NO FGV POM UPGRADING PROPOSAL – EFFLUENT TARGET TARGET WAY FORWARD FINAL WRITTEN APPROVAL
TREATMENT PLANT (COMPLIANCE BOD 20 PERIOD COMPLETION DISCHARGE
(WATERCOURSE) DATE
1 KULAI MEMBRANE FILTRATION SYSTEM (MFS) 2022 15 SEPT 2022 100% WATERCOURSE 14 SEPT 2022
(BOD FD < 20 mg/L (CONSTRUCTION)
2 KAHANG MEMBRANE FILTRATION SYSTEM (MFS) 2022 31 DEC 2022 100% WATERCOURSE TARGET SUBMISSION –
(BOD FD < 20 mg/L MID OCT 2022
3 ADELA MEMBRANE FILTRATION SYSTEM (MFS) 2022 31 DEC 2022 100% WATERCOURSE TARGET SUBMISSION –
(BOD FD < 20 mg/L MID OCT 2022
4 AIR TAWAR MEMBRANE FILTRATION SYSTEM (MFS) 2022 31 DEC 2022 100% WATERCOURSE TARGET SUBMISSION –
(BOD FD < 20 mg/L MID OCT 2022 VIOLATION REQUEST STATUS – 2022/2023
PERIOD
DATE DATE APPROVAL
5 SEMENCHU MEMBRANE FILTRATION SYSTEM (MFS) 2022 31 DEC 2022 100% WATERCOURSE TARGET SUBMISSION – NO ITEM REQUEST
SUBMISSION RECEIVED
(BOD FD < 20 mg/L MID OCT 2022 APPROVED
1 MAR 2022 –
6 TENGGAROH MEMBRANE FILTRATION SYSTEM (MFS) 2023 31 DEC 2023 100% WATERCOURSE 2023 1 1ST 9 FEB 2022 8 JUNE
30 JUNE 2022
4 (BOD FD < 20 mg/L REQUEST
8 PALONG FURROW EXPANSION (100% ONTO LAND 2022 31 DEC 2022 100% ONTO LAND TARGET SUBMISSION – SUGGESTION
BY DOE TO
TIMUR DISCHARGE) MID OCT 2022 APPROVED
FROM JULY
9 BELITONG MEMBRANE FLAT SHEET REPLACEMENT 2022 30 SEPT 2022 100% WATERCOURSE - 2022 – DEC
(EXISTING MBR SYSTEM) (BOD FD < 20 mg/L 2022
10 TENGGAROH ONTO LAND DISCHARGE SYSTEM 2022 31 AUG 2022 100% ONTO LAND 24 AUG 2022 LETTER FOR FEE
PAYMENT
TIMUR (CONSTRUCTION) 2ND RECEIVED – 23 1 JUL 2022 – 31
3 4 AUGUST 2022
REQUEST AUG 2022 DEC 2022
11 WAHA ONTO LAND DISCHARGE SYSTEM 2023 31 DEC 2023 100% ONTO LAND 2023 PAYMENT DONE
ON 19 SEPT 2022
1 KULAI POM
2022 Jan Feb Mar Apr May Jun Jul Aug Sep MATTERS REMARKS
UPGRADING PROPOSAL
Membrane
Filtration System
(MFS)
Ex- Polishing Plant
VIOLATION
FGV KULAI POM REQUEST TO 9 DEC 2021 – 31 DEC 2022
MEMBRANE FILTRATION SYSTEM (MFS) - 2022 DOE
NO ITEM START END JAN FEB MAR APR MAY JUNE JUL AUG SEP OCT NOV DEC
PIC DEPT
2 VISA 28 FEB 14
MAR ZAINAL ARIF OPERATION
EX POLISHING:
BOD : 62 mg/L
SS : 170 mg/L
2022 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC MATTERS REMARKS
SPEC & BUDGET ALLOCATION RM4,000,000
CALCULATION,
BUDGET REF. NO. CAP22/4400/537
PROTOTYPE
TIMELINE TESTING ESTIMATION RM400,000
OVERALL ETP
VIOLATION
FGV KAHANG POM REQUEST TO 9 DEC 2021 – 31 DEC 2022
MEMBRANE FILTRATION SYSTEM (MFS) - 2022 DOE
NO ITEM START END JAN FEB MAR APR MAY JUNE JUL AUG SEP OCT NOV DEC
PIC DEPT
2022 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
MATTERS REMARKS
SPEC &
CALCULATION, BUDGET ALLOCATION RM4,000,000
TIMELINE PROTOTYPE BUDGET REF. NO. CAP22/4400/537
To be EXISTING ETP TESTING
PURCHASING ESTIMATION RM450,000
completed Conventional Ponding
by Dec 2022 Biogas Plant DOCUMENTS & CURRENT COMPLIANCE BOD FD
Activated Sludge System VISA APPROVAL WATERCOURSE <
(Polishing Plant) WRITTEN 59 mg/L UNTIL
JULY 2022
APPROVAL ACTIVATED
UPGRADING SLUDGE PROCESS
Polishing Plant
VIOLATION
FGV ADELA POM REQUEST TO 9 DEC 2021 – 31 DEC 2022
MEMBRANE FILTRATION SYSTEM (MFS) - 2022 DOE
NO ITEM START END JAN FEB MAR APR MAY JUNE JUL AUG SEP OCT NOV DEC
PIC DEPT
ZAINAL ARIF
3 PMT & MO 15 MAR 22 15/9 – OPERATION / ENGINEERING /
FATIHA
MAR 26/9 MILL
MM
2022 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
SPEC &
CALCULATION,
TIMELINE PROTOTYPE
TESTING
To be EXISTING ETP
PURCHASING
completed Conventional Ponding
DOCUMENTS & DIFFUSERS REPLACEMENTS
by Dec 2022 Activated Sludge System
(Polishing Plant)
VISA APPROVAL Oct Nov Dec Feb Mar Apr May Jun
WRITTEN 2021/2022 Jan 22
21 21 21 22 22 22 22 22
APPROVAL
UPGRADING SPEC & CALCULATION
WORKS ON SITE
UPGRADING PROPOSAL TENDER DOCUMENTS &
COMISSIONING VISA APPROVAL
Diffusers
Replacement TENDERING PROCESS
Multi Filtration
System (MFS) UPGRADING WORKS ON
SITE
RE-COMISSIONING
Facultative Stage
Anaerobic Stage
VIOLATION
FGV AIR TAWAR POM 9 DEC 2021 – 31 DECEMBER
REQUEST TO
AERATION MODIFICATION (FGVPI – 55/2021 - 31 DISEMBER 2021 – 17 JUNE 2022 2022
DOE
NO ITEM START END DEC JAN FEB MAR APR MAY JUNE JUL AUG SEP OCT NOV DEC
2021 PIC DEPT
3 PROCUREMENT BY 1 MAR 21
VENDOR MAR AZRE VENDOR
4 AQUARATOR 23 MAR 2 JUNE 2 UNIT AQUARATOR HAS BEEN INSTALLED & OPERATED BY 11th APRIL 2022
MANUFACTURED/ 1 UNIT WILL BE SHIPPING OUT FROM JAPAN BY 15th AUGUST 2022 AZRE VENDOR
DELIVERY TO SITE ESTIMATED TO BE ARRIVED BY 15TH SEPTEMBER 2022
5 ELECTRICAL 7 MAR 14
PREPARATION MAR AZRE VENDOR
6 SITE PREPARATION 1 MAR 24 EMPTYING & DISMANTLING DIFFUSERS FOR 3 UNIT AEARTION COMPARTMENT COMPLETE 100%
,EMPTYING MAR 2 UNIT AWUARATOR HAS BEEN INSTALLED IN AERATION 1A & AERATION 2
AERATION TANK & AZRE VENDOR
DISMANTLING
DIFFUSERS
VIOLATION
FGV AIR TAWAR POM REQUEST TO 9 DEC 2021 – 31 DEC 2022
MEMBRANE FILTRATION SYSTEM (MFS) - 2022 DOE
NO ITEM START END JAN FEB MAR APR MAY JUNE JUL AUG SEP OCT NOV DEC
PIC DEPT
ZAINAL ARIF
3 PMT & MO 15 MAR 22 15/9 – OPERATION / ENGINEERING /
FATIHA
MAR 26/9 MILL
MM
2022 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Polishing Plant
VIOLATION
FGV SEMENCHU POM
REQUEST TO 9 DEC 2021 – 31 DEC 2022
MEMBRANE FILTRATION SYSTEM (MFS) - 2022
DOE
NO ITEM START END JAN FEB MAR APR MAY JUNE JUL AUG SEP OCT NOV DEC
PIC DEPT
2023 Jan Feb Mar Apr May Jun Jul MATTERS REMARKS
UPGRADING PROPOSAL
Membrane
Filtration System
(MFS)
LOJI POLISHING
2023 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec MATTERS REMARKS
BUDGET ALLOCATION CAPEX 2023
SPEC & CALCULATION
TIMELINE BUDGET REF. NO. TBD
TENDER DOCUMENTS
EXISTING ETP ESTIMATION Rm1,300,000
To be & VISA APPROVAL
completed Conventional Ponding CURRENT COMPLIANCE BOD FD
Biogas Reactor WRITTEN APPROVAL
by Dec 2023 WATERCOURSE <
Activated Sludge System 60 mg/L
TENDERING PROCESS
(Polishing Plant) ACTIVATED
UPGRADING WORKS SLUDGE PROCESS
ON SITE
COMISSIONING
UPGRADING PROPOSAL
Aeration Improvement
Membrane Filtration
System (MFS)
EXISTING ALGAE B2
•To be TIMELINE
completed by
December
2022
FACULTATIVE STAGE
VIOLATION
FGV PALONG TIMUR POM REQUEST TO 9 DEC 2021 – 31 DEC 2022
LAND IRRIGATION - 2022 DOE
NO ITEM START END JAN FEB MAR APR MAY JUNE JUL AUG SEP OCT NOV DEC
PIC DEPT
1 DESIGN & 15 JAN 22 JAN
CALCULATION ZAINAL ARIF OPERATION
2 VISA 15 FEB 15
MAR ZAINAL ARIF OPERATION
11 START WORKS 21 JUNE 30 11/10 – 26/12 (93 DAYS) – 3 MONTHS ZAINAL ARIF OPERATION
NOV
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep MATTERS REMARKS
2021/2022
21 21 21 22 22 22 22 22 22 22 22 22
TIMELINE SPEC & BUDGET ALLOCATION RM2,750,000
EXISTING ETP CALCULATION BUDGET REF. NO. CAP21/4000860/419
To be
completed Conventional Ponding TENDER
VALUE CONTRACT RM470,000
by Biogas Reactor DOCUMENTS & VISA AWARDED
September Activated Sludge System APPROVAL
2022 (Polishing Plant) CONTRACT AWARDED FGVPISB – 56/2021
TENDERING PROCESS
UPGRADING WORKS VENDOR AWARDED AZ RENEWABLE
ENERGY SDN BHD
ON SITE
UPGRADING PROPOSAL CONTRACT PERIOD 31 DEC 2021 – 17 JUNE
Membrane RE-COMISSIONING
2022
Filtration System
(MFS) EOT UNTIL 17TH
Ex- Polishing Plant SEPTEMBER 2022
•To be TIMELINE
completed by
early Nov
2022
VIOLATION
FGV TENGGAROH TIMUR POM REQUEST TO 9 DEC 2021 – 30 NOV 2022
LAND IRRIGATION - 2022 DOE
NO ITEM START END JAN FEB MAR APR MAY JUNE JUL AUG SEP OCT NOV DEC
PIC DEPT
10 AWARDING 26 MAY 26
MAY HABIBAH PROCUREMENT
•To be TIMELINE
completed by FGVPM Aping Selatan – Block 35 (80 Hectares)
December
2023