AmbujaNeotia DOC No: Checklist/Super-Structure/002 Revision Number: R2

Issue Date: 02/02/23 Revision Date: 02/02/23

Project – URVISHA (Newtown) Reference Pour Card No:

Contractor’s Name – S. M. NIRMAN

Check list for: LAYING OF CEMENT CONCRETE WORK

Date of Submission-
Location:
Ambuja Neotia
Contractor. Group.
Date of Inspection-
Drawing No. Rev.

ITEM DESCRIPTION YES NO YES NO REMARKS


A1 Pre-concreting: Is the layout been
checked before concrete pour?
B1 During Concreting: Is the maximum
free fall (1.5 m) of concrete controlled?
B2 Is there any apparent segregation of
aggregates?
B3 Whether the concrete is poured in
position within initial setting period of
concrete?
B4 Is the concrete poured from one end
and advanced in a forward direction?
B5 Is the concrete vibrated to satisfactory
consistency?
B6 If there were interruption during the
pouring? what is the maximum
interruption time?
B7 Is there adequate protection available
for poured concrete from rain, cold or
extreme hot temperatures?
B8 Whether construction joint has been
treated properly?
B9 Whether the displacement of
reinforcement during concreting has
been done?
C1 Post Pour: Whether the adequate
curing of concrete surface is done?
C2 Is the surface of poured concrete
visually acceptable (free from cracks/
bulging/ honeycombs/ porosity/
exposed re-bar/ color blemishes)?
C3 Is the poured concrete acceptable as per
layout/ level/ alignment?
C4 Formation of feather edge observed?

Signature of Contractor’s representative Signature of Employer representative


Date: Date: