𝑈𝐴𝐿 𝑃𝑅𝑂𝐹𝐼𝑇


𝑅𝐴𝑇𝐸 𝑂𝐹 𝑅𝐸𝑇𝑈𝑅𝑁 =
𝐶𝐴𝑃𝐼𝑇𝐴𝐿 𝐼𝑁𝑉𝐸𝑆𝑇𝐸𝐷

Page | 84
ENERGY AUDIT OF BUILDING 3
85
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

𝐴𝑁𝑈𝐴𝐿 𝑆𝐴𝑉𝐼𝑁𝐺
𝑅𝐴𝑇𝐸 𝑂𝐹 𝑅𝐸𝑇𝑈𝑅𝑁 =
𝐶𝐴𝑃𝐼𝑇𝐴𝐿 𝐼𝑁𝑉𝐸𝑆𝑇𝐸𝐷
841 129 𝑃𝐻𝑃
𝑅𝐴𝑇𝐸 𝑂𝐹 𝑅𝐸𝑇𝑈𝑅𝑁 = 𝑋 100%
3 915 000 𝑃𝐻𝑃
𝑅𝐴𝑇𝐸 𝑂𝐹 𝑅𝐸𝑇𝑈𝑅𝑁 = 21.4847%

PAY BACK PERIOD

ASSUME,

𝑆𝐴𝐿𝑉𝐴𝐺𝐸 𝑉𝐴𝐿𝑈𝐸 = 0𝑃𝐻𝑃

𝐼𝑁𝑉𝐸𝑆𝑇𝑀𝐸𝑁𝑇 − 𝑆𝐴𝐿𝑉𝐴𝐺𝐸 𝑉𝐴𝐿𝑈𝐸


𝑃𝐴𝑌 𝐵𝐴𝐶𝐾 𝑃𝐸𝑅𝐼𝑂𝐷 =
𝑁𝐸𝑇 𝐴𝑁𝑁𝑈𝐴𝐿 𝐶𝐴𝑆𝐻 𝐹𝐿𝑂𝑊
3 915 000𝑃𝐻𝑃 − 0 𝑃𝐻𝑃
𝑃𝐴𝑌 𝐵𝐴𝐶𝐾 𝑃𝐸𝑅𝐼𝑂𝐷 =
841 129 𝑃𝐻𝑃
𝑃𝐴𝑌 𝐵𝐴𝐶𝐾 𝑃𝐸𝑅𝐼𝑂𝐷 = 4.6544 𝑌𝐸𝐴𝑅𝑆

𝑃𝐴𝑌 𝐵𝐴𝐶𝐾 𝑃𝐸𝑅𝐼𝑂𝐷 = 4 𝑌𝐸𝐴𝑅𝑆 𝐴𝑁𝐷 9 𝑀𝑂𝑁𝑇𝐻𝑆

Page | 85
ENERGY AUDIT OF BUILDING 3
86
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

APPENDIX B: LED Catalog

Page | 86
ENERGY AUDIT OF BUILDING 3
87
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

Page | 87
ENERGY AUDIT OF BUILDING 3
88
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

Page | 88
ENERGY AUDIT OF BUILDING 3
89
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

Page | 89
ENERGY AUDIT OF BUILDING 3
90
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES – QUEZON CITY

Appendix C: Power Rate

MANILA, Philippines - Philippine power rates remain one of the highest in


Southeast Asia as of end-2016 due to continued lack of government subsidies,
latest Department of Energy (DOE) data showed.

Based on the Power Development Plan 2017 to 2040 released yesterday, the
country’s power rates are among the highest in the region, at par with the level in
Singapore. In terms of electricity rates to industries, both countries have rates of P5.84
per kilowatt-hour (kwh). But in terms of commercial and household rates, the Philippines
has the highest at P7.49 per kwh and P8.90 per kwh, respectively.

(Source: https://www.doe.gov.ph/energists/index.php/83-categorised/electric-power-
industry/12561-philippine-electricity-rates-still-highest-in-southeast-asia)