Professional Documents
Culture Documents
20.06.2021 - Method Statement - Schinldler Elevator
20.06.2021 - Method Statement - Schinldler Elevator
C2100000213
01 20/06/2021
RAH-02-104822-BA-3581-00003-0000
PROJECT ID: UIR00RAH0363
PAGE 1 OF 56
RAHRC
MOHAMED KRISHNA
JAYARAJ P
MUNIR PRADHAN
DESIGN AND BUILD OF
SWIMMING POOL AND
ASSOCIATED FACILITIES IN THE
CLUB (RAHRC)
REVISION DATE
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 2 OF 56
REVISION SCHEDULE
MOHAMED KRISHNA
MUNIR PRADHAN
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 3 OF 56
Table of Contents
1. Introduction
2. Scope of work
3. Materials
4. Equipment
5. Procedure
6. Installation overview
9. Scaffolding
12. Counterweight
18. Wiring
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 4 OF 56
RAHRC
Method Statement for Installation and
Commissioning of
Schindler 3300 Elevators S3300
Elevators
Rev No. Date Status Prepared by Checked by Approved by
TECHNICAL
SALES SALES AND FIELD
01 20.06.2021
COORDINATOR ENGINEER OPERATION
HEAD
MOHAMED KRISHNA
JAYARAJ P
MUNIR PRADHAN
Consultant Comments
Review Comments
Approved with
Approved A B Revise and Re-submit C Rejected D
comments
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 5 OF 56
Issue Record
MOHAMED MUNIR
Prepared By: SALES COORDINATOR
20.06.2021
KRISHNA PRADHAN
Reviewed By: SALES ENGINEER
20.06.2021
JAYARAJ P
Approved By TECHNICAL AND FIELD 20.06.2021
OPERATIONS HEAD
Approved By
PDO:
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 6 OF 56
1. Introduction
This method statement serves to outline the steps and actions that Schindler will adopt to undertake
the installation of Machine-Room-Less Elevators.
2. Scope of Work
This method statement covers the complete works required to offload, shift, install, test, commission
and hand-over the elevators installed by Schindler
3. Materials
1. Schindler elevator materials (including doors, brackets, guiderails, cars, ropes, etc…)
2. Scaffolding (by main contractor)
4. Equipment
1. General hand tools (i.e.: Screw-drivers, wrenches, pliers, cutters, etc…)
2. Electrical tool-set (hand-drill, grinder, cutter)
3. Electrical hoists
4. Shifting equipment (Boom loaders, hydraulic trolleys, etc…)
5. PPEs (gloves, goggles, hard hats, plastic gloves)
5. Procedure
1. Material receipt at site (in standard 40 feet containers)
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 7 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 8 OF 56
6. Installation Overview
Inspection Inspect site, with attention to Hoistway and Machine room
Scaffolding Install and check Scaffolding by authorized Scaffolding Installer
Hoistway Material Clean guide rails
Install Pit Ladder
Install Guide Rail Brackets
Install Guide rails and fishplates
Install Pit set
Install Counterweight
Install Machine support (CW Fix point)
Install U-Beams (Car Fix point)
Install LMS
Machine Lift Machine to Hoistway Head
Install Machine
Connect Machine Electrically
Landing Door Entrances Install and Check Landing Door
Scaffolding Remove lower Scaffolding
Control Install Control Box in Landing Door Frame
Install Control modules
Car Install Car Sling (Lower Yoke, Uprights, Upper Yoke)
Install Safety Gears
Install Platform
Install Car Walls
Install COP
Install Service Platform
Install Guide Shoes
Install Door Drive
Install Interior
Connect Car Electrically
Suspension Ropes Install Suspension Ropes
Governor System Install Tension Weight
Install Governor
Install Governor Rope
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 9 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 10 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 11 OF 56
9. Scaffolding
Note: It is suggested that no high rise hoistways the scaffolding
be built in stage with each new section being supported on
beams designed to support the scaffolding weight.
Make sure that the site dimensions have been checked against
the elevator layout drawings.
Check that hoistway is clear of debris
Determine position of scaffolding so that it does not interfere
with the plumb lines and guide rails.
Position timber on the pit floor to form level base for scaffold
erection.
Assemble scaffolding framework installing tie rods at intervals
for stability
For an easy access of the machine, make sure that the
uppermost platform is installed with a distance 1.2 to 1.3 meter.
Observer safety precautions (for example, erection of safe
working platform, kick boards, ladders and barriers)
Third party certification to be provided once scaffold complete, with scaff tag prior to access for lift
technicians.
Weekly inspection to be conducted by competent scaffold supervisor or if there is any major changes
in weather which could affect scaffolding.
Note: Under No circumstances is Schindler to alter the scaffold. Any amendment to scaffold must be
first advised to third party scaffold team + BM Safety dept.
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 12 OF 56
Drop Plumb lines for car and counterweight guide rails and door positioning.
Check the position of plumb line with reference to hoistway and door openings.
Prepare table showing the dimensions from each line to the hoistway wall for each floor and take these
measurements and record them in the table.
Check that the dimensions are adequate to accommodate the elevator(s) and if not arrange the plumb
line(s) to obtain the optimum position.
Discuss the table with the builder, explaining any problems that may occur and if both parties are
agreed have the builder date and sign the table.
Keep copies of the dimension table on site and in the office file.
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 13 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 14 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 15 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 16 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 17 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 18 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 19 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 20 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 21 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 22 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 23 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 24 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 25 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 26 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 27 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 28 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 29 OF 56
12. Counterweight
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 30 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 31 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 32 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 33 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 34 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 35 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 36 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 37 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 38 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 39 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 40 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 41 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 42 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 43 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 44 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 45 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 46 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 47 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 48 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 49 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 50 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 51 OF 56
18. Wiring
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 52 OF 56
C2100000213
01 20/06/2021
RAH-02-104822-QA-5733-00001-0000
PROJECT ID: UIR00RAH0363
PAGE 53 OF 56
REVISION DATE
C2100000213
01 20/06/2021
RAH-02-104822-BA-3581-00003-0000
PROJECT ID: UIR00RAH0363
PAGE 54 OF 56
Document Compliance to
2 Technical submittals Specification / IFC DRAWINGS.
Review specification and materials
Specifications C H H
Specification /Finishes
Document As per the specification
3 Material submittals Specification, Document
Review and approved finishes
Specifications C H H
(Approved M.S)
and colours
REVISION DATE
C2100000213
01 20/06/2021
RAH-02-104822-BA-3581-00003-0000
PROJECT ID: UIR00RAH0363
PAGE 55 OF 56
REVISION DATE
C2100000213
01 20/06/2021
RAH-02-104822-BA-3581-00003-0000
PROJECT ID: UIR00RAH0363
PAGE 56 OF 56
S/C : Subcontractor
F: Foreman ICL : Inspection Check List PP: Pouring Permit
C : Internal Checking Point SE : Site Engineer
SO: Safety Officer TR : Test Report V: Visual Inspection
ABBREVIATIONS: W : Witness Point QI : Quality Inspector
DS: Document Submittal ITL : Independent Testing Lab FT : Field Test
H : Hold Point SI: Safety Inspector
TF: Transmittal Form SR : Survey Report LT : Laboratory Test
SEE: Section Engineer