TITLE SHEET 1 OF 9
MECHANICAL SYSTEMS - 4
SPEC. NO.TCE.3837A-H-
500-01
WATER SYSTEMS
12.1 The water treatment plant shall provide make up water of the
specified quality (demineralised) and quantity to meet the feed
cycle make up requirement of the HRSG. The treatment is covered
in two stages - filtration and demineralisation. The filtered water
serves as influent to the demineralisation plant and the filtered
water is also utilised as plant potable water.
12.1.1 Alum dosing system with tanks and pumps shall be provided
upstream of filter to limit the turbidity levels. Clarified water shall be
subjected to chlorination to destroy organic matter and algae at
suction of water treatment plant supply pumps.
12.1.2 DM plant shall consist of 2 trains, of 50% capacity each. Each train
shall consist of the following units in the following sequence:
12.1.4 Waste water from the DM plant and filters shall be led to a common
neutralising pit. The neutralising pit shall be in two compartments
and the active volume of each pit shall be atleast 120% of the total
waste arising from regeneration of one complete DM plant train and
filter back wash water. Plant shall be designed in such a way that
the regenerant effluent from cation, anion and mixed bed units shall
neutralise each other.
12.1.5 Suitable bulk acid / alkali tanks and measuring tanks required for
regeneration of ion exchange units shall be provided. 30% HCL
and 48% NaOH shall be used as regenerants. DM water shall be
used for regeneration and suitable capacity DM regeneration tank
with associated pumps shall be provided.
12.1.6 The back wash water for the filters shall be led from the filtered
water over head tank which shall have adequate capacity for
washing all the filters and also cater to about two (2) hours potable
water requirement of the plant. Filtered water overhead tank shall
be filled through a line from the outlet of filters.
b) Plant Instrumentation
ii) Inlet (rate of) flow indicators and outlet flow totalizers.
c) Annunciations
ISSUE
R0
This system shall meet the service water requirements of the plant
including makeup to the air-conditioning and ventilation system and
other miscellaneous services. Water from the clarified water
storage tank shall be drawn by two (2) Nos. (1 operating + 1
standby) service water pumps and led to the service water
overhead tank of 8 hours storage capacity. The tank shall be
located at a suitable elevation so as to ensure distribution of water
to all the consumption points by gravity. The service water pumps
shall be housed in the clarified water pump house.
(a) This system shall supply potable water (of filtered water
quality) to the plant. Potable water shall be drawn from the
ISSUE
R0
(c) Control panels required for the service water pumps shall be
located in the clarified water pumphouse and the control
panels for the potable water pumps shall be located in the
water treatment plant building.
ISSUE
R0
Design Code for tanks and pressure IS : 2825/ ASME Sec VIII
vessels
c) Type Vertical
2.0
Activated Carbon Filters
a) Total Numbers Two (2) x 50% capacity
c) Type Vertical
REV. NO. Ro PPD. BY : JOB NO. CLIENT: VEMAGIRI POWER GEN. LTD.
DATE Nov 2001 CKD. BY : TCE. PROJECT : CCPP at Vemagiri
REV. BY DATE : 3837A
CONSULTANTS: TCE CONSULTING ENGINEERS LIMITED TCE FORM 330 R1
VEMAGIRI POWER GENERATION LTD. SECTION : D1.12
SPEC.NO.TCE.3837A-H- DATA SHEET - A1.12.1
500-01
WATER TREATMENT PLANT SHEET 7 OF 9
REV. NO. Ro PPD. BY : JOB NO. CLIENT: VEMAGIRI POWER GEN. LTD.
DATE Nov 2001 CKD. BY : TCE. PROJECT : CCPP at Vemagiri
REV. BY DATE : 3837A
CONSULTANTS: TCE CONSULTING ENGINEERS LIMITED TCE FORM 330 R1
VEMAGIRI POWER GENERATION LTD. SECTION : D1.12
SPEC.NO.TCE.3837A-H- DATA SHEET - A1.12.1
500-01
WATER TREATMENT PLANT SHEET 8 OF 9
v) Degassed Blowers
a) Quantity 2 x 100%
b) Capacity By Bidder
b) Bulk Chemical Storage Tank 2 tanks each for storing 30% HCl
capacity and 48% NaOH. Each tank shall
be of 15 tons storage capacity.
c) Acid & Caustic Dilution Stations Dilution tanks adequate for one
regeneration, with 20% margin on
capacity, online mixing tees with
block & bleed, and ejectors.
8.0 Sodium Hypo Chlorite ( NaOCl) Dosing 2 x 100% capacity NaOCl dosing
System pumps, 2 Nos.dosing tank each of
capacity to store one shifts
requirement of chlorine.
a) Pipe materials
12.2 Strong acid cation unit Sodium at the outlet = not greater
than 1 ppm as Ca CO3 (av. leakage)
12.4 Strong base anion unit i. Silica at the outlet = 0.1 ppm as
SiO2
ii.CO2 at outlet = Nil
iii.Conductivity = not greater than 6
micro mho/cm
12.5 Mixed bed unit Total solids at the outlet = not greater
0.15 ppm in which silica shall not
exceed 0.02 ppm
Conductivity at the outlet = not greater
than 0.1 micro-mho/ cm @ 25 deg. C
REV. NO. Ro PPD. BY : JOB NO. CLIENT: VEMAGIRI POWER GEN. LTD.
DATE Nov 2001 CKD. BY : TCE. PROJECT : CCPP at Vemagiri
REV. BY DATE : 3837A
CONSULTANTS: TCE CONSULTING ENGINEERS LIMITED TCE FORM 330 R1