Digital Applications for Large Buildings & Critical Facilities - IEC design guide
Ref: ESXP2G001EN
https://www.schneider-electric.com/tools/registration/promo/ww/en/countryselect/A09116
• Insulation Monitoring
• Electrical Distribution Monitoring & Alarming
• Backup Power Testing
• Energy Usage Analysis
• Power Factor Correction
Healthcare
300-Bed Hospitals
IEC Electrical Reference Architecture Guide
schneider-electric.com/ecostruxure
www.schneider-electric.com Healthcare - 300-Bed Hospitals Healthcare - 300-Bed Hospitals www.schneider-electric.com
Introduction - Patient Safety with the IEC Standard Electrical Distribution Principle
The main objective of the electrical distribution design is Continuity of services in the Hospital is mainly provided by:
IEC Electrical Reference Architecture Guide 3 4 IEC Electrical Reference Architecture Guide
www.schneider-electric.com Healthcare - 300-Bed Hospitals Healthcare - 300-Bed Hospitals www.schneider-electric.com
Reduce Risk and Ensure Future-Ready Design Avoid Downtime by Preventing Power Failures
Compliant with IEC Standard & Best Practices The Power Monitoring and Control system
reinforces and maintains energy availability
performance for the full life cycle of the
Hospital building.
DC DC This system shall be composed of:
AC AC
• Power Monitoring and Alarming Easergy
T300
• Live data display
MV ATS
Car park Utility 1 Utility 2 2N MV/LV Roof - Native support for a wide range of devices
Solar Backup redundant Solar and communication protocols
transformers
- Electrical network Single-Line Diagram (SLD)
including real-time device status.
N +1 diesel
• Events and alarms
Generators
- Chronological display of events and alarms Electrical distribution - power network
with sorting and filtering capabilities
Main LV Main LV - Intelligent alarm grouping into summary Masterpact NT06
630 A
switchgears switchgears incidents.
See Digital applications for Large Buildings & Critical Facilities
- Part 1 Electrical distribution monitoring & Alarming Compact NSX
250 A
• Specific Alarming
By automatically sending notifications for
Compact NSX
alarms and events to designated users using 100 A
Centralised mobile devices, users can quickly identify
UPS (N+1) system abnormalities and take appropriate
Acti 9
action. Speci�c alarm focus on UPS Galaxy VS* iC60
UPS
Specific alarms are focused on the UPS by
centralizing all UPS remaining battery time. LV Circuit Breaker
Operating
Ward feeder A centralized operating ward alarm system Discrimination
is also recommended by the IEC standard. * Native device integration pending for Galaxy VS.
IEC Electrical Reference Architecture Guide 5 6 IEC Electrical Reference Architecture Guide
www.schneider-electric.com Healthcare - 300-Bed Hospitals Healthcare - 300-Bed Hospitals www.schneider-electric.com
Avoid Electrical Fires and Ensure Protection Reduce Electric Shock and Downtime Risks
The risk of fire is clearly identified in the There shall be a focus on the electrical risk in the
IEC 60364-7-710 installation guide for medical operating theatre due to the patient environment.
locations and IEC 60364-5-51 installation guide More and more electrical equipment is being Main LV
DC DC
UPS
for electrical equipment due to dense occupation AC AC
Switchboard
connected invasively or intrusively in the
and di culty of evacuation (BA3 and BD4). patient's body.
Car park Utility 1 Utility 2 2N MV/LV Roof
• Redundant MV/LV dry transformer Solar Backup redundant Solar Due to the wet location classification, this area
In many cases, dry type transformers
transformers must be protected against indirect contact
are selected for public and/or high rise of electricity.
N +1 diesel
buildings instead of oil type transformers. Generators
Trihal MV/LV transformer
The transformer's windings temperature and Canalis busbar Acti9 Acti9
• Group 2 medical location Smartlink SI B
must be monitored through PT100 probes. Main LV Main LV
Smartlink SI B
By adding Easergy TH110 thermal sensors at The main solution provided to protect the Main Emergency
switchgears switchgears Isolated Smart Panel
the connexion points, preventive maintenance patient from electric shock is managed through supply supply
is reinforced by permanently detecting the Insulation neutral system (IT) as
temperature deviation from normal recommended in IEC 60364-7-710.
operating conditions. Away from the patient environment, in the
Centralised operating room and intensive care unit the TNS
• Busbar connection instead of cable UPS (N+1)
network is well protected by the RCD 30 mA –
The first application is the link between the MV/ SI model for load sensitivity and the RCBO
LV transformer and the Main LV Switchboard Masterpact compact model. RCD protection must be
MTZ Operating
due to power performance, and as a minimum Ward feeder installed for all TNS sockets and lighting
Remote TNS
the vertical busbar in the case of a high-rise Control systems as a minimum.
Canalis
building design. KSA Lastly, to complete the electrical protection
• Main LV breaker facility design, the IEC standard recommends
Remote control of the LV Masterpact breaker installing the Isolated Smart Panel less than (x6)
in the Main LV Switchboard is a good idea, Isolated 25 m from the IT sockets.
Smart
through the use of Bluetooth technology. Panel
• Group 1 medical location
• Arc Fault Detection Device The RCD 30 mA SI model is also recommended Acti9
Smartlink SI B
According to IEC 60364-7-710 an Arc Fault Acti9 due the connected electronic devices. 24
Sheddable Hospitalisation Security Operating rooms Data Arc Fault Vdc Vigilohm
Detection Device is not required in the load ward switchboard & Intensive Care Unit Center Detection • Group 0 medical location and other IM20-H
distribution board of a Group 2 location Device Insulation
The RCD 300 mA /RCD 30 mA type B is
due to the 24/7 presence of medical sta Monitoring
recommended for the application including Device
able to react in case of fire. (x12)
3-phase motors.
• Isolated Smart Panel
Vigilohm
The design of the distribution board for the IMD IFL12H
Operating room and Intensive care unit is 100% Insulation Fault Locator
IEC standard-compliant: Acti9
Smartlink Modbus RS485
• IT and TNS network
See Healthcare 300-bed IEC Hospital "Distribution boards" - Isolated Smart Panel folio
• Double incomers with ATS 30 ms transfer
performance
• Total breaker discrimination
• Isolated transformer and monitoring system
• Insulation fault location
• Monitoring system.
See Digital applications for Large Buildings & Critical Facilities
- Part 1 Insulation Monitoring
Operating Ward dashboard
IEC Electrical Reference Architecture Guide 7 8 IEC Electrical Reference Architecture Guide
www.schneider-electric.com Healthcare - 300-Bed Hospitals Healthcare - 300-Bed Hospitals www.schneider-electric.com
Save Money by Reducing Energy Costs Maintain Compliance with the Regulations and Sustainability
IEC Electrical Reference Architecture Guide 9 10 IEC Electrical Reference Architecture Guide
www.schneider-electric.com Healthcare - 300-Bed Hospitals
The Generator capacity report checks the Generator Load Summary report
redundancy performance depending on load
change. Load discrimination (Groups 2,1 and
0) is used to inform key decision of whether
to buy a new Generator or reinforce load
shedding automation.
• UPS monthly test:
The IEC 60364-7-710 standard recommends
monthly testing of the endurance UPS backup
system on battery within minimum 50%
connected load for 15 min. By incorporating an
auto test function, the Galaxy VS fulfills this
testing requirement.
In addition to this global auto test facility, a Lithium
battery system can identify precisely which cell
of the battery has failed when this occurs.
This optional accurate diagnosis reinforces
energy availability performance and
UPS Monthly Test report
operational e ciency.
• Operating room Isolated power report
For each Vigilohm IM20-H in the room,
the report shows:
•Impedance graph - Displays a comparison
of impedance measurements with the
impedance threshold. The impedance
threshold is a blue line and the actual
measurements are shown as a green line.
A red line shows occasions when impedance Schneider Electric Industries SAS
has dropped below the threshold. 35, rue Joseph Monier
•Transformer load graph - Displays a CS 30323
92506 Rueil Malmaison Cedex
comparison of transformer load France
measurements to the load threshold.
The threshold is a blue line and the actual RCS Nanterre 954 503 439
Capital social 896 313 776 €
measurements are shown with a green line.
www.schneider-electric.com
A red line shows occasions when the load
has risen above the threshold.
•Events table - Shows information for each
event that occurred in the date range. March 2019
•Data log table (optional) - Contains ©2019 Schneider Electric. All Rights Reserved. Life Is On Schneider Electric is
measurements for impedance, load, and Isolated Power report a trademark and the property of Schneider Electric SE, its subsidiaries and a liated