Lecture 5

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 26

Cleanouts

Cleanouts
Cleanouts
Cleanout Size
Cleanout Size
Cleanouts Types

• ( CO ) Cleanout

• Wall Cleanout ( WCO )

• Floor, Cleanout ( FCO )


Floor Drain
Trench Drain
Gully Trap
Grease Interceptor
Inspection Champers ( IC ) [ Manholes ]
Distance Between Inspection Champers

8 6 4 ‫قطر الماسورة بالبوصة‬

50 30 15 ) ‫المسافة ( متر‬
Slowdown Champers
Slowdown Champers
Subsoil drainage System( Sump pit & Sump pump )
EXAMPLE
• 10 Flash Valve WC, 4 Urinals, 10 Lavatories, 2 Service Sinks, 6 Kitchen
Sinks
• 10 WC * 10 fu = 100 fu
• 4 UR * 5 fu = 20 fu
• 10 LAV. * 2 fu = 20 fu
• 2 SS * 3 fu = 6 fu
• 6 SK * 4 fu = 24 fu
∑dfu = 170
• 170 dfu = 85 gpm = Qsump pump

• Trench Floor Drain = 6 fu


• PARK Floor Drain = 6 fu
Sump Pump Calculation

• Pump Flow Rate


𝑉𝑜𝑙𝑢𝑚𝑒
• Qpump = , Volume = Qpump * Time
𝑇𝑖𝑚𝑒
• For Example
• Q = 80 gpm = 5 lit/sec
• Time = 5 min. = 300 sec.
• Volume = 300* 5 = 1500 lit = 1.5 m3
• Pump Head Calc.
• Pump Head = Static Press. + Resd. Press. + Friction
Sump Pit
Septic Tank & Holding Tank
Septic Tank Volume

• Septic Tank Volume ( m3 ) = Water Consumption Per Day ( m3 / day ) * No. of


Storage Days * ( 80 : 100 % )

• Holding Tank Volume ( m3 ) = Water Consumption Per Day ( m3 / day ) * No. of


Storage Days * ( 80 : 100 % )