Professional Documents
Culture Documents
Addendum 2 BoQ CPPD Karawang Final
Addendum 2 BoQ CPPD Karawang Final
Addendum 2 BoQ CPPD Karawang Final
30,227,611,968
Jumlah 3,341,835,552
C. TOTAL
No Pekerjaan Total
1 A. PEMBANGUNAN GEDUNG 30,227,611,968
2 B. SARANA & PRASARANA LINGKUNGAN 3,341,835,552
JUMLAH 33,569,447,520
DAFTAR HARGA SATUAN UPAH & BAHAN
PEMBANGUNAN GEDUNG CABANG PELAYANAN PENDAPATAN DAERAH PROVINSI WILAYAH KABUPATEN KARAWANG TAHAP I
TAHUN ANGGARAN 2017
Harga Satuan Bahan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 1
HARGA SATUAN
NO. TENAGA KERJA SATUAN
(Rp.)
49 Plint keramik uk. 10x60 cm bh
50 Step Noshing 10 x 60 cm bh
51 Drymix Floor hardener @ 25 kg kg
52 Beton ready mix K300, tanpa pompa dll m3 ###
53 Beton ready mix K350, tanpa pompa dll m3 ###
54 Tiang pancang (pile/ready mix) Uk. □ 40x40 m
55 Drop Hammer Luar Kota unit
54 Beton Gravel U 40 cm m'
55 Batu alam andesit basalto hitam Finishing bakar 20 x 40 m2
56 Air ltr
57 Kanstten 40x20x10 cm m'
58 Tiang Beton bertulang 300x16x20 cm btg
59 Panel Beton bertulang 240x40x5 cm lbr
60 Pondasi Precast 80x38x50 cm set
60 Kawat Duri Y 7 m'
61 Besi Siku L. 40 x 40 x 4 m'
C BAHAN KAYU
1 Kayu Balok Kamper Samarinda Basah m3
2 Kayu Balok Rasamala m3
3 Kayu Papan Terentang m3
4 Dolken dia. 5 s/d 7 cm btg
5 Dolken dia. 8 s/d 10 cm btg
6 Multiplek 9 mm, uk. 1,2 x 2,5 lbr
7 Multiplek 12 mm, uk. 1,2 x 2,4 lbr
8 Multiplek 15 mm, uk. 1,2 x 2,4 lbr
9 Multiplek 18 mm, uk. 1,2 x 2,4 lbr
10 Plywood 9 mm lbr
11 Megateak 4 mm, uk. 1,2 x 2,4 lbr
12 Gypsum Board, Set. jayaboard, uk. 1,2 x 2,4 lbr
13 Gypsum knauf, Set. uk. 1,2 x 2,4 lbr
14 GRC / Kalsiboard lbr
15 Aclirick uk. 1,4 x 2,5 m2
16 Shunda Plafon 30 x 100 cm m'
17 List shunda plafon m'
18 List gypsum 7 cm m
19 List gypsum 10 cm m
20 HPL lbr
21 MDF Tebal 18 mm m2 ###
22 karpet 0% Woll, 100 % Nylon m2 ###
23 Karpet Bahan Polypropelene (Tajima, DESSO, Aximinster) m2 ###
24 Vertical blind m2 ###
25 Shadow line m' ###
D BAHAN CAT
1 Plamur Tembok Set. MATEX kg
2 Cat dasar kg
3 Cat tembok kg
4 Cat tembok Interior, warna Stand. liter
5 Cat tembok Exterior, warna Std. liter
6 Cat besi/kayu Set. Avian kg
7 Lem kayu kg
8 Lem kuning kg
9 Sealent tube
10 Rol Cat bh
11 Cat Duko kg
12 Kuas bh
13 Water Proofing coating liquid setara SIKA m2
14 Water Proofing membrane 3mm m2
15 Wallpaper m2
16 Sealent GE / Dow Coming Non Asan tube
17 Coumpond zak
Harga Satuan Bahan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 2
HARGA SATUAN
NO. TENAGA KERJA SATUAN
(Rp.)
18 White Sreen Microvision bh
19 Aquaproof kg
F BAHAN PENGGANTUNG
1 Pintu plastik untuk wc bh
2 Kait angin bh
3 Handle jendela bh
4 Handle pintu bh
Harga Satuan Bahan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 3
HARGA SATUAN
NO. TENAGA KERJA SATUAN
(Rp.)
5 Engsel jendela psg
6 Engsel pintu psg
7 Engsel angin psg
8 Slot pintu bh
9 Slot jendela bh
10 Kunci tanam 2 slag bh
11 Kunci tanam 1 slag bh
12 Kunci tanam biasa bh
13 Kunci silinder bh
14 Grendel tanam bh
15 Door closer bh
16 Door Stoper bh
17 Paku seng kg
18 Paku campuran 1" - 5" kg
19 Paku beton kg
20 Paku triplek kg
21 Paku GRC kg
22 Sekrup gypsum kg
23 Sekrup bh
24 Sekrup fixer bh
25 Sekrup steel sheet bh
26 Sekrup zincalume bh
27 Pintu tempered polos 12 mm - uk. 87x213,5 unit
28 Pintu aluminium + engsel tanam - uk. 90x215 cm unit
29 Pintu aluminum + engsel kupu-kupu - uk. 90x215 cm unit
30 Jendela casement - uk 60x120 cm (lengkap tanpa kaca) unit
31 Engsel pintu Alumunium ( Floor Hinge ), ex DORMA, uk. Pintu Standar unit ###
32 Floor Hinge Dorma BTS 84 unit ###
33 Fitting Dorma PT 10/PSS unit ###
34 Patch Lock Dorma US 10/PSS unit ###
35 PHD R&Z 803 - 600mm SS / SSCH unit ###
36 Dorma ES 200,2x160 kg unit ###
Spesifikasi :
- Mini Drive unit
- Transformer
- Motor, Decoder
- Basic Control Module (BM)
- Functionl Module (FM)
- Track and Mounting profile 4000 mm
- Carier, Return pulley
- Ent Stop
- Door bracket with adjusment device
- Belt connection
37 Handle Laci bh ###
38 Engsel laci bh ###
39 Plastic m2 ###
H BAHAN KACA
1 Kaca polos, t = 5 mm m2 ###
2 Kaca rayben, t = 5 mm m2
3 Kaca cermin, t = 5 mm m2
4 Kaca repsol, t = 5 mm m2
5 Kaca tempered, t = 6 mm m2
6 Kaca tempered, t = 8 mm m2
7 Kaca tempered, t = 12 mm m2
8 Kaca tempered, t = 15 mm m2
9 Karet list kaca m
10 Curtain wall m2
11 Lapisan Sandblast m2
12 Kaca rayben, t = 8 mm m2
13 Kaca Stopsol 8 mm m2
Harga Satuan Bahan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 4
HARGA SATUAN
NO. TENAGA KERJA SATUAN
(Rp.)
I BAHAN AKSESORIES SANITASI
1 Wastafel 'LW 240 CJ ex. TOTO, Komplit Kran & acc bh
2 Closet duduk 'CW 704 J / SW 704 J Komplit & acc bh
3 Closet duduk Ex. KIA lengkap bh
4 Closet Jongkok 'type CE 9 ex. TOTO bh
5 Closet jongkok setara INA bh
6 Jet Washer bh
6 Urinoir unit
7 Sekat urinoir unit
8 Bak fiberglass uk. 55x55x60 cm bh
9 Shower spray unit
10 Kran air Panas,Dingin setara SunAi bh
11 Sliding rail unit
12 Floor Drain 'TX 1B ex. TOTO bh
13 Tempat sabun bh
14 Tisue holder bh
15 Kran Zink 'T 30 AR13NV7N ex. TOTO bh
16 Kitchen Zink'Hwaco 1L unit
17 Kran dinding type TMN Picarlo bh
18 Kaca cermin m2
19 Kran air uk. 1/2" bh
J BAHAN MINYAK
1 Alat - alat bantu ls
2 Sewa alat untuk pengelasan jam
3 Sewa molen set
4 Sewa kuali termasuk angkutan set
5 Meni besi kg
6 Nat kg
7 Minyak bekisting ltr
K ALAT BERAT
1 Buldoser 100 - 150 hp jam
2 Concrete mixer 0,3 - 0,6 m3 jam
3 Crane 10 - 15 ton jam
4 Dump truck 3-4 m3 jam
5 Dump truck 10 Ton jam
6 Mesin Bor Dia. 60 cm jam
7 Excavator 80 - 140 HP jam
8 Generator set jam
9 Concrete vibrator jam
10 Water pump 70 - 100 mm jam
11 Wheel Loader 1,0 - 1,6 m3 jam
12 Pile Driver + hammer jam
13 Tower Crane jam
14 Welding set jam
15 Water tanker 3000-4500 L jam
16 Motor grader jam
17 Vibrator roller jam
18 Tandem roller jam
19 Mixer truck jam
20 Concrete pump jam
21 P. Tyre Roller jam
22 Air compresor jam
23 Cold milling jam
24 3-Wheel Roller jam
Harga Satuan Bahan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 5
DAFTAR HARGA SATUAN UPAH & BAHAN
PEMBANGUNAN GEDUNG CABANG PELAYANAN PENDAPATAN DAERAH PROVINSI WILAYAH KABUPATEN KARAWANG TAHAP I
TAHUN ANGGARAN 2017
Harga Satuan
No. Jenis Bahan Bangunan Sat.
Rp.
1 2 3 4
L. PEKERJAAN PLAMBING
1 Pompa Transfer Air Bersih Kap. 180 lpm, 4 KW, c/w Pressure Tank, Panel & Aksesoris (Lengkap) Set
2 Pompa Booster Kap. 2 x 30 lpm, 2,2 KW, c/w Pressure Tank, Panel & Aksesoris Set
3 Biofilter Kapasitas 15 m3 Lengkap dengan Pemasangan Unit ###
4 Tangki Air Fibre Glass (FRP) Kap. 16 m3 Buah ###
5 Tangki Air Fibre Glass (FRP) Kap. 8 m3 Buah
6 Tangki Air (Un-Pressure Tank) Kap. 4000 L, Setara Wika Buah
7 Pipa Pralon PVC. ( AW ) Dia. 1/2 " Btg
8 Pipa Pralon PVC. ( AW ) Dia. 3/4 " Btg
9 Pipa Pralon PVC. ( AW ) Dia. 1 " Btg
10 Pipa Pralon PVC. ( AW ) Dia. 1 1/4 " Btg
11 Pipa Pralon PVC. ( AW ) Dia. 1 1/2 " Btg
12 Pipa Pralon PVC. ( AW ) Dia. 2 " Btg
13 Pipa Pralon PVC. ( AW ) Dia. 2 1/2 " Btg
14 Pipa Pralon PVC. ( AW ) Dia. 3 " Btg
15 Pipa Pralon PVC. ( AW ) Dia. 4 " Btg
16 Pipa Pralon PVC. ( AW ) Dia. 5 " Btg
17 Pipa Pralon PVC. ( AW ) Dia. 6 " Btg
18 Pipa Pralon PVC. ( D ) Dia. 1 1/2 " Btg
19 Pipa PPR PN 10 Dia. 1/2" Btg
20 Pipa PPR PN 10 Dia. 3/4" Btg
21 Pipa PPR PN 10 Dia. 1" Btg
22 Pipa PPR PN 10 Dia. 1 1/4" Btg
23 Pipa PPR PN 10 Dia. 1 1/2" Btg
24 Pipa PPR PN 10 Dia. 2" Btg
25 Pipa PPR PN 10 Dia. 2 1/2" Btg
26 Pipa PPR PN 10 Dia. 3" Btg
27 Pipa PPR PN 10 Dia. 4" Btg
28 Pipa PPR PN 10 Dia. 5" Btg
29 Pipa PPR PN 10 Dia. 6" Btg
30 Gate Valve (Screw) Class 125, Brass Diameter 2" Buah
31 Gate Valve (Screw) Class 125, Brass Diameter 3" Buah
32 Gate Valve (Screw) Class 125, Brass Diameter 4" Buah
33 Gate Valve (Flange) Class 10K, Cast Iron - Non Raise Stem Diameter 3" Buah
34 Swing Check (Screw) Valve Class 125, Bronze Diameter 2" Buah
35 Y Strainer (Flange) Class 10K, Cast Iron Diameter 3" Buah
36 Sealtape Buah
36 Water Meter Buah
37 Water Meter Induk 2" Buah
38 Header Pipa Diameter 4" Buah
39 Header Pipa Diameter 6" Buah
40 Header Pipa Diameter 8" Buah
41 Sand Filter Kapasitas 400 lpm Buah
42 Chemical Tank + Dosing Pump Buah
43 Water Heater Wika EWH 30 Buah
Harga Satuan Bahan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 6
Harga Satuan
No. Jenis Bahan Bangunan Sat.
Rp.
1 2 3 4
11 Pipa Black Steel Sch. 40 Dia. 2 1/2 " Btg
12 Pipa Black Steel Sch. 40 Dia. 3 " Btg
13 Pipa Black Steel Sch. 40 Dia. 4 " Btg
14 Pipa Black Steel Sch. 40 Dia. 5 " Btg
15 Pipa Black Steel Sch. 40 Dia. 6 " Btg
16 Gate Valve (Flange) Class 10K, Cast Iron - Non Raise Stem Diameter 2 1/2" Buah
17 Gate Valve (Flange) Class 10K, Cast Iron - Non Raise Stem Diameter 4" Buah
18 Gate Valve (Flange) Class 10K, Cast Iron - Non Raise Stem Diameter 6" Buah
19 Gate Valve (Screw) Class 125, Brass Diameter 1" Buah
20 Swing Check Valve (Flange) Class 10K, Cast Iron Diameter 6" Buah
21 Y Strainer (Flange) Class 10K, Cast Iron Diameter 6" Buah
22 Tozen Flexible Rubber Double Bello Class 10K (Flange) Diameter 6" Buah
23 Mesin Pompa Semi Hisap Buah
24 Pressure Gauge Buah
Harga Satuan Bahan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 7
Harga Satuan
No. Jenis Bahan Bangunan Sat.
Rp.
1 2 3 4
35 Kabel, NYFGbY 3 x 300 mm2 m
36 Kabel, NYFGbY 4 x 2,5 mm2 m
37 Kabel, NYFGbY 4 x 4 mm2 m
38 Kabel, NYFGbY 4 x 16 mm2 m
39 Kabel, NYFGbY 4 x 25 mm2 m
40 Kabel, NYFGbY 4 x 35 mm2 m
41 Kabel, NYFGbY 4 x 95 mm2 m
42 Kabel, NYFGbY 2 (4 x 240 mm2) m
43 Kabel, NYFGbY 4 x 150 mm2 m
44 Kabel, NYFGbY 4 x 185 mm2 m
45 Kabel, NYFGbY 2(4 x 300 mm2) m
46 Kabel, N2XSY (1 x 500 mm2) m
47 Kabel, N2XSY (1 x 400 mm2) m
48 Kabel, UTP Cat 5e m
49 Kabel, UTP Cat 6e m
50 Twisted Shielded 2 x AWG 18 (Data) m
51 FRC 3 x 1,5 mm2 m
52 ITC 2 x 2 x 0,6 mm2 m
53 Kabel, Coaxial RG 6 m
54 Kabel, Coaxial RG 8 m
55 BC 6-10 mm2 m
56 BC 50 mm2 m
57 BC 70 mm2 m
58 BC 95 mm2 m
59 Ground Rod Tembaga Murni Dia. 5/8", 3 m, 5.3 Kg / Btg Btg
60 Ground Rod Tembaga Murni Dia. 5/8", 4 m, 7.1 Kg / Btg Btg
61 Ground Rod Tembaga Murni Dia. 5/8", 3 m, 7.6 Kg / Btg Btg
62 Pipa Conduit (Ex. Ega) m
63 Pipa Conduit TM 20 mm m
64 Klem Hiro 20 mm (White) pcs
65 Elbow Hiro 20 mm (White) pcs
66 Inbow Doos Eagles pcs
67 Inbow Doos Bulat pcs
68 Inbow Doos Kaleng pcs
69 Solasi Listrik - Nito, Electrical Tape pcs
70 Solasi Listrik - Unibell, Electrical Tape pcs
71 Solasi Listrik - Unibell, Small Electrical Tape pcs
72 Solasi Listrik - 3M Electrical Tape Tape 1500 pcs
73 Klem Kabel MeetClips No. 6 pcs
74 Klem Kabel MeetClips No. 7 pcs
75 Klem Kabel MeetClips No. 8 pcs
76 Klem Kabel MeetClips No. 9 pcs
77 Klem Kabel MeetClips No. 10 pcs
78 Socket Pipa Buah
79 Tee Doos Buah
80 Klem Pipa Buah
81 Fisher Buah
82 Las Doop Buah
83 Isolasi Ban Buah
84 Fiting Lampu Buah
85 Sekring Kas 2 Group Biasa Unit
86 Saklar Tunggal Standard (1 Phase) Buah
87 Saklar Ganda Standard (1 Phase) Buah
88 Stop Kontak Standard (1 Phase) Buah
89 Greed Switch 4 Gang Buah
90 Stop Kontak AC 3 Pin Set
91 Stop Kontak lantai Set
92 Instalasi Titik Lampu / Stop Kontak (Upah dan Alat) Titik
Harga Satuan Bahan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 8
Harga Satuan
No. Jenis Bahan Bangunan Sat.
Rp.
1 2 3 4
93 Power Monitoring (PM 820) Buah
94 Pilot Lamp Buah
95 Selector Switch M-O-A 2P Buah
96 Fuse & Indicator Buah
97 Box Panel (180 x 80 x 60) cm Buah
98 Box Panel (43 x 33 x 20) cm Buah
99 Rel MCB AIumunium m
100 MCB Domae 1 Kutub 4 A (Kap. < 4.5 KA) Buah
101 MCB Domae 1 Kutub 6 A (Kap. < 4.5 KA) Buah
102 MCB Domae 1 Kutub 10 A (Kap. 6 KA) Buah
103 MCB Domae 1 Kutub 16 A (Kap. 6 KA) Buah
104 MCB Domae 1 Kutub 20 A (Kap. 10 KA) Buah
105 MCB Domae 1 Kutub 25 A (Kap. 10 KA) Buah
106 MCB Domae 1 Kutub 32 A (Kap. 10 KA) Buah
107 MCB Domae 1 Kutub 40 A (Kap. 10 KA) Buah
108 MCB Domae 3 Kutub 10 A (Kap. 6 KA) Buah
109 MCB Domae 3 Kutub 25 A (Kap. 10 KA) Buah
110 MCB Domae 3 Kutub 32 A (Kap. 15 KA) Buah
111 MCB Domae 3 Kutub 40 A (Kap. 15 KA) Buah
112 MCB Domae 3 Kutub 50 A (Kap. 20 KA) Buah
113 MCB Domae 3 Kutub 63 A (Kap. 20 KA) Buah
114 MCCB EZC100 F 3 Kutub 20 A (Kap. 10 KA) Buah
115 MCCB EZC100 F 3 Kutub 25 A (Kap. 10 KA) Buah
116 MCCB EZC100 F 3 Kutub 30 A (Kap. 15 KA) Buah
117 MCCB EZC100 F 3 Kutub 40 A (Kap. 15 KA) Buah
118 MCCB EZC100 F 3 Kutub 50 A (Kap. 20 KA) Buah
119 MCCB EZC100 F 3 Kutub 60 A (Kap. 20 KA) Buah
120 MCCB EZC100 N 3 Kutub 75 A (Kap. 20 KA) Buah
121 MCCB EZC100 N 3 Kutub 80 A (Kap. 20 KA) Buah
122 MCCB EZC100 N 3 Kutub 100 A (Kap. 20 KA) Buah
123 MCCB EZC100 N 3 Kutub 200 A (Kap. 20 KA) Buah
125 MCCB EZC100 N 3 Kutub 160 A (Kap. 36 KA) Buah
126 MCCB EZC100 N 3 Kutub 300 A (Kap. 36 KA) Buah
127 MCCB EZC100 N 3 Kutub 800 A Buah
128 Box Panel MCB Sek. Presto Unit
Harga Satuan Bahan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 9
Harga Satuan
No. Jenis Bahan Bangunan Sat.
Rp.
1 2 3 4
22 Lampu SL 25 W Buah
23 Lampu Mercuri 80 W Buah
24 Armatur Down Light Buah
25 Lampu RMI SK NW 2 x 36 Buah
26 Lampu RM5 1 x 36 Buah
27 Lampu RMI SK NW 2 x 18 Buah
28 Lampu Indirect 1 x 18 W Buah
29 Lampu TLD Buah
30 Lampu Downlight HL Buah
31 Lampu Taman PLC Buah
32 Lampu Sorot HPIT Buah
33 Lampu Nicad Baterai Buah
34 Lampu Exit Buah
35 Emergency Kit Lamp Buah
36 Tiang PJU + Lampu penerangan Solar Cell 30 Watt Buah
DC Setara 250 Watt AC (Tiang Oktagonal Double tinggi 7m)
Material pelengkap ls
F. GENSET
1 Unit Utama :
Unit Genset, Kapasitas 200 KVA c/w Panel Kontrol AMF & ATS set. Perkins Unit
Pemindahan Genset ke Pondasi unit
Grounding Body Genset titik
Ducting Pengarah Udara Panas unit
2 Sistem Bahan Bakar :
Daily Storage Tank, Kapasitas : 50 Liter unit
Weekly Storage Tank, Kapasitas : 500 Liter unit
Electric Transfer Pump 30 lpm / Gear Pump unit
Hand Pump 8 lpm unit
Pemipaan Bahan Bakar Pipa Black Steel Sch. 40 :
- Diameter 25 mm m'
- Gate Valve, Strainer, Check Valve + Aksesoris ls
- Level Switch + Kabel unit
3 Sistem Elektrikal
Panel Pompa Solar unit
G. PENANGKAL PETIR
1 Air Terminal (R = 68 m), EF System Unit
2 Kabel XLPE 70 m2 m
3 Obstruction Lamp dan Instalasi m
4 Grounding System Set
- Copper Road
Pentanahan Max. 2 Ohm Bahan GSP Diameter 50 mm2 + BC 70 mm2
Bak Kontrol (40 x 40 x 40) cm Lengkap dengan Cover
Material Bantu dan Aksesoris
5 Testing / Pengukuran Pentanahan Titik
6 Tiang / Menara - Dudukan EF Unit
I. PEKERJAAN TELEPON
1 Peralatan Utama :
PABX 16/120 Extension set
Include :
- Billing System
- Battery Back Up
- Operator Console
- Biaya Pemasangan dan Setting Program PABX
- Battery + Charger
2 Main Distribution Frame (MDF) unit
3 CTBT 20 Pairs Unit
Harga Satuan Bahan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 10
Harga Satuan
No. Jenis Bahan Bangunan Sat.
Rp.
1 2 3 4
4 Terminal Box Telepon 10 Pairs Unit
5 Kabel, ITC 4 x 0,6 mm2 m
6 Kabel, ITC 2 Pairs m
7 Kabel, ITC 10 Pairs m
8 Kabel, ITC 20 Pairs m
9 Kabel, ITC 30 Pairs m
10 Kabel, ITC 40 Pairs m
11 Kabel, ITC 50 Pairs m
12 Kabel, ITC 60 Pairs m
13 Kabel, ITC 70 Pairs m
14 Kabel, ITC 80 Pairs m
15 Kabel, ITC 90 Pairs m
16 Kabel, ITC 100 Pairs m
17 Socket Telepon (RJ-11) Buah
18 Hand Set Analog Buah
19 Patch Panel + Switch HUB 12 Port Buah
L. PEKERJAAN CCTV
1 Digital Multiplexer Recorder Hard Disk 1 Tera, 36 Channel c/w Controller Ethernet Unit
2 DVR CCTV HDD (32 Channel) Unit
3 Monitor CCTV Unit
4 Kamera CCTV Indoor Dome Camera Buah
5 Kamera CCTV Buah
Harga Satuan Bahan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 11
Harga Satuan
No. Jenis Bahan Bangunan Sat.
Rp.
1 2 3 4
16 CD/MMC/USB player with FM Tunner Buah
17 Remote Microphone Buah
18 Fireman's Microphone Buah
19 Car Call Mic w/chime Buah
20 Voice Announcement Board w/ CF card (for Evac) Buah
21 System Manager w/ Modules Buah
22 Surveillance Frame w/ Modules Buah
23 10x420W Power Amplifier Buah
24 3x240W Power Amplifier (Car Call) Buah
25 Speaker Selector 3x10 ch Buah
26 Cabinet Rack w/Acc. Buah
27 Change Over Switch Buah
28 BOX 200 X 300 MM Buah
29 BOX MDF Buah
Harga Satuan Bahan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 12
Harga Satuan
No. Jenis Bahan Bangunan Sat.
Rp.
1 2 3 4
43 Y- Branch (Outdoor Unit Connection) bh
R. PEKERJAAN ELEVATOR
2 PASSENGER ELEVATOR
Kapasitas : 15 orang / 1000 kg Unit
Kecepatan : 20 Mpm : 60 mpm
Lintasan : 5 lantai
Tipe : Machine Roomless ###
Termasuk ARD dan Instalasi ###
3 Pemasangan :
- Izin Depnaker Unit
- Test dan Commisioning (Termasuk Listrik) Unit
Harga Satuan Bahan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 13
ANALISA HARGA SATUAN PEKERJAAN
PEMBANGUNAN GEDUNG CABANG PELAYANAN PENDAPATAN DAERAH PROVINSI WILAYAH KABUPATEN
KARAWANG TAHAP I
TAHUN ANGGARAN 2017
A BAHAN
1 Pipa PVC 1.2000 m1 - -
2 Perlengkapan 1.0000 ls - -
B TENAGA
1 Pekerja 0.0360 Oh - -
2 Tukang Pipa 0.0600 Oh - -
3 Kepala Tukang 0.0060 Oh - -
4 Mandor 0.0020 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 50
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
G Pembulatan dari HSP (F) -
O.13 1 M1 PEMASANGAN PIPA PVC AW DIAMETER 1 1/4"
A BAHAN
1 Pipa PVC 1.2000 m1 - -
2 Perlengkapan 1.0000 ls - -
B TENAGA
1 Pekerja 0.0540 Oh - -
2 Tukang Pipa 0.0900 Oh - -
3 Kepala Tukang 0.0090 Oh - -
4 Mandor 0.0030 Oh - -
C PERALATAN
A BAHAN
1 Pipa PVC 1.2000 m1 - -
2 Perlengkapan 1.0000 ls - -
B TENAGA
1 Pekerja 0.0540 Oh - -
2 Tukang Pipa 0.0900 Oh - -
3 Kepala Tukang 0.0090 Oh - -
4 Mandor 0.0030 Oh - -
C PERALATAN
A BAHAN
1 Pipa PVC 1.2000 m1 - -
2 Perlengkapan 1.0000 ls - -
B TENAGA
1 Pekerja 0.0540 Oh - -
2 Tukang Pipa 0.0900 Oh - -
3 Kepala Tukang 0.0090 Oh - -
4 Mandor 0.0030 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 51
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
2 Tukang Pipa 0.1350 Oh - -
3 Kepala Tukang 0.0135 Oh - -
4 Mandor 0.0040 Oh - -
C PERALATAN
A BAHAN
1 Pipa PVC 1.2000 m1 - -
2 Perlengkapan 1.0000 ls - -
B TENAGA
1 Pekerja 0.0810 Oh - -
2 Tukang Pipa 0.1350 Oh - -
3 Kepala Tukang 0.0135 Oh - -
4 Mandor 0.0040 Oh - -
C PERALATAN
A BAHAN
1 Pipa PVC 1.2000 m1 - -
2 Perlengkapan 1.0000 ls - -
B TENAGA
1 Pekerja 0.0810 Oh - -
2 Tukang Pipa 0.1350 Oh - -
3 Kepala Tukang 0.0135 Oh - -
4 Mandor 0.0040 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 52
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) -
G Pembulatan dari HSP (F) -
O.20 1 M1 PEMASANGAN PIPA PVC AW DIAMETER 6"
A BAHAN
1 Pipa PVC 1.2000 m1 - -
2 Perlengkapan 1.0000 ls - -
B TENAGA
1 Pekerja 0.0810 Oh - -
2 Tukang Pipa 0.1350 Oh - -
3 Kepala Tukang 0.0135 Oh - -
4 Mandor 0.0040 Oh - -
C PERALATAN
A BAHAN
1 Pipa PVC 1.2000 m1 - -
2 Perlengkapan 1.0000 ls - -
B TENAGA
1 Pekerja 0.0540 Oh - -
2 Tukang Pipa 0.0900 Oh - -
3 Kepala Tukang 0.0090 Oh - -
4 Mandor 0.0030 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 53
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
1 Tukang Pipa 0.0167 Oh - -
2 Kepala Tukang 0.0083 Oh - -
3 Mandor 0.0042 Oh - -
C PERALATAN
A BAHAN
1 Pipa Pollypropeline / PN - 10 1.2000 m1 - -
2 Perlengkapan 1.0000 ls - -
B TENAGA
1 Tukang Pipa 0.0250 Oh - -
2 Kepala Tukang 0.0125 Oh - -
3 Mandor 0.0050 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 54
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
O.42 1 M PEMASANGAN PIPA POLLYPROPELINE / PN - 10 DIAMETER 1 1/2"
1
A BAHAN
1 Pipa Pollypropeline / PN - 10 1.2000 m1 - -
2 Perlengkapan 1.0000 ls - -
B TENAGA
1 Tukang Pipa 0.0250 Oh - -
2 Kepala Tukang 0.0125 Oh - -
3 Mandor 0.0050 Oh - -
C PERALATAN
A BAHAN
1 Pipa Pollypropeline / PN - 10 1.2000 m1 - -
2 Perlengkapan 1.0000 ls - -
B TENAGA
1 Tukang Pipa 0.0292 Oh - -
2 Kepala Tukang 0.0146 Oh - -
3 Mandor 0.0049 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 55
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
A BAHAN
1 Pipa Pollypropeline / PN - 10 1.2000 m1 - -
2 Perlengkapan 1.0000 ls - -
B TENAGA
1 Tukang Pipa 0.0292 Oh - -
2 Kepala Tukang 0.0146 Oh - -
3 Mandor 0.0049 Oh - -
C PERALATAN
A BAHAN
1 Pipa Pollypropeline / PN - 10 1.2000 m1 - -
2 Perlengkapan 1.0000 ls - -
B TENAGA
1 Tukang Pipa 0.0292 Oh - -
2 Kepala Tukang 0.0146 Oh - -
3 Mandor 0.0049 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 56
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
2 Kepala Tukang 0.0833 Oh - -
3 Mandor 0.0417 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 57
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
2 Kepala Tukang 0.1667 Oh - -
3 Mandor 0.0833 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 58
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
2 Kepala Tukang 1.0000 Oh - -
3 Mandor 1.0000 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 59
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
2 Kepala Tukang 0.3333 Oh - -
3 Mandor 0.1667 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 60
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 61
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
1 Tukang Listrik 0.0667 Oh - -
2 Kepala Tukang Listrik 0.0667 Oh - -
3 Mandor 0.0333 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 62
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
A BAHAN
1 Lampu Downlight PLC 1.0000 bh - -
2 Instalasi Kabel 1.0000 Titik - -
B TENAGA
1 Tukang Listrik 0.0667 Oh - -
2 Kepala Tukang Listrik 0.0667 Oh - -
3 Mandor 0.0333 Oh - -
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 63
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) -
G Pembulatan dari HSP (F) -
O.117 1 BUAH PEMASANGAN SAKLAR GANDA
A BAHAN
1 Saklar Ganda 1.0000 bh - -
B TENAGA
1 Tukang Listrik 0.0500 Oh - -
2 Kepala Tukang Listrik 0.0500 Oh - -
3 Mandor 0.0250 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 64
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 65
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
5
Klem Pipa 3.0000 bh - -
6
Fisher 6.0000 bh - -
7
Las Doop 2.0000 bh - -
8
Isolasi Ban 0.2500 bh - -
B TENAGA
1 Tukang Listrik 0.2000 Oh - -
2 Kepala Tukang Listrik 0.2000 Oh - -
3 Mandor 0.1667 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 66
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
F Harga Satuan Pekerjaan (D+E) -
G Pembulatan dari HSP (F) -
O.128 1 TITIK INSTALASI DETEKTOR, BELL, DAN INDIKATOR
A BAHAN
1 Kabel NYY 4 x 1,5 mm2 11.0000 m1 - -
2 Pipa Conduit 11.0000 m1 - -
3 Socket Pipa 1.0000 bh - -
4 Tee Doos 2.0000 bh - -
5 Klem Pipa 3.0000 bh - -
6 Fisher 6.0000 bh - -
7 Las Doop 2.0000 bh - -
8 Isolasi Ban 0.2500 bh - -
B TENAGA
1 Tukang Listrik 0.3000 Oh - -
2 Kepala Tukang Listrik 0.3000 Oh - -
3 Mandor 0.1667 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 67
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
A BAHAN
1 Kabel NYM 4 x 4 mm2 16.0000 m1 - -
2 Isolasi Ban 1.0000 bh - -
B TENAGA
1 Tukang Listrik 0.3000 Oh - -
2 Kepala Tukang Listrik 0.3000 Oh - -
3 Mandor 0.1667 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 68
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
3
Socket Pipa 10.0000 bh - -
4
Tee Doos 2.0000 bh - -
5
Klem Pipa 23.0000 bh - -
6
Fisher 46.0000 bh - -
7
Las Doop - bh - -
8
Isolasi Ban - bh - -
B TENAGA
1 Pekerja 0.3000 Oh - -
2 Kepala Tukang Listrik 0.3000 Oh - -
3 Mandor 0.1667 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 69
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
G Pembulatan dari HSP (F) -
O.137 1 TITIK INSTALASI FIRE ALARM
A BAHAN
1 Kabel NYY 2 x 1 x 1,5 mm2 14.0000 m1 -
2 Pipa Conduit 14.0000 m1 -
3 Socket Pipa 1.0000 bh -
4 Tee Doos 2.0000 bh -
5 Isolasi Ban 0.2500 bh -
B TENAGA
1 Pekerja 0.3000 Oh -
2 Kepala Tukang Listrik 0.3000 Oh - -
3 Mandor 0.1667 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 70
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
B TENAGA
1 Tukang Listrik 2.0000 Oh - -
2 Kepala Tukang Listrik 2.0000 Oh - -
3 Mandor 2.0000 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 71
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C) -
E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) -
G Pembulatan dari HSP (F) -
O.146 1 UNIT PEMASANGAN PANEL POMPA
A BAHAN
1 MCB 20 A / 1 Fasa 1.0000 bh - -
2 MCB 25 A / 1 Fasa 3.0000 bh - -
3 MCB 35 A / 1 Fasa 2.0000 bh - -
4 MCB 50 A / 3 Fasa 1.0000 bh - -
5 Pilot Lamp 3.0000 bh - -
6 Fuse & Indicator 1.0000 bh - -
7 Box Panel (43 x 33 x 20) cm 1.0000 unit - -
8 Grounding BC 50 mm2 1.0000 ls - -
9 Material Bantu 1.0000 ls - -
- CU Bars
- Sepatu Kabel
- Roll Isolator
- Spiral Duck Kabel
- Duck Kabel
- Mur Baut
B TENAGA
1 Tukang Listrik 1.0000 Oh - -
2 Kepala Tukang Listrik 1.0000 Oh - -
3 Mandor 0.5000 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 72
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) -
G Pembulatan dari HSP (F) -
O.148 1 UNIT PEMASANGAN PANEL LP LT. DUA
A BAHAN
1 MCB 4 A / 1 Fasa 6.0000 bh - -
2 MCB 6 A / 1 Fasa 2.0000 bh - -
3 MCB 10 A/ 1 Fasa 13.0000 bh - -
4 MCB 50 A / 3 Fasa 1.0000 bh - -
5 Pilot Lamp 3.0000 bh - -
6 Fuse & Indicator 1.0000 bh - -
7 Box Panel (43 x 33 x 20) cm 1.0000 unit - -
8 Grounding BC 50 mm2 1.0000 ls - -
9 Material Bantu 1.0000 ls - -
- CU Bars
- Sepatu Kabel
- Roll Isolator
- Spiral Duck Kabel
- Duck Kabel
- Mur Baut
B TENAGA
1 Tukang Listrik 1.0000 Oh - -
2 Kepala Tukang Listrik 1.0000 Oh - -
3 Mandor 0.5000 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 73
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C) -
E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) -
G Pembulatan dari HSP (F) -
O.150 1 UNIT PEMASANGAN PANEL LP LT. EMPAT
A BAHAN
1 MCB 4 A / 1 Fasa 7.0000 bh - -
2 MCB 6 A / 1 Fasa 5.0000 bh - -
3 MCB 10 A/ 1 Fasa 6.0000 bh - -
4 MCB 63 A / 3 Fasa 1.0000 bh - -
5 Pilot Lamp 3.0000 bh - -
6 Fuse & Indicator 1.0000 bh - -
7 Box Panel (43 x 33 x 20) cm 1.0000 unit - -
8 Grounding BC 50 mm2 1.0000 ls - -
9 Material Bantu 1.0000 ls - -
- CU Bars
- Sepatu Kabel
- Roll Isolator
- Spiral Duck Kabel
- Duck Kabel
- Mur Baut
B TENAGA
1 Tukang Listrik 1.0000 Oh - -
2 Kepala Tukang Listrik 1.0000 Oh - -
3 Mandor 0.5000 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 74
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) -
G Pembulatan dari HSP (F) -
O.152 1 UNIT PEMASANGAN PANEL LP LT. ROOFTOP
A BAHAN
1 MCB 4 A / 1 Fasa 9.0000 bh - -
3 MCB 10 A/ 1 Fasa 2.0000 bh - -
3 MCB 25 A / 3 Fasa 1.0000 bh - -
2 Pilot Lamp 3.0000 bh - -
3 Fuse & Indicator 1.0000 bh - -
4 Box Panel (43 x 33 x 20) cm 1.0000 unit - -
5 Grounding BC 50 mm2 1.0000 ls - -
6 Material Bantu 1.0000 ls - -
- CU Bars
- Sepatu Kabel
- Roll Isolator
- Spiral Duck Kabel
- Duck Kabel
- Mur Baut
B TENAGA
1 Tukang Listrik 1.0000 Oh - -
2 Kepala Tukang Listrik 1.0000 Oh - -
3 Mandor 0.5000 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 75
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
G Pembulatan dari HSP (F) -
O.154 1 UNIT PEMASANGAN PANEL PP-AC LT. DUA
A BAHAN
1 MCB 4 A / 1 Fasa 27.0000 bh - -
2 MCB 10 A/ 3 Fasa 1.0000 bh - -
3 Pilot Lamp 3.0000 bh - -
4 Fuse & Indicator 1.0000 bh - -
5 Box Panel (43 x 33 x 20) cm 1.0000 unit - -
6 Grounding BC 50 mm2 1.0000 ls - -
7 Material Bantu 1.0000 ls - -
- CU Bars
- Sepatu Kabel
- Roll Isolator
- Spiral Duck Kabel
- Duck Kabel
- Mur Baut
B TENAGA
1 Tukang Listrik 1.0000 Oh - -
2 Kepala Tukang Listrik 1.0000 Oh - -
3 Mandor 0.5000 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 76
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
1
MCB 4 A / 1 Fasa 22.0000 bh - -
2
MCB 10 A/ 3 Fasa 1.0000 bh - -
3
Pilot Lamp 1.0000 bh - -
4
Fuse & Indicator 1.0000 bh - -
5
Box Panel (43 x 33 x 20) cm 1.0000 unit - -
6
Grounding BC 50 mm2 1.0000 ls - -
7
Material Bantu 1.0000 ls - -
- CU Bars
- Sepatu Kabel
- Roll Isolator
- Spiral Duck Kabel
- Duck Kabel
- Mur Baut
B TENAGA
1 Tukang Listrik 1.0000 Oh - -
2 Kepala Tukang Listrik 1.0000 Oh - -
3 Mandor 0.5000 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 77
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
5
Fuse & Indicator 1.0000 bh - -
6
Box Panel (43 x 33 x 20) cm 1.0000 unit - -
7
Grounding BC 50 mm2 1.0000 ls - -
8
Material Bantu 1.0000 ls - -
- CU Bars
- Sepatu Kabel
- Roll Isolator
- Spiral Duck Kabel
- Duck Kabel
- Mur Baut
B TENAGA
1 Tukang Listrik 1.0000 Oh - -
2 Kepala Tukang Listrik 1.0000 Oh - -
3 Mandor 0.5000 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 78
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
7 Material Bantu 1.0000 ls - -
- CU Bars
- Sepatu Kabel
- Roll Isolator
- Spiral Duck Kabel
- Duck Kabel
- Mur Baut
B TENAGA
1 Tukang Listrik 1.0000 Oh - -
2 Kepala Tukang Listrik 1.0000 Oh - -
3 Mandor 0.5000 Oh - -
C PERALATAN
A BAHAN
1 Kabel NYY 1.0000 m1 - -
B TENAGA
1 Tukang 0.0167 Oh - -
2 Kepala Tukang Listrik 0.0167 Oh - -
3 Mandor 0.0083 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 79
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
A BAHAN
1 Kabel NYY 1.0000 m1 - -
B TENAGA
1 Tukang 0.0167 Oh - -
2 Kepala Tukang Listrik 0.0167 Oh - -
3 Mandor 0.0083 Oh - -
C PERALATAN
A BAHAN
1 Kabel NYY 2.0000 m1 - -
B TENAGA
1 Tukang 0.0167 Oh - -
2 Kepala Tukang Listrik 0.0167 Oh - -
3 Mandor 0.0083 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 80
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
C PERALATAN
A BAHAN
1 Kabel NYY 1.0000 m1 - -
B TENAGA
1 Tukang 0.0333 Oh - -
2 Kepala Tukang Listrik 0.0333 Oh - -
3 Mandor 0.0167 Oh - -
C PERALATAN
A BAHAN
1 Kabel NYY 1.0000 m1 - -
B TENAGA
1 Tukang 0.0500 Oh - -
2 Kepala Tukang Listrik 0.0500 Oh - -
3 Mandor 0.0250 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 81
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
3 Mandor 0.0250 Oh - -
C PERALATAN
A BAHAN
1 Kabel NYY 1.0000 m1 - -
B TENAGA
1 Tukang 0.0500 Oh - -
2 Kepala Tukang Listrik 0.0500 Oh - -
3 Mandor 0.0250 Oh - -
C PERALATAN
A BAHAN
1 Kabel NYY 1.0000 m1 - -
B TENAGA
1 Tukang 0.0500 Oh - -
2 Kepala Tukang Listrik 0.0500 Oh - -
3 Mandor 0.0250 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 82
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
2 Kepala Tukang Listrik 0.0500 Oh - -
3 Mandor 0.0250 Oh - -
C PERALATAN
A BAHAN
1 Kabel NYY 12.0000 m1 - -
B TENAGA
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 83
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
1 Tukang 0.0500 Oh - -
2 Kepala Tukang Listrik 0.0500 Oh - -
3 Mandor 0.0250 Oh - -
C PERALATAN
A BAHAN
1 Kabel NYY 24.0000 m1 - -
B TENAGA
1 Tukang 0.0500 Oh - -
2 Kepala Tukang Listrik 0.0500 Oh - -
3 Mandor 0.0350 Oh - -
C PERALATAN
A BAHAN
1 Kabel NYMHY 4.0000 m1 - -
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 84
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
B TENAGA
1 Tukang 0.0500 Oh - -
2 Kepala Tukang Listrik 0.0500 Oh - -
3 Mandor 0.0350 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 85
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
F Harga Satuan Pekerjaan (D+E) -
G Pembulatan dari HSP (F) -
O.189 1 M1 PEMASANGAN KABEL NYFGbY 4 x 25 MM2
A BAHAN
1 Kabel NYFGbY 1.0000 m1 - -
2 Galian, Urugan, dan Pelindung Kabel 1.0000 m1 - -
B TENAGA
1 Tukang 0.0833 Oh - -
2 Kepala Tukang Listrik 0.0833 Oh - -
3 Mandor 0.0833 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 86
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
3 Mandor 0.0833 Oh - -
C PERALATAN
A BAHAN
1 Kabel NYFGbY 1.0000 m1 - -
2 Galian, Urugan, dan Pelindung Kabel 1.0000 m1 - -
B TENAGA
1 Tukang 0.0833 Oh - -
2 Kepala Tukang Listrik 0.0833 Oh - -
3 Mandor 0.0833 Oh - -
C PERALATAN
A BAHAN
1 Kabel NYFGbY 2.0000 m1 - -
2 Galian, Urugan, dan Pelindung Kabel 1.0000 m1 - -
B TENAGA
1 Tukang 0.0833 Oh - -
2 Kepala Tukang Listrik 0.0833 Oh - -
3 Mandor 0.0833 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 87
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
A BAHAN
1 Kabel NYFGbY 6.0000 m1 - -
2 Galian, Urugan, dan Pelindung Kabel 1.0000 m1 - -
B TENAGA
1 Tukang 0.0833 Oh - -
2 Kepala Tukang Listrik 0.0833 Oh - -
3 Mandor 0.0833 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 88
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C) -
E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) -
G Pembulatan dari HSP (F) -
O.202 1 UNIT PEMASANGAN CTB 20 PAIRS
A BAHAN
1 CTB 20 Pairs 1.0000 bh - -
B TENAGA
1 Pekerja 1.0000 Oh - -
2 Tukang Listrik 1.0000 Oh - -
3 Mandor 0.5000 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 89
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C) -
E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) -
G Pembulatan dari HSP (F) -
O.206 1 UNIT PEMASANGAN TERMINAL BOX 10 PAIRS
A BAHAN
1 Terminal Box 10 Pairs 1.0000 unit - -
B TENAGA
1 Pekerja 0.5000 Oh - -
2 Tukang Listrik 0.5000 Oh - -
3 Mandor 0.2500 Oh - -
C PERALATAN
A BAHAN
1 Kabel ITC 20 x 4 x 0,6 mm2 1.0000 m1 - -
B TENAGA
1 Pekerja 0.0167 Oh - -
2 Tukang Listrik 0.0167 Oh - -
3 Mandor 0.0083 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 90
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
A BAHAN
1 Kabel ITC 40 x 4 x 0,6 mm2 1.0000 m1 - -
B TENAGA
1 Pekerja 0.0167 Oh - -
2 Tukang Listrik 0.0167 Oh - -
3 Mandor 0.0083 Oh - -
C PERALATAN
A BAHAN
1 Kabel ITC 80 x 4 x 0,6 mm2 1.0000 m1 - -
B TENAGA
1 Pekerja 0.0167 Oh -
2 Tukang Listrik 0.0167 Oh -
3 Mandor 0.0083 Oh -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 91
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
A BAHAN
1 Kabel Data Cat 6 Type Outdoor 1.0000 m1 - -
B TENAGA
1 Pekerja 0.0167 Oh - -
2 Tukang Listrik 0.0167 Oh - -
3 Mandor 0.0083 Oh - -
C PERALATAN
A BAHAN
1 FRC 3 x 1,5 mm2 1.0000 m1 - -
B TENAGA
1 Pekerja 0.0167 Oh - -
2 Tukang Listrik 0.0167 Oh - -
3 Mandor 0.0083 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 92
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
C PERALATAN
A BAHAN
1 Kabel Coaxial RG 6 1.0000 m1 - -
B TENAGA
1 Tukang 0.0100 Oh - -
2 Kepala Tukang Listrik 0.0100 Oh - -
3 Mandor 0.0100 Oh - -
C PERALATAN
A BAHAN
1 Kabel Coaxial RG11 / 10C 1.0000 m1 - -
B TENAGA
1 Tukang 0.0100 Oh -
2 Kepala Tukang Listrik 0.0100 Oh -
3 Mandor 0.0100 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 93
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
3 Mandor 0.0250 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 94
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
3 Mandor 0.0833 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 95
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
3 Mandor 0.2500 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 96
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
3 Mandor 0.2500 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 97
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
3 Mandor 0.1250 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 98
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
3 Mandor 0.0833 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 99
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
3 Mandor 0.3333 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 100
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
3 Mandor 0.5000 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 101
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
3 Mandor 0.1667 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 102
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
3 Mandor 0.0250 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 103
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
B TENAGA
1 Tukang Pipa 0.0167 Oh - -
2 Kepala Tukang Pipa 0.0167 Oh - -
3 Mandor 0.0083 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 104
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
O.276 1 UNIT PEMASANGAN WATER LEVEL CONTROL
A BAHAN
1 Water Level Control 1.0000 unit -
2 Alat Bantu 1.0000 ls -
B TENAGA
1 Tukang Pipa 1.0000 Oh - -
2 Kepala Tukang Pipa 1.0000 Oh - -
3 Mandor 1.0000 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 105
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C) -
E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) -
G Pembulatan dari HSP (F) -
O.286 1 BUAH PEMASANGAN FIRE EXTINGUISHER KAPASITAS 5 KG
A BAHAN
1 Fire Extinguisher 1.0000 bh - -
B TENAGA
1 Tukang Pipa 0.3333 Oh - -
2 Kepala Tukang Pipa 0.3333 Oh - -
3 Mandor 0.1667 Oh - -
C PERALATAN
A BAHAN
1 Pipa Refrigerant + Armaflex 1.0000 m - -
2 Alat Bantu 1.0000 ls - -
B TENAGA
1 Tukang Pipa 0.0833 Oh - -
2 Kepala Tukang Pipa 0.0833 Oh - -
3 Mandor 0.0833 Oh - -
C PERALATAN
A BAHAN
1 Pipa Drain PVC + Isolasi 1.0000 unit - -
2 Alat Bantu 1.0000 ls - -
B TENAGA
1 Tukang Pipa 0.0833 Oh - -
2 Kepala Tukang Pipa 0.0833 Oh - -
3 Mandor 0.0833 Oh - -
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 106
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 107
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
B TENAGA
1 Pekerja 1.0000 Oh - -
2 Tukang AC 1.0000 Oh - -
3 Mandor 0.5000 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 108
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
O.302 1 UNIT PEMASANGAN INDOOR AC CASSETTE MOUNTED TYPE, KAPASITAS 9000 BTUH, 1 PK
A BAHAN
1 AC Cassette 1.0000 unit - -
2 Alat Bantu 1.0000 set - -
B TENAGA
1 Pekerja 1.0000 Oh - -
2 Tukang AC 1.0000 Oh - -
3 Mandor 0.5000 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 109
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C) -
E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) -
G Pembulatan dari HSP (F) -
O.306 1 UNIT PEMASANGAN OUTDOOR AC VRV KAPASITAS 406000 BTUH, 42 PK
A BAHAN
1 Outdoor Unit (VRV) 1.0000 unit - -
2 Alat Bantu 1.0000 set - -
B TENAGA
1 Pekerja 1.0000 Oh - -
2 Tukang AC 1.0000 Oh - -
3 Mandor 0.5000 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 110
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
3 Mandor 0.5000 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 111
ANALISA HARGA SATUAN PEKERJAAN
PERATURAN MENTERI PU NO. 28/PRT/M2013
PEMBANGUNAN GEDUNG CABANG PELAYANAN PENDAPATAN DAERAH PROVINSI WILAYAH KABUPATEN
KARAWANG TAHAP I
TAHUN ANGGARAN 2017
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 1
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) -
B.3 1 m3 PEMBUANGAN TANAH SEJAUH 2,5 KM
A TENAGA
1 Operator 0.1635 Oh - -
B PERALATAN
1 Dump Truck 0.1200 jam - -
2 Excavator 0.0461 jam - -
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 2
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C) -
E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) -
B.9 1 m3 URUGAN SIRTU
A BAHAN
1 Sirtu 1.2000 m3 - -
B TENAGA
1 Pekerja 0.2500 Oh - -
2 Mandor 0.0250 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 3
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 4
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 5
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
4 Mandor 0.0220 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 6
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
2 Tukang batu 0.1000 Oh - -
3 Kepala tukang 0.0100 Oh - -
4 Mandor 0.0065 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 7
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 8
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
2 Paku 0.2000 kg - -
3 Minyak bekisting 0.2000 ltr - -
4 Balok kayu kelas III 0.0090 lbr - -
5 Plywood 9 mm 0.1750 lbr - -
6 Kayu dolken Ø 8 - 10 cm 1.0000 btg - -
B TENAGA KERJA
1 Pekerja 0.6600 Oh - -
2 Tukang kayu 0.3300 Oh - -
3 Kepala tukang 0.0330 Oh - -
4 Mandor 0.0330 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 9
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
1 Semen portland 371.0000 kg - -
2 Pasir beton 698.0000 kg - -
3 Batu split 2/3 1,047.0000 kg - -
4 Air 215.0000 ltr - -
B TENAGA KERJA
1 Pekerja 1.6500 Oh - -
2 Tukang batu 0.2750 Oh - -
3 Kepala tukang 0.0280 Oh - -
4 Mandor 0.1650 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 10
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) -
E.13 1 kg PEKERJAAN PEMBESIAN DENGAN BESI BETON ULIR U-39
A BAHAN
1 Besi beton ulir U-39 1.0500 kg - -
2 Kawat bendarat 0.0150 kg - -
B TENAGA KERJA
1 Pekerja 0.0070 Oh - -
2 Tukang besi 0.0070 Oh - -
3 Kepala tukang 0.0007 Oh - -
4 Mandor 0.0004 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 11
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C) -
E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) -
E.17 1 m' KOLOM PRAKTIS BETON BERTULANG ( 11 X 11 ) cm
A BAHAN
1 Kayu papan kelas III 0.0020 m3 - -
2 Paku 0.0100 kg - -
3 Minyak bekisting 0.1500 ltr - -
4 Besi beton polos 3.0000 kg - -
5 Kawat Beton 0.4500 kg - -
6 Semen portland 4.0000 kg - -
7 Pasir beton 0.0060 m3 - -
8 Kerikil 0.0090 m3 - -
B TENAGA KERJA
1 Pekerja 0.1800 Oh - -
2 Tukang batu 0.0200 Oh - -
3 Tukang kayu 0.0200 Oh - -
4 Tukang besi 0.0200 Oh - -
5 Kepala tukang 0.0060 Oh - -
6 Mandor 0.0090 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 12
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
C Harga Satuan Pekerjaan -
E.20 MEMBUAT BETON STRUKTUR FILE CAP P.2, K - 300
A BAHAN
1 Pasang Bekisting batako untuk file cap 2.5758 m2 - -
2 Membuat beton dengan beton k - 300 1.0000 m3 - -
3 Pembesian dengan besi ulir 65.1595 kg - -
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 13
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
4 Pembesian dengan besi polos 46.7752 kg - -
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 14
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
4 Pembesian dengan besi polos 37.5750 kg - -
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 15
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
4 Pembesian dengan besi polos 95.6382 kg - -
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 16
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
C Harga Satuan Pekerjaan -
E.45 MEMBUAT BETON STRUKTUR PELAT LANTAI, K - 300 uk. T = 15 cm ( PARKIR )
A BAHAN
1 Membuat beton dengan beton k - 300 1.0000 m3 - -
2 Pembesian dengan besi polos 51.7780 kg - -
###
B Jumlah Bahan, Tenaga, dan Peralatan (A+B+C) -
C Harga Satuan Pekerjaan -
E.46 MEMBUAT BETON STRUKTUR SHEAR WALL GWT, K - 300 uk. T = 20 cm
A BAHAN
1 Pasang Bekisting untuk lantai 5.0000 m2 - -
2 Membuat beton dengan beton k - 300 1.0000 m3 - -
3 Pembesian dengan besi polos 129.4449 kg - -
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 17
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 18
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
3 Pembesian dengan besi polos 188.2975 kg - -
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 19
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) -
G.5 1 m2 PAS. SHUNDA PLAFON 9mm + RANGKA HOLLOW 40 x 40
A BAHAN
1 Shunda plafon 3.3333 m' - -
2 Skrew 8.0000 bh - -
3 Rangka Plafond Hollow 40 x 40 5.3000 m' - -
4 Penggantung 1.0000 bh - -
B TENAGA
1 Pekerja 0.0840 Oh - -
2 Tukang kayu 0.1260 Oh - -
3 Kepala tukang 0.1050 Oh - -
4 Mandor 0.0210 Oh - -
C PERALATAN
1 Alat Bantu 1.0000 ls -
2 Steiger Werk 0.2500 ls -
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 20
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
3 Kepala tukang 0.0100 Oh - -
4 Mandor 0.1600 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 21
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) -
H.5 MEMASANG 1 BUAH SEKAT URINAL
A BAHAN
1 Sekat urinal setara TOTO 1.0000 unit - -
2 Perlengkapan 12 % harga urinal 0.1200 ls - -
B TENAGA
1 Pekerja 1.0000 Oh - -
2 Tukang 1.0000 Oh - -
3 Kepala tukang 0.1000 Oh - -
4 Mandor 0.1000 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 22
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 23
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
3 Kepala tukang 0.0100 Oh - -
4 Mandor 0.0050 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 24
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 25
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
J.6 1 kg PASANG BAJA IWF
A BAHAN
1 Baja IWF 1.1500 kg - -
B TENAGA
1 Pekerja 0.0600 Oh - -
2 Tukang besi 0.0600 Oh - -
3 Kepala tukang 0.0060 Oh - -
4 Mandor 0.0030 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 26
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 27
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) -
J.18 1 m2 PASANG SUN SHADING
A BAHAN
1 Besi Hollow 50 / 100, Tebal 1.2 mm 6.2000 m' - -
2 Kawat las 0.0500 kg - -
3 Alat Bantu 1.0000 ls - -
B TENAGA
1 Pekerja 0.0150 Oh - -
2 Tukang besi 0.1500 Oh - -
3 Kepala tukang 0.0150 Oh - -
4 Mandor 0.0075 Oh - -
C PERALATAN
1 Las listrik 0.0220 jam - -
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 28
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
1 Pekerja 1.0000 Oh - -
2 Tukang kayu 3.0000 Oh - -
3 Kepala tukang 0.3000 Oh - -
4 Mandor 0.0500 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 29
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
1 Pekerja 0.0100 Oh - -
2 Tukang kayu 0.0010 Oh - -
3 Kepala tukang 0.0010 Oh - -
4 Mandor 0.0015 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 30
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
5 Aksesories ( 2 % ) 1.0000 ls - -
B TENAGA
1 Pekerja 3.0000 Oh - -
2 Tukang kayu 1.5000 Oh - -
3 Kepala tukang 0.0750 Oh - -
4 Mandor 0.0750 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 31
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
1 Pekerja 1.5000 Oh - -
2 Tukang kayu 0.7500 Oh - -
3 Kepala tukang 0.3250 Oh - -
4 Mandor 0.1000 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 32
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
1 Aluminium profil warna 4" 5.3000 m - -
2 Pintu Spandrell frame alumunium 1.7200 m2 - -
3 HPL 3.4400 m2 - -
4 Engsel Pintu 1.0000 bh - -
5 Kunci Pintu 1.0000 bh - -
6 Handle Pintu 1.0000 bh - -
7 Aksesories ( 2 % ) 1.0000 ls - -
B TENAGA
1 Pekerja 1.5000 Oh - -
2 Tukang kayu 0.7500 Oh - -
3 Kepala tukang 0.3250 Oh - -
4 Mandor 0.1000 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 33
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
K.18 1 UNIT PASANG PINTU TYPE PS .3
A BAHAN
1 Hollow Galvalum Hi Steel 40x60x0.6 mm 3.4000 m - -
2 Pintu Besi plat baja 0.3700 m2 - -
3 Engsel Pintu 1.0000 bh - -
4 Kunci Pintu 1.0000 bh - -
5 Handle Pintu 1.0000 bh - -
6 Aksesories ( 2 % ) 1.0000 ls - -
B TENAGA
1 Pekerja 1.0000 Oh - -
2 Tukang kayu 0.5000 Oh - -
3 Kepala tukang 0.0500 Oh - -
4 Mandor 0.0500 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 34
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
3 Aksesories ( 2 % ) 1.0000 ls - -
B TENAGA
1 Pekerja 0.7000 Oh - -
2 Tukang kayu 0.3500 Oh - -
3 Kepala tukang 0.1800 Oh - -
4 Mandor 0.0900 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 35
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
3 HPL 2.5800 m2 - -
4 Engsel Pintu 1.0000 bh - -
5 Kunci Pintu Silender 1.0000 bh - -
6 Slot Pintu 1.0000 bh - -
7 Aksesories ( 2 % ) 1.0000 ls - -
B TENAGA
1 Pekerja 0.4000 Oh - -
2 Tukang kayu 0.2000 Oh - -
3 Kepala tukang 0.0600 Oh - -
4 Mandor 0.0400 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 36
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
3 Karet List 3.8000 m' - -
4 Aksesories ( 2 % ) 1.0000 ls - -
B TENAGA
1 Pekerja 0.4000 Oh - -
2 Tukang kayu 0.2000 Oh - -
3 Kepala tukang 0.0600 Oh - -
4 Mandor 0.0400 Oh - -
C PERALATAN
L.3 1 set PASANG AKSESORIES UNTUK DAUN PINTU KACA, ex. Dorma
A BAHAN
1 Floor hinge dorma 1.0000 unit - -
2 Handle pintu 2.0000 set - -
3 pitting 1.0000 unit - -
4 Kunci 1.0000 set - -
B TENAGA
1 Pekerja 0.1250 Oh - -
2 Tukang 0.0630 Oh - -
3 Kepala tukang 0.0310 Oh - -
4 Mandor 0.0160 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 37
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
1 Kaca Rayben 5 mm 1.1000 m2 - -
2 Sealent 0.0500 tube - -
B TENAGA
1 Pekerja 0.0150 Oh - -
2 Tukang 0.1500 Oh - -
3 Kepala tukang 0.0150 Oh - -
4 Mandor 0.0008 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 38
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C) -
E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) -
L.8 1 m2 PASANG KACA TEMPERED tebal 6 mm
A BAHAN
1 Kaca tempered 1.1000 m2 - -
2 Sealent 0.0500 tube - -
B TENAGA
1 Pekerja 0.0165 Oh - -
2 Tukang 0.1650 Oh - -
3 Kepala tukang 0.0165 Oh - -
4 Mandor 0.0008 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 39
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
1 Pekerja 0.0360 Oh - -
2 Tukang 0.1750 Oh - -
3 Kepala tukang 0.0650 Oh - -
4 Mandor 0.0060 Oh - -
C PERALATAN
D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C) -
E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) -
L.13 1 m2 CURTAIN WALL
A BAHAN
1 Silent 2.0000 bh -
2 Material/Alat bantu 1.0000 ls -
3 Pek. Rangka + Bracket Kaca Frameless 1.0000 m² -
B TENAGA
1 Pekerja 0.0360 Oh -
2 Tukang 0.1750 Oh -
3 Kepala tukang 0.0650 Oh -
4 Mandor 0.0060 Oh -
C PERALATAN
D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C) -
E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) -
L.15 1 m2 PASANG KACA RAYBEN TEBAL 8 mm
A BAHAN
1 Kaca rayben hijau 1.1000 m2 - -
B TENAGA
1 Pekerja 0.0165 Oh - -
2 Tukang 0.1650 Oh - -
3 Kepala tukang 0.0165 Oh - -
4 Mandor 0.0008 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 40
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
2 Tukang 0.3500 Oh - -
3 Kepala tukang 0.0350 Oh - -
4 Mandor 0.0180 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 41
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
3 Kepala tukang 0.0120 Oh - -
4 Mandor 0.0125 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 42
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C) -
E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) -
M.7 1 m2 PASANG VINYL SHEET
A BAHAN
1 Vynyl sheet anti kimia 1.0500 m2 - -
2 Peralatan 0.1200 ls - -
B TENAGA 0.15
1 Pekerja 0.1500 Oh - -
2 Tukang 0.1500 Oh - -
3 Kepala tukang 0.0150 Oh - -
4 Mandor 0.0080 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 43
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
2 Semen portland 1.1400 kg - -
3 Pasir pasang 0.0030 m3 - -
B TENAGA
1 Pekerja 0.0900 Oh - -
2 Tukang 0.0900 Oh - -
3 Kepala tukang 0.0090 Oh - -
4 Mandor 0.0050 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 44
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) -
M.16 1 m2 SCREEDING T = 3 cm
A BAHAN
1 Semen 0.2880 zak - -
1 Pasir beton 0.0390 m3 - -
B TENAGA
1 Pekerja 0.1000 Oh - -
2 Tukang 0.0100 Oh - -
3 Kepala tukang 0.2000 Oh - -
4 Mandor 0.0100 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 45
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 46
No. Uraian Koefisien Satuan Harga satuan Jumlah Harga
(Rp) (Rp)
a b c d e f
D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C) -
E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) -
N.4 1 m2 WALLPAPER
A BAHAN
1 Wallpaper 1.2000 m2 - -
2 Lem 0.2000 kg - -
B TENAGA
1 Pekerja 0.0200 Oh - -
2 Tukang cat 0.2000 Oh - -
3 Kepala tukang 0.0200 Oh - -
4 Mandor 0.0025 Oh - -
C PERALATAN
Analisa Harga Satuan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 47
DAFTAR HARGA SATUAN PEKERJAAN
PEMBANGUNAN GEDUNG CABANG PELAYANAN PENDAPATAN DAERAH PROVINSI WILAYAH KABUPATEN KARAWANG TAHAP I
TAHUN ANGGARAN 2017
Harga Satuan
Kode Uraian
(Rp)
a b c
Harga Satuan Pekerjaan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 6
Harga Satuan
Kode Uraian
(Rp)
a b c
O.107 1 BUAH PEMASANGAN LAMPU TLT5 2 x 18 W - LOUVRE M7 -
O.108 1 BUAH PEMASANGAN LAMPU TLT5 1 x 18 W - LOUVRE M7 -
O.109 1 BUAH PEMASANGAN LAMPU INDIRECT TL 1 x 18 W - BLK -
O.110 1 BUAH PEMASANGAN LAMPU DOWNLIGHT PLC 1 x 18 W -
O.111 1 BUAH PEMASANGAN LAMPU DOWNLIGHT HL 36 W/ 12 V -
O.116 1 BUAH PEMASANGAN SAKLAR TUNGGAL -
O.117 1 BUAH PEMASANGAN SAKLAR GANDA -
O.118 1 BUAH PEMASANGAN GREED SWITCH 4 GANG -
O.119 1 BUAH PEMASANGAN STOP KONTAK 1 FASA -
O.120 1 BUAH PEMASANGAN STOP KONTAK AC -
O.121 1 BUAH PEMASANGAN STOP KONTAK LANTAI -
O.122 1 BUAH PEMASANGAN EMERGENCY KIT LAMP -
O.123 1 BUAH PEMASANGAN EXHAUST FAN 200 CFM -
O.124 1 BUAH PEMASANGAN EXHAUST FAN 16 W -
O.125 1 TITIK INSTALASI PENERANGAN -
O.126 1 TITIK INSTALASI STOP KONTAK -
O.127 1 TITIK INSTALASI EXHAUST FAN -
O.128 1 TITIK INSTALASI DETEKTOR, BELL, DAN INDIKATOR -
O.129 1 TITIK INSTALASI DAYA AC - 1 FASA -
O.130 1 TITIK INSTALASI DAYA AC - 3 FASA -
O.131 1 TITIK INSTALASI DAYA UNIT INDOOR UNIT AC -
O.132 1 TITIK INSTALASI DAYA UNIT OUTDOOR UNIT AC -
O.133 1 TITIK INSTALASI TELEPON -
O.134 1 TITIK INSTALASI DATA -
O.135 1 TITIK INSTALASI TATA SUARA -
O.136 1 TITIK INSTALASI MATV -
O.137 1 TITIK INSTALASI FIRE ALARM -
O.138 1 M1 PEMASANGAN KABEL TRAY LEBAR 20 CM 198,000.00
O.139 1 M1 PEMASANGAN KABEL TRAY LEBAR 30 CM -
O.140 1 M1 PEMASANGAN KABEL TRAY LEBAR 40 CM 261,360.00
O.141 1 M1 PEMASANGAN KABEL TRAY LEBAR 60 CM 261,360.00
O.142 1 UNIT PEMASANGAN CUBICLE PANEL TM -
O.143 1 UNIT PEMASANGAN CAPACITOR BANK 360 KVAR -
O.144 1 UNIT PEMASANGAN PANEL LVMDP -
O.145 1 UNIT PEMASANGAN PANEL MDP - CPDP KARAWANG -
O.146 1 UNIT PEMASANGAN PANEL POMPA -
O.147 1 UNIT PEMASANGAN PANEL LP LT. SATU -
O.148 1 UNIT PEMASANGAN PANEL LP LT. DUA -
O.149 1 UNIT PEMASANGAN PANEL LP LT. TIGA -
O.150 1 UNIT PEMASANGAN PANEL LP LT. EMPAT -
O.151 1 UNIT PEMASANGAN PANEL LP LT. LIMA -
O.152 1 UNIT PEMASANGAN PANEL LP LT. ROOFTOP -
O.153 1 UNIT PEMASANGAN PANEL PP-AC LT. SATU -
O.154 1 UNIT PEMASANGAN PANEL PP-AC LT. DUA -
O.155 1 UNIT PEMASANGAN PANEL PP-AC LT. TIGA -
O.156 1 UNIT PEMASANGAN PANEL PP-AC LT. EMPAT -
O.157 1 UNIT PEMASANGAN PANEL PP-AC LT. LIMA -
O.158 1 UNIT PEMASANGAN PANEL PP-AC LT. ROOFTOP -
O.160 1 UNIT PEMASANGAN PANEL R. POMPA -
O.161 1 UNIT PEMASANGAN PANEL POS JAGA -
O.164 1 UNIT PEMASANGAN PANEL LIFT -
O.165 1 M1 PEMASANGAN KABEL NYY 4 x 4 MM2 -
O.166 1 M1 PEMASANGAN KABEL NYY 4 x 6 MM2 -
Harga Satuan Pekerjaan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 7
Harga Satuan
Kode Uraian
(Rp)
a b c
O.167 1 M1 PEMASANGAN KABEL NYY 4 x 10 MM2 -
O.168 1 M1 PEMASANGAN KABEL NYY 2 x (4 x 10 MM2) -
O.169 1 M1 PEMASANGAN KABEL NYY 4 x 16 MM2 -
O.170 1 M1 PEMASANGAN KABEL NYY 4 x 25 MM2 -
O.171 1 M1 PEMASANGAN KABEL NYY 4 x 35 MM2 -
O.172 1 M1 PEMASANGAN KABEL NYY 4 x 50 MM2 -
O.173 1 M1 PEMASANGAN KABEL NYY 4 x 70 MM2 -
O.174 1 M1 PEMASANGAN KABEL NYY 4 x 95 MM2 -
O.175 1 M1 PEMASANGAN KABEL NYY 4 x 120 MM2 -
O.176 1 M1 PEMASANGAN KABEL NYY 4 x 150 MM2 -
O.177 1 M1 PEMASANGAN KABEL NYY 4 x (1 x 185 MM2) -
O.178 1 M1 PEMASANGAN KABEL NYY 4 x (1 x 240 MM2) -
O.179 1 M1 PEMASANGAN KABEL NYY 4 x 2 x (1 x 145 MM2) -
O.180 1 M1 PEMASANGAN KABEL NYY 4 x 2 x (1 x 300 MM2) -
O.181 1 M1 PEMASANGAN KABEL NYY 4 x 3 x (1 x 300 MM2) -
O.182 1 M1 PEMASANGAN KABEL NYY 4 x 4 x (1 x 300 MM2) -
O.183 1 M1 PEMASANGAN KABEL NYY 6 x 4 x (1 x 300 MM2) -
O.184 1 M1 PEMASANGAN KABEL NYY 3 x (1 x 70 MM2) 326,560.00
O.185 1 M1 PEMASANGAN KABEL NYMHY 4 x (3 x 1,5 MM2) 63,490.00
O.186 1 M1 PEMASANGAN KABEL NYFGbY 3 x 2,5 MM2 175,120.00
O.187 1 M1 PEMASANGAN KABEL NYFGbY 3 x 300 MM2 -
O.188 1 M1 PEMASANGAN KABEL NYFGbY 4 x 16 MM2 -
O.189 1 M1 PEMASANGAN KABEL NYFGbY 4 x 25 MM2 -
O.190 1 M1 PEMASANGAN KABEL NYFGbY 4 x 35 MM2 -
O.191 1 M1 PEMASANGAN KABEL NYFGbY 4 x 95 MM2 -
O.192 1 M1 PEMASANGAN KABEL NYFGbY 4 x 150 MM2 -
O.193 1 M1 PEMASANGAN KABEL NYFGbY 4 x 185 MM2 -
O.194 1 M1 PEMASANGAN KABEL NYFGbY 2(4 x 240 MM2) -
O.195 1 M1 PEMASANGAN KABEL NYFGbY (4 x 300 MM2) -
O.196 1 M1 PEMASANGAN KABEL NYFGbY 6(4 x 300 MM2) -
O.197 1 M1 PEMASANGAN KABEL N2XSY (1 x 400 MM2) -
O.198 1 M1 PEMASANGAN KABEL N2XSY (1 x 500 MM2) -
O.199 1 UNIT PEMASANGAN TRAFO 400 KVA -
O.200 1 UNIT PEMASANGAN UPS KAPASITAS 20 KVA -
O.201 1 UNIT PEMASANGAN UPS KAPASITAS 40 KVA -
O.202 1 UNIT PEMASANGAN CTB 20 PAIRS -
O.203 1 UNIT PEMASANGAN PESAWAT TELEPON SINGLE LINE -
O.204 1 UNIT PEMASANGAN SOCKET TELEPON (RJ - 11) -
O.205 1 UNIT PEMASANGAN PATCH PANEL + SWITCH HUB 12 PORT -
O.206 1 UNIT PEMASANGAN TERMINAL BOX 10 PAIRS -
O.207 1 M1 PEMASANGAN KABEL TELEPON 10 PAIRS -
O.208 1 M1 PEMASANGAN KABEL TELEPON 20 PAIRS -
O.209 1 M1 PEMASANGAN KABEL TELEPON 30 PAIRS -
O.210 1 M1 PEMASANGAN KABEL TELEPON 40 PAIRS -
O.211 1 M1 PEMASANGAN KABEL TELEPON 50 PAIRS -
O.212 1 M1 PEMASANGAN KABEL TELEPON 80 PAIRS -
O.213 1 M1 PEMASANGAN KABEL DATA CAT 5E -
O.214 1 M1 PEMASANGAN KABEL DATA CAT 6 TYPE OUTDOOR -
O.215 1 M1 PEMASANGAN TWISTED SHIELDED 2 x AWG 18 (DATA) -
O.216 1 M1 PEMASANGAN FRC 3 x 1,5 MM2 (POWER) -
O.217 1 M1 PEMASANGAN ITC 2 x 2 x 0,6 MM2 (PHONE) -
O.218 1 M1 PEMASANGAN KABEL COAXIAL RG 6 -
O.219 1 M1 PEMASANGAN KABEL COAXIAL RG 8 -
Harga Satuan Pekerjaan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 8
Harga Satuan
Kode Uraian
(Rp)
a b c
O.220 1 M1 PEMASANGAN KABEL COAXIAL RG 11 / 10C -
O.221 1 BUAH PEMASANGAN SOCKET DATA -
O.222 1 BUAH PEMASANGAN SMOKE DETECTOR -
O.223 1 BUAH PEMASANGAN ROR -
O.224 1 BUAH PEMASANGAN INDICATOR FLASHING LAMP -
O.225 1 BUAH PEMASANGAN ALARM BELL -
O.226 1 BUAH PEMASANGAN MANUAL BREAK GLASS -
O.227 1 BUAH PEMASANGAN MCFA, KAPASITAS 20 ZONE -
O.228 1 BUAH PEMASANGAN ANNOUNCIATOR PANEL KAPASITAS 30 ZONE -
O.229 1 BUAH PEMASANGAN TB - FIRE ALARM -
O.230 1 BUAH PEMASANGAN SPLITER -
O.231 1 BUAH PEMASANGAN COUPLER -
O.232 1 BUAH PEMASANGAN SOCKET TV -
O.233 1 BUAH PEMASANGAN TB - SOUND SYSTEM -
O.234 1 BUAH PEMASANGAN RADIO TUNNER AM/FM -
O.235 1 BUAH PEMASANGAN AUTORESERVE CASSETTE -
O.236 1 BUAH PEMASANGAN CD PLAYER -
O.237 1 BUAH PEMASANGAN PAGGING MICROPHONE -
O.238 1 BUAH PEMASANGAN MIXER FRAME W/ MODULE -
O.239 1 BUAH PEMASANGAN EQUALIZER -
O.240 1 BUAH PEMASANGAN 300W POWER AMPLIFIER -
O.241 1 BUAH PEMASANGAN CEILING SPEAKER -
O.242 1 BUAH PEMASANGAN COLUMN SPEAKER -
O.243 1 BUAH PEMASANGAN VOLUME CONTROL -
O.244 1 BUAH PEMASANGAN TERMINAL BOX + BOOSTER -
O.245 1 BUAH PEMASANGAN ACTIVE FILTER -
O.246 1 BUAH PEMASANGAN DIGITAL SATELITE RECEIVER & MODULATOR -
O.247 1 UNIT PEMASANGAN PC COMPUTER & PRINTER -
O.248 1 UNIT PEMASANGAN 21 LCD TFT MONITOR -
O.249 1 UNIT PEMASANGAN DIGITAL VIDEO RECORDER (DVR) -
O.250 1 UNIT PEMASANGAN RACK CCTV 3,192,750.00
O.251 1 UNIT PEMASANGAN DOM CAMERA -
O.252 1 UNIT PEMASANGAN MASTER STATION DIGITAL -
O.256 1 UNIT PEMASANGAN MESIN POMPA SEMI HISAP -
O.257 1 BUAH PEMASANGAN PRESSURE GAUGE -
O.258 1 BUAH PEMASANGAN PRESSURE SWITCH -
O.259 1 BUAH PEMASANGAN PRESSURE TANK KAPASITAS 1000 LITER 17,050,000.00
O.265 1 UNIT PEMASANGAN FLOW METER (FLOW RATE 0-15 LITER/MENIT) -
O.266 1 UNIT PEMASANGAN FLOW METER (FLOW RATE FOR BABY USE) -
O.267 1 M1 PEMASANGAN PIPA TEMBAGA (ASTM 218) DIAMETER 1/2" -
O.268 1 M1 PEMASANGAN PIPA TEMBAGA (ASTM 218) DIAMETER 3/4" -
O.269 1 M1 PEMASANGAN PIPA TEMBAGA (ASTM 218) DIAMETER 1" -
O.270 1 UNIT PEMASANGAN POMPA TRANSFER MULTISTAGE KAPASITAS 505 LPM / 100 M -
O.272 1 UNIT PEMASANGAN POMPA BOOSTER KAPASITAS 30 LPM / 41 M -
O.276 1 UNIT PEMASANGAN WATER LEVEL CONTROL -
O.277 1 UNIT PEMASANGAN CARBON FILTER -
O.285 1 BUAH PEMASANGAN INDOOR HYDRANT BOX -
O.286 1 BUAH PEMASANGAN FIRE EXTINGUISHER KAPASITAS 5 KG -
O.287 1 BUAH PEMASANGAN HEAD SPRINKLER -
O.288 1 UNIT PEMASANGAN SENTRAL GAS VACUUM KAPASITAS 311 LPM @ 450 MMHG -
O.289 1 UNIT PEMASANGAN SENTRAL COMPRESSED AIR KAPASITAS 410 LPM -
O.290 1 UNIT PEMASANGAN CENTRAL ALARM PANEL TYPE 3 GAS -
O.291 1 UNIT PEMASANGAN ALARM PANEL TYPE 3 GAS -
Harga Satuan Pekerjaan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 9
Harga Satuan
Kode Uraian
(Rp)
a b c
O.292 1 UNIT PEMASANGAN VALVE BOX TYPE 3 GAS -
O.293 1 M1 PEMASANGAN PIPA REFRIGERANT -
O.294 1 M1 PEMASANGAN PIPA DRAIN PVC + ISOLASI DIAMETER 1" -
O.295 1 UNIT PEMASANGAN INDOOR AC SPLIT WALL MOUNTED TYPE, KAPASITAS 4500 BTUH, 1/2 PK -
O.296 1 UNIT PEMASANGAN INDOOR AC SPLIT WALL MOUNTED TYPE, KAPASITAS 6500 BTUH, 3/4 PK -
O.297 1 UNIT PEMASANGAN INDOOR AC SPLIT WALL MOUNTED TYPE, KAPASITAS 9000 BTUH, 1 PK -
O.298 1 UNIT PEMASANGAN INDOOR AC SPLIT WALL MOUNTED TYPE, KAPASITAS 13500 BTUH, 1 1/2 PK -
O.299 1 UNIT PEMASANGAN INDOOR AC SPLIT WALL MOUNTED TYPE, KAPASITAS 27000 BTUH, 3 PK -
O.300 1 UNIT PEMASANGAN INDOOR AC CASSETTE MOUNTED TYPE, KAPASITAS 4500 BTUH, 1/2 PK -
O.301 1 UNIT PEMASANGAN INDOOR AC CASSETTE MOUNTED TYPE, KAPASITAS 6750 BTUH, 3/4 PK -
O.302 1 UNIT PEMASANGAN INDOOR AC CASSETTE MOUNTED TYPE, KAPASITAS 9000 BTUH, 1 PK -
O.303 1 UNIT PEMASANGAN INDOOR AC CASSETTE MOUNTED TYPE, KAPASITAS 13500 BTUH, 1 1/2 PK -
O.304 1 UNIT PEMASANGAN INDOOR AC CASSETTE MOUNTED TYPE, KAPASITAS 18000 BTUH, 2 PK -
O.305 1 UNIT PEMASANGAN INDOOR AC CASSETTE MOUNTED TYPE, KAPASITAS 27000 BTUH, 3 PK -
O.306 1 UNIT PEMASANGAN OUTDOOR AC VRV KAPASITAS 406000 BTUH, 42 PK -
O.307 1 UNIT PEMASANGAN OUTDOOR AC VRV KAPASITAS 345000 BTUH, 36 PK -
O.308 1 UNIT PEMASANGAN OUTDOOR AC VRV KAPASITAS 324000 BTUH, 34 PK -
O.309 1 UNIT PEMASANGAN OUTDOOR AC VRV KAPASITAS 273000 BTUH, 28 PK -
O.310 1 UNIT PEMASANGAN PRESSURERIZE FAN KAPASITAS 12.000 CFM / 1,98 INWG / INLINE AXIAL FAN -
O.311 1 UNIT PEMASANGAN BOOSTER FAN KAPASITAS 200 CFM -
O.312 1 UNIT PEMASANGAN RETURN AIR GRILLE 14" x 14" -
Harga Satuan Pekerjaan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 10
DAFTAR HARGA SATUAN PEKERJAAN
PEMBANGUNAN GEDUNG CABANG PELAYANAN PENDAPATAN DAERAH PROVINSI WILAYAH KABUPATEN KARAWANG TAHAP I
TAHUN ANGGARAN 2017
JUMLAH HARGA
KODE JENIS PEKERJAAN
Rp
a b c
Harga Satuan Pekerjaan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 1
JUMLAH HARGA
KODE JENIS PEKERJAAN
Rp
a b c
E.19 MEMBUAT BETON STRUKTUR FILE CAP P.1, K - 300 -
E.20 MEMBUAT BETON STRUKTUR FILE CAP P.2, K - 300 -
E.21 MEMBUAT BETON STRUKTUR FILE CAP P.3, K - 300 -
E.22 MEMBUAT BETON STRUKTUR FILE CAP P.4, K - 300 -
E.23 MEMBUAT BETON STRUKTUR FILE CAP P.5, K - 300 -
E.24 MEMBUAT BETON STRUKTUR FILE CAP P.6, K - 300 -
E.25 MEMBUAT BETON STRUKTUR PONDASI SETEMPAT R. GENSET & R. POMPA P.1, K - 300 -
E.26 MEMBUAT BETON STRUKTUR SF.1, K - 300 uk. 300 X 600 mm -
E.27 MEMBUAT BETON STRUKTUR SF.2, K - 300 uk. 200 X 400 mm -
E.28 MEMBUAT BETON STRUKTUR SF.1 R. GENSET & R. POMPA, K - 300 uk. 150 X 300 mm -
E.29 MEMBUAT BETON STRUKTUR K.1, K - 300 uk. 700 X 700 mm -
E.30 MEMBUAT BETON STRUKTUR K.2, K - 300 uk. 700 X 700 mm -
E.31 MEMBUAT BETON STRUKTUR K.3, K - 300 uk. 600 X 600 mm -
E.32 MEMBUAT BETON STRUKTUR K.4, K - 300 uk. 600 X 600 mm -
E.33 MEMBUAT BETON STRUKTUR K.5, K - 300 uk. 300 X 300 mm -
E.34 MEMBUAT BETON STRUKTUR K.6, K - 300 uk. 600 X 600 mm -
E.35 MEMBUAT BETON STRUKTUR K.1 R. GENSET & R. POMPA, K - 300 uk. 250 X 250 mm -
E.36 MEMBUAT BETON STRUKTUR B.1, K - 300 uk. 400 X 800 mm -
E.37 MEMBUAT BETON STRUKTUR B.2, K - 300 uk. 400 X 800 mm -
E.38 MEMBUAT BETON STRUKTUR B.3, K - 300 uk. 200 X 300 mm -
E.39 MEMBUAT BETON STRUKTUR B.A, K - 300 uk. 200 X 400 mm -
E.40 MEMBUAT BETON STRUKTUR RB.1, K - 300 uk. 250 X 400 mm -
E.41 MEMBUAT BETON STRUKTUR B.1 R. GENSET & R. POMPA, K - 300 uk. 150 X 300 mm -
E.42 MEMBUAT BETON STRUKTUR B.L R. GENSET & R. POMPA, K - 300 uk. 100 X 400 mm -
E.43 MEMBUAT BETON STRUKTUR PELAT LANTAI, K - 300 uk. T = 13 cm -
E.44 MEMBUAT BETON STRUKTUR PELAT LANTAI, K - 300 uk. T = 15 cm -
E.45 MEMBUAT BETON STRUKTUR PELAT LANTAI, K - 300 uk. T = 15 cm ( PARKIR ) -
E.46 MEMBUAT BETON STRUKTUR SHEAR WALL GWT, K - 300 uk. T = 20 cm -
E.47 MEMBUAT BETON STRUKTUR LANTAI GWT, K - 300 uk. T = 20 cm -
E.48 MEMBUAT BETON STRUKTUR ANAK TANGGA, K - 300 -
E.49 MEMBUAT BETON STRUKTUR HAMPARAN TANGGA, K - 300 -
E.50 MEMBUAT BETON STRUKTUR BALOK BORDES, K - 300 -
E.51 MEMBUAT BETON STRUKTUR DPT, K - 300 uk. T = 15 cm -
E.52 MEMBUAT BETON STRUKTUR PELAT LANTAI, K - 300 uk. T = 12 cm -
E.53 MEMBUAT BETON STRUKTUR PELAT LANTAI, K - 300 uk. T = 10 cm -
E.54 MEMBUAT BETON STRUKTUR PELAT LANTAI R. GENSET & R. POMPA, K - 300 uk. T = 20 cm -
E.55 MEMBUAT BETON STRUKTUR PELAT LANTAI R. GENSET & POMPA, K - 300 uk. T = 10 cm -
E.56 MEMBUAT BETON STRUKTUR SF.1 R. POS, K - 300 uk. 150 X 200 mm -
E.57 MEMBUAT BETON STRUKTUR K.1 R. POS, K - 300 uk. 150 X 150 mm -
E.58 MEMBUAT BETON STRUKTUR B.1 R. POS, K - 300 uk. 150 X 200 mm -
E.59 MEMBUAT BETON STRUKTUR B.L R. POS, K - 300 uk. 100 X 200 mm -
E.60 MEMBUAT BETON STRUKTUR PELAT LANTAI UNTUK JALAN. T = 20 CM -
E.61 1 BUAH PASANG PONDASI PRECAST BETON BERTULANG -
Harga Satuan Pekerjaan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 2
JUMLAH HARGA
KODE JENIS PEKERJAAN
Rp
a b c
ANALISA BIAYA KONSTRUKSI PEKERJAAN SITE
I.8 1 m3 LAPISAN PONDASI AGREGAT KELAS A -
I.9 1 m' CUTTERING & JOINT SEALENT -
Harga Satuan Pekerjaan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 3
JUMLAH HARGA
KODE JENIS PEKERJAAN
Rp
a b c
M.1 1 m2 PASANG LANTAI HOMOGENOUS POLISHED UK. 60 x 60 cm -
M.2 1 m2 PASANG LANTAI HOMOGENOUS UNPOLISHED UK. 60 x 60 cm -
M.3 1 m2 PASANG LANTAI HOMOGENOUS POLISHED UK. 80 x 80 cm -
M.4 1 m2 PASANG LANTAI KERAMIK UNPOLISHED UK. 40 x 40 cm -
M.5 1 m2 PASANG LANTAI KERAMIK POLISHED 30 X 30 CM -
M.6 1 m2 PASANG LANTAI KERAMIK UNPOLISHED 30 X 30 CM -
M.7 1 m2 PASANG VINYL SHEET -
M.8 1 m2 PASANG LANTAI KERAMIK KM/WC 30 X 30 CM -
M.9 1 m2 PASANG DINDING HOMOGENOUS 30 x 60 cm -
M.10 1 m PASANG PLINT UK. 10 X 60 CM -
M.11 1 m PASANG STEP NOSHING 10 X 60 CM -
M.12 1 m2 PASANG PAVING BLOCK NATURAL T = 8 CM -
M.13 1 m2 FLOOR HARDENER FERROVAX -
M.14 1 m2 COATING WATERPROOFING -
M.15 1 m2 MEMBRANCE WATERPROOFING -
M.16 1 m2 SCREEDING T = 3 cm -
M.17 1 m2 PASANG FLOOR HARDENER -
M.18 1 m' PASANG PLINT KAYU 1/10 -
M.19 1 m' PASANG STAINLESS STEEL -
M.20 1 m2 PASANG KARPET BAHAN NILON -
M.21 1 m2 PASANG DINDING MARMER SET. TULUNG AGUNG -
M.22 1 m2 PASANG DINDING MARMER SET. CARARA -
M.23 1 m2 PASANG PARQUET JATI -
Harga Satuan Pekerjaan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 4
SCHEDULE PELAKSANAAN
Pekerjaan : Pekerjaan Pembangunan Gedung Kantor Cabang Pelayanan Dinas Pendapatan ( CPDP )
Tahun Anggaran : 2016
BOBOT Jangka Waktu Pelaksanaan
NO URAIAN PEKERJAAN
JUMLAH HARGA % MARET APRIL MEI JUNI JULY AGUSTUS SEPTEMBER OKTOBER keterangan
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
RENCANA
A. PEKERJAAN SARANA & PRASARANA
I. PEKERJAAN PEMATANGAN TANAH & LAHAN
1.1. PEKERJAAN PERSIAPAN LAPANGAN Rp. 939,294,050.13 3.87 0.97 0.97 0.97 0.97
II. PEKERJAAN PAGAR BETON
2.1. PEKERJAAN PAGAR DEPAN Rp. 480,043,579.00 1.98 0.49 0.49 0.49 0.49
2.2. PEKERJAAN PAGAR BELAKANG Rp. 366,387,315.40 1.51 0.50 0.50 0.50
2.3. PEKERJAAN DRAINASE Rp. 80,830,164.00 0.33 0.33
2.4. PEKERJAAN ELEKTRIKAL PAGAR Rp. Tahap ke II #VALUE! #VALUE!
III. PEKERJAAN JALAN & LANSKAP
3.1 PEKERJAAN JALAN & PJU Rp. 458,257,460.00 1.89 0.63 0.63 0.63
3.2 PEKERJAAN LANSKAP Rp. 12,595,800.00 0.05 0.05
B. PEKERJAAN STANDAR
I. PEKERJAAN PERSIAPAN
1.1. PEKERJAAN PERSIAPAN LAPANGAN Rp. 157,562,893.00 0.65 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
II. PEKERJAAN STRUKTUR RENCANA
2.1. PEKERJAAN LANTAI SATU Rp. 721,321,883.21 2.97 0.99 0.99 0.99
2.2. PEKERJAAN LANTAI DUA Rp. 1,608,543,801.42 6.63 1.66 1.66 1.66 1.66
2.3. PEKERJAAN LANTAI TIGA Rp. - 0.00 - - - -
2.4. PEKERJAAN LANTAI EMPAT Rp. - 0.00 - - - -
2.5. PEKERJAAN LANTAI LIMA Rp. - 0.00 - - - -
2.6. PEKERJAAN LANTAI ROOF TOP Rp. 1,314,180,889.02 5.42 1.35 1.35 1.35 1.35
2.7. PEKERJAAN LANTAI RING BALOK 1 Rp. 338,805,848.40 1.40 1.40
III. PEKERJAAN ARSITEKTUR
3.1. PEKERJAAN LANTAI SATU Rp. 652,773,302.40 2.69 0.90 0.90 0.90
3.2. PEKERJAAN LANTAI DUA Rp. 1,130,679,825.24 4.66 1.55 1.55 1.55
3.3. PEKERJAAN LANTAI TIGA Rp. - 0.00 - - -
3.4. PEKERJAAN LANTAI EMPAT Rp. - 0.00 - - - -
3.5. PEKERJAAN LANTAI LIMA Rp. - 0.00 - -
3.6. PEKERJAAN LANTAI ROOFTOP Rp. - 0.00 - -
3.7. PEKERJAAN FIXTURES LAVATORY Rp. 638,687,328.20 2.63 0.66 0.66 0.66 0.66
IV. PEKERJAAN ELEKTRIKAL ARUS LEMAH
4.1. PEKERJAAN TITIK INSTALASI DAYA DAN ARMATUR PENERANGAN Rp. 512,164,080.00 2.11 1.06 1.06
V. PEKERJAAN PLAMBING
5.1. PEKERJAAN AIR BERSIH Rp. 50,770,880.00 0.21 0.21
5.2. PEKERJAAN AIR KOTOR Rp. 70,227,100.00 0.29 0.29
5.3. PEKERJAAN TALANG AIR HUJAN Rp. - 0.00 -
5.4. PEKERJAAN LAINNYA Rp. 10,000,000.00 0.04 0.04
III.
2.4. PEK. RAMP TYPE 4
PEKERJAAN BIOFILTER & SALURAN AIR HUJAN
Rp. 13,493,281.16 0.06
0.04
0.06 RENCANA
3.1. PEKERJAAN GALIAN TANAH Rp. 8,864,077.50 0.04 0.04
3.2. PEKERJAAN PASANGAN Rp. 151,258,552.60 0.62 0.62
IV. PEKERJAAN GROUND WATER TANK
4.1. PEKERJAAN GROUND WATER TANK Rp. 185,705,282.70 0.77 0.77
V. PEKERJAAN TANGGA
5.1. PEK. TANGGA TYPE 1 Rp. 2,630,770.01 0.01 0.01
5.2. PEK. TANGGA TYPE 2 Rp. 2,963,815.86 0.01 0.01
VI. PEKERJAAN BACKDROP & WALL TREATMENT
6.1. LANTAI DUA Rp. 374,891,716.13 1.55 1.55
6.2. LANTAI TIGA Rp. 272,265,634.91 1.12 1.12
6.3. LANTAI EMPAT Rp. 260,550,148.81 1.07 1.07
6.4. LANTAI LIMA Rp. 420,477,102.23 1.73 0.87 0.87
VII. PEKERJAAN FINISHING EKSTERIOR DAN INTERIOR GEDUNG
7.1. PEKERJAAN FINISHING & AKSESORIES Rp. 2,880,719,976.86 11.87 1.98 1.98 1.98 1.98 1.98 1.98
VIII. PEKERJAAN ELEKTRIKAL ARUS KUAT
8.1. PEKERJAAN SUMBER DAYA DAN KABEL UTAMA Rp. 856,355,430.00 3.53 1.18 1.18 1.18
8.2. PEKERJAAN PANEL DAN KABEL FEEDER Rp. 260,838,730.00 1.07 1.07
8.3. PEKERJAAN KABEL TRAY Rp. 87,586,420.00 0.36 0.36
8.4. PEKERJAAN PENGADAAN DAN PEMASANGAN DIESEL GENERATING SET Rp. 493,318,300.00 2.03 2.03
8.5. PEKERJAAN PENANGKAL PETIR (ELEKTROSTATIS / EF SYSTEM) Rp. 104,193,600.00 0.43 0.43
IX. PEKERJAAN ELEKTRIKAL ARUS LEMAH
9.1. PEKERJAAN TELEPON Rp. 91,736,720.00 0.38 0.38
9.2. PEKERJAAN LAN (DATA) Rp. 38,099,590.00 0.16 0.16
9.3. PEKERJAAN CCTV Rp. 109,602,480.00 0.45 0.23 0.23
9.4. PEKERJAAN TATA SUARA Rp. 105,274,450.00 0.43 0.43
9.5. PEKERJAAN FIRE ALARM Rp. 330,669,500.00 1.36 0.68 0.68
X. PEKERJAAN MEKANIKAL DAN PLAMBING
10.1. PEKERJAAN UTAMA DEEP WELL Rp. 250,000,000.00 1.03 1.03
10.2. PERALATAN UTAMA HYDRANT, SPRINKLER & APPAR Rp. 1,023,526,860.00 4.22 2.11 2.11
10.3. PERALATAN UTAMA AIR BERSIH Rp. 386,380,100.00 1.59 1.59
10.4. PEKERJAAN HYDRANT & SPLINKER Rp. 362,356,890.00 1.49 1.49
10.5. PEKERJAAN TATA UDARA Rp. 3,113,860,090.00 12.83 3.21 3.21 3.21 3.21
10.7. PEKERJAAN ELEVATOR Rp. 958,000,000.00 3.95 1.97 1.97
24,264,217,295.32 #VALUE!
RENCANA PROGRES PER MINGGU 0.99 0.99 1.02 1.05 1.33 2.69 3.40 3.04 1.68 1.68 2.27 4.59 3.82 5.54 3.02 2.79 6.77 7.29 8.13 7.52 6.80 5.62 #VALUE! 3.34 2.66 2.66 2.00 2.00 0.22 0.17 0.13 0.02
KUMULATIF PROGRES RENCANA 0.99 1.98 3.00 4.05 5.38 8.07 11.47 14.51 16.18 17.86 20.13 24.72 28.55 34.09 37.11 39.90 46.67 53.96 62.09 69.61 76.41 82.03 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
dibuat oleh :
Konsultan Perencana
PT. Nusantara Citra Konsultan
Ir. S. Haryanto
Direktur Utama
REKAPITULASI TOTAL
BILL OF QUANTITY (BOQ)
KONSTRUKSI BANGUNAN GEDUNG
PEMBANGUNAN GEDUNG CABANG PELAYANAN PENDAPATAN DAERAH PROVINSI WILAYAH KABUPATEN KARAWANG
TAHAP I
TAHUN ANGGARAN 2017
A B C
B. PEKERJAAN STANDAR Rp -
JUMLAH TOTAL Rp -
DIBULATKAN Rp -
Terbilang : ..................................................................................................................................................................
Karawang, 2017
Penawar Jasa
PT/CV....................................
Nama
Direktur/Direktris
###
Rekapitulasi Total Pekerjaan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I
REKAPITULASI PEKERJAAN SARANA PRASARANA
PEMBANGUNAN GEDUNG CABANG PELAYANAN PENDAPATAN DAERAH PROVINSI WILAYAH KABUPATEN
KARAWANG TAHAP I
TAHUN ANGGARAN 2017
A B C
Rekapitulasi BOQ Sarana Prasarana Standar Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I
BILL OF QUANTITY
PEMBANGUNAN GEDUNG CABANG PELAYANAN PENDAPATAN DAERAH PROVINSI WILAYAH KABUPATEN KARAWANG TAHAP I
NO URAIAN PEKERJAAN VOLUME SAT KODE HARGA SATUAN SUB JUMLAH HARGA
(Rp) (Rp)
a b c d e f g = (c x f)
###
A. PEKERJAAN SARANA & PRASARANA
I. PEKERJAAN PEMATANGAN TANAH & LAHAN
1.1. PEKERJAAN TANAH
- Pek. Pembersihan lahan & lapangan 2,281.00 m2 A.2. - -
- Pek. Urugan tanah dipadatkan area lokasi site & bangunan dengan 3,329.23 m3 B.11 - -
alat berat, ( Ketinggian lihat pada gambar )
JUMLAH 1.1. -
JUMLAH I.PEKERJAAN PEMATANGAN TANAH & LAHAN -
Bill Of Quantity Sarana Prasarana Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 1
NO URAIAN PEKERJAAN VOLUME SAT KODE HARGA SATUAN SUB JUMLAH HARGA
(Rp) (Rp)
a b c d e f g = (c x f)
- Pondasi Batu Kali 1 pc : 4 ps 66.25 m3 C.2 - -
c. Pekerjaan Pasangan Dinding
- Pek. Pas. Plesteran + acian 21.00 m2 - - -
JUMLAH 2.3. -
JUMLAH II.PEKERJAAN PAGAR BETON -
III. PEKERJAAN JALAN & LANSKAP
3.1 PEKERJAAN JALAN & PJU
c. Pekerjaan Jalan
- Pek. Lavelling LPA t = 15 cm 1,338.86 m2 I.8 - -
- Pek. Penghamparan Beton Ready Mix f'c 25 Mpa, T = 20 cm (K-300) 267.77 m3 E.60 - Tahap Ke II
- Pek. Cuttering & joint Sealent 528.00 m' I.9 - Tahap Ke II
JUMLAH 3.1 -
JUMLAH III.PEKERJAAN JALAN & LANSKAP -
Bill Of Quantity Sarana Prasarana Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 2
REKAPITULASI PEKERJAAN STANDAR
PEMBANGUNAN GEDUNG CABANG PELAYANAN PENDAPATAN DAERAH PROVINSI WILAYAH KABUPATEN KARAWANG TAHAP I
TAHUN ANGGARAN 2017
A B C
B. PEKERJAAN STANDAR
I. PEKERJAAN PERSIAPAN
1.1. PEKERJAAN PERSIAPAN LAPANGAN -
JUMLAH I.PEKERJAAN PERSIAPAN Rp -
II. PEKERJAAN STRUKTUR
2.1. PEKERJAAN LANTAI SATU -
2.2. PEKERJAAN LANTAI DUA -
2.3. PEKERJAAN LANTAI TIGA -
2.4. PEKERJAAN LANTAI EMPAT -
2.5. PEKERJAAN LANTAI LIMA -
2.6. PEKERJAAN LANTAI ROOF TOP -
2.7. PEKERJAAN LANTAI RING BALOK 1 -
JUMLAH II.PEKERJAAN STRUKTUR Rp -
III. PEKERJAAN ARSITEKTUR
3.1. PEKERJAAN LANTAI SATU -
3.2. PEKERJAAN LANTAI DUA -
3.3. PEKERJAAN LANTAI TIGA -
3.4. PEKERJAAN LANTAI EMPAT -
3.5. PEKERJAAN LANTAI LIMA -
3.6. PEKERJAAN LANTAI ROOFTOP -
3.7. PEKERJAAN FIXTURES LAVATORY -
JUMLAH III.PEKERJAAN ARSITEKTUR Rp -
IV. PEKERJAAN ELEKTRIKAL ARUS LEMAH
4.1. PEKERJAAN TITIK INSTALASI DAYA DAN ARMATUR PENERANGAN -
JUMLAH IV.PEKERJAAN ELEKTRIKAL ARUS LEMAH Rp -
V. PEKERJAAN PLAMBING
5.1. PEKERJAAN AIR BERSIH -
5.2. PEKERJAAN AIR KOTOR -
5.3. PEKERJAAN TALANG AIR HUJAN -
5.4. PEKERJAAN LAINNYA -
JUMLAH V.PEKERJAAN PLAMBING Rp -
JUMLAH B.PEKERJAAN STANDAR Rp -
Rekapitulasi BOQ Standar Pekerjaan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I
BILL OF QUANTITY
PEMBANGUNAN GEDUNG CABANG PELAYANAN PENDAPATAN DAERAH PROVINSI WILAYAH KABUPATEN KARAWANG TAHAP I
TAHUN ANGGARAN 2017
B. PEKERJAAN STANDAR
I. PEKERJAAN PERSIAPAN
1.1. PEKERJAAN PERSIAPAN LAPANGAN
a. Pek. Pengukuran dan pasang bouwplank 507.97 m' A.1 - -
b. Mobilisasi & Demobilisasi 1.00 ls - -
c. Pembuatan Papan Nama Proyek 1.00 ls - -
d. Administrasi & Pelaporan ( Dokumentasi ) 1.00 ls - -
e. Biaya Loading Test ( Tes PDA ) 1.00 ttk - -
f. Biaya Sewa Mobil Crane 24 m 3.00 bln - -
JUMLAH I.PEKERJAAN PERSIAPAN -
II. PEKERJAAN STRUKTUR
2.1. PEKERJAAN LANTAI SATU
2.1.1. Pekerjaan Beton
a. Pek. Kolom Beton, Ready Mix f'c 25 Mpa, Elv. +1.44 s/d +5.60 m (K-300)
- Pek. Beton Struktur K.1, uk. 70 x 70 cm, Besi (U39. 99 kg) & (U24. 33 kg) 25.48 m3 E.29 - -
- Pek. Beton Struktur K.2, uk. 70 x 70 cm, Besi (U39. 60 kg) & (U24. 33 kg) 12.74 m3 E.30 - -
- Pek. Beton Struktur K.4, uk. 60 x 60 cm, Besi (U39. 81 kg) & (U24. 38 kg) 26.21 m3 E.32 - -
- Pek. Beton Struktur K.6, Besi (U39. 81 kg) & (U24. 38 kg) 7.49 m3 E.34 - -
b. Pek. Plat Lantai Beton Parkiran Ready Mix f'c 25 Mpa (K-300)
- Urugan Pasir dengan Pasir Urug tebal 10 cm 57.11 m3 B.10 - -
- Lantai Kerja 1 PC : 3 pasir : 5 kerikil 28.55 m3 E.1 - -
- Pek. Beton Struktur Plat Lantai Elv. +2.10 m, t = 15 cm, Besi (U24. 52 kg) 85.66 m3 E.45 - -
c. Pek. Plat Lantai Beton Ramp Type 1 Ready Mix f'c 25 Mpa (K-300)
- Urugan Pasir dengan Pasir Urug tebal 10 cm 1.32 m3 B.10 - -
- Lantai Kerja 1 PC : 3 pasir : 5 kerikil 0.66 m3 E.1 - -
- Pek. Beton Struktur Plat Lantai Elv. +2.10 m, t = 15 cm, Besi (U24. 52 kg) 1.98 m3 E.45 - -
d. Pek. Plat Lantai Beton Ramp Type 2 Ready Mix f'c 25 Mpa (K-300)
- Urugan Pasir dengan Pasir Urug tebal 10 cm 0.80 m3 B.10 - -
- Lantai Kerja 1 PC : 3 pasir : 5 kerikil 0.40 m3 E.1 - -
- Pek. Beton Struktur Plat Lantai Elv. +2.10 m, t = 15 cm, Besi (U24. 52 kg) 1.20 m3 E.45 - -
e. Pek. Plat Lantai Beton Ramp Type 3 Ready Mix f'c 25 Mpa (K-300)
- Urugan Pasir dengan Pasir Urug tebal 10 cm 2.64 m3 B.10 - -
- Lantai Kerja 1 PC : 3 pasir : 5 kerikil 1.32 m3 E.1 - -
- Pek. Beton Struktur Plat Lantai Elv. +2.10 m, t = 15 cm, Besi (U24. 52 kg) 3.96 m3 E.45 - -
f. Pek. Fit Lift Beton, Ready Mix f'c 25 Mpa (K-300)
- Urugan Pasir dengan Pasir Urug tebal 10 cm 0.68 m3 B.10 - -
- Lantai Kerja 1 PC : 3 pasir : 5 kerikil 0.34 m3 E.1 - -
- Pek. Beton Struktur Plat Lantai Elv. + 1.50 m, t = 12 cm, Besi (U24. 165 kg) 0.81 m3 E.52 - -
- Pek. Dinding Shear Wall Fit Lift, t = 15 cm, tinggi = 1.40 m, Besi (U24. 52 kg) 2.18 m3 E.51 - -
2.1.2. Pekerjaan Tangga
a. Pekerjaan Tangga Lantai 1 s/d Lt.2, Type 1
- Pek. Struktur Beton Anak Tangga, Besi (U24. 101,3 kg) 0.92 m3 E.48 - -
- Pek. Struktur Beton Hamparan Tangga, Besi (U39. 113 kg) & (U24. 66 kg) 1.83 m3 E.49 - -
- Pek. Struktur Beton Bordes Tangga, Besi (U39. 113 kg) & (U24. 66 kg) 0.74 m3 E.49 - -
- Pek. Struktur Beton Balok Bordes Tangga, Besi (U39. 99 kg) & (U24. 61 kg) 0.14 m3 E.50 - -
b. Pekerjaan Tangga Lantai 1 s/d Lt.2, Type 2
- Pek. Struktur Beton Anak Tangga, Besi (U24. 101,3 kg) 1.06 m3 E.48 - -
- Pek. Struktur Beton Hamparan Tangga, Besi (U39. 113 kg) & (U24. 66 kg) 2.16 m3 E.49 - -
- Pek. Struktur Beton Bordes Tangga, Besi (U39. 113 kg) & (U24. 66 kg) 0.84 m3 E.49 - -
- Pek. Struktur Beton Balok Bordes Tangga, Besi (U39. 99 kg) & (U24. 61 kg) 0.16 m3 E.50 - -
Jumlah 2.1. -
2.2. PEKERJAAN LANTAI DUA
2.2.1. Pekerjaan Kolom, Balok & Plat Lantai
a. Pek. Kolom Beton, Ready Mix f'c 25 Mpa, Elv. +5.60 s/d +9.80 m (K-300)
- Pek. Beton Struktur K.1, uk. 70 x 70 cm, Besi (U39. 99 kg) & (U24. 33 kg) 20.58 m3 E.29 - -
- Pek. Beton Struktur K.2, uk. 70 x 70 cm, Besi (U39. 60 kg) & (U24. 33 kg) 10.29 m3 E.30 - -
- Pek. Beton Struktur K.4, uk. 60 x 60 cm, Besi (U39. 81 kg) & (U24. 38 kg) 21.17 m3 E.32 - -
- Pek. Beton Struktur K.6, Besi (U39. 81 kg) & (U24. 38 kg) 6.05 m3 E.34 - -
b. Pek. Balok Beton Ready Mix f'c 25 Mpa, Elv. + 5.60 (K-300)
- Pek. Beton Struktur B.1. uk. 40 x 80 cm, Besi (U39. 125 kg) & (U24. 69 ) 18.16 m3 E.36 - -
- Pek. Beton Struktur B.2. uk. 40 x 80 cm, Besi (U39. 102 kg) & (U24. 47 ) 66.64 m3 E.37 - -
- Pek. Beton Struktur B.3. uk. 20 x 30 cm, Besi (U39. 170 kg) & (U24. 96 kg) 4.27 m3 E.38 - -
- Pek. Beton Struktur B.A. uk. 20 x 40 cm, Besi (U39. 256 kg) & (U24. 85 kg) 18.29 m3 E.39 - -
c. Pek. Plat Lantai Beton Ready Mix f'c 25 Mpa + 5.60 (K-300)
- Pek. Beton Struktur Plat Lantai, t = 13 cm, Besi (U24. 158,79 kg) 93.79 m3 E.43 - -
2.2.2. Pekerjaan Tangga
Bill Of Quantity Standar Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 1
HARGA SATUAN SUB JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT KODE
(Rp) (Rp)
a b c d e f g = (c x f)
a. Pekerjaan Tangga Lantai 2 s/d Lt.3, Type 1
- Pek. Struktur Beton Anak Tangga, Besi (U24. 101,3 kg) 0.92 m3 E.48 - -
- Pek. Struktur Beton Hamparan Tangga, Besi (U39. 113 kg) & (U24. 66 kg) 1.83 m3 E.49 - -
- Pek. Struktur Beton Bordes Tangga, Besi (U39. 113 kg) & (U24. 66 kg) 0.74 m3 E.49 - -
- Pek. Struktur Beton Balok Bordes Tangga, Besi (U39. 99 kg) & (U24. 61 kg) 0.14 m3 E.50 - -
b. Pekerjaan Tangga Lantai 2 s/d Lt.3, Type 2
- Pek. Struktur Beton Anak Tangga, Besi (U24. 101,3 kg) 1.06 m3 E.48 - -
- Pek. Struktur Beton Hamparan Tangga, Besi (U39. 113 kg) & (U24. 66 kg) 2.16 m3 E.49 - -
- Pek. Struktur Beton Bordes Tangga, Besi (U39. 113 kg) & (U24. 66 kg) 0.84 m3 E.49 - -
- Pek. Struktur Beton Balok Bordes Tangga, Besi (U39. 99 kg) & (U24. 61 kg) 0.16 m3 E.50 - -
Jumlah 2.2. -
2.3. PEKERJAAN LANTAI TIGA
2.3.1. Pekerjaan Kolom, Balok & Plat Lantai
a. Pek. Kolom Beton, Ready Mix f'c 25 Mpa, Elv. +9.80 s/d +14.00 m (K-300)
- Pek. Beton Struktur K.3, uk. 60 x 60 cm, Besi (U39. 108 kg) & (U24. 38 kg) 15.12 m3 E.30 - -
- Pek. Beton Struktur K.4, uk. 60 x 60 cm, Besi (U39. 81 kg) & (U24. 38 kg) 28.73 m3 E.32 - -
- Pek. Beton Struktur K.6, Besi (U39. 81 kg) & (U24. 38 kg) 6.05 m3 E.34 - -
b. Pek. Balok Beton Ready Mix f'c 25 Mpa, Elv. + 9.80 (K-300)
- Pek. Beton Struktur B.1. uk. 40 x 80 cm, Besi (U39. 125 kg) & (U24. 69 ) 18.16 m3 E.36 - -
- Pek. Beton Struktur B.2. uk. 40 x 80 cm, Besi (U39. 102 kg) & (U24. 47 ) 66.64 m3 E.37 - -
- Pek. Beton Struktur B.3. uk. 20 x 30 cm, Besi (U39. 170 kg) & (U24. 96 kg) 4.27 m3 E.38 - -
- Pek. Beton Struktur B.A. uk. 20 x 40 cm, Besi (U39. 256 kg) & (U24. 85 kg) 18.29 m3 E.39 - -
c. Pek. Plat Lantai Beton Ready Mix f'c 25 Mpa + 9.80 (K-300)
- Pek. Beton Struktur Plat Lantai, t = 13 cm, Besi (U24. 158,79 kg) 93.79 m3 E.43 - -
2.3.2. Pekerjaan Tangga
a. Pekerjaan Tangga Lantai 3 s/d Lt.4, Type 1
- Pek. Struktur Beton Anak Tangga, Besi (U24. 101,3 kg) 0.92 m3 E.48 - -
- Pek. Struktur Beton Hamparan Tangga, Besi (U39. 113 kg) & (U24. 66 kg) 1.83 m3 E.49 - -
- Pek. Struktur Beton Bordes Tangga, Besi (U39. 113 kg) & (U24. 66 kg) 0.74 m3 E.49 - -
- Pek. Struktur Beton Balok Bordes Tangga, Besi (U39. 99 kg) & (U24. 61 kg) 0.14 m3 E.50 - -
b. Pekerjaan Tangga Lantai 3 s/d Lt.4, Type 2
- Pek. Struktur Beton Anak Tangga, Besi (U24. 101,3 kg) 1.06 m3 E.48 - -
- Pek. Struktur Beton Hamparan Tangga, Besi (U39. 113 kg) & (U24. 66 kg) 2.16 m3 E.49 - -
- Pek. Struktur Beton Bordes Tangga, Besi (U39. 113 kg) & (U24. 66 kg) 0.84 m3 E.49 - -
- Pek. Struktur Beton Balok Bordes Tangga, Besi (U39. 99 kg) & (U24. 61 kg) 0.16 m3 E.50 - -
Jumlah 2.3. -
2.4. PEKERJAAN LANTAI EMPAT
2.4.1. Pekerjaan Kolom, Balok & Plat Lantai
a. Pek. Kolom Beton, Ready Mix f'c 25 Mpa, Elv. +14.00 s/d +18.20 m (K-300)
- Pek. Beton Struktur K.3, uk. 60 x 60 cm, Besi (U39. 108 kg) & (U24. 38 kg) 15.12 m3 E.30 - -
- Pek. Beton Struktur K.4, uk. 60 x 60 cm, Besi (U39. 81 kg) & (U24. 38 kg) 28.73 m3 E.32 - -
- Pek. Beton Struktur K.6, Besi (U39. 81 kg) & (U24. 38 kg) 6.05 m3 E.34 - -
b. Pek. Balok Beton Ready Mix f'c 25 Mpa, Elv.+ 14.00 (K-300)
- Pek. Beton Struktur B.1. uk. 40 x 80 cm, Besi (U39. 125 kg) & (U24. 69 ) 18.16 m3 E.36 - -
- Pek. Beton Struktur B.2. uk. 40 x 80 cm, Besi (U39. 102 kg) & (U24. 47 ) 66.64 m3 E.37 - -
- Pek. Beton Struktur B.3. uk. 20 x 30 cm, Besi (U39. 170 kg) & (U24. 96 kg) 4.27 m3 E.38 - -
- Pek. Beton Struktur B.A. uk. 20 x 40 cm, Besi (U39. 256 kg) & (U24. 85 kg) 18.29 m3 E.39 - -
c. Pek. Plat Lantai Beton Ready Mix f'c 25 Mpa + 14.00 (K-300)
- Pek. Beton Struktur Plat Lantai, t = 13 cm, Besi (U24. 158,79 kg) 93.79 m3 E.43 - -
2.4.2. Pekerjaan Tangga
a. Pekerjaan Tangga Lantai 4 s/d Lt.5, Type 1
- Pek. Struktur Beton Anak Tangga, Besi (U24. 101,3 kg) 0.92 m3 E.48 - -
- Pek. Struktur Beton Hamparan Tangga, Besi (U39. 113 kg) & (U24. 66 kg) 1.83 m3 E.49 - -
- Pek. Struktur Beton Bordes Tangga, Besi (U39. 113 kg) & (U24. 66 kg) 0.74 m3 E.49 - -
- Pek. Struktur Beton Balok Bordes Tangga, Besi (U39. 99 kg) & (U24. 61 kg) 0.14 m3 E.50 - -
b. Pekerjaan Tangga Lantai 4 s/d Lt.5, Type 2
- Pek. Struktur Beton Anak Tangga, Besi (U24. 101,3 kg) 1.06 m3 E.48 - -
- Pek. Struktur Beton Hamparan Tangga, Besi (U39. 113 kg) & (U24. 66 kg) 2.16 m3 E.49 - -
- Pek. Struktur Beton Bordes Tangga, Besi (U39. 113 kg) & (U24. 66 kg) 0.84 m3 E.49 - -
- Pek. Struktur Beton Balok Bordes Tangga, Besi (U39. 99 kg) & (U24. 61 kg) 0.16 m3 E.50 - -
Jumlah 2.4. -
2.5. PEKERJAAN LANTAI LIMA
2.5.1. Pekerjaan Kolom, Balok & Plat Lantai
a. Pek. Kolom Beton, Ready Mix f'c 25 Mpa, Elv. +18.20 s/d +22.40 m (K-300)
- Pek. Beton Struktur K.3, uk. 60 x 60 cm, Besi (U39. 108 kg) & (U24. 38 kg) 15.12 m3 E.30 - -
- Pek. Beton Struktur K.4, uk. 60 x 60 cm, Besi (U39. 81 kg) & (U24. 38 kg) 28.73 m3 E.32 - -
- Pek. Beton Struktur K.6, Besi (U39. 81 kg) & (U24. 38 kg) 6.05 m3 E.34 - -
b. Pek. Balok Beton Ready Mix f'c 25 Mpa, Elv. + 18.20 (K-300)
- Pek. Beton Struktur B.1. uk. 40 x 80 cm, Besi (U39. 125 kg) & (U24. 69 ) 18.16 m3 E.36 - -
- Pek. Beton Struktur B.2. uk. 40 x 80 cm, Besi (U39. 102 kg) & (U24. 47 ) 66.64 m3 E.37 - -
Bill Of Quantity Standar Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 2
HARGA SATUAN SUB JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT KODE
(Rp) (Rp)
a b c d e f g = (c x f)
- Pek. Beton Struktur B.3. uk. 20 x 30 cm, Besi (U39. 170 kg) & (U24. 96 kg) 4.27 m3 E.38 - -
- Pek. Beton Struktur B.A. uk. 20 x 40 cm, Besi (U39. 256 kg) & (U24. 85 kg) 18.29 m3 E.39 - -
c. Pek. Plat Lantai Beton Ready Mix f'c 25 Mpa + 18.20 (K-300)
- Pek. Beton Struktur Plat Lantai, t = 13 cm, Besi (U24. 158,79 kg) 93.79 m3 E.43 - -
2.5.2. Pekerjaan Tangga
a. Pekerjaan Tangga Lantai 5 s/d Lt.Roof Top, Type 1
- Pek. Struktur Beton Anak Tangga, Besi (U24. 101,3 kg) 0.92 m3 E.48 - -
- Pek. Struktur Beton Hamparan Tangga, Besi (U39. 113 kg) & (U24. 66 kg) 1.83 m3 E.49 - -
- Pek. Struktur Beton Bordes Tangga, Besi (U39. 113 kg) & (U24. 66 kg) 0.74 m3 E.49 - -
- Pek. Struktur Beton Balok Bordes Tangga, Besi (U39. 99 kg) & (U24. 61 kg) 0.14 m3 E.50 - -
b. Pekerjaan Tangga Lantai 4 s/d Lt.Roop Top, Type 2
- Pek. Struktur Beton Anak Tangga, Besi (U24. 101,3 kg) 1.06 m3 E.48 - -
- Pek. Struktur Beton Hamparan Tangga, Besi (U39. 113 kg) & (U24. 66 kg) 2.16 m3 E.49 - -
- Pek. Struktur Beton Bordes Tangga, Besi (U39. 113 kg) & (U24. 66 kg) 0.84 m3 E.49 - -
- Pek. Struktur Beton Balok Bordes Tangga, Besi (U39. 99 kg) & (U24. 61 kg) 0.16 m3 E.50 - -
Jumlah 2.5. -
2.6. PEKERJAAN LANTAI ROOF TOP
2.6.1. Pekerjaan Kolom, Balok & Plat Lantai
a. Pek. Kolom Beton, Ready Mix f'c 25 Mpa, Elv. +22.40 s/d +25.60 m (K-300)
- Pek. Beton Struktur K.3, uk. 60 x 60 cm, Besi (U39. 108 kg) & (U24. 38 kg) 4.61 m3 E.30 - -
- Pek. Beton Struktur K.5, uk. 30 x 30 cm, Besi (U39. 227 kg) & (U24. 76 kg) 4.32 m3 E.32 - -
b. Pek. Balok Beton Ready Mix f'c 25 Mpa, Elv. + 22.40 (K-300)
- Pek. Beton Struktur B.1. uk. 40 x 80 cm, Besi (U39. 125 kg) & (U24. 69 ) 17.28 m3 E.36 - -
- Pek. Beton Struktur B.2. uk. 40 x 80 cm, Besi (U39. 102 kg) & (U24. 47 ) 64.90 m3 E.37 - -
- Pek. Beton Struktur B.3. uk. 20 x 30 cm, Besi (U39. 170 kg) & (U24. 96 kg) 1.50 m3 E.38 - -
- Pek. Beton Struktur B.A. uk. 20 x 40 cm, Besi (U39. 256 kg) & (U24. 85 kg) 26.22 m3 E.39 - -
c. Pek. Plat Lantai Beton Ready Mix f'c 25 Mpa + 22.40 (K-300)
- Pek. Beton Struktur Plat Lantai, t = 13 cm, Besi (U24. 158,79 kg) 89.56 m3 E.43 - -
Jumlah 2.6. -
2.7. PEKERJAAN LANTAI RING BALOK 1
2.7.1. Pekerjaan Balok & Plat Lantai
a. Pek. Balok Beton Ready Mix f'c 25 Mpa, Elv. + 25.60 (K-300)
- Pek. Beton Struktur RB.1. uk. 25 x 40 cm, Besi (U39. 102 kg) & (U24. 73 ) 21.72 m3 E.40 - -
b. Pek. Plat Lantai Beton Ready Mix f'c 25 Mpa + 25.60 (K-300)
- Pek. Beton Struktur Plat Lantai, t = 13 cm, Besi (U24. 153 kg) 29.51 m3 E.43 - -
- Pek. Membrance Waterproofing 226.98 m2 M.15 - -
- Pek. Sreeding t = 3 cm 226.98 m2 M.16 - -
- Pek. Coating Waterproofing 226.98 m2 M.14 - -
Jumlah 2.7. -
JUMLAH II.PEKERJAAN STRUKTUR -
Bill Of Quantity Standar Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 3
HARGA SATUAN SUB JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT KODE
(Rp) (Rp)
a b c d e f g = (c x f)
3.2.5. Pekerjaan Penutup Lantai dan Dinding
d. Pek. Pas. Homogenous tile tangga 20 x 60 cm, polished set. Granito 44.89 m2 M.1 - -
g. Pek. Pas. Step Noshing 10 x 60 cm 66.00 m' M.11 - -
Bill Of Quantity Standar Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 4
HARGA SATUAN SUB JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT KODE
(Rp) (Rp)
a b c d e f g = (c x f)
3.4.5. Pekerjaan Penutup Lantai dan Dinding
a. Pek. Pas. Homogenous tile 60 x 60 cm, polished set. Granito 455.61 m2 M.1 - -
b. Pek. Pas. Carpet tile nilon 250.23 m2 M.20 - -
c. Pek. Pas. Homogenous tile tangga 20 x 60 cm, polished set. Granito 44.89 m2 M.1 - -
d. Pek. Pas. Homogenous tile 30 x 30 cm, unpolished 25.05 m2 M.6 - -
e. Pek. Pas. Homogenous tile dinding wc 30 x 60 cm, dekoratif polished 141.31 m2 M.9 - -
f. Pek. Pas. Step Noshing 10 x 60 cm 66.00 m' M.11 - -
g. Pek. Pas. Plint Homogenous tile 10 x 60 cm 81.82 m' M.10 - -
h. Pek. Pas. Plint Kayu 157.20 m' M.18 - -
i. Pek. Membrance Waterproofing kamar mandi 25.05 m2 M.15 - -
Bill Of Quantity Standar Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 5
HARGA SATUAN SUB JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT KODE
(Rp) (Rp)
a b c d e f g = (c x f)
3.6.7. Pekerjaan Pengecatan
a. Pek. Pengecatan dinding 1,220.12 m2 N.2 - -
Jumlah 3.6. -
3.7. PEKERJAAN FIXTURES LAVATORY
3.7.3. Lantai Tiga
a. Floor Drain 4.00 bh H.8 - -
b. Closet duduk Warna standar 5.00 bh H.1 - -
c. Jet Washer 5.00 bh - - -
d. Wasthafel 3.00 bh H.3 - -
e. Tisue holder 5.00 bh H.9 - -
f. Kran air dinding 4.00 bh H.13 - -
g. Shower 1.00 bh H.7 - -
h. Cermin Grevel 3.23 m2 L.11 - -
i. Vanity counter, uk. 60 x 90 cm 3.00 bh - -
j. Partisi Cubical exlude pintu terpasang + aksesories 17.20 m2 - - -
3.7.4. Lantai Empat
a. Floor Drain 5.00 bh H.8 - -
b. Closet duduk Warna standar 10.00 bh H.1 - -
c. Jet Washer 10.00 bh - - -
d. Wasthafel 6.00 bh H.3 - -
e. Tisue holder 10.00 bh H.9 - -
f. Kran air dinding 5.00 bh H.13 - -
g. Urinoir lengkap 3.00 bh H.4 - -
h. Tanda Toilet Male / Female 2.00 ls H.13 - -
i. Cermin Grevel 6.46 m2 L.11 - -
j. Partisi penyekat urinoir 3.00 bh H.5 - -
k. Vanity counter, uk. 60 x 90 cm 2.00 bh - -
l. Vanity counter, uk. 60 x 130 cm 2.00 bh - -
m. Partisi Cubical exlude pintu terpasang + aksesories 38.70 m2 - - -
3.7.5. Lantai Lima
a. Floor Drain 10.00 bh H.8 - -
b. Closet duduk Warna standar 11.00 bh H.1 - -
c. Jet Washer 11.00 bh - - -
d. Wasthafel 3.00 bh H.3 - -
e. Tisue holder 11.00 bh H.9 - -
f. Kran air dinding 10.00 bh H.13 - -
g. Shower 7.00 bh H.7 - -
h. Cermin Grevel 3.23 m2 L.11 - -
i. Vanity counter, uk. 60 x 90 cm 3.00 bh - -
j. Partisi Cubical exlude pintu terpasang + aksesories 17.20 m2 - - -
Jumlah 3.7. -
JUMLAH III.PEKERJAAN ARSITEKTUR -
Bill Of Quantity Standar Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 6
BACK UP VOLUME
LANTAI SATU
HITUNGAN VOLUME PASANGAN DINDING BATA & PLESTERAN 1 : 5 & 1 : 3
Nama Proyek
Lokasi
Pekerjaan : Pasangan Dinding Baru
DIMENSI PENGURANG
LUAS TOTAL
NAMA RUANG DINDING LEBAR TINGGI JUMLAH LUAS DINDING TIPE KUSEN LUAS KUSEN JUMLAH KUSEN LUAS KUSEN
(m) (m) (m2) (m )
2
(m) (m2) (m2)
PEK. DINDING BATA
PEK. PLESTERAN
Plesteeran kolom praktis beton 0.6 4.15 43 107.07 107.07
172 Jumlah 1 : 5
Jumlah 1 : 3 214.18
Nama Proyek
Lokasi
Pekerjaan : Partisi Triplek
DIMENSI PENGURANG
LUAS TOTAL
NAMA RUANG DINDING LEBAR TINGGI JUMLAH LUAS DINDING TIPE KUSEN LUAS KUSEN JUMLAH KUSEN LUAS KUSEN
(m) (m) (m2) (m2) (m) (m2) (m2)
Nama Proyek
Lokasi
Pekerjaan : Pek. Pasangan lantai Keramik `
DIMENSI
NAMA RUANG DINDING LUAS
(m) (m) (m2)
Nama Proyek
Lokasi
Pekerjaan : Pek. Pasangan Plafond
DIMENSI
NAMA RUANG DINDING LEBAR LUAS
(m) (m) (m2)
Gypsum - 101.187 101.187 101.187
Acian Plafond - 619.4 75.5595 528.7286
GRC 42.1175 42.1175
Drop Ceiling
List Plafond 135.13 135.13 135.13
LUAS TOTAL
LANTAI DUA
HITUNGAN VOLUME PASANGAN DINDING BATA & PLESTERAN 1 : 5 & 1 : 3
Nama Proyek
Lokasi
Pekerjaan : Pasangan Dinding Baru
DIMENSI PENGURANG
LUAS TOTAL
NAMA RUANG DINDING LEBAR TINGGI JUMLAH LUAS DINDING TIPE KUSEN LUAS KUSEN JUMLAH KUSEN LUAS KUSEN
(m) (m) (m2) (m2) (m) (m2) (m2)
PEK. DINDING BATA
Dinding TOLIET HORIZONTAL 32.15 4.15 1 133.4225 P.1 1.98 3 5.94 126.71
PS.1 0.77 1 0.77 422.83
VERTIKAL 24.95 4.15 1 103.5425 P.1 1.98 3 5.94 96.83
PS.1 0.77 1 0.77
Jumlah 223.54
PEK. PLESTERAN
Plesteeran kolom praktis beton 0.6 4.15 45 112.05 112.05
180 Jumlah 1 : 5 398.59
Jumlah 1 : 3 447.07
Nama Proyek
Lokasi
Pekerjaan Partisi PR.1
DIMENSI PENGURANG
LUAS TOTAL
NAMA RUANG DINDING LEBAR TINGGI JUMLAH LUAS DINDING TIPE KUSEN LUAS KUSEN JUMLAH KUSEN LUAS KUSEN
(m) (m) (m2) (m )
2
(m) (m2) (m2)
Nama Proyek
Lokasi
Pekerjaan : Pek. Pasangan lantai Keramik
DIMENSI
NAMA RUANG DINDING LUAS
(m) (m) (m2)
Nama Proyek
Lokasi
Pekerjaan : Pek. Pasangan Plafond
DIMENSI
NAMA RUANG DINDING LEBAR LUAS
(m) (m) (m2)
LUAS TOTAL
LANTAI TIGA
HITUNGAN VOLUME PASANGAN DINDING BATA & PLESTERAN 1 : 5 & 1 : 3
Nama Proyek
Lokasi
Pekerjaan : Pasangan Dinding Baru
DIMENSI PENGURANG
LUAS TOTAL
NAMA RUANG DINDING LEBAR TINGGI JUMLAH LUAS DINDING TIPE KUSEN LUAS KUSEN JUMLAH KUSEN LUAS KUSEN
(m) (m) (m2) (m )
2
(m) (m2) (m2)
PEK. DINDING BATA
Dinding TOLIET HORIZONTAL 16.1 4.15 1 66.815 P.1 1.98 2 3.96 62.08
PS.1 0.77 1 0.77 371.39
VERTIKAL 21.16 4.15 1 87.814 P.1 1.98 2 3.96 83.08
PS.1 0.77 1 0.77
Jumlah 145.16
PEK. PLESTERAN
Plesteeran kolom praktis beton 0.6 4.15 44 109.56 109.56
176 Jumlah 1 : 5 452.45
Jumlah 1 : 3 290.32
Nama Proyek
Lokasi
Pekerjaan Partisi PR.1
DIMENSI PENGURANG
LUAS TOTAL
NAMA RUANG DINDING LEBAR TINGGI JUMLAH LUAS DINDING TIPE KUSEN LUAS KUSEN JUMLAH KUSEN LUAS KUSEN
(m) (m) (m2) (m2) (m) (m2) (m2)
Nama Proyek
Lokasi
Pekerjaan : Pek. Pasangan lantai Keramik
DIMENSI
NAMA RUANG DINDING LUAS
(m) (m) (m2)
Nama Proyek
Lokasi
Pekerjaan : Pek. Pasangan Plafond
DIMENSI
NAMA RUANG DINDING LEBAR LUAS
(m) (m) (m2)
LUAS TOTAL
LANTAI EMPAT
HITUNGAN VOLUME PASANGAN DINDING BATA & PLESTERAN 1 : 5 & 1 : 3
Nama Proyek
Lokasi
Pekerjaan : Pasangan Dinding Baru
DIMENSI PENGURANG
LUAS TOTAL
NAMA RUANG DINDING LEBAR TINGGI JUMLAH LUAS DINDING TIPE KUSEN LUAS KUSEN JUMLAH KUSEN LUAS KUSEN
(m) (m) (m2) (m2) (m) (m2) (m2)
PEK. DINDING BATA
Dinding TOLIET HORIZONTAL 32.6 4.15 1 135.29 P.1 1.98 2 3.96 130.56
PS.1 0.77 1 0.77 433.91
VERTIKAL 24.4 4.15 1 101.26 P.1 1.98 3 5.94 94.55
PS.1 0.77 1 0.77
Jumlah 225.10
PEK. PLESTERAN
Plesteeran kolom praktis beton 0.6 4.15 45 112.05 112.05
180 Jumlah 1 : 5 417.62
Jumlah 1 : 3 450.20
Nama Proyek
Lokasi
Pekerjaan Partisi PR.1
DIMENSI PENGURANG
LUAS TOTAL
NAMA RUANG DINDING LEBAR TINGGI JUMLAH LUAS DINDING TIPE KUSEN LUAS KUSEN JUMLAH KUSEN LUAS KUSEN
(m) (m) (m2) (m )
2
(m) (m2) (m2)
Nama Proyek
Lokasi
Pekerjaan : Pek. Pasangan lantai Keramik
DIMENSI
NAMA RUANG DINDING LUAS
(m) (m) (m2)
Nama Proyek
Lokasi
Pekerjaan : Pek. Pasangan Plafond
DIMENSI
NAMA RUANG DINDING LEBAR LUAS
(m) (m) (m2)
LUAS TOTAL
LANTAI LIMA
HITUNGAN VOLUME PASANGAN DINDING BATA & PLESTERAN 1 : 5 & 1 : 3
Nama Proyek
Lokasi
Pekerjaan : Pasangan Dinding Baru
DIMENSI PENGURANG
LUAS TOTAL
NAMA RUANG DINDING LEBAR TINGGI JUMLAH LUAS DINDING TIPE KUSEN LUAS KUSEN JUMLAH KUSEN LUAS KUSEN
(m) (m) (m2) (m2) (m) (m2) (m2)
PEK. DINDING BATA
Dinding TOLIET HORIZONTAL 36.3 4.15 1 150.645 P.1 1.98 2 3.96 145.91
PS.1 0.77 1 0.77 575.66
VERTIKAL 43.5 4.15 1 180.525 P.1 1.98 1 1.98 177.77
PS.1 0.77 1 0.77
Jumlah 323.68
PEK. PLESTERAN
Plesteeran kolom praktis beton 0.6 4.15 59 146.91 146.91
236 Jumlah 1 : 5 503.96
Jumlah 1 : 3 647.36
DIMENSI PENGURANG
LUAS TOTAL
NAMA RUANG DINDING LEBAR TINGGI JUMLAH LUAS DINDING TIPE KUSEN LUAS KUSEN JUMLAH KUSEN LUAS KUSEN
(m) (m) (m2) (m )
2
(m) (m2) (m2)
Nama Proyek
Lokasi
Pekerjaan : Pek. Pasangan lantai Keramik
DIMENSI
NAMA RUANG DINDING LUAS
(m) (m) (m2)
Nama Proyek
Lokasi
Pekerjaan : Pek. Pasangan Plafond
DIMENSI
NAMA RUANG DINDING LEBAR LUAS
(m) (m) (m2)
LUAS TOTAL
LANTAI ROOFTOP
HITUNGAN VOLUME PASANGAN DINDING BATA & PLESTERAN 1 : 5 & 1 : 3
Nama Proyek
Lokasi
Pekerjaan : Pasangan Dinding Baru
DIMENSI PENGURANG
LUAS TOTAL
NAMA RUANG DINDING LEBAR TINGGI JUMLAH LUAS DINDING TIPE KUSEN LUAS KUSEN JUMLAH KUSEN LUAS KUSEN
(m) (m) (m2) (m2) (m) (m2) (m2)
PEK. DINDING BATA
Dinding TOLIET HORIZONTAL 14.4 4.15 1 59.76 P.1 1.98 2 3.96 55.03
PS.1 0.77 1 0.77 551.28
VERTIKAL 11.5 4.15 1 47.725 P.1 1.98 1 1.98 44.97
PS.1 0.77 1 0.77
Jumlah 100.00
PEK. PLESTERAN
Plesteeran kolom praktis beton 0.6 4.15 34 84.66 84.66
136 Jumlah 1 : 5 902.56
Jumlah 1 : 3 199.99
Nama Proyek
Lokasi
Pekerjaan Partisi PR.1
DIMENSI PENGURANG
LUAS TOTAL
NAMA RUANG DINDING LEBAR TINGGI JUMLAH LUAS DINDING TIPE KUSEN LUAS KUSEN JUMLAH KUSEN LUAS KUSEN
(m) (m) (m2) (m )
2
(m) (m2) (m2)
Nama Proyek
Lokasi
Pekerjaan : Pek. Pasangan lantai Keramik
DIMENSI
NAMA RUANG DINDING LUAS
(m) (m) (m2)
Nama Proyek
Lokasi
Pekerjaan : Pek. Pasangan Plafond
DIMENSI
NAMA RUANG DINDING LEBAR LUAS
(m) (m) (m2)
LUAS TOTAL
BILL OF QUANTITY
PEMBANGUNAN GEDUNG CABANG PELAYANAN PENDAPATAN DAERAH PROVINSI WILAYAH KABUPATEN KARAWANG TAHAP I
TAHUN ANGGARAN 2017
A. PEKERJAAN STANDAR
IV. PEKERJAAN ELEKTRIKAL ARUS LEMAH
4.1. PEKERJAAN TITIK INSTALASI DAYA DAN ARMATUR PENERANGAN
c. Lantai Tiga
1. Saklar dan Stop Kontak
- Saklar Tunggal 8.00 bh O.116 - -
- Saklar Ganda 29.00 bh O.117 - -
- Saklar Tukar 2.00 bh - - -
- Greed Switch 4 Gang 1.00 bh O.118 - -
- Stop Kontak 250 w + Instalasi Kabel 20.00 bh O.119 - -
- Stop Kontak AC + Instalasi Kabel 3.00 bh O.120 - -
- Stop Kontak lantai 250 w + Instalasi Kabel 7.00 bh O.121 - -
- Stop Kontak 500 w + Instalasi Kabel 1.00 bh - - -
2. Fixtures Lampu Lengkap dengan Armatur
- Lampu STRIP LED 12 W + Instalasi Kabel 75.00 bh O.102 - -
- Lampu TL LED INDIRECT 1 X 18 W + Instalasi Kabel 46.00 bh O.109 - -
- Lampu TL LED 1 X 18 W + Instalasi Kabel 5.00 bh O.108 - -
- Lampu TL RMI 2 x 18 W T5 Balast Elektronik + Instalasi Kabel 2.00 bh O.103 - -
- Lampu TL RMI 2 x 36 W T5 Balast Elektronik + Instalasi Kabel 36.00 bh O.103 - -
- Lampu Downlight PLC 36 W / 4 Pin + Instalasi Kabel 82.00 bh O.111 - -
3. Exhaust Fan 36 W + Instalasi Kabel 5.00 bh O.124 - -
d. Lantai Empat
1. Saklar dan Stop Kontak
- Saklar Tunggal 10.00 bh O.116 - -
- Saklar Ganda 14.00 bh O.117 - -
- Saklar Tukar 2.00 bh - - -
- Greed Switch 4 Gang 1.00 bh O.118 - -
- Stop Kontak 250 w + Instalasi Kabel 21.00 bh O.119 - -
- Stop Kontak AC + Instalasi Kabel 2.00 bh O.120 - -
2. Fixtures Lampu Lengkap dengan Armatur
- Lampu STRIP LED 12 W + Instalasi Kabel 51.00 bh O.102 - -
- Lampu TL LED 1 X 18 W + Instalasi Kabel 9.00 bh O.108 - -
- Lampu TL RMI 2 x 18 W T5 Balast Elektronik + Instalasi Kabel 21.00 bh O.103 - -
- Lampu Downlight PLC 18 W / 4 Pin + Instalasi Kabel 4.00 bh O.110 - -
- Lampu Downlight PLC 36 W / 4 Pin + Instalasi Kabel 94.00 bh O.111 - -
3. Exhaust Fan 36 W + Instalasi Kabel 9.00 bh O.124 - -
e. Lantai Lima
1. Saklar dan Stop Kontak
- Saklar Tunggal 9.00 bh O.116 - -
- Saklar Ganda 30.00 bh O.117 - -
- Saklar Tukar 2.00 bh - - -
- Greed Switch 4 Gang 1.00 bh O.118 - -
- Stop Kontak 250 w + Instalasi Kabel 24.00 bh O.119 - -
- Stop Kontak AC + Instalasi Kabel 9.00 bh O.120 - -
- Stop Kontak 500 w + Instalasi Kabel 7.00 bh - - -
2. Fixtures Lampu Lengkap dengan Armatur
- Lampu STRIP LED 12 W + Instalasi Kabel 32.00 bh O.102 - -
- Lampu TL LED 1 X 18 W + Instalasi Kabel 4.00 bh O.108 - -
- Lampu TL RMI 2 x 18 W T5 Balast Elektronik + Instalasi Kabel 14.00 bh O.103 - -
- Lampu Downlight PLC 18 W / 4 Pin + Instalasi Kabel 44.00 bh O.110 - -
- Lampu Downlight PLC 36 W / 4 Pin + Instalasi Kabel 58.00 bh O.111 - -
3. Exhaust Fan 36 W + Instalasi Kabel 12.00 bh O.124 - -
Jumlah 4.1. -
JUMLAH IV. PEKERJAAN INSTALASI TITIK DAYA DAN ARMATUR PENERANGAN -
V. PEKERJAAN PLAMBING
5.1. PEKERJAAN AIR BERSIH
a. Lantai Satu
a. Pemipaan Polypropelyne PN.10 :
- Diameter 1/2" + Aksesories 36.00 m1 O.38 - -
Bill Of Quantity Standar Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 7
HARGA SATUAN SUB JUMLAH HARGA
NO URAIAN PEKERJAAN VOL SAT KODE (Rp) (Rp)
a b c d e f g = (c x f)
- Diameter 1" + Aksesories 23.00 m1 O.40 - -
c. Material Bantu (Mur-Baut, Flens, Support, Klem, Fitting, dll.) 1.00 ls - - -
b. Lantai Dua
a. Pemipaan Polypropelyne PN.10 :
- Diameter 1/2" + Aksesories 86.00 m1 O.38 - -
- Diameter 1" + Aksesories 41.00 m1 O.40 - -
b. Material Bantu (Mur-Baut, Flens, Support, Klem, Fitting, dll.) 1.00 ls - - -
c. Lantai Tiga
a. Pemipaan Polypropelyne PN.10 :
- Diameter 1/2" + Aksesories 42.00 m1 O.38 - -
- Diameter 1" + Aksesories 33.00 m1 O.40 - -
b. Material Bantu (Mur-Baut, Flens, Support, Klem, Fitting, dll.) 1.00 ls - - -
d. Lantai Empat
a. Pemipaan Polypropelyne PN.10 :
- Diameter 1/2" + Aksesories 86.00 m1 O.38 - -
- Diameter 1" + Aksesories 41.00 m1 O.40 - -
b. Material Bantu (Mur-Baut, Flens, Support, Klem, Fitting, dll.) 1.00 ls - - -
e. Lantai Lima
a. Pemipaan Polypropelyne PN.10 :
- Diameter 1/2" + Aksesories 91.00 m1 O.38 - -
- Diameter 1" + Aksesories 65.00 m1 O.40 - -
b. Material Bantu (Mur-Baut, Flens, Support, Klem, Fitting, dll.) 1.00 ls - - -
f. Lantai Rooftop
a. Pemipaan Polypropelyne PN.10 :
- Diameter 1/2" + Aksesories 91.00 m1 O.38 - -
- Diameter 1" + Aksesories 23.00 m1 O.40 - -
b. Material Bantu (Mur-Baut, Flens, Support, Klem, Fitting, dll.) 1.00 ls - - -
g. Shaft
a. Pemipaan Polypropelyne PN.10 :
- Diameter 3" + Aksesories 110.00 m1 O.45 - -
b. Material Bantu (Mur-Baut, Flens, Support, Klem, Fitting, dll.) 1.00 ls - - -
Jumlah 5.1. -
5.2. PEKERJAAN AIR KOTOR
a. Lantai Satu
1. Distribusi Air Ke Biofil
- Pemipaan Air Kotor dan Bekas PVC Tipe AW Kelas 10 kg/cm 2 :
PVC Diameter 2" + Aksesories 5.00 m1 O.15 - -
PVC Diameter 3" + Aksesories 10.00 m1 O.17 - -
PVC Diameter 6" + Aksesories 20.00 m1 O.20 - -
b. Lantai Dua
1. Distribusi Air Kotor
- Pemipaan Air Kotor dan Bekas PVC Tipe AW Kelas 10 kg/cm 2 :
PVC Diameter 2" + Aksesories 20.00 m1 O.15 - -
PVC Diameter 3" + Aksesories 20.00 m1 O.17 - -
c. Lantai Tiga
1. Distribusi Air Kotor
- Pemipaan Air Kotor dan Bekas PVC Tipe AW Kelas 10 kg/cm 2 :
PVC Diameter 2" + Aksesories 7.00 m1 O.15 - -
PVC Diameter 3" + Aksesories 10.00 m1 O.17 - -
d. Lantai Empat
1. Distribusi Air Kotor
- Pemipaan Air Kotor dan Bekas PVC Tipe AW Kelas 10 kg/cm 2 :
PVC Diameter 2" + Aksesories 20.00 m1 O.15 - -
PVC Diameter 3" + Aksesories 18.00 m1 O.17 - -
e. Lantai Lima
1. Distribusi Air Kotor
- Pemipaan Air Kotor dan Bekas PVC Tipe AW Kelas 10 kg/cm 2 :
PVC Diameter 2" + Aksesories 20.00 m1 O.15 - -
PVC Diameter 3" + Aksesories 18.00 m1 O.17 - -
f. Lantai Rooftop
1. Distribusi Air Kotor
- Pemipaan Air Kotor dan Bekas PVC Tipe AW Kelas 10 kg/cm 2 :
PVC Diameter 2" + Aksesories 5.00 m1 O.15 - -
PVC Diameter 3" + Aksesories 8.00 m1 O.17 - -
b. Shaft
- Pemipaan Air Kotor dan Bekas PVC Tipe AW Kelas 10 kg/cm 2 :
PVC Diameter 3" + Aksesories 195.00 m1 O.17 - -
Bill Of Quantity Standar Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 8
HARGA SATUAN SUB JUMLAH HARGA
NO URAIAN PEKERJAAN VOL SAT KODE (Rp) (Rp)
a b c d e f g = (c x f)
PVC Diameter 4" + Aksesories 195.00 m1 O.18 - -
Jumlah 5.2. -
5.3. PEKERJAAN TALANG AIR HUJAN
1. Pemipaan Tipe AW Kelas 10 kg/cm2 :
- PVC Diameter 4" 336.00 m1 O.18 - -
- Material Bantu (Mur-Baut, Flens, Support, Klem, Fitting, dll.) 1.00 ls - - -
2. Roof Drain
- RD Diameter 4" 12.00 bh O.96 - -
Jumlah 5.3. -
5.4. PEKERJAAN LAINNYA
- Testing dan Commisioning 1.00 ls -
Jumlah 5.4. -
JUMLAH V. PEKERJAAN PLAMBING -
Bill Of Quantity Standar Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 9
REKAPITULASI PEKERJAAN NON STANDAR
PEMBANGUNAN GEDUNG CABANG PELAYANAN PENDAPATAN DAERAH PROVINSI WILAYAH KABUPATEN KARAWANG TAHAP I
TAHUN ANGGARAN 2017
A B C
Rekapitulasi BOQ Standar Pekerjaan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I
X. PEKERJAAN MEKANIKAL DAN PLAMBING
10.1. PEKERJAAN UTAMA DEEP WELL -
10.3. PERALATAN UTAMA AIR BERSIH
10.4. PEKERJAAN HYDRANT & SPLINKER -
10.5. PEKERJAAN TATA UDARA -
10.6. PEKERJAAN WATER HEATER -
10.7. PEKERJAAN ELEVATOR -
JUMLAH X.PEKERJAAN MEKANIKAL DAN PLAMBING Rp -
JUMLAH C.PEKERJAAN NON STANDAR Rp -
Rekapitulasi BOQ Standar Pekerjaan Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I
BILL OF QUANTITY
PEMBANGUNAN GEDUNG CABANG PELAYANAN PENDAPATAN DAERAH PROVINSI WILAYAH KABUPATEN KARAWANG TAHAP I
TAHUN ANGGARAN 2017
Bill Of Quantity Non Standar Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 1
HARGA SATUAN SUB JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT KODE
(Rp) (Rp)
a b c d e f g = (c x f)
JUMLAH I.PEKERJAAN PONDASI & BETON -
II. PEKERJAAN RAMP DIPABLE & CEK FISIK RODA
2.1. PEK. RAMP TYPE 1
a. Pek. Tanah
- Pek. Galian ramp 1.15 m3 B.1 - -
- Pek. Buangan tanah Galian keluar Lokasi 1.15 m3 B.2 - -
Bill Of Quantity Non Standar Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 2
HARGA SATUAN SUB JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT KODE
(Rp) (Rp)
a b c d e f g = (c x f)
JUMLAH II.PEKERJAAN RAMP DIPABLE & CEK FISIK RODA -
III. PEKERJAAN BIOFILTER & SALURAN AIR HUJAN
3.1. PEKERJAAN GALIAN TANAH
- Pek. Galian tanah untuk Biofilter 250 x 230 x 215 cm ( 2 buah ) 24.72 m3 B.1 - -
- Pek. Galian tanah untuk saluran air hujan 40.50 m3 B.1 - -
- Pek. Buangan tanah ke luar Lokasi 65.23 m3 B.2 - -
Jumlah 3.1. -
3.2. PEKERJAAN PASANGAN
- Pas. Biofilter Septicktank Kav 15 m3 berikut pemasangan ( 2 buah ) 2.00 Unit - - -
- Pas. Lantai kerja untuk biofilter t = 10 cm 1.15 m3 E.1 - -
- Aksesoris Biofilter 2.00 Unit - -
- Pek. Pas. Gravel beton ø 40 cm 124.40 m' - - -
- Pek. Pas. Grill besi 74.64 m2 - - -
- Pek. Pas. Plat duiker beton 1.28 m3 E.53 - -
- Pek. Bak Kontrol 40 x 40 cm 16.00 bh O.98 -
Jumlah 3.2. -
JUMLAH III.PEKERJAAN BIOFILTER & SALURAN AIR HUJAN -
IV. PEKERJAAN GROUND WATER TANK
4.1. PEKERJAAN GROUND WATER TANK
4.1.1. PEKERJAAN TANAH
a. Pek. Galian Tanah
- Pek. Galian tanah GWT 143.37 m3 B.1 - -
- Pek. Urugan tanah kembali 36.89 m3 B.4 - -
- Pek. Buangan tanah ke luar Lokasi 106.48 m3 B.2 - -
4.1.2. Pekerjaan Beton
a. Pek. Pelat lantai beton GWT, elv. - 3.55 m (K-300)
- Urugan Pasir dengan Pasir Urug tebal 10 cm 3.93 m3 B.10 - -
- Lantai Kerja 1 PC : 3 pasir : 5 kerikil 1.96 m3 E.1 - -
- Pek. Beton Struktur Lantai GWT, Besi (U24. 49 kg) 9.13 m3 E.47 - -
b. Pek. Dinding shear wall GWT t=20 cm (K-300)
- Pek. Beton Struktur Shear Wall GWT, Besi (U24. 49 kg) 18.74 m3 E.46 - -
c. Pek. Plat Lantai atas GWT t=10 cm (K-300) ###
- Pek. Beton Struktur Lantai Atas GWT, Besi (U24. 98 kg) 4.09 m3 E.53 - -
4.1.3. Pekerjaan Lain - Lain
a. Pek. Finishing & Aksesories
- Pek. Keramik 30 x 30 cm 99.00 m2 M.8 - -
- Pek. Coating Waterproofing 63.40 m2 M.14 - -
- Pas. Pintu main hole 1.00 unit - -
- Pas. Tangga main hole 3.40 m' - - -
Jumlah 4.1. -
JUMLAH IV.PEKERJAAN GROUND WATER TANK -
V. PEKERJAAN TANGGA ###
5.1. PEK. TANGGA TYPE 1
a. Pek. Tanah
- Pek. Galian tangga 0.72 m3 B.1 - -
- Pek. Buangan tanah Galian keluar Lokasi 0.72 m3 B.3 - -
b. Pek. Pondasi & Kolom Tangga
- Beton Ready Mix f'c 25 MPa (K-300) 0.36 m3 E.11 - -
- Besi Beton U-39 44.79 kg E.13 - -
- Besi Beton U-24 12.13 kg E.12 - -
- Bekisting 3.48 m2 E.7 - -
Jumlah 5.1. -
5.2. PEK. TANGGA TYPE 2
a. Pek. Tanah
- Pek. Galian tangga 0.96 m3 B.1 - -
- Pek. Buangan tanah Galian keluar Lokasi 0.96 m3 B.3 - -
b. Pek. Pondasi & Kolom Tangga
- Beton Ready Mix f'c 25 MPa (K-300) 0.41 m3 E.11 - -
- Besi Beton U-39 49.55 kg E.13 - -
- Besi Beton U-24 13.62 kg E.12 - -
- Bekisting 3.88 m2 E.7 - -
Jumlah 5.2. -
JUMLAH V.PEKERJAAN TANGGA -
VII. PEKERJAAN FINISHING EKSTERIOR DAN INTERIOR GEDUNG
7.1. PEKERJAAN FINISHING & AKSESORIES
a. Pek. Pas. Railling tangga Type.1 Lt. 1 s/d Lt. Rooftop ( 5 Unit )
- Pek. Railing tangga dengan hollow galvanis 101.06 m2 J.17 - -
- Pek. Handrail Stainless Steel 96.25 m' - -
b. Pek. Pas. Railling tangga Type 2. Lt. 1 s/d Lt. Rooftop ( 5 Unit )
- Pek. Railing tangga dengan hollow galvanis 52.50 m2 J.17 - -
- Pek. Handrail Stainless Steel 50.00 m' - -
c. Pek. Pas. Railling Ramp Type 4
- Pek. Railing tangga dengan hollow galvanis 8.40 m2 J.17 - -
- Pek. Handrail Stainless Steel 8.00 m' - -
Bill Of Quantity Non Standar Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 3
HARGA SATUAN SUB JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT KODE
(Rp) (Rp)
a b c d e f g = (c x f)
d. Pek. Pas. Sun Shading 154.96 m2 J.18 - -
e. Alumunium Composite Panel ( ACP ) 1,989.88 m2 D.13 - -
f. Pek. Pas. Curtain Wall 1,026.25 m2 L.13 -
g. Pek. Pas. Kanopi
- Span IWF 350.175.5.11 mm 758.27 kg J.6 - -
Pas. Plat Dudukan / Baseplat 350 x 160 x 8 14.54 kg J.6 -
- Pas. Plat Penyambung t = 8 mm 21.82 kg J.6 - -
- Plat Kopel t = 8 mm 1.38 kg J.6 - -
- Baut, Mur dia. 12 mm 24.00 bh - -
- Alumunium Composite Panel ( ACP ) 15.52 m2 D.13 - -
h. Pek. Tangga Entrance
- Pek. Pas. Bata merah 1 pc : 5 psr ( Rolag ) 23.33 m2 - - -
- Pek. Pas. Plesteran dinding t= 2 cm, 1 pc : 5 psr 46.66 m2 D.4 - -
- Urugan Pasir dengan Pasir Urug Tebal 10 cm 0.86 m3 B.10 - -
- Pek. Beton K - 100 0.97 m2 E.1 - -
j. Pas. Hurup papan nama dengan stainless steel t = 50 cm 55.00 bh - -
k. Pas. Logo Jawa Barat 1.00 bh - -
l. Pas. Logo Kujang 1.00 bh - -
Jumlah 7.1. -
JUMLAH VII.PEKERJAAN FINISHING EKSTERIOR DAN INTERIOR GEDUNG -
Bill Of Quantity Non Standar Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 4
BILL OF QUANTITY
PEMBANGUNAN GEDUNG CABANG PELAYANAN PENDAPATAN DAERAH PROVINSI WILAYAH KABUPATEN KARAWANG TAHAP I
Bill Of Quantity Non Standar Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 5
HARGA SATUAN SUB JUMLAH HARGA
NO URAIAN PEKERJAAN VOL SAT KODE (Rp) (Rp)
a b c d e f g = (c x f)
2. Kabel Feeder
- Dari MDP - Gedung ke LP Lt. Rooftop, NYY (4 x 10 mm2) + netral 24.00 m' O.167 - -
- Dari MDP - Gedung ke PP AC Outdoor Lt. Rooftop, NYY (4 x 150 mm2) + netral 36.00 m' O.176 - -
- Dari MDP - Gedung ke PP LIFT, NYY 4 x 50 mm2 + netral 40.00 m' O.172 - -
JUMLAH 8.2. -
8.3. PEKERJAAN KABEL TRAY
c. Lantai Tiga
- Kabel Tray 30 x 30 cm 54.00 m1 O.139 -
###
- Material Bantu (Support, Fitting, Mur-baut, dll.) 1.00 ls - -
d. Lantai Empat
- Kabel Tray 30 x 30 cm 54.00 m1 O.139 -
###
- Material Bantu (Support, Fitting, Mur-baut, dll.) 1.00 ls - -
e. Lantai Lima
- Kabel Tray 30 x 30 cm 54.00 m1 O.139 -
###
- Material Bantu (Support, Fitting, Mur-baut, dll.) 1.00 ls - -
JUMLAH 8.3. -
8.5. PEKERJAAN PENANGKAL PETIR (ELEKTROSTATIS / EF SYSTEM)
1. Air Terminal (R = 135 m) 2.00 unit - - -
2. Kabel XLPE 70 mm2 108.00 m1 - - -
###
3. Obstruction Lamp dan Instalasi 2.00 bh - - -
4. Grounding System 2.00 ls - - -
5. Alat Bantu dan Testing Commisioning 2.00 lot - - -
JUMLAH 8.5. -
JUMLAH VIII.PEKERJAAN ELEKTRIKAL ARUS KUAT -
###
Bill Of Quantity Non Standar Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 6
HARGA SATUAN SUB JUMLAH HARGA
NO URAIAN PEKERJAAN VOL SAT KODE (Rp) (Rp)
a b c d e f g = (c x f)
- Testing dan Commisioning 1.00 ls - -
b. Lantai Satu
- Titik Instalasi Socket Data, UTP - Cat 5e dalam Konduit PVC 2.00 titik O.134 -
c. Lantai Dua
- Titik Instalasi Socket Data, UTP - Cat 5e dalam Konduit PVC 8.00 titik O.134 -
d. Lantai Tiga
- Socket Data (LAN) 7.00 bh O.221 - -
- Titik Instalasi Socket Data, UTP - Cat 5e dalam Konduit PVC 7.00 titik O.134 - -
e. Lantai Empat
- Socket Data (LAN) 3.00 bh O.221 - -
- Titik Instalasi Socket Data, UTP - Cat 5e dalam Konduit PVC 3.00 titik O.134 - -
f. Lantai Lima
- Socket Data (LAN) 7.00 bh O.221 - -
- Titik Instalasi Socket Data, UTP - Cat 5e dalam Konduit PVC 7.00 titik O.134 - -
JUMLAH 9.2. -
9.3. PEKERJAAN CCTV
a. Peralatan Utama CCTV
- Digital Multiplexer Recorder Hard Disk 1 Tera, 36 Channel 1.00 unit - - -
Lengkap dengan Controller Ethernet
- DVR CCTV HDD (36 Channel) 1.00 unit - -
- Monitor CCTV 1.00 unit - -
- Testing dan Commisioning 1.00 ls - -
b. Lantai Satu
- Titik Instalasi Power Kamera, NYM 3 x 2,5 mm 2 dalam Konduit PVC 5.00 titik O.126 -
c. Lantai Dua
- Titik Instalasi Kamera, UTP - Cat 6e dalam Konduit PVC 6.00 titik O.134 -
- Titik Instalasi Power Kamera, NYM 3 x 2,5 mm 2 dalam Konduit PVC 6.00 titik O.126 -
d. Lantai Tiga
- Kamera CCTV 1.00 unit O.250 -
(Weatherproof IR Camera, ⅟3" Sony CCD Sensor, IR LED, Auto White
Balanced Mode)
- Kamera CCTV ( Dome ) 2.00 unit O.250 -
(Indoor Dome Camera, ⅟3" Sony CCD Sensor, TVL, 0.03 Lux, Auto White
Balanced Mode)
- Titik Instalasi Kamera, UTP - Cat 6e dalam Konduit PVC 3.00 titik O.134 - -
- Titik Instalasi Power Kamera, NYM 3 x 2,5 mm 2 dalam Konduit PVC 3.00 titik O.126 - -
e. Lantai Empat
- Kamera CCTV 1.00 unit O.250 -
(Weatherproof IR Camera, ⅟3" Sony CCD Sensor, IR LED, Auto White
Balanced Mode)
- Kamera CCTV ( Dome ) 5.00 unit O.250 -
(Indoor Dome Camera, ⅟3" Sony CCD Sensor, TVL, 0.03 Lux, Auto White
Balanced Mode)
- Titik Instalasi Kamera, UTP - Cat 6e dalam Konduit PVC 6.00 titik O.134 -
- Titik Instalasi Power Kamera, NYM 3 x 2,5 mm 2 dalam Konduit PVC 6.00 titik O.126 -
f. Lantai Lima
- Kamera CCTV 1.00 unit O.250 -
(Weatherproof IR Camera, ⅟3" Sony CCD Sensor, IR LED, Auto White
Balanced Mode)
- Kamera CCTV ( Dome ) 2.00 unit O.250 -
(Indoor Dome Camera, ⅟3" Sony CCD Sensor, TVL, 0.03 Lux, Auto White
Balanced Mode)
- Titik Instalasi Kamera, UTP - Cat 6e dalam Konduit PVC 3.00 titik O.134 - -
- Titik Instalasi Power Kamera, NYM 3 x 2,5 mm 2 dalam Konduit PVC 3.00 titik O.126 - -
JUMLAH 9.3. -
9.4. PEKERJAAN TATA SUARA
a. Peralatan Utama Tata Suara ( Server Room )
a. Power Amplifier 300 W 2.00 unit O.240 - -
b. Equalizer 1.00 unit O.239 - -
c. Mixer Pree Amp 1.00 unit O.238 - -
d. CD/MP3 1.00 unit O.236 - -
e. Radio Tunner 1.00 unit O.234 - -
f. Emergency Microphone 1.00 unit O.237 - -
g. Pagging Microphone 1.00 unit O.237 - -
h. System Car Call
- Power Amplifier 300 W 1.00 unit - - -
- Pagging Microphone 1.00 unit O.237 - -
Bill Of Quantity Non Standar Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 7
HARGA SATUAN SUB JUMLAH HARGA
NO URAIAN PEKERJAAN VOL SAT KODE (Rp) (Rp)
a b c d e f g = (c x f)
i. Main Distribution Frame (MDF) 1.00 unit - - -
j. Cabinet Rack dan Aksesoris 1.00 set - -
b. Lantai Satu
- Kabel dari MDF ke TB-TS Lt. Satu, NYMHY 4 x (3 x 1,5 mm 2) 7.00 m' O.185 -
- Titik Instalasi Speaker, NYMHY 3 x 1,5 mm 2 dalam Konduit PVC 10.00 titik O.135 -
c. Lantai Dua
- Kabel dari MDF ke TB-TS Lt. Dua, NYMHY 4 x (3 x 1,5 mm 2) 22.00 m' O.185 -
- Titik Instalasi Speaker, NYMHY 3 x 1,5 mm 2 dalam Konduit PVC 14.00 titik O.135 -
d. Lantai Tiga
- TB-TS Lt. Tiga 1.00 bh O.233 -
- Kabel dari MDF ke TB-TS Lt. Tiga, NYMHY 4 x (3 x 1,5 mm 2) 37.00 m' O.185 -
- Ceiling Speaker 3 W 8.00 bh O.241 -
- Volume Control 2.00 bh O.243 -
- Titik Instalasi Speaker, NYMHY 3 x 1,5 mm 2 dalam Konduit PVC 10.00 titik O.135 -
e. Lantai Empat
- TB-TS Lt. Empat 1.00 bh O.233 -
- Kabel dari MDF ke TB-TS Lt. Empat, NYMHY 4 x (3 x 1,5 mm 2) 52.00 m' O.185 -
- Microphone 3.00 bh O.237 -
- Ceiling Speaker 3 W 7.00 bh O.241 -
- Column Speaker 4.00 bh O.242 -
- Volume Control 3.00 bh O.243 -
- Titik Instalasi Speaker, NYMHY 3 x 1,5 mm 2 dalam Konduit PVC 17.00 titik O.135 -
f. Lantai Lima
- TB-TS Lt. Lima 1.00 bh O.233 -
- Kabel dari MDF ke TB-TS Lt. Lima, NYMHY 4 x (3 x 1,5 mm 2) 67.00 m' O.185 -
- Ceiling Speaker 3 W 8.00 bh O.241 -
- Volume Control 2.00 bh O.243 -
- Titik Instalasi Speaker, NYMHY 3 x 1,5 mm 2 dalam Konduit PVC 10.00 titik O.135 -
JUMLAH 9.4. -
9.5. PEKERJAAN FIRE ALARM
a. Peralatan Utama Fire Alarm ( Server Room )
a. MCFA Tipe Konvensional Kap. 20 Zone c/w Baterai dan Charger 1.00 unit O.227 - -
b. Main Distribution Frame (MDF) 50 Pairs 1.00 unit - - -
c. Announciator Panel 30 Zone 1.00 unit - - -
b. Lantai Satu
b. Kabel dari MDF ke TBFA-Lt.Satu, Twisted Shelded 18 PAR + NYM 2 x 2,5 mm 2 8.00 m' O.137 -
h. Titik Instalasi
- Instalasi Detektor, NYY 4 x 1,5 mm 2 62.00 titik O.128 -
- Instalasi Bell dan Indikator, NYY 4 x 1,5 mm 2 4.00 titik O.128 -
c. Lantai Dua
b. Kabel dari MDF ke TBFA-Lt.Dua, Twisted Shelded 18 PAR + NYM 2 x 2,5 mm 2 23.00 m' O.137 -
h. Titik Instalasi
- Instalasi Detektor, NYY 4 x 1,5 mm 2 93.00 titik O.128 -
- Instalasi Bell dan Indikator, NYY 4 x 1,5 mm 2 4.00 titik O.128 -
d. Lantai Tiga
a. TB-FA Lt. Tiga 1.00 unit O.229 -
b. Kabel dari MDF ke TBFA-Lt.Tiga, Twisted Shelded 18 PAR + NYM 2 x 2,5 mm 2 38.00 m' O.137 -
c. Smoke Detector 50.00 bh O.222 -
d. Heat Detector 51.00 bh O.223 -
e. Manual Break Glass 1.00 bh O.226 -
f. Bell Alarm 2.00 bh O.225 -
g. Indicator Lamp 2.00 bh O.224 -
h. Titik Instalasi
- Instalasi Detektor, NYY 4 x 1,5 mm 2 101.00 titik O.128 -
- Instalasi Bell dan Indikator, NYY 4 x 1,5 mm 2 4.00 titik O.128 -
i. Peralatan Bantu 1.00 ls - -
e. Lantai Empat
a. TB-FA Lt. Empat 1.00 unit O.229 -
b. Kabel dari MDF ke TBFA-Lt.Empat, Twisted Shelded 18 PAR + NYM 2 x 2,5 mm 2 53.00 m' O.137 -
c. Smoke Detector 51.00 bh O.222 -
d. Heat Detector 51.00 bh O.223 -
e. Manual Break Glass 1.00 bh O.226 -
f. Bell Alarm 2.00 bh O.225 -
g. Indicator Lamp 2.00 bh O.224 -
h. Titik Instalasi
- Instalasi Detektor, NYY 4 x 1,5 mm 2 102.00 titik O.128 -
- Instalasi Bell dan Indikator, NYY 4 x 1,5 mm 2 4.00 titik O.128 -
Bill Of Quantity Non Standar Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 8
HARGA SATUAN SUB JUMLAH HARGA
NO URAIAN PEKERJAAN VOL SAT KODE (Rp) (Rp)
a b c d e f g = (c x f)
i. Peralatan Bantu 1.00 ls - -
f. Lantai Lima
a. TB-FA Lt. Lima 1.00 unit O.229 -
b. Kabel dari MDF ke TBFA-Lt.Lima], Twisted Shelded 18 PAR + NYM 2 x 2,5 mm 2 68.00 m' O.137 -
c. Smoke Detector 46.00 bh O.222 -
d. Heat Detector 46.00 bh O.223 -
e. Manual Break Glass 1.00 bh O.226 -
f. Bell Alarm 2.00 bh O.225 -
g. Indicator Lamp 2.00 bh O.224 -
h. Titik Instalasi
- Instalasi Detektor, NYY 4 x 1,5 mm 2 92.00 titik O.128 -
- Instalasi Bell dan Indikator, NYY 4 x 1,5 mm 2 4.00 titik O.128 -
i. Peralatan Bantu 1.00 ls - -
JUMLAH 9.5. -
JUMLAH IX.PEKERJAAN ELEKTRIKAL ARUS LEMAH -
###
Bill Of Quantity Non Standar Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 9
HARGA SATUAN SUB JUMLAH HARGA
NO URAIAN PEKERJAAN VOL SAT KODE (Rp) (Rp)
a b c d e f g = (c x f)
- Package Booster Pump 1.00 set O.272 - -
Tipe : Horizontal Multistage Centrifugal Pump
Laju Alir : 400 lpm
Daya : 2,2 kW / 3 x 220-240 V/380 V / 50 Hz
Max. Head : 30 m
- Panel Kontrol Pompa Booster 1.00 set INCLUDE
- Instalasi Daya Listrik Pompa 1.00 titik O.130 -
JUMLAH 10.3. -
10.4. PEKERJAAN HYDRANT & SPLINKER
3. Lantai Tiga
a. Instalasi Hydrant ( APPAR )
- Fire Extinguisher Kapasitas 5 kg (Dry Chemical Multi Purpose) 3.00 bh O.286 - -
- Peralatan Bantu (Fitting-fitting) 1.00 ls - - -
b. Instalasi Sprinkler
- Pemipaan Black Steel Sch 40 (ASTM A53) :
- Diameter 4" 36.00 m1 O.35 - -
- Diameter 2 ⅟2" 54.00 m1 O.33 - -
- Diameter 1" 316.00 m1 O.29 - -
- Head Sprinkler 79.00 bh O.287 - -
- Gate Valve Diameter 2 ⅟2" 2.00 bh O.61 - -
- Drain Valve Diameter 1" 2.00 bh O.60 - -
- Water Flow Switch 1.00 bh O.93 -
- Pressure Gauge 1.00 bh O.257 -
- Peralatan Bantu (Fitting-fitting) 1.00 ls - -
4. Lantai Empat
a. Instalasi Hydrant ( APPAR )
- Fire Extinguisher Kapasitas 5 kg (Dry Chemical Multi Purpose) 3.00 bh O.286 - -
- Peralatan Bantu (Fitting-fitting) 1.00 ls - - -
b. Instalasi Sprinkler
- Pemipaan Black Steel Sch 40 (ASTM A53) :
- Diameter 4" 51.00 m1 O.35 - -
- Diameter 2 ⅟2" 54.00 m1 O.33 - -
- Diameter 1" 212.00 m1 O.29 - -
- Head Sprinkler 53.00 bh O.287 - -
- Gate Valve Diameter 2 ⅟2" 2.00 bh O.61 - -
- Drain Valve Diameter 1" 2.00 bh O.60 -
- Water Flow Switch 1.00 bh O.93 -
- Pressure Gauge 1.00 bh O.257 -
- Peralatan Bantu (Fitting-fitting) 1.00 ls - -
5. Lantai Lima
a. Instalasi Hydrant ( APPAR )
- Fire Extinguisher Kapasitas 5 kg (Dry Chemical Multi Purpose) 3.00 bh O.286 - -
- Peralatan Bantu (Fitting-fitting) 1.00 ls - - -
b. Instalasi Sprinkler
- Pemipaan Black Steel Sch 40 (ASTM A53) :
- Diameter 4" 66.00 m1 O.35 - -
- Diameter 2 ⅟2" 54.00 m1 O.33 - -
- Diameter 1" 300.00 m1 O.29 - -
- Head Sprinkler 75.00 bh O.287 - -
- Gate Valve Diameter 2 ⅟2" 2.00 bh O.61 - -
- Drain Valve Diameter 1" 2.00 bh O.60 - -
- Water Flow Switch 1.00 bh O.93 -
- Pressure Gauge 1.00 bh O.257 - -
- Peralatan Bantu (Fitting-fitting) 1.00 ls - -
JUMLAH 10.4. -
10.5. PEKERJAAN TATA UDARA
1. Lantai Satu ###
- Pipa Refrigerant ASTMB - 280 + Isolasi Armaflex Diameter 3/4" 56.00 m1 O.293 - -
###
- Pipa Drain + Isolasi PVC Kelas AW Diameter 1 ⅟2 " 56.00 m1 O.294 - -
- Y - Branch
- Pipe Indoor Connection 8.00 bh - - -
- Pipe Outdoor Connection 8.00 bh - - -
- Titik Instalasi Daya Indoor Unit 8.00 titik O.131 - -
2. Lantai Dua ###
- Pipa Refrigerant ASTMB - 280 + Isolasi Armaflex Diameter 3/4" 247.00 m1 O.293 - -
###
- Pipa Drain + Isolasi PVC Kelas AW Diameter 1 ⅟2 " 247.00 m1 O.294 - -
- Y - Branch
Bill Of Quantity Non Standar Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 10
HARGA SATUAN SUB JUMLAH HARGA
NO URAIAN PEKERJAAN VOL SAT KODE (Rp) (Rp)
a b c d e f g = (c x f)
- Pipe Indoor Connection 27.00 bh - - -
- Pipe Outdoor Connection 27.00 bh - - -
- Titik Instalasi Daya Indoor Unit 26.00 titik O.131 - -
- Titik Instalasi Daya Outdoor Unit 1.00 titik O.132 -
3. Lantai Tiga ###
- Indoor Unit (IU) Kapasitas 7.500 btuh, 3/4 PK, Split Wall Mounted Type 1.00 unit O.296 - -
###
- Indoor Unit (IU) Kapasitas 9.600 btuh, 1 PK, Split Wall Mounted Type 1.00 unit O.297 - -
###
- Indoor Unit (IU) Kapasitas 9.600 btuh, 1 PK, Cassette Type 7.00 unit O.302 - -
- Indoor Unit (IU) Kapasitas 12.300 btuh, 1 1/2 PK, Cassette Type 13.00 unit O.303 - -
- Indoor Unit (IU) Kapasitas 19.100 btuh, 2 PK, Cassette Type 7.00 unit O.304 - -
- Outdoor Unit (OU) Lt. 3 Kapasitas 345.000 btuh, 36 PK 1.00 unit O.307 - -
- Pipa Refrigerant ASTMB - 280 + Isolasi Armaflex Diameter 3/4" 263.00 m1 O.293 - -
###
- Pipa Drain + Isolasi PVC Kelas AW Diameter 1 ⅟2 " 263.00 m1 O.294 - -
- Y - Branch
- Pipe Indoor Connection 30.00 bh - - -
- Pipe Outdoor Connection 30.00 bh - - -
- Titik Instalasi Daya Indoor Unit 29.00 titik O.131 - -
- Titik Instalasi Daya Outdoor Unit 1.00 titik O.132 -
4. Lantai Empat ###
- Indoor Unit (IU) Kapasitas 7.500 btuh, 3/4 PK, Split Wall Mounted Type 1.00 unit O.296 - -
###
- Indoor Unit (IU) Kapasitas 12.300 btuh, 1 1/2 PK, Cassette Type 5.00 unit O.303 - -
- Indoor Unit (IU) Kapasitas 19.100 btuh, 2 PK, Cassette Type 14.00 unit O.304 - -
- Outdoor Unit (OU) Lt. 4 Kapasitas 324.000 btuh, 34 PK 1.00 unit O.308 - -
- Pipa Refrigerant ASTMB - 280 + Isolasi Armaflex Diameter 3/4" 235.00 m1 O.293 - -
###
- Pipa Drain + Isolasi PVC Kelas AW Diameter 1 ⅟2 " 235.00 m1 O.294 - -
- Y - Branch
- Pipe Indoor Connection 21.00 bh - - -
- Pipe Outdoor Connection 21.00 bh - - -
- Titik Instalasi Daya Indoor Unit 20.00 titik O.131 - -
- Titik Instalasi Daya Outdoor Unit 1.00 titik O.132 -
5. Lantai Lima ###
- Pipa Refrigerant ASTMB - 280 + Isolasi Armaflex Diameter 3/4" 193.00 m1 O.293 - -
###
- Pipa Drain + Isolasi PVC Kelas AW Diameter 1 ⅟2 " 193.00 m1 O.294 - -
- Y - Branch
- Pipe Indoor Connection 25.00 bh - - -
- Pipe Outdoor Connection 25.00 bh - - -
- Titik Instalasi Daya Indoor Unit 24.00 titik O.131 - -
- Titik Instalasi Daya Outdoor Unit 1.00 titik O.132 -
JUMLAH 10.5. -
10.6. PEKERJAAN WATER HEATER
1. Lantai Tiga ###
- Pek. Pemasangan Water Heater Kapasitas 30 L + Instalasi Terpasang 1.00 unit - - -
###
2. Lantai Lima ###
- Pek. Pemasangan Water Heater Kapasitas 30 L + Instalasi Terpasang 7.00 unit - - -
###
JUMLAH 10.6. -
10.7. PEKERJAAN ELEVATOR
a. Passenger Elevator 1.00 unit - - -
- Penggerak : Permanent Magnet Generator
- Tipe : Standard
- Kapasitas : 1000 kg (15 orang)
- Kecepatan : 60 H938mpm / 1 mps
- No. of Stop :5
- Opening : 5 Entrance - 2 Side Open (Center Open)
- Main Floor : Lantai 1
Lengkap dengan Aksesoris Elevator, Instalasi (Kabel dan Fitting), Exhaust Fan,
serta Panel Kontrol Elevator
b. Pemasangan
- Biaya Izin Depnaker 1.00 unit - - -
- Jasa Pemasangan dan Test Commisioning (Termasuk Listrik) 1.00 unit - - -
JUMLAH 10.7. -
JUMLAH X.PEKERJAAN MEKANIKAL DAN PLAMBING -
Bill Of Quantity Non Standar Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 11
REKAPITULASI PEKERJAAN BANGUNAN PENUNJANG
PEMBANGUNAN GEDUNG CABANG PELAYANAN PENDAPATAN DAERAH PROVINSI WILAYAH KABUPATEN
KARAWANG TAHAP I
TAHUN ANGGARAN 2017
A B C
Rekapitulasi BOQ Bangunan Penunjang Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I
BILL OF QUANTITY
PEMBANGUNAN GEDUNG CABANG PELAYANAN PENDAPATAN DAERAH PROVINSI WILAYAH KABUPATEN KARAWANG TAHAP I
TAHUN ANGGARAN 2017
Bill Of Quantity Bangunan Penunjang Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 1
HARGA SATUAN SUB JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT KODE
(Rp) (Rp)
a b c d e f g = (c x f)
Jumlah 1.3. -
JUMLAH I.RUMAH POMPA -
III. POS JAGA TYPE I ( 1 UNIT )
3.1. PEKERJAAN STRUKTUR
a. Pek. Galian Tanah
- Pek. Galian pondasi batu kali 1 : 5 8.05 m3 B.1 - -
- Pek. Urugan tanah kembali 5.37 m3 B.4 - -
- Pek. Buangan tanah ke luar Lokasi 2.68 m3 B.2 - -
b. Pek. Pondasi Batu Kali
- Urugan Pasir dengan Pasir Urug tebal 10 cm 0.70 m3 B.10 - -
- Lantai Kerja 1 PC : 3 pasir : 5 kerikil tebal 5 cm 0.35 m3 E.1 - -
- Pondasi batu kosong ( Aanstamping ) 1.05 m3 C.3 - -
- Pondasi batu kali 3.36 m3 C.1 - -
c. Pek. Sloof SF1, uk. 15 x 20 cm Elv. + 0.94 m Ready mix f'c 25 MPa (K-300)
- Urugan Pasir dengan Pasir Urug Tebal 10 cm 0.11 m3 B.10 - -
- Lantai Kerja 1 PC : 3 Pasir : 5 Krikil 0.05 m3 E.1 - -
- Pek. Beton Struktur SF.1, Besi (U24. 188 kg) 0.21 m3 E.56 - -
d. Pek. Kolom Beton Elv. + 0.94 s/d + 4.04 m Ready mix f'c 25 MPa (K-300)
- Pek. Beton Struktur K.1, 15 x 15 cm Besi (U24. 240 kg) 0.31 m3 E.57 - -
e. Pek. Balok Beton Elv. + 4.04 m Ready mix f'c 25 MPa (K-300)
- Pek. Beton Struktur RB, 15 x 20 cm Besi (U24. 188 kg) 0.33 m3 E.58 - -
- Pek. Beton Struktur B.L, 10 x 20 cm Besi (U24. 420 kg) 0.23 m3 E.59 - -
f. Pek. Plat Lantai Beton t = 10 cm Elv. + 4.04 Ready Mix f'c 25 Mpa (K-300)
- Pek. Beton Struktur Plat Lantai Elv. +4.04 m, t = 10 cm, Besi (U24. 126 kg) 0.83 m3 E.55 - -
- Pek. Membrance Waterproofing 8.35 m2 M.15 - -
- Pek. Sreeding t = 3 cm 8.35 m2 M.16 - -
- Pek. Coating Waterproofing 8.35 m2 M.14 - -
Jumlah 3.1. -
3.2. PEKERJAAN ARSITEKTUR
a. Pekerjaan Tanah
- Pek. Urugan pasir dengan pasir urug t = 20 cm 0.75 m3 B.10 - -
b. Pekerjaan Pasangan
- Pek. Pas. Bata ringan 14.23 m2 D.7 - -
- Pek. Plesteran mortar 28.46 m2 D.8 - -
- Pek. Acian mortar 28.46 m2 D.9 - -
c. Pekerjaan Kusen Pintu, Jendela, dan Kaca
- Pas. Kusen dan daun pintu type P1 ( 1 unit ) 1.00 unit K.23 - -
- Pas. Kusen dan daun pintu type P2 ( 1 unit ) 1.00 unit K.24 - -
- Pas. Kusen dan daun jendela type J1 ( 1 unit ) 1.00 unit K.25 - -
- Pas. Kusen dan daun jendela type J2 ( 1 unit ) 1.00 unit K.26 - -
d. Pekerjaan Plafond
- Pas. Penutup plafond GRC 4 mm + Rangka hollow 40 x 40 mm 3.73 m2 G.4 - -
- Pas. List Profil Gypsum 10 cm 15.00 m' G.2 - -
e. Pekerjaan Penutup Lantai dan Dinding
- Pek. Pas. Keramik tile 30 x 30 cm, polished 3.87 m2 M.5 - -
- Pek. Rolag bata merah 1 pc : 3 ps + Plesteran 1 pc : 3 ps + Acian 0.71 m2 - - -
f. Pekerjaan Pengecatan
- Pek. Pengecatan dinding 28.46 m2 N.2 - -
- Pek. Pengecatan plafond 3.73 m2 N.4 - -
Jumlah 3.2. -
JUMLAH III.POS JAGA TYPE I ( 1 UNIT ) -
IV. POS JAGA TYPE II ( 2 UNIT )
4.1. PEKERJAAN STRUKTUR
a. Pek. Galian Tanah
- Pek. Galian pondasi batu kali 1 : 5 12.19 m3 B.1 - -
- Pek. Urugan tanah kembali 8.13 m3 B.4 - -
- Pek. Buangan tanah ke luar Lokasi 4.06 m3 B.2 - -
b. Pek. Pondasi Batu Kali
- Urugan Pasir dengan Pasir Urug tebal 10 cm 1.06 m3 B.10 - -
- Lantai Kerja 1 PC : 3 pasir : 5 kerikil tebal 5 cm 0.53 m3 E.1 - -
- Pondasi batu kosong ( Aanstamping ) 1.59 m3 C.3 - -
- Pondasi batu kali 5.09 m3 C.1 - -
c. Pek. Sloof SF1, uk. 15 x 20 cm Elv. + 0.94 m Ready mix f'c 25 MPa (K-300)
- Urugan Pasir dengan Pasir Urug Tebal 10 cm 0.16 m3 B.10 - -
- Lantai Kerja 1 PC : 3 Pasir : 5 Krikil 0.08 m3 E.1 - -
- Pek. Beton Struktur SF.1, Besi (U24. 188 kg) 0.32 m3 E.56 - -
d. Pek. Kolom Beton Elv. + 0.94 s/d + 4.04 m Ready mix f'c 25 MPa (K-300)
- Pek. Beton Struktur K.1, 15 x 15 cm Besi (U24. 240 kg) 0.46 m3 E.57 - -
e. Pek. Balok Beton Elv. + 4.04 m Ready mix f'c 25 MPa (K-300)
- Pek. Beton Struktur RB, 15 x 20 cm Besi (U24. 188 kg) 0.48 m3 E.58 - -
- Pek. Beton Struktur B.L, 10 x 20 cm Besi (U24. 420 kg) 0.27 m3 E.59 - -
f. Pek. Plat Lantai Beton t = 10 cm Elv. + 4.04 Ready Mix f'c 25 Mpa (K-300)
- Pek. Beton Struktur Plat Lantai Elv. +4.04 m, t = 10 cm, Besi (U24. 126 kg) 1.11 m3 E.55 - -
- Pek. Membrance Waterproofing 11.10 m2 M.15 - -
- Pek. Sreeding t = 3 cm 11.10 m2 M.16 - -
Bill Of Quantity Bangunan Penunjang Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 2
HARGA SATUAN SUB JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT KODE
(Rp) (Rp)
a b c d e f g = (c x f)
- Pek. Coating Waterproofing 11.10 m2 M.14 - -
Jumlah 4.1. -
4.2. PEKERJAAN ARSITEKTUR
a. Pekerjaan Tanah
- Pek. Urugan pasir dengan pasir urug t = 20 cm 1.36 m3 B.10 - -
b. Pekerjaan Pasangan
- Pek. Pas. Bata ringan 23.13 m2 D.7 - -
- Pek. Plesteran mortar 46.26 m2 D.8 - -
- Pek. Acian mortar 46.26 m2 D.9 - -
c. Pekerjaan Kusen Pintu, Jendela, dan Kaca
- Pas. Kusen dan daun pintu type P1 ( 1 unit ) 1.00 unit K.23 - -
- Pas. Kusen dan daun pintu type P2 ( 1 unit ) 1.00 unit K.24 - -
- Pas. Kusen dan daun jendela type J1 ( 1 unit ) 1.00 unit K.25 - -
- Pas. Kusen dan daun jendela type J2 ( 1 unit ) 1.00 unit K.26 - -
- Pas. Kusen dan daun jendela type BV.`1 ( 2 unit ) 1.00 unit K.27 - -
d. Pekerjaan Plafond
- Pas. Penutup plafond GRC 4 mm + Rangka hollow 40 x 40 mm 5.90 m2 G.4 - -
- Pas. List Profil Gypsum 10 cm 13.70 m' G.2 - -
e. Pekerjaan Penutup Lantai dan Dinding
- Pek. Pas. Keramik tile 30 x 30 cm, polished 5.86 m2 M.5 - -
- Pek. Pas. Keramik tile 30 x 30 cm, untuk wc 5.86 m2 M.8 - -
- Pek. Pas. Keramik dinding wc 30 x 60 cm, dekoratif polished 6.00 m2 M.9 - -
- Pek. Rolag bata merah 1 pc : 3 ps + Plesteran 1 pc : 3 ps + Acian 0.96 m2 - - -
f. Pekerjaan Pengecatan
- Pek. Pengecatan dinding 46.26 m2 N.2 - -
- Pek. Pengecatan plafond 5.90 m2 N.4 - -
g. Pekerjaan Fixtures Lavatory
- Floor Drain 1.00 bh H.8 - -
- Closet jongkok 1.00 bh H.2 - -
- Kran air dinding 1.00 bh H.13 - -
Jumlah 4.2. -
4.3. PEKERJAAN MEKANIKAL ELEKTRIKAL
a. Pekerjaan Panel & Kabel Feeder
1. Panel Daya Listrik
- LP - Pos Jaga 1.00 unit O.161 - -
2. Kabel Feeder
- Dari MDP - Gedung ke LP Lt. 1, NYY (4 x 4 mm2) + netral 28.00 m' O.165 - -
b. Pekerjaan Titik Instalasi Daya & Armatur Penerangan
1. Saklar dan Stop Kontak
- Saklar Tunggal 2.00 bh O.116 - -
- Stop Kontak 250 w + Instalasi Kabel 3.00 bh O.119 - -
2. Fixtures Lampu Lengkap dengan Armatur
- Lampu Downlight PLC 36 W / 4 Pin + Instalasi Kabel 3.00 bh O.111 - -
3. Exhaust Fan 36 W + Instalasi Kabel 1.00 bh O.124 - -
c. Pekerjaan Plumbing
1. Pekerjaan Air Bersih Dengan Pipa Polypropelyne PN.10
- Diameter 1/2" + Aksesories 25.00 m' O.38 - -
2. Pekerjaan Air kotor Dengan Pipa PVC Tipe AW Kelas 10 kg/cm2
- PVC Diameter 2" + Aksesories 15.00 m' O.15 - -
- PVC Diameter 3" + Aksesories 30.00 m' O.17 - -
d. Pekerjaan Talang Air Hujan
1. Pemipaan Tipe AW Kelas 10 kg/cm 2 :
- PVC Diameter 3" 9.00 m1 O.17 - -
- Material Bantu (Mur-Baut, Flens, Support, Klem, Fitting, dll.) 1.00 ls - - -
2. Roof Drain
- RD Diameter 3" 2.00 bh - - -
Jumlah 4.3. -
JUMLAH IV.POS JAGA TYPE II ( 2 UNIT ) -
Bill Of Quantity Bangunan Penunjang Pembangunan Gedung Cabang Pelayanan Pendapatan Daerah Provinsi Wilayah Kabupaten Karawang Tahap I 3