Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

STAMP

B
3
A B C D E F G H I J K L M N

Plot Limit 5465 Plot Limit


410 775 780 375 790 545 240 540 230 260 520 300 97
°
322
1 0.80
6.49
ONU

D3 4.72 GENERAL NOTES


370

3.51
-

3.26
- W6 GD5
C2 -
- W5
F9
2.02

2
1.20
X1 1- DO NOT SCALE THIS DRAWING FOLLOW
WRITTEN DIMENSIONS ONLY .
0.80

3.50
‫لدددـدددـم‬
‫لدددـدددـم‬
EXIT
D3
GD3
2- ALL THE DIMENSIONS ARE IN
C2

AL2
EXIT -
F9
W5

-
-
W6
METERS .AND LEVELS ARE IN METERS.
‫ة صت ق قة د‬
OTHERWISE MENTIONED.
-

790
GENERATOR ROOM
ONU
7.35
ONU
935

0.80
7.42 3- MAIN CONTRACTOR SHOULD CROSS
GD3
CHECK ALL THE ARCHITECTURAL ,

3.52
C2
D3
STRUCTURAL, MEP AND RELATED

9.10
- W5
F9
-
-

-
W6
DRAWINGS AND REPORT TO ARCHITECT
7.85
1.20
X2 /ENGINEER OF ANY DISCREPANCY PRIOR

M
TO COMMENCEMENT OF WORKS ON SITE.
0.80 8.16

ROAD 6.70
GD3

4- MAIN CONTRACTOR SHOULD PREPARE

2.30

3.70
D3

-
C2

F9
W5

-
-
W6
THE SHOP DRAWINGS AND SUBMIT TO
THE CONSULTANT FOR APPROVAL.
-
430

780
ONU
8.55
ONU

PREFERRED
0.80
8.57 5- MAIN CONTRACTOR SHOULD SUBMIT TO
PARKING
THE CONSULTANT SAMPLES OF ALL
4
GD3

2.30

3.73
D3

D2
-
C2
W5
MATERIALS FOR APPROVAL .
-
F9
2.09 -
-
W6
2.00
ADJACENT PLOT

X3
325

1.20
NO ENTRY
9.05

D2 SLOPE 1:12
4125

5 0.80
9.06

390
GD3

4 NAKHEEL FINAL DESIGN 15-11-2021

3.70
AL2
RAMP SLOPE 1:10 % D3

A
Bicycle

X4A
RAMP LENGTH 39.40

3.30
Bicycle C2
Parking - W5
Parking F9
‫ق غ‬ ‫ة صت ق‬

FROM 0.36 m TO 4.30 m WATCHMAN ROOM


-
-
-
W6

3 TRAKHEES CONCEPT 10-10-2021


540

ONU
TO PODIUM FD1 9.45 ONU

1.40
2.10

0.20
MAXIMUM
HEIGHT 2.4m ‫عافت إ ىصقأ‬
NAKHEEL PRELIMINARY DESIGN
2
R4

‫لدددـدددـم‬
2 28-09-2021
.0

D4ROLL MAT
0

0.80
RESUBMISSION

3.60
EXIT D2

8.28
GD3
AL2

3.70
03

2.10
‫ة صت ق اقققت‬
GARBAGE ROOM
2.10 2.10 2.65 04 02
D3
CARD BOARD

05 01

6
PLASTIC

06 C2 -
GLASS

PAPER
METAL

- W5 - W6
07 F92.06 -

08
1.20 1 NAKHEEL PRELIMINARY DESIGN 23-08-2021

780
09
10
11 9.90

4
12
380

1.5
0
13
REV. DESCRIPTION DATE
08

09

11

13

15
16
17

18
19
10

12

14

14
‫ةت ق قفقغ‬ ‫ة صت ق‬ 9.92
Pump Room 15
01
07
06
05
04

03
02

3.70
FD2 GD4
GD6 D3
FD2

7
0.73 FD2
CLIENT NAME:
0.30

C2
‫ق د ط‬
‫ق د ط‬
STAIRCASE - W5
12U DB STAIRCASE F9 -
2.06

X5
- W6
-

2.04
D2 FD1 01 ONU

10.35
01
AWS KAMIL HAMDI AL SHARQI
400

02 CCTV
Room

SD1

WM
SD1 FD1

BD
2.07
D2 DB
‫ة صت ق اقققت‬
W03

U21

BD
GARBAGE ROOM

SD1 D2 FD1 03 04 FD1

U21
8

610
‫ة صت ق اغ فقغ‬ 1.98
ELECTRICAL ROOM

SD1
SD2

SD1 D2 D1
WM

D2 W07

90

3.55
WM °
D2 D1
WM
D1 D2 X6
1.65

2.45
D2
745

D1
D1

D2
7.95

7.50

2.08

GD1

9 MAXIMUM
HEIGHT 2.4m ‫عافت إ ىصقأ‬
‫عاجت ق ىطقأ‬
Assembly Point
3.80
97
‫لدددـدددـم‬ ‫لــددددددددم‬
CURTAIN BOX CURTAIN BOX CURTAIN BOX CURTAIN BOX CURTAIN BOX CURTAIN BOX CURTAIN BOX CURTAIN BOX °
EXIT 2.26
ENTRANCE AL1
‫ة صت ق ق ة قى‬
W06 W06 W06 W06 W06 W06 W06 W06
TRANSFORMER ROOM
‫عاجت ق ىطقأ‬
Assembly Point

2.05
2.00

1.40

322

Plot Limit Plot Limit


B
1
Flat Number (( G01-G02-G03-G04))
ROAD 6.00 M LOCATION:
J.V.C DUBAI
PLOT NO.:
JVC13CMRA011

40 cm PROJECT:
COMMERCIAL RESIDENTIAL BUILDING
80 cm 40 cm
120 (G+1 PODIUM+3 TYPICAL FLOORS+4TH.+5TH.FLOOR)
QTY= 1 PCS
20 cm TO PODIUM QTY= 1 PCS QTY= 2 PCS QTY= 4 PCS MAXIMUM QTY= 2 PCS
HEIGHT 2.4m ‫عافت إ ىصقأ‬
40 cm 30 cm 21 DRAWING TITLE:
QTY= 1 PCS ‫عاجت ق ىطقأ‬
Assembly Point GROUND FLOOR SINAGE PLAN
QTY= 1 PCS
QTY= 1 PCS 20
ARCH.
80 cm
80 cm
80 cm
CHECK BY.
QTY= 2 PCS STRUC.
Bicycle QTY= 2 PCS ‫لــددددددددم‬
QTY= 1 PCS
20 cm NO ENTRY QTY= 1 PCS 30 QTY= 5 PCS 30 cm 30 cm QTY= 1 PCS ELC.
Parking ENTRANCE MECH
QTY= 1 PCS
DATE
30 cm 40 cm 80 cm
QTY= 1--8 PCS 10 cm QTY=1 PCS DRAWING CODE (COM) :
40 cm QTY= 1 PCS 40 cm
30 cm ‫لدددـدددـم‬ QTY= 4 PCS
QTY= 4 PCS 30 cm
QTY=1 PCS EXIT JOB NO: DWG NO: SCALE: REV. NO.
QTY= 1 PCS 30 cm A2
0
45 cm

You might also like