DESIGN AND BUILD OF

SWIMMING POOL AND


ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-BA-3581-00003-0000
PROJECT ID: UIR00RAH0363
PAGE 1 OF 56

RAHRC

Method Statement for Installation and


Commissioning of
Schindler 3300 Elevators

UNIT ORIGINATOR DISC. DOC SEQUENCE SHEET


AREA Rev
DOCUMENT CODE CODE CODE TYPE NO NO
NUMBER RAH 02 104822 BA 5733 00001 0000 01
Rev
Date Status Prepared by Checked by Approved by
No.
TECHNICAL AND
SALES SALES
00 20.06.2021 FIELD OPERATION
COORDINATOR ENGINEER
HEAD

MOHAMED KRISHNA
JAYARAJ P
MUNIR PRADHAN
DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 2 OF 56

REVISION SCHEDULE

Rev. No. Rev. Date Revision Description Prepared By Approve By


RAHRC - Design and Build of
Swimming Pool and Associated
Facilities in the Club Method SALES SALES
01 20/06/2021 COORDINATOR ENGINEER
statement for Installation and
Commissioning of Schindler 3300
elevators

MOHAMED KRISHNA
MUNIR PRADHAN

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 3 OF 56

Table of Contents
1. Introduction

2. Scope of work

3. Materials

4. Equipment

5. Procedure

6. Installation overview

7. Checking & Preparing building site

8. Inspection – Inspect Site

9. Scaffolding

10. Install plumb gauges in the hoist way

11. Brackets, guides and Machine support

12. Counterweight

13. Pit set

14. Machine installation

15. Roping and shaft cables

16. Landing doors

17. Cabin installation

18. Wiring

19. Final inspections

20. Plant equipment & tools

21. Inspection and Test Plan

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 4 OF 56

RAHRC
Method Statement for Installation and
Commissioning of
Schindler 3300 Elevators S3300
Elevators
Rev No. Date Status Prepared by Checked by Approved by
TECHNICAL
SALES SALES AND FIELD
01 20.06.2021
COORDINATOR ENGINEER OPERATION
HEAD

MOHAMED KRISHNA
JAYARAJ P
MUNIR PRADHAN

Consultant Comments

Review Comments

Approved with
Approved A B Revise and Re-submit C Rejected D
comments

Name Signature Designation Date

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 5 OF 56

Design and Build of Swimming Pool and Associated Facilities in


Contract:
the Club (RAHRC)
Reference: C2100000213
Method Statement for Installation
Method Statement and Commissioning of
MS No: 001
Title: S3300 Elevators

Issue Record

Rev. No: Date Prepared: Reason for Revision:


01 20.06.2021 First Issue

Name Signature Date

MOHAMED MUNIR
Prepared By: SALES COORDINATOR
20.06.2021

KRISHNA PRADHAN
Reviewed By: SALES ENGINEER
20.06.2021

JAYARAJ P
Approved By TECHNICAL AND FIELD 20.06.2021
OPERATIONS HEAD
Approved By
PDO:

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 6 OF 56

1. Introduction
This method statement serves to outline the steps and actions that Schindler will adopt to undertake
the installation of Machine-Room-Less Elevators.

2. Scope of Work
This method statement covers the complete works required to offload, shift, install, test, commission
and hand-over the elevators installed by Schindler

3. Materials
1. Schindler elevator materials (including doors, brackets, guiderails, cars, ropes, etc…)
2. Scaffolding (by main contractor)

4. Equipment
1. General hand tools (i.e.: Screw-drivers, wrenches, pliers, cutters, etc…)
2. Electrical tool-set (hand-drill, grinder, cutter)
3. Electrical hoists
4. Shifting equipment (Boom loaders, hydraulic trolleys, etc…)
5. PPEs (gloves, goggles, hard hats, plastic gloves)

5. Procedure
1. Material receipt at site (in standard 40 feet containers)

• Access route assessment in advance

2. Material offloading, storing and shifting on site

• Offloading material from the container with use of boom loaders


• Shifting material on site with use of boom loaders and tower crane
• Storing material on site (As per Manufacturer’s recommendation)

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 7 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 8 OF 56

6. Installation Overview
Inspection Inspect site, with attention to Hoistway and Machine room
Scaffolding Install and check Scaffolding by authorized Scaffolding Installer
Hoistway Material Clean guide rails
Install Pit Ladder
Install Guide Rail Brackets
Install Guide rails and fishplates
Install Pit set
Install Counterweight
Install Machine support (CW Fix point)
Install U-Beams (Car Fix point)
Install LMS
Machine Lift Machine to Hoistway Head
Install Machine
Connect Machine Electrically
Landing Door Entrances Install and Check Landing Door
Scaffolding Remove lower Scaffolding
Control Install Control Box in Landing Door Frame
Install Control modules
Car Install Car Sling (Lower Yoke, Uprights, Upper Yoke)
Install Safety Gears
Install Platform
Install Car Walls
Install COP
Install Service Platform
Install Guide Shoes
Install Door Drive
Install Interior
Connect Car Electrically
Suspension Ropes Install Suspension Ropes
Governor System Install Tension Weight
Install Governor
Install Governor Rope

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 9 OF 56

Scaffolding Remove Scaffolding


Power Supply and other Power Supply Cables
Cables Machine Room Cables
Hoistway Cables
Travelling Cables Install and connect Travelling Cables
Car Components Install wiring of LMS (Load Monitoring System), OKR (Car top
Inspection), Door Drive
Installation Travel Start Commissioning
Hoistway Information Install and connect AGSI (All Gear Shaft Information)
Car and Landing Elements Install and connect Car & Landing Elements
Adjustments and Final
Check

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 10 OF 56

7. Checking and Preparing Building Site


• The layout drawings and building plan are available.
• The work site has been checked by the supervisor and found ready for material delivery
according to the builder’s work plan.
• The packing list is available.
• The tools are in good working condition and inspected according to the local Schindler
procedures.

8. Inspection - Inspect site


The purpose of this inspection is to alert both the builder and the Schindler office, as early as possible,
of any discrepancies or deviations in the structure which may affect the installation of the elevator. It
also draws attention to any site conditions which could cause delays or possible damage to elevator
equipment when the elevator equipment is delivered.

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 11 OF 56

Clean and dry conditions on site are absolute necessities to


provide the client with an on-time quality elevator installation.
The builder must duly rectify / complete in a timely manner
the requisite as per the “Checklist for Building Check – Pre
installation Check list” provide by Schindler.

9. Scaffolding
Note: It is suggested that no high rise hoistways the scaffolding
be built in stage with each new section being supported on
beams designed to support the scaffolding weight.

Make sure that the site dimensions have been checked against
the elevator layout drawings.
Check that hoistway is clear of debris
Determine position of scaffolding so that it does not interfere
with the plumb lines and guide rails.
Position timber on the pit floor to form level base for scaffold
erection.
Assemble scaffolding framework installing tie rods at intervals
for stability
For an easy access of the machine, make sure that the
uppermost platform is installed with a distance 1.2 to 1.3 meter.
Observer safety precautions (for example, erection of safe
working platform, kick boards, ladders and barriers)
Third party certification to be provided once scaffold complete, with scaff tag prior to access for lift
technicians.
Weekly inspection to be conducted by competent scaffold supervisor or if there is any major changes
in weather which could affect scaffolding.

Note: Under No circumstances is Schindler to alter the scaffold. Any amendment to scaffold must be
first advised to third party scaffold team + BM Safety dept.

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 12 OF 56

10. Install the plumb gauges in the hoist way head


Prepare plumbing lines at top and bottom according to the layout drawings.

Drop Plumb lines for car and counterweight guide rails and door positioning.

Align plumb lines relative to builder's grid (if applicable).

Check the position of plumb line with reference to hoistway and door openings.

Prepare table showing the dimensions from each line to the hoistway wall for each floor and take these
measurements and record them in the table.

Check that the dimensions are adequate to accommodate the elevator(s) and if not arrange the plumb
line(s) to obtain the optimum position.

Discuss the table with the builder, explaining any problems that may occur and if both parties are
agreed have the builder date and sign the table.

Keep copies of the dimension table on site and in the office file.

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 13 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 14 OF 56

11. Brackets, Guide Rails & Machine Support


Mark car and counter weight guide rail support bracket locations from pit level according to the
approved lay out drawing. Mark car and counter weight rail joints on the well wall. Adjust bracket
location in case any rail joint and bracket location is at the same location

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 15 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 16 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 17 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 18 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 19 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 20 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 21 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 22 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 23 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 24 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 25 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 26 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 27 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 28 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 29 OF 56

12. Counterweight

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 30 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 31 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 32 OF 56

13. Pit Set

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 33 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 34 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 35 OF 56

14. Machine Installation

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 36 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 37 OF 56

15. Roping and shaft cables

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 38 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 39 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 40 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 41 OF 56

16. Landing doors

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 42 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 43 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 44 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 45 OF 56

17. Cabin Installation

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 46 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 47 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 48 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 49 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 50 OF 56

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 51 OF 56

18. Wiring

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 52 OF 56

19. Final Inspections

Schindler Inspection, Customer Inspection, Acceptance and


Handing Over.

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 53 OF 56

20. Plant Equipment and Tools


• Fork lift for shifting
• Chain block for hoisting the machine
• Web sling for hoisting the machine
• D shekel for hoisting the machine
• Spanners (8mm to 24mm) for bolt tightening
• Screw driver for screws loose and tightining
• Line indicator for power inspection
• Multimeter for electrical installation
• Side cutter
• Cutting plier
• Nose plier
• Hammer
• Drilling machine for holes for anchor bolts
• Hack saw frame with blade for cutting the guides
• Chain block with Web sling will be used in order to hoist the machinery.

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE CLUB (RAHRC)

REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-BA-3581-00003-0000
PROJECT ID: UIR00RAH0363
PAGE 54 OF 56

21. Inspection and Test plan


Name / Signature Prepared by: Mohamed Munir Reviewed by: Krishna Pradhan Approved by: Jayaraj P.
Inspection Parties / type of
Project Inspection/ Inspection
No Description of Inspection / Testing Specification/Drawings Testing Acceptance Criteria Record (Internal Checking, Hold or Witness point)
Remarks
(ICL, TR, .etc.)
’ Reference Method ACC Cons-
ITL
SE QCI ultant

Document As per IFC drawings


1 Shop drawing submission Specification / IFC Drawings.
Review structure size and levels
Drawings C H H

Document Compliance to
2 Technical submittals Specification / IFC DRAWINGS.
Review specification and materials
Specifications C H H

Specification /Finishes
Document As per the specification
3 Material submittals Specification, Document
Review and approved finishes
Specifications C H H
(Approved M.S)
and colours

Specification / IFC Drawings/


Document As per Schindler safe Schindler
4 Method statement and Risk assessment Schindler Safe work
Review work procedure procedures
C H H
procedures

Check levels and


Visual
5 Setting Out / Survey Shop Drawings centerline of the setting ICL / SR H H H Checklist
Inspection
out as per the Grid line
provided by Main
contractor

MASS INTERNATIONAL CO. LLC


DESIGN AND BUILD OF SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE CLUB (RAHRC)

REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-BA-3581-00003-0000
PROJECT ID: UIR00RAH0363
PAGE 55 OF 56

Inspection Parties / type of


Project Inspection/ Inspection
No Description of Inspection / Specification/ Testing Acceptance Criteria Record (Internal Checking, Hold or Witness point)
Remarks
(ICL, TR, .etc.)
Testing Drawings’ Method ACC Cons-
Reference ITL
SE QCI ultant

Visual As per the Method


6 Mechanical Installation Completion Shop Drawings ICL H H H IR
Inspection statement/Schindler standards
Visual As per the Method
7 Electrical Installation Completion Shop Drawings ICL W W W Checklist
Inspection statement/Schindler standards
ICL,
Visual As per the Method Approved
8 Architectural Inspection/Mockup Shop Drawings H H H
Inspection statement/Schindler standards Material
sample
Checklist &
As per the Method
DM
Visual statement/Schindler standards/
Shop Drawings Approved H W H H Checklist
9 Testing & Commissioning Inspection Local Third-party Inspections &
Third party
Project specification
Certificate
Approval of
mechanical,
Visual Specification, Previous electrical,
10 Mechanical and Electrical Snags (if Specification C H H
Inspection inspection approvals architectural
any)
inspection
copy
Approval of
mechanical,
Shop Drawings, Visual Specification, Previous electrical,
11 H H H
Handover Material approvals Inspection inspection approvals architectural
inspection
copy
MASS INTERNATIONAL CO. LLC
DESIGN AND BUILD OF SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE CLUB (RAHRC)

REVISION DATE

C2100000213
01 20/06/2021
RAH-02-104822-BA-3581-00003-0000
PROJECT ID: UIR00RAH0363
PAGE 56 OF 56

S/C : Subcontractor
F: Foreman ICL : Inspection Check List PP: Pouring Permit
C : Internal Checking Point SE : Site Engineer
SO: Safety Officer TR : Test Report V: Visual Inspection
ABBREVIATIONS: W : Witness Point QI : Quality Inspector
DS: Document Submittal ITL : Independent Testing Lab FT : Field Test
H : Hold Point SI: Safety Inspector
TF: Transmittal Form SR : Survey Report LT : Laboratory Test
SEE: Section Engineer

MASS INTERNATIONAL CO. LLC