Tórshavn municipality

THE GENERAL BUILDING CONSENT


Last updated 12 January 2023
Machine Translated by Google

Contents
CHAP. I. TRANSITIONAL ORDERS................................................. ................................5 § 1. The building
authority ............. ................................................ ................................................ ..........5 § 2. The increase for which the
building consent is valid for ............................. ......................................5 § 3. Building
applications....... ................................................ ................................................ ..........6 § 4. Building permit and building
tax................................. ................................................ .............8 § 5. Transfer and demolition of
buildings ............................ ..........................................9 § 6 Insurance, during
construction ............................................. ............................................10 § 7. Punishment for violation of the directives
in the building agreement, access authorization and guarantee of intentions,
etc. ................................................ ................10 § 8. Exemption from existing
rules .......................... ................................................ ...................11 § 9.
Complaint............................ ................................................ ................................................ ........11 CHAP. II. DRAINAGE,
WATER SUPPLY AND OTHER UTILITIES. ......................................12 § 1.
Drainage...... ................................................ ................................................ .................12 § 2. Changes in runoff, some
of which are................... ................................................ ....13 § 3. Water
supply ........................................ ................................................ ...............................13 § 4. Obligation to
disclose .............. ................................................ ............................................13 CHAP. III. UNBUILDED
ØKINI ................................................ ................................................ ............14 § 1. Detention
space ................................ ................................................ ....................................14 § 2. Induction and transfer of
holding spaces ...... ................................................ .......14 § 3. Addition to space
factor .................................... ................................................ ...............................15 § 4. Access from road to unbuilt
øki .......... ................................................ ...........................17 CHAP. IV. BUILDING INITIATIVE
INTENT................................................ ...........................18 § 1. Basic
management .................. ................................................ ................................................ 18 § 2. Intentions for the 1st
land ownership................................................ ..............................................19 § 3 .Intentions for the 2nd land
survey............................................. .............................................20 § 4. Subdivision av 3. basic
possession................................................... ....................................21 § 5. Intentions for the parties in possession A1
in the 3rd possession ... ..........................................21 § 6. Intentions for the parties in possession A2 in the 3rd
basic consultation .............................................23 § 7. Intentions for A3 in the 3rd ground
management ......................................... .......................................23 § 8. intentions for possession part B1 in 3. basic
possession................................................... .......25 § 9. Intentions for occupancy part B2 in the 3rd land
occupancy ............................... ........................25 § 10. Intentions for occupancy part B3 in the 3rd basic
occupancy.............. .......................................26 § 11. Intentions for possession of B4 in 3. basic
possession................................................... ....26 § 12. Intentions for occupancy part B5 in the 3rd basic
occupancy................................. ...................27 § 13. Intentions for occupancy part B6 in the 3rd basic
occupancy................... ....................................27 § 14. Intentions for occupancy part B7 in the 3rd basic
occupancy.... ................................................28 § 15. Intentions for occupancy part B8 in the 3rd land
occupancy....................................... ..............28 § 16. Intentions for occupancy part B9 in the 3rd basic
occupancy...................... .............................29 § 17. Intentions for the occupants B10 in the 3rd land
occupation......... .................................29 § 18. Intentions for the occupancy parties B11 in the 3rd land
occupancy...... ....................................30 § 19. Intentions for the occupancy parties C1 in the 3rd basic
occupancy... ........................................30 § 20. Intentions for the parties in possession C1A in 3 .ground
possession........................................30 § 21. Intentions for possession C2 in the 3rd
phase................................................... .......31 § 22. Intentions for the occupancy parties C3 in the 3rd basic
occupancy .............................. ..................31 § 23. Intentions for possession party D in the 3rd Basic
Possession................... ...............................32 § 24. Intentions for occupancy party E in the 3rd Basic
occupancy....... ............................................32 § 25. Intentions for the occupancy party F in the 3rd basic
occupancy............................................. ........33 § 26. Intentions for the 4th Basic
Council................................. ................................................ ..33 § 27. Analysis, elimination of levels of use,
etc. .......................34 § 28. Concerning the height and distance changes of the houses................. ......................35
Machine Translated by Google

CHAP. V. ROADS................................................... ................................................ ...............................37 § 1. Analysis of


roads............ ................................................ ..............................................37 § 2 About laying down and making
roads................................................ ..........................................38 § 3. Construction
lines.. ................................................ ................................................ .....................39 § 4. License to take over roads for special
use................ ................................................ 39 § 5. Corner cutting and view
increase............................................ ...........................................40 § 6. Removal of
roads ................................................ ................................................ ...........40 § 7. Fence across the
road............................ ................................................ .........................40 CHAP. VI. FURNISHING OF
HOUSES .............................................. ..........................................41 § 1.
Burum.. ................................................ ................................................ .............................41 § 2.
Cooks ................ ................................................ ................................................ ................41 § 3. Extra bed inside and outside
the apartment ......................... ............................................41 § 4.
Apartments ................................................ ................................................ .................................42 § 5. Access and stairwell
replacement......... ................................................ .........................42 § 6. Trash and the
like.................. ................................................ ...........................................44 § 7. Another house still bungalow
house ................................................ ........................................44 § 8. Work
bed .... ................................................ ................................................ .................44 § 9. Lodging houses and the
like.......................... ................................................ ............................45 § 10. Car shed and car
shelter ............... ................................................ ..........................................45 CHAP. VII. CONSTRUCTION
INTENTIONS................................................ ...........................46 § 1. Normal
claim ................ ................................................ ................................................ .....46 § 2. Requirements for building
space...................................... ................................................ ....................46 § 3. Foundation and basement
floor...................... ................................................ ......................47 § 4. Basement exterior
walls...................... ................................................ .........................................47 § 5. Exterior
walls.... ................................................ ................................................ ........................47 § 6. Load-bearing retaining
walls................... ................................................ .....................................48 § 7. Partition walls that do not
carry ..... ................................................ ............................................48 § 8. Return
floor ................................................ ................................................ ..........................48 § 9.
Floor................... ................................................ ................................................ .................49 § 10.
Tax............................ ................................................ ................................................ ......49 § 11. Thanksgiving and
omanlights ..................................... ................................................ ..........50 § 12. The
income................................... ................................................ ............................................50 § 13. Other
constructions ................................................ ................................................ ...51 CHAP. VIII. FIRE WOOD
EXCHANGE ................................................ ................................................51 CHAP . IX. FIREPLACES, HEATING WORKS AND
CHIMNEYS ............................................. ...........51 CHAP. X. INDEMNIFICATION AGAINST THE
SLAVES............................................. ..............................................52 § 1 .Slav, it comes up from the
ground................................... ..........................................52 § 2. Slevja
(condens )................................................. ................................................ .............52 CHAP. XI. TEMPERATURE
BREAKING................................................... ................................................ ...........54 § 1. Normal
claim ................................ ................................................ .......................................54 § 2. External walls and return
beds..... ................................................ ................................................ §54 3. Floor and
ceiling................................... ................................................ ..........................55 § 4. Windows and
doors................. ................................................ ......................................56 § 5. Second
house ...... ................................................ ................................................ ................56 § 6. Work bed ,
etc.:............................. ................................................ ...................................56 CHAP. XII. THE AIR
PRESSURE................................................... ................................................ .........58 § 1. Ordinary
claim ................................... ................................................ ....................................58 § 2. Making of air
fresheners ....... ................................................ ................................................ 59 § 3. Natural air
exchange ............................................. ................................................ .............59 § 4. Mechanical
ventilation............................ ................................................ ..........................59 CHAP. XIII. SECOND CONTRACT RELATED
BUILDING............................................ ....61
Machine Translated by Google

§ 1. Poem exchange .............................................. ................................................ ...................61 § 2.


Deposits.......................... ................................................ ..........................................61 CHAP. XIV.
EXIT................................................ ................................................ ..............61 § 1. Changes in the building
agreement............................ ................................................ ...........61
Machine Translated by Google

CHAP. I. TRANSITIONAL ORDERS.

§ 1. The building authority

1 The building authority in Tórshavn municipality has a similar decision to


the town council on town ordinances and building consents (technical
committee of the town council).

2 The building representative, on behalf of the village council, supervises that


the building consents are kept and that the records are clear.

3 The building representative will be appointed by the building authority.

§ 2. The increase for which the building consent is valid

1 This building permit is valid for the entire municipality of Tórshavn

2 The intentions in the agreement apply:

a) New building.

b) Remodeling or building aftrat buildings, some


are

c) Change in incorporation or use of buildings, some of which are, and


some of which had come under the agreement, were new buildings.
The consent is also valid for buildings that are, when the clear
individual rules directly permit them.

3 The building will be fired:

a) Fixed constructions, procedures, equipment and land regulation,


which depending on the plan in the building agreement may be
described as a building.

b) Constructions that can be moved, such as bunks, tents, boat trailers


or the like, when they are used as a building, which is not covered
by the building.

c) Tongs, cranes, transport bridges, tunnels, platforms and other


constructions in the future, which the building authority (technical
committee) will be natural, when thinking about general safety,
order and health, which these rules are intended to cover

one.
Machine Translated by Google

4 Existing buildings may not be redeveloped, raised or otherwise


altered, in such a way that they are in violation of the applicable
regulations.

5 If such an extensive renovation or change is to be made of buildings,


which are that the entire building will therefore be renovated in the
main parts (major renovation), the work must, if possible, be done
in such a way that the building in all parts corresponds to the
intentions that apply to new construction.

6 New construction, alterations, renovations and major renovations


must, in addition to being in accordance with the applicable building
permit, also comply with possible town ordinances, special building
permits, servitudes, where the municipality has authority, and when
issuing permits in other ways (in §3 subsection 8. petticoat)

§ 3. Building applications

1 Construction, covered by intentions in building consents, similar to


the Løgtingslag on city ordinances and building consents, may not
be carried out without written permission from the building
representative.

2 All applications, including applications for permission to dig for ground


and possible explosions, for changes inside or outside, for example,
to break solid walls (walls) and storage beds, install fireplaces, take
down or move houses, weigh -, sewer - and drainage work, must
be sent to the building representative.

3 The technical committee and the building representative may demand


to receive all the information that is necessary in all respects to
assess the one submitted building plan, which is, depending on the
circumstances, the only complete building plan for the building for
which a permit will be applied for.

4 Surveys and plans must be made by people who have the skills to do
to
so, architects, building experts, engineers, technicians or others
whom the building authority thinks have sufficient knowledge for
this, and their plans and plans must cover the requirements that
will normally be put in place technical design.
Machine Translated by Google

5 All receipts, plans, payments, excavations, etc. supporting


documents in connection with the building application must be
dated, have matr. no. on the eye, and he, who has installed
them, must sign in the right corner. Hesin is responsible for
ensuring that the documents are complete.

6 Some supporting documents with the application for house construction Of course there will also be a "Tá íd
must be omitted: bygt must"

a) Copies of deeds and servitudes.

b) Site plan, not smaller than 1:1000, which shows the position
and layout of the land, how it faces streets and alleys, where
and how the intended houses should stand, and the intended
water supply.

c) The foundation plan must provide information on the current


and future elevation of the foundation, the elevation of thin
foundations
and the elevation of the road. If necessary, the building
authority may require cuttings in the land, which must
describe the planning.

d) Plans of the houses in a scale of at least 1:100 at the


prescribed scale, both main scale and passing individual
scales. It must be stated what the bed is intended for.

Bearing constructions must be taken and the rafters fixed,


as well as doors, sanitary
insertions etc. are accepted.

e) Cross-sections of at least 1:50 which are necessary to get one


level of the houses and pictures of all the exterior sides of
the houses.

f) Disbursements, some of which together with receipts provide


a complete and complete description of the intended building.

g) Location of one possible future


garage/garage shed, outhouse, etc

7 The building representative may require that individual designs


together with drawings must be available and submitted for
approval, before the building begins.

8 Applications for receipts, payments and withdrawals - including


withdrawals from the building level or the net utilization level -
and others
Machine Translated by Google

supporting documents must contain all the information necessary for


the payment to be understood and to obtain a decision on what is
being applied for.

Deviations from laws, consents, servitudes and other intentions -


here in the possible city planning -
must be clearly stipulated, and the rights of the person who has given
permission for a deviation must be immediately informed. Such
deviations are only acknowledged by the building representative,
when they have been mentioned in the application and it is stipulated
in the building permit, that the necessary permission or exceptional
permission is given, see §4, par. 3.

§ 4. Building permit and the building permit

1 A building permit must be granted in writing.

2 The building permit may be bound by taxes, which will be considered


necessary, when thinking about columning, surroundings and
construction, up to the entrance, space standards and fields, and of
the overall building plan for the increase, it is about. A building permit
can also be granted with security measures (such as fences, barriers,
shelters, etc.)

3 In the event that the building permit stipulates a requirement that plans
that are not included in the building agreement must be completed,
such requirements shall be stipulated together with information about
the authorization for them, and in the event that the requirement is
set forth by others still chose the building authority, information about
this and about where a complaint about this requirement can be sent
in - and possibly within each trial.

4 A building permit is valid for one year from the tenth day, it is admitted.
If construction is not started within that time, the permit is forfeited,
and a new building permit must be obtained.

5 The builder's representative must be disclaimed in writing before


construction begins.

6 If a building is started, it will be delayed for 6 months or longer, the


building representative must be notified, and the building will be
started again. If the stay is longer than one year, a new building
permit must be obtained.
Machine Translated by Google

7 When the building is completed, the building permit shall be issued,


and the certificate obtained from him - the building certificate - that
the building, as far as confirmation is possible, is made in accordance
with the building agreement and the special regulations that were put
in place when the building permit was granted. A fined building permit
does not prevent the building authority from being able to demand a
rectification of non-compliance, which appears in the second light
case (see §7, subsection 2.)

8 Before the building permit is given, the building representative makes


sure that the city engineer has approved that the drain, sewer, rat
trap, cleaning works and roads are in order, and that comments from
the fire inspection have been received that there is nothing left to
clean chimneys, fireplaces and smoke pipes

9 The building representative can in special cases give the building permit
for a building, even if it has not yet been completed in accordance
with the building permit. This can only be done, provided that the
owner of the houses that will be built agrees in writing that the trade-
offs must be in order, corresponding to the building consent within a
set period, and agrees that the building authority will otherwise write
what remains in , do for him steaming. The building authority may
require a bank lien or other security granted for such a building, when
the building permit is issued. In addition, the building authority can
confirm how far the building has progressed since the building permit
was granted, if the builder so wishes.

§ 5. Transfer and demolition of buildings

Disposal in connection with


1 All buildings, in all their parts and all that belong to them, must always
be kept in perfect and good condition. In the case of a building the demolition of a building must be
separated
demolition that is particularly bad, the building authority can order
that the slope be repaired and, if necessary, make repairs for the
owner.

2 A building may not be taken down, unless permission is obtained from


the building authority. In an application for such a permit, the height
and area of the building must be submitted.

3 Demolition and construction requests must be paid promptly and in


accordance with the clear intentions of the building authority in the
individual cases, including removal or covering of foundations, etc.
on the road.
Machine Translated by Google

10

4 If the house has drains, water, electricity, telephone or the like, it


is not allowed to start the work, until written permission is
obtained.

§ 6. Insurance during construction

1 When the ground collapses or explodes, the builder must take all
necessary insurance measures to protect against problems or
damage.

§ 7. Punishment for violation of the regulations


in the building agreement, access authorization and
insurance of intentions, etc.

1 The following will be fined:

a) He who is outside the license starts work, which is subject to


the provisions in the building agreement.

b) He, who pretends to announce the building representative


from several, who is appointed.

c) He who begins to use a building without the prescribed


permission or the permission of the owner. Cf. §4, par. 5, 7 and 8.
d) He who obstructs a follow-up survey, which is legally permitted.

e) He who does not comply with lawfully received orders.

f) He who pretends to commit a conflict, and which the building


authority requires, which is necessary so that the residents
of the building or other people do not get into trouble.

g) He, who otherwise commits a violation of this general building


agreement and of the resolutions in special building
agreements, which are approved by the national government.

2 It is the duty of those who, at one time and in each time, have only
one eye to correct what is unlawful in it.

3 If work is carried out that falls under the intentions of the building
consent, unless the required permission is obtained, the building
authority may demand that the law directly prohibits the carrying
out of this work.
Machine Translated by Google

11

4 If the owner does not comply with the order he has received, he
may be ordered by the court to carry out the compensation, if
the previously agreed time has passed, he is forced by a
sufficiently large continuing compensation.

5 When the obligation to correct an illegal transaction imposed by a


court is not complied with, the previously set time limit has
expired, and when the payment of fines, which are sentenced in
accordance with paragraph 1, the intended payment must not
be received results, the building authority may require help from
the police to get access to do what the building authority is
forced to do in order for the exchange to be legal.

§ 8. Removed from existing rules

1 The building authority may, where it is difficult to maintain the


intentions in this building consent, and where it is about a matter
of little significance, give notices relating to the intentions in this
building consent.

2 Before the application is given, the invitation shall be sent to the


neighbor in writing, and they shall have the opportunity to
examine the application for at least two weeks from the time
they received the invitation. Possible comments from friends are
helpful

§ 9. Appeal

1 The decisions of the village council, in relation to the general and


special housing agreements, may be subject to appeals
established by the national governor.

2 Unless otherwise stated, the appeal period is 4 weeks from that


date, as long as the decision is known and information is given
about this period and to what authority the appeal can be made.
For decisions that are publicly announced, the appeal period will
expire from this day.

3 Complaints about the planning order, which the building authority


has given, do not take away from doing according to it; the
appeals authority is allowed to decide, the time limit for appeals
may be extended in the cases.
Machine Translated by Google

12

CHAP. II. DRAINAGE, WATER SUPPLY AND OTHER


UTILITIES.

§ 1. Withdrawal

1 If the building authority has approved otherwise, the building


and structure/procedure must have good drainage, both for
dirty water and for rainwater, sewage water and ground
water for use, which would otherwise be necessary.

2 The building authority is authorized, where applicable, to


require all measures to be carried out, which are required in
accordance with the building permit and other laws and
regulations, in order for this to be done. of the house that
will be built, get the necessary agreements for the title of the
property in question.

3 When the foundation will be broken apart from the borings that
lie ahead, these must be protected, and access for cleaning,
possibly to lay bare feet, must be secured in such a way that
the building authority approves.

4 When the surveyors, in order to get boring and similar in light


matters, are forced to find the power to break the runoff from
one eye, the building authority can have them do the work
that is required for this, both on this eye, which number is
around, and in their eyes, some are close. If they are found
to be loose or broken, which in whole or in part must be
considered to be due to the unrest, the owner of this house
shall reimburse the building authority after the demolition of
the works that pass the surveys and work done by them.

5 The production and use of runoff from the eyes of ten runoff
equipment, which belongs to the hermitage, must be closed
to any time applicable orders and resolutions.

6 In the decree, rules could be set, which ensure that the sewer
will not be used in any other way than was intended when it
was made, such as putting harmful substances or lies in it.
This rule also applies to drifts, which are

7 § 1, subsection 4, 5 and 6 are also valid for runoff,


some are.
Machine Translated by Google

13

§ 2. Changes in derivations, some of which are

1 It may be required that drains and drainage equipment within a


certain period of time, which the building authority determines
and stipulates, must be made to correspond to the regulations
set forth in § 1 of this chapter.

2 The above resolutions do not infringe the right of artists to demand


withdrawal, which is changed for health reasons.

§ 3. Water supply
The city council agreed, (with authorization
1 The building authority shall ensure, before a new building is in law no. 48 of 24 March 1899 om
Tilvejebringelse af Vedtægt for Benytteln
constructed, that it has a reliable and sufficiently good supply of af Vand fra Tórshavns Vandværk), on
drinking water, which shall be in accordance with the rules of 24 June 1999 a regulation on the use of water from
the municipality. Depending on the circumstances, there must Tórshavnar Vatnverki, which is
confirmed by Føroya Landsstýri.
be a safe and secure access to the building for firefighting.

§ 4. Obligation to disclose

1 A person who owns water supplies, sewage, electricity supplies,


telephone supplies, television supplies and other supplies must
notify the municipality in detail of where these are.

2 A contractor who is going to dig a hole in front of the municipality


must, before starting the work, have a permit from the city
engineer. An application for a graviloyvi must contain information
about where the plan is to dig, the cause of the digging and
information about what will be buried.
Machine Translated by Google

14

CHAP. III. UNBUILDED ØKINI

§ 1. Retention space

3 In the case of residences, one outdoor holding space must be


ensured, which is at least as large as the entire level of use in
the residences.

4 In residential areas, if the other has not been approved by the


building authority, a sufficiently large and open space must also
be provided for the children to hang out and play.

Sostatt must be done:

Shelter and play area for small children of up to 400 m2 for


each of the 20 dwellings, (they must be no more than 75 m
from the ten dwellings, which is the furthest away),

Storage and staking space of 2000 m2 for each of the 200


dwellings (it must lie at most 150 m from ten dwellings, which is
the furthest away)

5 In houses that are completely or partially converted to work,


unless the building authority approves otherwise, a special
outdoor storage space must be made for those who work in the
company. The building authority can decide in individual cases
whether the support of the reserved spaces is necessary.

6 The building authority may grant immediate relief to older buildings


in relation to these rules, so that a comprehensive solution is
obtained for a larger building.

7 In addition to roads, parking, cleaning works, etc., Hóskand must


also contribute at least 10% of the total area to the community,
including playgrounds, free parks
v.m.

§ 2. Adoption and transfer of holding spaces

1 Unbuilt buildings, which are created by and used as storage


space or similar to these intentions, are not allowed to be used
for other purposes, even if they were created. In the case of
unbuilt buildings, which are useful for the purposes stipulated
in this chapter, only houses that were built before the regulations
came into force, the building authority is authorized to prohibit
them from being built or used in such a way, that they will be
harmful to this end.
Machine Translated by Google

15

2 Storage space, stake space and also, which are for traveling by teams that
use the house or others, must be kept in good condition, so that they can
be used for their intended purpose without any problems. The building
authority can initiate forced transfer requests for the owner's eviction. (in
second chapter I, § 8, subsections 5 and 7).

§ 3. Addition to space factor

1 A large enough space must be provided, so that the residents and those who
work in the building, visiting business people, suppliers and others can
leave their motor vehicles on the road that belongs to the building.

2 Residences and apartments:

a) Residences in the 1st and 2nd plots 1.5 spaces per house, harav 0.5
per felags parkersøki

b) Residence in the 3rd plot of land 2.5 spaces per house


0.5 per partner parking fee

c) Increase an apartment in residential buildings by 1.0 space

d) Double houses and terraced houses in 3. Plot area 2.0 spaces per
house unit, harav 1.0 on felags parkersøki

e) Apartment building 1.0 space per 75 m² apartment with a parking


space

f) Colleges and youth apartments 0.5 places per apartment


unit on a shared parking lot

g) Apartments for the elderly 1.5 places per apartment unit, harav 0.5
per felags parkersøki

h) Some retirement homes, kindergartens, etc. 1.0 places per 50


m² house size

i) Summer house 2.0 spaces per house

3 Work and fortress buildings:

a) New and extension in the 1st and 2nd plot no. 1.0 space per 50 m2
house size
Machine Translated by Google

16

b) Dining halls, cinemas, meeting houses and other buildings, where


enough people gather 1.0 space per 25 m² house size

c) Hotel or 1.0 places per chambers

d) Sports facilities after a single assessment of people's capacity


for the whole area and/or part of the area

e) Schools for children: 1.0 places per 60 m² house size

f) Schools for the elderly: 1.0 places per 25 m² house size

g) Fortress buildings (crafts, etc.) 1.0 space per 50 m² house size

h) Office space: 1.0 space per 30 m² house size

i) Storage: 1.0 space per 60 m² house size

j) Grocery stores and the retail store: 1.0 space per 252 house
dimensions for the first 2500 m² and 1.0 space per 50 m²
house size for the dimension oman for 2500m².

k) Other traders: 1.0 space per 30 m² house size

4 The house dimension is the gross dimension.

5 One building can be divided into several rooms (handles, desks,


storage rooms, etc.).

6 For buildings that are not mentioned in the overview,


will be assessed based on utilization.

7 For residences and apartments, it is required that at least 1 space per


house/apartment must be outside a gap house/shelter.

8 In areas with enough parking, e.g. athletic areas,


the number of parking spaces can be determined after one total
measurement.

9 In the 1st and 2nd land tenures, one must be paid


parking base, so it is not necessary to provide all the parking space.
Machine Translated by Google

17

§ 4. Access from a road to an unbuilt øki

1 The pre-arranged access from the road to the field must always
be sufficiently well-lit and passable, and it must not be used in
any other way, such as for example as a parking space,
storage or the like, which is contrary to what it was intended
for.

The fire department's rescue agent must always enter the


piece unhindered.
Machine Translated by Google

18

CHAP. IV. BUILDING INITIATIVE INTENT

§ 1. Basic management

The municipality will be improved in 4 basic areas:

The 1st land area is one coherent central city district.

The 2nd plot of land is one plot of land, which is adjacent to the central
district.

3. land tenure, they are part of the municipality, which are otherwise
proposed for construction.

4. the basic area is the rest of the municipality.

The grounds are marked on a map, which can be found on the website
Tórshavn Municipality –
www.torshavn.fo

The map is on file at the technical office of the town council.


Machine Translated by Google

19

§ 2. Intentions for the 1st land tenure

1 1. plot area will be proposed mixed bungalow and center building. The central building can only be a

house, which will be completely or partially converted into shops, offices, meeting rooms, health
centers and the like.

2 The construction level may not increase by 0.6.

Analysis and elimination of the level of construction


3 The level of utilization may not go up by 1.3 However, it can go up to the right half for basic pieces and level of use see §25.

that are 200 m2 or less and for pieces between 200 m2 and 500 m2

will be placed evenly decreasing as shown in figure 1.

2,0

1,9

1,8

1,7

1,6

1,5

1,4

1,3

1,2

0 100 200 300 400 500 600 Fig

4 Houses may not be built further to the right than 11 m to the lowest point at the outer wall and 13 m

to the ridge. The basement will be fumigated on some floors.

5 If a house is built with a one-way pitched roof or flat roof, the lower side may be at most 11 m to the

lowest point at the outer wall and the right side may be 13 m at most1

6 Houses must usually be built together with the front side to the road line or to the building line, where

one roof is laid.

The planning height must be approved by the


7 It is possible for the card to depart from the intentions in para. 2, 3, 4 and 5 in a special building building authority according to § 26, 9

permit for a reasonable, naturally delimited increase.

8 The building authority may, with a special building permit, for a building that is naturally demarcated

and occupied, that the street height can be used for outdoor use (handil, dining room, etc.).

§2 pcs. 4 and 5 eru bridges open on 31 October 2013


Machine Translated by Google

20

§ 3. Intentions for the 2nd land tenure.

1 2. land use will be all, of which it is proposed a mixed housing and


center building. The central building can only be a house, which
will be completely or partially converted into shops, small crafts,
offices, kitchens, meeting houses, health centers and the like.

2 The building level may not increase by 0.5

3 The level of utilization may not increase by 0.7. However, for basic Analysis and elimination of the construction stage and
the utilization stage see §25.
pieces that are 200 m2 or smaller, it can go up to the right half
and for pieces between 200 m2 and 500 m2
will be placed evenly decreasing, as shown in figure 2.

1,2

1,1

1,0

0,9

0,8

0,7

0,6

0 100 200 300 400 500 600 Figure 2

4 Houses may not be built further to the right than 8 m to the lowest
point of the outer wall and 10 m to the ridge.

5 If a house is built with a one-way pitched roof or flat roof, the lower
side may be at most 8 m to the lowest point at the outer wall and
the right side may be 10 m2 at most
The planning height must be approved by the building
authority according to § 26, 9

6 Houses must usually stand by themselves and be placed in a road


line, where one tile is lying. It may be allowed to build a house
together, if the circumstances, according to the assessment of
the village council, make it advisable.

7 It is possible for the card to depart from the intentions in para. 2, 3,


4 and 5 in a special building permit for a reasonable, naturally
delimited increase.

2
§3 pcs. 4 and 5 eru bridges open on 31 October 2013
Machine Translated by Google

21

§ 4. Subdivision of the 3rd plot of land

3. ground clearance will be proposed here end

A Bungalow building
B Commercial building
C Middle-position ending
D General endings
E Small boat and leisure activities
F Leisure facilities and activities

Existing uses are marked with letters on a map that can be found on the
Tórshavn municipality's website.

The map is on file at the technical office of the town council.

§ 5. Intentions for the occupancy parties A1 in the 3rd


basic occupancy

1 It is only permitted to build detached houses, which may also have one
smaller apartment, which cannot be exchanged for an owner-occupied
apartment, and, with the permission of the building authority, duplexes,
which may also have one smaller apartment, which cannot be
exchanged for an owner-occupied apartment, and terraced houses,
etc. dwellings for one house.

In relation to residential construction, the building authority can grant


a license for other activities that include small works and buildings,
which naturally belong to the building, provided that this is not available
or spoils the land as a residential building and some of the buildings
are classified as works in Tórshavn municipality.

2 The foundation pieces must be at least 500 m2. When the building is
carried out after a special building permit, the village council can lie
that the plots are smaller than 500 m2, so at least 400 m2 for detached
houses and 300 m2
for which part of one semi-detached or terraced house.
One part of their smallest dimension can be laid as a companion land
and as a space element.

Analysis and elimination of the level of construction


In connection with one naturally limited increase, most of the basic and level of use see §25.
pieces are smaller than the intentions in pkt. 2 permit, the building
authority may grant a permit to deviate from the set support on the In the occupied part A1, houses with a more
common ridge construction can be built in two levels at
plots. The hood to preserve the ladies on the mountain. the most, with fresh air and may not be further than 6 m
to the lowest point of the outer wall and 9 m to
the ridge from the planning level.
Machine Translated by Google

22

3 Excavation will only be permitted if it complies with the only excavation


plan that the building authority has approved for a naturally
delimited area, and if the construction is otherwise guaranteed in
accordance with the municipality's normal excavation policies.

4 The building level may not increase by 0.3

5 The level of utilization may not rise by 0.6 for detached houses and
0.7 for semi-detached or terraced houses. However, it may be
possible for foundation pieces for detached houses, which are 200
m2 or smaller, to go up to the right half, and for pieces between
200 m2 and 500 m2 they will be placed evenly decreasing in this Most permitted heights on houses.

way, as shown in figure 3.

1,0

0,9

0,8

0,7

0,6

0,5
The usual distance from the stands to the goal is 2.5 m.
When building with a one-sided roof slope,
0 100 200 300 400 500 600 Figure 3 the distance to the goal must be increased by a length
(x) where the lowest point is further to the right by 6
m. For example, if the building will be built up to 7.5 m, the
6 Houses with more common ridge construction may only be built in distance to the goal must be at least 4.0

two stories in excess of the used ceiling and may not be straighter
m
than 6 m to the lowest point at the outer wall and 9 m to the ridge.
Basements will be fumigated on some floors.

7 If a house is built with a one-way pitched roof or a flat roof, the lower
pitch may be at most 6 m to the lowest point at the outer wall and
the pitch on the right may be 7.5 m at most.

8 If the lowest point at the outside wall is more than 6 m, the distance The proposal does not imply that a special
from the goal must be increased by some, as long as the lowest building permit will be issued to convert one residence
into apartments.
point is further 6 m to the right.

9 In a special building permit, it is not allowed to exceed the level of


use, which is in para. 5, when the lake will be destroyed as a whole.

In a special building permit, it may be permitted to build apartments


for a naturally limited increase.

In a special building permit, it is possible to deviate from the


intentions regarding the number of hills and hill settlements, where
the land is laid out in such a way that it naturally falls into it.
Machine Translated by Google

23

Analysis and elimination of the level of construction


and level of use see §25.

§ 6. Intentions for the parties in possession A2 in the 3rd possession

1 Loyvt is only building houses on several floors for the purpose of residences. In
connection with a building, it must be carried out to make a bed for shared use,
such as a living room, sink bed, etc., for people who live there.

2 Extension to such a building will only be permitted with a corresponding special


building permit, which the building authority has approved for a naturally limited
area.

3 The building level may not increase by 0.25.

4 The level of utilization may not increase by 0.8.

5 Houses may only be built with a maximum of 5 storeys above the usable ceiling and
may not be straighter than 15 m to the lowest point at the outer wall and 18 m
measured to the ridge. Basements will be fumigated on some floors.
In the A2 area, houses may be built in a
maximum of 5 storeys with new ceilings and
may not be straighter than 15 m to the lowest
point of the outer wall and 18 m to the
ridge from the planning height

§ 7. Intentions for A3 in the 3rd ground management There is also a companion's living/retention
space for the piece of furniture. Up to 100
m2 of each foundation piece will be laid
1 The increase will be proposed for a mixed residential and central building, which is out for free, do not escape from them
allowed to have traders, small crafts and small businesses, offices, salons, approx. 10%, which must be paid out as
meeting houses, health centers and the like. a bonus in connection with one withdrawal in
accordance with the normal withdrawal rules.

2 Exclusions can only be done with a special construction agreement.


Analysis and elimination of the level of construction
and level of use see §25.

3 The plot must be at least 400 m2 for detached houses, 300 m2 for semi-detached
houses and 250 m2 for terraced houses. One part of these can be laid for free,
but at most 100 m2 for each piece of ground.

4 Construction level 0.3

3
§5, par. 1 and 9 amended on 1 April 2016
Machine Translated by Google

24

5 The level of utilization may not rise by 0.6 for detached houses
and 0.7 for semi-detached or terraced houses. However, for
basic pieces that are 200 m2, it can go up to the right half,
and for pieces between 200 m2 and 500 m2 , they will be
placed evenly decreasing down to the usual set minimum
dimension. In a separate building permit, the level of use
may be increased based on the overall building by up to a
naturally limited increase.

6 Houses with more common ridge construction may only be


built in two stories in excess of the used ceiling and may not In the occupied part A3, houses with a more common
be straighter than 6 m to the lowest point at the outer wall ridge construction may at most be built in two levels with

and 9 m to the ridge. Basements will be fumigated on some used ceilings and may not be further than 6 m to the lowest
point of the outer wall and 9 m to the ridge from the
floors. .
planning height.

7 If a house is built with a one-way pitched roof or a flat roof, the


lower edge may be a maximum of 6 m to the lowest point at
the outer wall and the right edge may be a maximum of 7.5
m.

8 If the slowest point at the outer wall is more than 6 m, the


distance from the goal must be increased by a length that
the slowest point is further 6 m to the right.

9 In a special building permit, the height may be waived and it


may be permitted to build right-of-way and it may be ordered
that the house be placed in a road line or building line,
(deviate from the intended construction and use levels and Most permitted heights on houses.

the smallest plot size).


4

The usual distance from the stands to the goal is 2.5 m.


When building with a one-sided roof slope,
the distance to the goal must be increased by a length
(x) where the lowest point is 6 m to the right. For
example, if the building will be built up to 7.5 m, the distance
to the goal must be at least 4.0

4
§7, par. 9 modified on April 1, 2016
Machine Translated by Google

25

§ 8. intentions for occupancy part B1 in the 3rd ground occupancy

1 The occupied part will as a whole be put to the end, which are directly
related to port operations, primarily offices and warehouses in connection
with ship travel and goods transport, as well as for activities, which have
a relationship with this, such as service activities and space standards,
etc.
The municipality of Tórshavn has made a
regulation on the classification of forts, which
are located in remote areas, which must be
2 Structures in this area must be able to be classified in environmental determined between the respective forts
categories 4 to 6 according to the rules of Tórshavn Municipality. and the owners of the residences. This is
to reduce the amount of noise, pollution,
etc. This regulation is approved by the town
council on February 19, 2009 case no. 2007-1253
3 The construction level for the harbor area as a whole and for the individual
harbor divisions may not exceed 0.5.
200 m2 is not the total dimension
4 The maximum permitted height of a building is 12 m, but there may be an of the building, but the dimension of each
exception when it comes to cranes and individual structures, e.g. stair floor, otherwise the same as the
dimension of the foundation.
towers, which are at most 2002
m to dimension.

5 Heights of houses must be set in each individual case based on the overall
measurement of use and mood.

6 Buildings may not be placed closer to the quay drums than 12 m.

7 It is possible for the card to depart from the intentions in para. 2, 3 and 4 in
a separate building consent for the whole increase or a natural part of it.

§ 9. Intentions for occupancy part B2 in the 3rd basic occupancy

1 The occupied part will be proposed for work purposes, related to shipping
and fishing and for activities related to housing, such as offices, service
activities, car insurance and the like.

2 Structures in this area must be able to be classified in environmental


categories 4 to 6 according to the rules of Tórshavn municipality.

3 The construction level for the occupied parts as a whole and for the
individual sections may not exceed 0.5.

4 Heights of houses must be set in each individual case based on an overall


measurement of use and mood.
Machine Translated by Google

26

5 A building may not be placed closer than 10 m to the quay drums.

6 It is possible for the card to deviate from the intentions in para. 2, 3


and 4, in a separate building consent for the whole increase or a
natural part of it.

§ 10. Intentions for occupancy part B3 in the 3rd basic occupancy

1 Loyvi is only to build houses for small work structures, workshops and
the like and service activities, which have a connection with this. It
is allowed on any piece of land to build a residence for the owner or
the fort's leaders.

2 Activities in this area of ownership must be able to be classified in


environmental categories 2 to 4 according to the rules of Tórshavn
municipality.

3 The basic pieces must be at least 800 m2 and at most 2000 m2.

4 Expropriation will only be permitted if it complies with the only


expropriation plan approved by the building authority for a naturally
delimited part of the occupied lot.

5 The construction level for the base piece must not exceed 0.5.

6 The volume of the house may not exceed 2 m3 for each m2 of the
piece.

7 No house and no house lot can be left still 9


m.

§ 11. Intentions for occupancy part B4 in the 3rd basic occupancy

1 Loyvt is the same as building houses for work structures, workshops


and the like as well as for service activities that have a connection
with this.

2 Activities in this area of ownership must be able to be classified in


environmental categories 2 to 4 according to the rules of Tórshavn
Municipality.

3 The basic pieces must be at least 1000 m2.

4 Expropriation will only be permitted if it complies with the only


expropriation plan that the building authority has
Machine Translated by Google

27

good for the natural demarcation of the property.

5 The building level may not increase by 0.5.

6 The volume of the house may not exceed 3 m3


how many m2 of basic floor space.

7 No house and no house lot may be left still 10


m.

§ 12. Intentions for occupancy part B5 in the 3rd basic occupancy

1 Loyvt is the only way to build houses for large work structures,
factories and the like for service activities that have a connection
with this.

2 Activities in this area of ownership must be able to be classified in


environmental categories 2 to 4 according to the rules of
Tórshavn Municipality.

3 The basic pieces must be at least 2000 m2.

4 Expropriation will only be permitted if it complies with the only


expropriation plan approved by the building authority for a
naturally delimited part of the occupied lot.

5 The building level may not increase by 0.5

6 The volume of the house must not exceed 3 m3


how many m2 of basic floor space.

7 No part of the external walls or income can be left over


12 m.

§ 13. Intentions for occupancy part B6 in the 3rd ground occupancy

1 Loyvt is only to make forts and build houses, meant for


central building, offices, warehouses and service buildings,
which are connected to these.

2 Activities in this area of ownership must be able to be classified in


environmental categories 2 to 4 according to the rules of
Tórshavn Municipality.
Machine Translated by Google

28

3 Construction can only be carried out after a permit is obtained


from the nature conservation committee, compare the Nature
Conservation Law from July 9, 1970 § 2, par. 2.

4 The basic pieces must be at least 1000 m2.

5 Expropriation will only be permitted if it is in accordance with the


only expropriation plan that the building authority has approved
for that individual lot.

6 The building level may not increase by 0.5.

7 No house and no house lot may be left more than 8 m.

§ 14. Intentions for occupancy part B7 in the 3rd basic occupancy

1 Loyvt is only to build houses for large work structures, factories,


warehouses and the like and for service activity, which has a
connection with this.

2 Structures in this area must be able to be classified in environmental


categories 5 to 7 according to the rules of Tórshavn Municipality.

3 The building must be set according to the overall plan for the entire
building or for suitable parts of the building.

4 The building level may not increase by 0.4

5 The volume of the houses may not exceed 2.5 m3


how many m2 of basic floor space.

6 No part of the outer walls or entrance may be straighter than 13


m, but necessary technical parts of the house may be straighter
at the close discretion of the town council.

§ 15. Intentions for occupancy part B8 in the 3rd basic occupancy

1 Loyvt is only to build houses for work forts, military under siege
and service forts, factories, warehouses and the like and for
service activity that has a connection with this.

2 Structures in this area must be able to be classified in environmental


categories 4 to 6 according to the rules of Tórshavn municipality.

3 Building must be set the corresponding overall plan for the entire
building or suitable parts of the building.
Machine Translated by Google

29

4 The construction level may not increase by 0.5

5 The volume of the houses may not exceed 3.0 m3


how many m2 of basic floor space

6 No part of the exterior walls or entrance may be straighter than 13 m,


but necessary technical parts of the house may be straighter at the
discretion of the town council.

§ 16. Intentions for occupancy part B9 in the 3rd basic occupancy

1 The occupied part B9 will be proposed for work, which is directly or


indirectly export-promoting and for activity, which has contact with
this work.
In addition, the existing electrical works and the second development
of the project will also be guaranteed.

2 Structures in this area must be able to be classified in environmental


categories 5 to 7 according to the rules of Tórshavn municipality.

3 The construction level for the occupied parts as a whole and for the
individual sections may not exceed 0.5.

4 Heights of houses must be set in each individual case based on the


overall measurement of use and mood.

5 Buildings may not be placed near dock drums yet


20 m.

6 All other buildings shall otherwise be subject to a separate building


permit for one natural demarcated hill.

7 In a separate construction agreement, a deviation from p. 2 and 3 will


be made for a building, which is intended to house service activities,
which is permitted in accordance with pkt. 1.

8 Special building consents must respect the decision of the conservation


authorities that the farmhouse will be preserved with one loose
foundation piece, marked with a bar on the accompanying map.

§ 17. Intentions for the occupancy parties B10 in the 3rd


basic occupancy

1 The increase will be examined in the center end issues, office end
issues, health end issues, etc. and activity, which is related to these.
Machine Translated by Google

30

2 Activities in this area must be able to be classified in environmental


categories 2 to 3 according to the rules of Tórshavn municipality.

3 Subdivision will only be permitted if it is in accordance with the building


plan, which the building authority has made for the entire occupied part.

4 The construction level may not increase by 0.4 and the utilization level
may not increase by 0.9, adjusted for the occupied parts as a whole.

5 No part of the external walls or income can be left over


10 m.

§ 18. Intentions for the occupancy parties B11 in the 3rd


basic occupancy

The occupied part will be examined for rock breakage and activity, which
has contact with these hoods.

§ 19. Intentions for the occupancy parties C1 in the 3rd


basic occupancy

1 The occupiers in their entirety will be provided with a central building, a


tea shop, an office, a health center, a meeting house, and the like.

2 Subdivision within the individual occupancy parties will only be permitted


by a separate building permit, which the building authority has approved
for the occupancy parties.

3 The building level may not increase by 0.4.

4 The level of utilization may not increase by 0.8.

§ 20. Intentions for the parties in possession C1A in the 3rd


possession

1 The occupied parts will be proposed as a whole for a central building, a


tea shop, an office, a health care center, a meeting house and the like.

2 The maximum permitted height of buildings is 9 m.


Machine Translated by Google

31

In connection with the construction of each individual plot, the


owner will be required to plant bushes/trees in a 5 m wide sector
between the building and Vegin Langa/Løgmannabreyt.

3 The construction level may not increase by 0.5

It is not allowed to have hangers standing on the base piece


outside, so that it is a matter of order.

4 The utility level may not increase by 1.0

5 2 parking spaces must be provided for each 50 m2 of the utilization


level in the buildings.

§ 21. Intentions for occupancy part C2 in the 3rd basic occupancy

1 The occupied part will be proposed in its entirety for central purpose,
especially intended for halls, exhibition halls, assembly halls,
concert halls and other educational halls and the like, and for
service activities, which have a connection with the hall, offices,
dining rooms, etc.

2 Subdivision will only be permitted with a special building permit, which


the building authority has approved for a naturally limited area.

3 The building level may not increase by 0.25.

4 The level of utilization may not increase by 0.5.

§ 22. Intentions for the occupancy parties C3 in the 3rd


basic occupancy

1 The occupied part will be proposed in its entirety to the center, tea
shops, offices, advice centers and service centers that have
contact with them. Loyvt is also building schools, public houses
and apartments.

2 Excavation and construction will only be permitted with a separate


building permit, which the building authority has
Machine Translated by Google

32

good for the whole increase or a naturally limited part of it.

3 The construction level for the occupied parts may not increase by 0.4.

4 The utility level for the occupied parties may not be increased
0,8.

§ 23. Intentions for possession party D in 3.


Basic management

1 The occupied parts of D1 will be offered in their entirety to the public,


nature conservation and educational purposes and the like. The
extension to Hoydalsá can only be ordered and built with a separate
building permit for the extension.

2 A building in D1 may be subject to a similar special building permit,


which is in accordance with par. 1.

3 The occupation part tarturin D2 will be explored separately and


others, depending on one overall plan for the whole area or one
part of the area may work together with the area.

4 Ownership parties D3 will be inspected in large general areas for


handling, schooling, health care and the like.

5 The building level may not exceed 0.25 within a naturally defined
height in D2 and D3 and the utilization level may not increase by
0.5.

6 Extension within the occupied parts D2 and D3 will only be permitted


after a separate building consent.

§ 24. Intentions for possession party E in 3.


Basic management

1 The occupied part will be used for small boating, leisure and sports
activities, which have to do with sea fishing, such as boat shelters,
fishing boats, outdoor space for small boats, rowing clubs, etc.

2 The arrangement and construction of the økken must be done in accordance


with a separate building permit.
Machine Translated by Google

33

§ 25. Intentions for the possession parties F in the


3rd possession

1 The occupied part will be proposed for holiday and summer


houses and holiday parks.

2 The arrangement and construction of the økkin must be done in parallel


with the original building permit.

§ 26. Intentions for 4. Basic consultation


Generally free land can be wood groves,
streets, smaller buildings in connection with
1
.4. land use will mainly be used for agriculture and general open land travel work, etc
and the like.
Løgtingslog no. 48 from 9 July 1970 on Nature
Conservation. Last amended by
2 Loyvt must also build a barn, outbuildings and other things that have to do
Løgtingslóg no. 110 from June 29, 1995. § 2. "It is
with normal plowing and earthwork. not allowed to build houses, shops, sheds or
anything outside of Uttangarð without permission
from the conservation committee. The
a) It is permitted to renovate existing residences and build something
exception is two smaller buildings, which according
back on them, as long as they are suitable for modern use as to old custom have been built outside in
residences. connection with agriculture, so that they do not
damage the nature.

b) On plots of land over 5,000 m2 , it is permitted to build a maximum of In connection with a building in the 4th plot, a
60 m2 in floor area, which could be a single holiday home in a self- building permit must always be applied for in
accordance with the General Building Agreement
supporting building, which is a maximum of 30 m2 in floor area.
KAP. I, § 2. and about a forced
parallel lie about nature conservation.

c) On plots of land under 5,000 m2 , it is permitted to build a total of 30


m2 floor space, which can also be a holiday home.

d) It is also permitted to construct buildings which are necessary for


generally useful services.

Onnur building and operation can cover all


e) Harafturat can be another building and activity, which does not claim pretensions and changes in Article 4. eg
to be located in the villages either, located in the 4th Basic Council. rolling, all road construction, bridges, sheds,
rolling, soil spreading, water supply,
combination of waterways, rivers and
riverbanks, ponds, special nature,
f) All buildings in the 4th Land Management in accordance with § 25, reclamation, clearing space, large masts,
antennas, wind turbines, etc.
subsection 2, letters d and e, must be issued with a corresponding
special building permit
v.m.

3 Houses and other buildings must be designed and placed in the landscape
in such a way that they cause the least damage.

4 In connection with a building in the 4th land area, the municipality is


particularly entitled to set requirements for mood and location.
Machine Translated by Google

34

5 In the villages of Kaldbak, Kaldbaksbotni, Hvítanesi, Norðadali, Syðradali, Nólsoy, Hestur, Koltur,
The construction level depends on the size of the
Kirkjubø and Velbastað, apart from what is intended for the 4th land survey, only special building
houses and the size of the foundation.
permits can be built. If the plot is, for example, 400 m2 and the house is
100 m2, the building level is 100/400 = 0.25
,

The level of utilization is a function of the combined


floor size of all floors and the size of the
foundation. The floor dimension on each individual
§ 27. Analysis, elimination of utilization levels etc
level will be measured from the exterior sides of the
external walls, while the floor dimension
on the ceiling level will be calculated as the
1 The largest permitted building on a plot of land will be determined for each piece of land separately,
dimension between the intersection point on the
depending on the size of the houses and the size of the plot. The count, which comes from this ceiling 1.5 m above the upper layer of beams (in

elimination, will be called the barley level. accordance with §25, 5). Is the plot, for example, 400
m2 and the house 100 m2, a basement, 100 m2
central height and 40 m2 ceiling, the utilization level
is 240/400 = 0.6

2 The maximum support for houses will be determined for each foundation piece separately, which is

the difference between the total floor dimension in all the building heights of the houses and the

dimension of the foundation piece. The number that comes from this elimination will be called

the utilization rate.

3 The relevant building for work will be based on two ordinary houses placed in such a way that

instead of the level of use, a prescribed ratio between the volume of the building and the

dimension of the foundation will be used.

4 The dimension of each individual height will be measured from the exterior sides of the exterior
The dimension of the ceiling height will be measured
walls. Fire walls or similar, which two houses have in common, will be destroyed by each house
as the dimension between the intersection point
up to half of the wall thickness. The basement will also be vented to floor level. If there is no on the outer side of the roof 1.5 m above the upper

basement, the building authority can allow for an ordinary residence, that 10% will be put back layer of beams

to the highest allowed building and utilization level. The inserted height/hems, which is less than 4.5 m2,
does not count towards the utilization level.

5 The dimension of ceiling heights ,


some dimensions will be destroyed by a water-

logged trench 1.5 m above the upper beam layer.

6 Loyvt is to increase the level of construction and use by 0.1, to a maximum of 50 m2, which can be

used for garages, carports, outbuildings, covered areas, etc.

5
Section 26, subsection 6 was amended on 31 October 2013
Machine Translated by Google

35

§ 28. Pertaining to the changes in height and distance of


the buildings

1 No house and no house lot can be made right without getting


good enough lighting and harmonious harmony with a house
on the same foundation and a house on neighboring pieces.

2 The distance between sheds, outhouses and other buildings,


such as the distance between smaller buildings and the
residence, can be reduced to 1 m. Outside of the windbreaks
for cages and kitchens, the distance between the two must
be at least 2.5 m.

3 The measures mentioned in par. 2, the paintings will be water-


leveled from the outside to the ground and at an angle on a
line or flat surface. The hill - the steep hill measured by the
water-drained surface. Rules in relation to building in front of the
border, as well as valid fire safety
regulations.
4 The exterior wall of houses, which face the neighbor's
boundary and is not at least 2.5 m from it, shall become a
fire protection wall. Exceptions may be allowed, in the case
that there is a fire problem, once a more favorable overall
building structure is built for the building, or in the case that
there is insurance for the distance between the building,
which faces the goal on both plots of land , will not be
smaller than 5 m.

5 In the 3rd plot, all buildings must stand on their own, at least
2.5 m from the goal. The exceptions are carports, carports,
sheds and small outbuildings with fireplaces.

These smaller buildings could be built closer to the border,


when these trees are finished:

a) The length of the building opposite the border, may not


be greater than 8 m. If the building faces two sides, the
total length must not be greater than 12 m.

Note: A building permit will be applied for for 2 bays, the


width may be 6 m and the length 6 m.

b) Up to 2.5 m from the border, the building may not be


further than 2.5 m

In ch. I, § 3, subsection 6c, it is certain that


c) Tap water must be kept on its own ground.
when a building permit is applied for, a site plan
Machine Translated by Google

36

we have information about the


current and future height level
(kotum) on the plot and it will be
6 In special building agreements it may be permitted to deviate from the provisions necessary to settle the case,
in para. 2, 4 and 5. the height level on thin plot pieces.

7 The building authority can permit small parts of the house, which usually protrude
from the houses themselves, for example ground, stairs, light boxes, balcony
(balcony) and the like, to protrude along building and road lines.

8 All exteriors of houses that are free must be made of such material and be
repaired in such a way, for example painted or plastered, that together with
those houses that stand nearby, they give a good overall picture. Also, the
shape and appearance of the building should be in such a way that it fits into
the landscape and surrounding area.

9 Planning height must be approved by the construction authority.


The planning height will be determined taking into account the existing land,
road and neighboring areas. It is also allowed for advanced planning heights,
where the land is laid out in such a way that this is one possibility.
Machine Translated by Google

37

CHAP. V. ROADS

§ 1. Analysis of roads
www.vejsektoren. UK;
www.vegvesen. en, handbook 017)
1 Some roads are to be separated from each other, which is laid or made
into a road, which consists of streets, channels and spaces.

2 The increase will be reduced to the road, if:

a) The public or more than one lute owner have agreed to travel on
the mountain

b) In addition to the town plan, property description, or register,


ensure that it can be used for road purposes.

3 There will be no fire in the road, if:

a) The general public or lot owners, who have consulted, also use it
for travel.

b) A fee is not paid for travel during marking or in any other visible
way.

4 The center line on the road will be technically required


the transfer at the municipality.
Machine Translated by Google

38

§ 2. About laying down and making roads

1 Crossing roads must be done according to applicable Danish and/or Norwegian


standards.

a) On the computer below, there are several guides


double cuts.

Norm. Eg.
Trip width min. width
m dm

60-70 mph 3,50 -

50 km/h 3,25 3,00


Cow variable
30-40km/t 2,75 -

10-20 mph 2,50 -

Parker Trucks and buses 2,60 -

ingsbreyt Personal cars 2,00 1,80

Single sugar variant 2,20 1,70


One-way gong and sugar
Chocolate switch 2,20 1,70

change/ A double-tracked sugar variant 2,50 2,50


channel to Two track gong and choke
the road switch 3,00 3,00

Part of the department changed 1,70 1,50


Chocolate channel 1,50 1,50

Go Normal gongubreyt 2,50 1,50


change Part of the department changed 1,30 1,00

b) The basis for determining the


for width (dimensioning) will be determined by
Tórshavn municipality.

c) When special circumstances speak for it, it may be allowed to make exceptions
to the road width requirements.

d) Vending spaces must be built according to applicable Danish and/or


Norwegian standards.
Machine Translated by Google

39

d) Holes must be laid at least 2 m


width

2. The road must be made in accordance with a project approved by


the town council.

Booklet 4 Crossroads
§ 3. Construction lines Handbook 017 Road and
street design
1. The building authority may require an adjacent building in front of
the road, which is, due to the second width of the road, to be built
up to 10 m away from the center line of the road + road register.

2. If the building authority complies with par. 1. has required a building


to be moved away from a road line, which may be increased
between this road line and that road line, which will be in the
future, will be required to widen the road.

§ 4. License to take over roads for special use

1. In roads that belong to private and public roads, even if they are
laid out and not made into a road, borings and cables will be laid
and placed like that, which according to the plan of the building
authority is necessary or thrown away.
Owners of unmade roads have an obligation to give access to the
road, which is necessary for inspection and repairs of this
equipment. The contract must always be, before work is started,
a document for damage that should be caused by this cause.

All permits for digging in the road and everything that will be put
in the road or that is removed for the road must be approved by
the city engineer, before digging can begin.

2. If it is necessary to move borings, cables, stands, etc., because


construction is taking place, the builder shall reimburse the
municipality or the building concerned for the removal of these
after removal. The same is true for all of us, we all have to wait
for the road that is forced by the building and which the building
authority can fix.

About public institutions such as the municipality or SEV


If we also sell this equipment, which is mentioned in 1, the seller
must give the buyer information about the above-mentioned
compensation obligations or make an agreement about who will
pay.
Machine Translated by Google

40

§ 5. Corner cutting and view increase

1 When the ground has a border against the road and it intersects at
an angle, which is smaller than 135º, this angle must be cut off
by a single line, which makes an equal angle with both road lines
and which must be 3 m long in ground area 1 and 2 and 5 m in
plots 3 and 4.

2 At the intersection of roads in plot areas 3 and 4, a view point must


be installed, and within this no part of the land, building, fence or
growth can be more than 1 m above the level of elevation in the
middle of the road in front of the plot in question.

3 The view must be comparable to Danish and/or


Norwegian norm

§ 6. Avtøka av vegum

1 The building authority may, when a special building consent is


made, decide that the existing roads and exits will be closed or
rearranged, when other road access will be ensured for the
concerned eyes.

2 It is not permitted to block the road with booms or in any other way
block public traffic, without the consent of the building authority
and the police. This consent may be withdrawn.

§ 7. Fence across the road

1 The building authority is authorized to decide that a piece of ground


must be placed opposite the road that runs ahead, otherwise the
mark between the ground and the road will be paid for in another
way.

2 When it comes to an industrial building, storage space and the like,


the building authority may require that the fence be placed high
enough against a neighbor's eye.
Machine Translated by Google

41

CHAP. VI. FURNISHING OF HOUSES

§ 1. Burum

1 Burums, two sitting rooms, bedrooms and similar beds, which are
intended for permanent accommodation by people during the
day or at night, must at least be closed.

2 Burums must at least have the same floor dimension of 6.5


m².

3 Residences with 4 apartments or more, the bed inside must be at


least 2.4 m high. In detached houses, the height can be reduced
to 2.3 m provided that the volume is at least 15m³.

In beds with slatted ceilings, the height must be at least 2.2 m


above one height, which is at least 3 m² and the volume must
be at least 15 m³.

4 Floor joists in burums may not normally lie lower than the outside
of the waist. Lumber replacements are unusual, it may be
possible that the bare floor under the wind eye wall lies to the
right, but the loin is on the outside.

5 Burums must have one wind eye dimension, which is at least 10%
of the floor dimension in the burum.

6 All cages must have at least one wind eye, which can be raised at
a free opening, which is at least 50 cm wide and 60 cm high.
The height + width of the free opening must be at least 1.50 m.

§ 2. Cooks

1. Kitchens must complete the requirements in § 1 regarding the floor


dimensions, volume, bed height, where they are and lighting conditions.

§ 3. Extra bed inside and outside the apartment


Machine Translated by Google

42

1 For extra beds not in the apartment, beds are intended for short stays
and are inside the apartment itself, such as doors, corridors,
dressing rooms, toilets and bathrooms.
We have extra beds, which are in the basement, in the attic or
outbuildings, some for example beds for non-garbage, sink beds,
cots, turkish beds, baby carriage beds, fire beds, fire beds, hobby
beds and shelves.

2 The floor size of toilets must be at least 1 m². In the bathroom next to
the toilet, the floor size must be at least 2 m². In residences with 4
apartments or more, the window width in the sink, coat rack and
towel rack must be at least 10% of the floor size.

§ 4. Apartments

1. An apartment must have at least one sitting room in addition to a


kitchen and toilet.

2. In all apartments, at least one bedroom - preferably the largest bed -


should have windows with good light.

3. Kitchens must have a kitchen table next to the work space and a sink,
storage for kitchen chairs, tableware, etc. and cooking space.

4. In the kitchen, there should be a very good channel bed in front of the
work space.

§ 5. Access and staircase replacement

1. Each residence must have stairs or direct access to the outside.


Stairs, doors and similar entrances must be made in such a way
and always be in such a condition that people can get a new toe
without any problems.

2. Outside the building authority's permission, no more than four


independent houses on each floor may have access to the same
stairwell.

3. Stairs, doors and similar access points shall be appropriate


channel bed and raised hatch heser tired:

a) In single-family houses (in semi-detached houses, terraced


houses, cottages and similar houses) at the second-floor
landings, the channel bed on the stairs between the floors must
be at least 80 cm, and the channel bed
Machine Translated by Google

43

on a possible basement staircase be at least 70


cm.

b) In two-family houses, the channel bed between the floors must


be at least 90 cm.

c) In other sitting houses, the channel bed on the stairs must be


at least 1 m.

d) Front beds from the stair bed and out must have a channel
bed, which is at least 1.2 m and the height inside must be at
least 2.2 m.

e) Up above stairs and stairwells, there must be at least 2 m high


free space painted in the gonglinjuni.

f) Indoor stairs must be made with a maximum of 18 cm steps


and a minimum of 25 cm of ground. Extra steps could be
made to a maximum of 21 cm steps and not less than a step.
In houses that have 2 floors above the basement level, stairs
may be made of combustible material at the rear, which has
class 1 cladding.

In houses with more than 2 floors above the basement level,


the stairs must be made of concrete or other fire-resistant
materials.

g) In single-family houses (up in semi-detached houses, terraced


houses, cottages, etc.) the stairs can be repaired up to 21 cm
steps, and no less ground than a step. On wooden stairs, the
guard on the back is not necessary, since the stairs only
connect 2 levels
together.

h) All stairs must have a strong balustrade on the bare sides,


which is at least 80 cm measured up from the front of the
stairs in stairwells. Vertical openings in the framework may
be a maximum of 12 cm wide. Watertight openings must be
made in such a way that children are safely protected. In
front of the wind eye or other opening, which is not at least
80 cm above the stairs or landings, a framework or other
suitable protection must be installed.

i) External stairs, which give access to more than one tenancy,


must be made of stone, concrete, iron gratings or the like.

j) External stairs to the main door must have at least 28 cm of


ground and other external stairs
Machine Translated by Google

44

at least 25 cm deep. The stairs may not be made more than


18 cm.

k) Outside stairs must have a balustrade if necessary.


Outside
basement stairs must have handrails on the other side.

l) Regarding stairs, which are different from the ones mentioned


above, the building authority in each individual case may
tighten or lower the requirements.

4. Balconies (balconies) and window doors must have frames that


are at least 1 m high. Vertical openings must not be more than
12 cm wide, and water openings must be made in such a way
that children are safely protected.

§ 6. Trash and the like

1. The space for rubbish bins or rubbish bags shall be as large as


the building authority needs. The bed, where the rubbish will be
kept inside, should have good light, and the door should only go
straight out into the field.

§ 7. Work house still bungalow house

1 The intentions regarding the incorporation of shop houses and the


access changes also apply to other houses in this respect, they
will be equalized with bungalow houses, or the intentions after
the assessment of the building authority are in accordance with
clear plans, which may be completed, when it is thought about
what will become of the building new to

2 In addition to what is required under par. 1, the building authority


may put forward additional requirements relating to instillation
and access to the tooth, if insurance, fire and health reasons
make it necessary.

§ 8. Work bed

1. The plans for the installation of dens, kitchens, extra beds in and
outside the apartment, will be used in relation to the installation
of work beds, unless the building authority approves deviations
from the plans.
Machine Translated by Google

45

2. The rooms, which will be used in connection with offices, storage


rooms and similar rooms, may be allowed with a smaller floor size,
bed height and light still installed.

3. Permission to install a work bed next to the floor, which lies under
the outside of the loin, can only be granted if the bed has drainage
or something else that protects against moisture from the ground.

§ 9. Lodging houses and the like

1. Special intentions apply to this, some of which will be intended


of construction value.

§ 10. Garage and garage

1. Interval sheds must stand at least 5 m from the goal to the road.
However, the building authority, when it is about a smaller road, or
when the land does not allow it, can give permission for a space
shed to be placed close to the road.

2. Garage sheds with a single floor dimension of up to 50 m² and


garage sheds with a single roof dimension of up to 50 m² must be
made in accordance with these instructions:

a) Possible flooring must be made of non-combustible materials.

b) The base (floor) must be sloped.

c) Car sheds must usually be ventilated through openings, which


are placed in the walls above each other.

d) It is not allowed to have a fireplace, otherwise it is


car shed, reinsilem for chimney.

e) In the event that a garage or carport will be built into a sitting


room or made in the basement of a sitting room - or at living
room level, the partition walls facing the sitting room must be
made of concrete at least 12 cm thick.

f) There must be an exit from the space shed, so that a BD-60 door
can be placed in the partition walls.

g) The floor, which is the ceiling above a garage or garage, must


be made with a surface inside, which is no worse than 13 mm
thick plasterboard.
Machine Translated by Google

46

3. Car sheds and carports with dimensions that are larger than
50 m² must in each individual case be made with the special
approval of the building authority.

GETS. VII. ÁSETINGAR UM CONSTRUCTION

§ 1. Ordinary croup

1. All construction work must be made from a material that is


durable and durable and in a manner that is both technically
and professionally sound and respectfully paid for.

2. In order that work can be done in anticipation of the weather,


necessary measures must be put in place.

§ 2. Need for building space

1. While construction work is being done, during demolition,


blasting and when the ground is broken, the insurance
measures must be put in place, which are necessary to
ensure people and property.
When the fire wall is built, insurance must be obtained to
ensure that the necessary construction measures on the
neighboring land in relation to the building can be carried out.

The building authority may in special cases require that the


building space be fenced inside.

2. The building constructions shall, during construction, where


necessary, be strengthened against constraints.
Casting forms, bars etc. must be strong enough and be made
to look.

3. Toilets, which are on the construction site, must be installed


and stand in such a place that they are not an obstacle for
people passing by or living next to them.

4. The access road to and from the construction site itself must
be reinforced in a safe manner and must be fenced in such a
way that they are in good condition.
Machine Translated by Google

47

the building site, and shall, if necessary, be redeveloped.

5. Roads may not, unless a special permit is obtained, be used for building
space or for storage of goods.

§ 3. Foundations and basement floor

1. Foundations must be brought down to a solid base.

2. Foundations must be made of ordinary concrete or other material,


which is uniformly strong and durable.

3. Bases must be at least 20 cm thick or at least have the same dimension


as the load-bearing part of the wall that stands on the base.

4. Basement floors must usually be made of concrete.

§ 4. Basement exterior walls

1. Basement exterior walls must be made of ordinary concrete, concrete


block stone or raised rubble.

2. Basement exterior walls must be at least 20 cm thick.

3. When the basement exterior walls are more than 1 height above the
usable ceiling height, either the dimension or the strength must be
increased.

4. Adjacent to basement exterior walls, which are affected by earth


pressure, similar measures must be taken or the exterior walls will be
supported by double walls or the like if necessary.

5. The cases mentioned in subsections 3 and 4 must in all cases be


approved by the building authority.

§ 5. Exterior walls

1. Exterior walls may be made of concrete, block stone and wood or other
materials approved by the building authority.
Machine Translated by Google

48

2. In houses with at most one floor and more ceiling height, exterior
walls may be made of 20 cm concrete, 20 cm block stone or 15
cm reinforced concrete. Exterior walls made of wood may be
made of posts, some of which are at least 45 x 95 mm with a
maximum of 60 cm between them. The frame layer must be
securely attached to the base, return floor, upper room and the
excess must be trimmed to the necessary extent.

3. In houses with 2 floors, the exterior walls at living room height


may be made of 25 cm concrete, 25 cm block stone or 20 cm
reinforced concrete, and the exterior walls at the upper level
from 20 cm concrete, 20 cm block stone or 15 cm reinforced concrete.
If the exterior walls are made of wood, the building authority
must approve the construction.

§ 6. Bearing retaining walls

1. Load-bearing retaining walls may be made of concrete, concrete


elements, block stone or wood or other materials approved by
the building authority.

2. In houses with at most one level and more ceiling height, partition
walls at the basement level canbearing
be made of 15 cm in

concrete, concrete elements or block stone or some wooden


wall with at least 45 x 95 mm posts with a maximum of 60 cm
between each post.

3. In houses with 2 floors, load-bearing partition walls in the basement


and living room height can be made of 15 cm thick concrete or
block stone, load-bearing partition walls in the upper floor from
10 cm concrete or block stone or some wooden wall with at least
45 x 95 mm posts at most 60 cm between each post. In relation
to the load-bearing partition walls made of wood on both upper
floors, the building authority must approve the construction.

§ 7. Partition walls that do not carry

1. Special requirements for the construction of non-load-bearing


partition walls will not usually be placed.
Harafturímót is not valid in checks, there are special declarations
regarding insurance against fire and indemnification, cf. VIII and
X chapters.

§ 8. Return floor
Machine Translated by Google

49

1. Subfloors between floors may be made of reinforced concrete,


weathered elements or some wooden or iron beams.

2. Cuts in beams for water lines and the like must not be made
far away from the mine more than 1/4 of the time, it lies free,
and the cuts in the upper and lower sides of the beam must
not go deeper than 2 cm. A cut or boring for vertical boring
must also not be longer than 1/4 of the free lying area, and
no more than 1/4 of the cross section may be cut away.

3. When the beams are laid on both sides and tie together the
load-bearing external walls, passing beams at least 3 m apart
must be laid from external wall to external wall.

4. Those beams that must be passable, must


have ties at both ends.

5. Wooden beam ends, which will be laid on concrete, must be


laid on roofing paper or similar. Cross-walk ledges may not
be used in places where two floors, one on top of the other,
have some wall thickness.

6. Wooden beams on those doors, which will be laid on concrete,


must be protected with wood preservatives.

7. Cribs under wooden beams must be ventilated in a hustling


manner.

§ 9. Floor

1. Wooden floors, they will be made of deviation 13, 16 or 19 mm


water-supported, plowed plywood boards, must have one
gap from center to center on the beams, the maximum
deviation is 41, 51 and 61 cm.
In wooden floors, which will be made of 22 mm parquet
boards, there must be at most 70 cm between beams.
In wooden floors, which are made of hollowed, plowed boards
with a thickness of 28 or 22 mm, there must be a maximum
deviation of 100 cm or 80 cm between the beams.

2. Regarding wooden floors, which will be laid on screeds on


reinforced concrete or element decks, the dimensions and
features mentioned in paragraph 1 apply.

§ 10. So
Machine Translated by Google

50

1. Outer beams made of wood may be used for trusses or frame


rafters or some axle construction.

2. Roof rafters, skylights, roof windows and other openings in the roof
surface may be installed in accordance with the stability of the
roof structure.

3. All roofs and roof beds must be accessible for inspection and
inspection. If there is no other way to reach the attic, the ladder
must be in the stairwell.

4. The dimensions of the upper rooms, like the other type, must be
approved by the building authority.

§ 11. Acknowledgments and blessings

1. Rafters, skylights, roof windows and other openings in the roof


surface may be placed in this gap, but they are not needed for
fixing in the roof.

2. The width of the rafters, measured where the front side meets the
roof, must not be greater than half the length of the roof side
where the rafters will be placed.

§ 12. Technology

1. In order to accept ceiling board and similar cases, it can be made


of waterproof, plowed plywood
from boards, which are 13, 16 and 19
mm thick.
The distance from center to center on the rafters must be 61, 91
and 122 cm, respectively. If the rafters will be made of 25 and 19
mm thick planks, the distance between the rafters must be 100
and 60 cm, respectively.

2. Rupp boards made of eternitt must be supported at least every 1.1


m. If we have a slope of 30o or less, the boards must be supported
at least every 55 cm.

3. If another type of income is used, the building authority shall


benign dimension and type.
4. Roofs must have gutters and downspouts or run-off inside, and the
income must slope opposite these gutters. On houses that stand
on their own, the building authority can lie that there is no need to
make gutters.
Machine Translated by Google

51

§ 13. Other constructions

1. Other constructions still clear in this chapter mentioned


must be approved by the building authority.

CHAP. VIII. FIRE WOOD EXCHANGE

1 The requirements in the "Regulation on fire protection and fire


insurance §§ 1-19 (RBB) apply to fire protection plans.

CHAP. IX. FIREPLACES, HEATING WORKS


AND CHIMNEYS

1 The requirements in the "Regulation on fire protection and fire


insurance §§ 20-25 (RBB) apply to installations for fireplaces,
heating systems and chimneys.
Machine Translated by Google

52

CHAP. X. INDEMNIFICATION AGAINST THE SLAVS

§ 1. Slav, which arises from the ground

1. In external walls and partitions made of materials other than


concrete, there must be one barrier layer, which is not penetrated
by a slave, about 15 cm above the ground level. If basement walls
or foundations made of concrete go up to the ground level, one
layer of protection must be laid.
If the lowest floor is laid lower than the protection layer, special
measures must be taken to protect the floor. On foundations, the
slav protection and the meeting between the walls and the
foundation must be in such a way that water that seeps in will not
be sucked up by the back wall, but will be carried away.

2. Exterior walls, facing the ground, must be protected on the outside


with asphalt or concrete or another safe way.

3. In crawler beds and other low beds, which are under a floor made of
wood, one layer of concrete, which is at least 8 cm thick, must be
poured on the ground. In those waters, this does not apply,
because water seeps out from under a rock, and care must be
taken to ensure that the water is removed.

4. Cots and other spaces that are under the floor must be ventilated.
Under wooden floors, the ventilation must at least be such that in
each of the external walls at equal intervals there will be an air
cleaning opening, the vent, which is not less in number than the
length multiplied by 6 plus 1, where L is the length of the wall
measured in meters.
Air cleaning openings must each have one dimension, which is at
least 150 cm².
The openings must be gridded or similar, so that they cannot be
lost again. In the return beds in the shots, there must be openings
corresponding to the openings in the outer walls.

§ 2. Slevja (condensation)

1. Income and ceiling space must be aired or otherwise used against


sloppiness.
Machine Translated by Google

53

2. Entrances, which also have a new tree or other organic material,


must have ventilation openings placed in such a way that the
entire underside of the entrance will be ventilated. The total
net dimension of the air cleaning openings must be at least
1/500 of the built-up height. Between the income made of
wood and the heated bed, a vapor-like layer must be placed.

3. All constructions must be done in such a way that there is no


slop on both the exterior and interior of the constructions. It
may be noted here that godlike lies must always be placed on
the hot side of the responsibility.
Machine Translated by Google

54

GETS. XI. PROFESSION OF FAITH

§ 1. Ordinary croup

1. The heat transfer efficiency of the insulation will be specified at the


transfer coefficient K measured in Kcal/m² hoC.

2. Houses, which must be insulated against heat in accordance with the


requirements, which will be carried out below, can only contain cold
bridges to a small extent, and must be made in such a way that the
heat loss does not increase significantly due to wind and snow.

§ 2. External walls and return beds

1. Outer walls that separate cages, galleys and extra beds, and return beds
that separate the said bed from the cold beds, must be made in such
a way that the flow angle K does not go up this way:

Heavy outer walls and return bed against roof bed 0,5

Low outer walls and return bed opposite roof bed 0,4

Glass exterior walls 2,7

Transfer bed to bed we have a temperature of 1.0

2. Tey in 1 mentioned requirement regarding thermal insulation can usually


be steamed at the ends of these constructions:

a) External walls with a weight of less than 100 kg/m² - K max. 0.4

Timber-framed wall, exterior clapboard cladding, internal cladding


and paneling, cavity covered with 10 cm rockwool or similar non-
abrasive material.

Wooden frame wall with cladding board outside ventilated cavities


and more windproof cladding, board cladding inside and the cavity
filled with 10 cm rock wool.
Machine Translated by Google

55

b) External walls with a weight over 100 kg/m² - K max. 0.85

Above-mentioned constructions, beyond 23 cm walls made of


aerated concrete blocks, 700 kg/m³, guaranteed by 5 cm stone
wool.
20 walls made
cm of glued together aerated concrete blocks, 550
kg/m³, protected by 5 cm stone wool.

20 cm concrete wall protected by 3 cm stone wool.

c) Partitions against non-heated beds - K max. 1.0

The above-mentioned constructions include 10 cm walls made


of aerated concrete blocks, 700 kg/m³, batten base with plate
cladding on both sides, the cavity covered with 5 cm rock wool.

§ 3. Floor and ceiling

1. The floor, ceiling and ceiling, separating cages, kitchens and extra
beds from the air or the ground or from cold beds, must be done in
such a way that the transport factor K does not go up through the
table below:

Floor made directly on soil density 0.3


Floor above ventilated cribs 0.4
Return floor versus bed we ongm heat 0.4
Ceiling and roof types, delimiting a heated bed
0,3

2. Tees in 1 mentioned requirement related to thermal insulation will


usually be steamed at the end of these constructions:

a) Floors and return floors directly on the ground level or outside -


K max. 0,3.

Reinforced concrete to a wooden floor on screeds, guaranteed


by 10 cm stone wool or the equivalent 16 cm Holstein tire to a
wooden floor on screeds, guaranteed by 10 cm rock wool or
equivalent in the outer perimeter (1 m in front of the outer
walls) and 5 cm rock wool or equivalent in the inner perimeter
(from 1 m to 6 m from the outer wall). Wooden beam layer with
plywood, precasting and plasterboard is responsible for 10 cm
rock wool or equivalent.

b) Floors and return floors against beds with heat K max. 0.4.

Clear constructions, some of which are mentioned under a, in


addition to underlays for plywood, precasting and
Machine Translated by Google

56

plasterboard covered with 10 cm rock wool or equivalent.

Reinforced concrete with wooden floor on piles, covered by


10 cm rock wool or equivalent,

16 cm Holstein tire on wooden floor on slats, covered by 7.5


cm steam wool or equivalent.

c) Ceiling and ceiling constructions, delimiting the heated bed -


K max. 0,40.

Underlays outside the floor slabs, but with precasting and


plasterboard, guaranteed by 10 cm rock wool or equivalent.

Ceiling board income for precasting and plasterboard,


guaranteed for 10 cm rock wool or equivalent.

§ 4. Windows and doors

1 Window blinds (with the exception of ventilation ducts and the like),
glass partitions and exterior doors that separate cellars, kitchens
and extra beds, must be made in such a way that the transport
factor K for both glass dimension and frame frame type does not
exceed this tool:

Vindeygu 2,7
Doors 3,1

2 Tey in 1 mentioned requirement related thermal insulation will


usually be vaporized at the end of the below mentioned wind eyes.

Vindeygu - K max. 2,70

2 layers of glass with at least 12 mm air gap.

§ 5. Second house

1 The recommendations for thermal insulation of beds in boarding


houses will be used in relation to beds in other buildings, this is
to be balanced with boarding houses, or the recommendations
after assessment by the building authority correspond to the
requirements that may be set due to the use of the buildings.

§ 6. Work bed, etc.:


Machine Translated by Google

57

1 Work beds, located in handholes next to the extra beds,


which belong to them, and which due to their use must
be heated to at least 18 ºC, must be protected against
heat loss in accordance with the above mentioned
requirements.

2 In the case that such beds should not be heated to 18 ºC,


the above-mentioned transfer rate may be increased by
50%. For ceiling and roof types, which delimit a heated
bed, the transmission coefficient K to can be increased
to 100%.

3 Work beds, which receive a lot of heat from the mask or


oven, or which will be particularly well ventilated, or which
must not be heated more than 10 ºC, must be guaranteed
for the corresponding use, so that a full return is obtained.
Machine Translated by Google

58

GETS. XII. LUFTNÝGGJAN

§ 1. Ordinary croup

1
In houses, the single bed should get enough fresh air and have
natural or mechanical ventilation, which is necessary for support
and use.

2 Burrooms must be guaranteed fresh air at the windward eye,


which can be left open, or an outside door, while no smoke hole
or vents will be required.

3 In kitchens, ventilation will be ensured by wind eyes, which may


be raised and adjusted (or slatted) or outside doors. Fresh air
can also be ensured by a single valve in the outer walls; the
other free opening must be at least 30 cm².

Kitchens must also be ventilated naturally through an exhaust


hood, which must be at least 150 cm² in two ways or with more
mechanical ventilation, which can provide a single air supply of
no less than 60 m³ at the time.

4 In toilets and bathtubs, fresh air must be ensured at wind holes,


which may be open and some are at least 0.2 m² or at a valve
with an opening of at least 100 cm².
Fresh air can also be ensured by an air freshening channel or
flap over or under the door.
Toilets and bathtubs must also be naturally ventilated by means
of an exhaust fan, it must be at least 150 cm² in two ways, or
the amount of air will not be less than 60 m³ in time.

5 Fresh air must be ensured in washrooms and turkish beds at the


window openings and, in addition, at a free opening, which is at
least 150 cm² either outside or under the door to the corridor
next to the door or outside the window openings. Washrooms
and drying rooms must also be ventilated naturally through a
dust extractor, which must be at least 150 cm² in two ways or
with more mechanical ventilation, which can provide a single air
supply of no less than 60 m³ at the time.

6 The building authority can claim that the requirement for natural
ventilation from kitchens in single-family houses (detached
houses, terraced houses, cottages and similar houses) will be
waived, when the electric ventilation, which has a connection to
the outside, will be done. The building authority can harafturat give a lift
Machine Translated by Google

59

regarding the requirements for natural ventilation from sinks


and turkish beds in single-family houses, etc., since the
windows in these beds are too low, or the beds in another way
have the possibility to get adequate ventilation. In large
laundromats with enough washing machines, it will be enough
new, the building authority can put forward a requirement for
a larger air supply and the air freshening is still required in
section 5.

§ 2. Type of air conditioner

1 Air cleaning ducts, which will be routed through the floor or walls,
which delimit fire elements, must, outside the first fire element,
which the duct vents, be connected to walls that at least
correspond to BD-house section 30.
This requirement does not apply to air vents, which are in
unused attic space above the upper floor.

§ 3. Natural air exchange

1 Ventilation for rectangular cross-sections must be done in such


a way that the slope between the longest and shortest side is
not more than 2:1, and must not have a smaller opening for a
distance of more than 10 cm.

2 Eitt luftræsi má ikki uttan góðkenning byggivaldsins


suck air from more than one bed.

3 Vents must open directly under the ceiling in these rooms, tey
air, and the opening must have the same cross-section as the
vent.

4 Air vents may be installed on a slope above the upper floor; the
angle can even in some cases be less than 30º in relation to
the water flow flat.

5 Air vents should go vertically up the entrance and be placed in


such a way that the wind does not blow down, and they should
be placed away from drafts, drafts and downspouts in the roof.

6 More vents may end under the same hood, but the ends of the
vents themselves must all lie in the same plane, equidistant
from the upper edge of the hood, unless the building authority
approves that the ends of the vents be done in a different way.

§ 4. Mechanical air exchange


Machine Translated by Google

60

1 Air vents must close the gap from the building authority regarding
tightness.
Some of the guidance below can be used.

Pressure Verified The slowest possible leak


gauge mm VS m³/m² . h
mm 20 4
VS 5-40 41-100 70 8

2 Vertical ventilation ducts for the upper floor can be connected to


the main duct, which is connected to the ventilators.

3 Ventilators, which will be connected to a duct larger than 1500


cm², must be located in special beds, which are attached to
the walls, ceiling and floor, at least as BS-Housalut 30. Small
ventilators may be located in unused roof beds, but may not
be outside the good theory of the building authority will be put
to bed, it will be used for another purpose.

4 Air from the air exchange equipment, which will be led away from
sitting houses, must be led away over the ceiling and out into
the air from windows and doors.
Machine Translated by Google

61

CHAP. XIII. SECOND WOOD


REPLACEMENT RELATED BUILDING

§ 1. Poem exchange

1 The construction authority pre-orders, when and where the


trade-offs make it necessary, the higher intentions regarding
the poetry trade-offs.

§ 2. Deposits

1 The building authority pre-ships, if and when the changes


make it necessary, the relevant intentions
posts of all kinds.

CHAP. XIV. EXIT

§ 1. Changes in the building agreement

1 Changes in the building agreement may be made after the


approval of the town council and with the approval
of the national board according to the rules regarding the
acceptance and approval of new building agreements.