Geotechnique Past Paper
Geotechnique Past Paper
Geotechnique Past Paper
The figure below shows a cross-section Die figuur hieronder toon ’n dwarssnit deur
through a concrete wall built on a riverbed. ’n betonwal wat op ’n rivierbedding gebou
The silty sand is anisotropic and laboratory is. Die slikkerige sand is anisotropies met kx
tests showed that kx = 4 x 10-7m/s = 4x10-7 m/s (horisontaal) en kz =1 x 10-7m/s
(horizontal) and kz = 1 x 10-7m/s (vertical). (vertikaal).
16 m
4m 4m
1m
3m 2m
2m
X
6m
7m
9m
Figure 1 / Figuur 1
A clay layer is 18m thick, and a large fill is to ’n Kleilaag is 18 m dik en ʼn groot opvulling
be constructed on it. The weight of the fill moet daarop gebou word. Die gewig van die
will cause a vertical pressure of 150kN/m2. opvulling sal ’n vertikale druk van 150kNm-2
The water table is at the surface and a veroorsaak. Die watertafel is aan die
oppervlakte en onderkant die klei is poreuse
porous rock underlies the clay allowing
rots sodat dreinering na bo en onder moontlik
drainage upwards and downwards. The clay
is. Die klei het die volgende eienskappe: ɣsat
has the following properties: ɣsat = 20kN/m3;
= 20kN/m3; Cc = 0.10; Ce = 0.02; σ’c = 180
Cc = 0.10; Ce = 0.02; σ’c = 180kN/m2; e0 = 0.5; kN/m2; e0 = 0.5; cv = 1.4m2/jr. Bepaal die
cv = 1.4m2/yr. Determine the following: volgende:
a) The consolidation settlement, soed, of the
clay layer (subdivide into six layers of 3m a) Die konsolidasieversakking, soed, van die
each). [20] kleilaag (deel op in ses lae van 3m elk).
[20]
b) Settlement, ten years after completion b) Versakking, tien jaar na voltooiing van
of construction, if the construction konstruksie, met ’n konstruksieperiode
period is five years. [5] van vyf jaar. [5]
a) What is the settlement 16 years after a) Hoeveel versakking sal afgehandel wees 16
construction commenced? [6] jaar nadat met konstruksie begin is? [6]
b) Calculate the time required for 220mm b) Bereken die tyd nodig vir 220mm
settlement. [6] versakking. [6]
c) When will a degree of consolidation of c) Wanneer sal ʼn graad van 90% konsolidasie
90% be reached? [6] bereik word? [6]
d) A set of 0.3m diameter sand drains is d) ʼn Stel sanddreine 0.3m in deursnit word in
installed at 6m spacing in a square ʼn vierkantige patroon teen 6m spasiëring
oor die volle diepte van die klei
pattern over the full clay depth.
geïnstalleer. Bereken die versakking 16 jaar
Determine the settlement 16 years
nadat met konstruksie begin is. [7]
after construction commenced. [7]
The top 0.5m of an 11m thick clay layer is Die boonste 0.5m van ʼn 11m dik kleilaag word
removed and a very long embankment verwyder, en ʼn baie lang wal gebou. Die snit
representing a strip load constructed. A van die wal word in Figuur 6 getoon. Die
cross-section of the embankment is shown maksimum netto druk van die opvulling (wal)
in Figure 6. The maximum net pressure by die hoogste punt is 150kN/m2. Die netto
that the fill exerts on the soil (i.e., at its druk a.g.v die reghoek alleen is 75kN/m2. Die
highest point) is 150kN/m2. The net eenheidsgewig van die versadigde in-situ klei is
pressure from the rectangular load alone 20kN/m3.
is 75 kN/m2. The unit weight of the
saturated in-situ clay soil is 20kN/m3 .
6,0 m
0,5 m
7,0 m
Figuur 6 / Figure 6