Professional Documents
Culture Documents
PF2.0 Dwgs Set
PF2.0 Dwgs Set
OIL DISCHARGE
ABSORBER FLUSHING FROM 1st STAGE
LINE TO BILGE TANK TO SLUDGE TANK
ISOLATION VALVE
OW002
OVERBOARD
DISCHARGE LINE
BILGE PUMP
BP
C BP DRY RUNNING C
PROTECTION LINE
ISOLATION VALVE
OW003
NON-RETURN VALVE
BACKWASH LINE OW001
BILGE PUMP SECOND STAGE
BP "ABSORBER"
BILGE TANK
SUCTION HEIGHT
MAXIMUM 5m
ELECTRICAL DATA
TYPE FIT 0.25 FIT 0.5 FIT 1.0 FIT 2.0/2.5 FIT 5.0 FIT 7.5 FIT 10.0
CAPACITY (m /h) 0.25 0.5 1 2.0/2.5 5 7.5 10
B PUMP (KW) 0.37 0.75 0.75 0.75 1.5 1.5 1.5 B
ELECTRIC HEATER (KW) - - - 3.0 3.0 3.63 3.0
CONTROL PANEL (W) 160 160 160 160 160 160 160
RATED CURRENT (A) 1.21 1.21 2 2.8 3.6 5.1 6.4
STARTING CURRENT (A) 3.5 3.5 12 16.8 21.6 30.6 38.4
NOTE: The presented instalation arrangement is for reference only TOTAL POWER CONSUMPTION (KW) 0.53 0.91 0.91 3.91 4.66 4.66 4.66
FIRST STAGE (SLUDGE LINE) (DN15) (DN15) (DN20) (DN25) (DN25) (DN25) (DN25) (DN25) MILLIMETERS WITHOUT WRITTEN PERMISSION FROM EPE.
OIL FLUSHING LINE FROM 1/2" 1/2" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" DIMENSIONS IN BRACKETS ARE DESIGNED BY: THIS DOCUMENT SHALL NOT
A SECOND STAGE (BILGE LINE) (DN15) (DN15) (DN20) (DN20) (DN20) (DN20) (DN20) (DN20)
IN INCHES S. Kardaris BE DUPLICATED IN WHOLE OR IN PART. A
1/2" 1/2" 1" 1 1/4" 1 1/4" 1 1/2" 1 1/2" 1 1/2"
OVERBOARD DISCHARGE LINE
(DN15) (DN15) (DN25) (DN32) (DN32) (DN40) (DN40) (DN40) CHECKED BY: TITLE: Poseidon FIT 2.0 instalation drawing
FIRST ANGLE PROJECTION DESCRIPTION: System instalation drawing
RETURN TO BILGE
1/2"
(DN15)
1/2"
(DN15)
1"
(DN25)
1 1/4"
(DN32)
1 1/4"
(DN32)
1 1/2"
(DN40)
1 1/2"
(DN40)
1 1/2"
(DN40)
N. Kyritsis
WEIGHT (Kg) APPROVED BY: SIZE: A3 DRAWING No: INSTDR-PF-2.0-O
EMPTY 157 157 400 720 650 845 870 1060
K. Stampedakis SCALE: 1:17 REVISION: - SHEET No: 1/2
IN OPERATION 215 215 500 890 800 2050 2100 2300
6 5 4 3 2 1
6 5 4 3 2 1
D D
1000
600
2675
2206
1006
C C
1675
600
B 100 1633 600 B
2333
14 5 4 4 14
88 235 25 113
D 2 1 D
25
11 13 7
18 7 6 1 12
11 10
15
12
700 21
1675
21
140
1530
1519
18
1082
18
944
704
902
460 13
90
8
785
17
C 26 C
230
26
100
673
3 23
19 20 4
53
461
10 13 15
336
73
180
380
8
140
38 90
760
B 11 B
135
7
380
464
25 STATUS: ............ PROJECT: ............
18 6 5 1 VESSEL: ......... SHIPYARD: ............
24 2 3 23 14
UNLESS OTHERWISE SPECIFIED RELEASE DATE THIS DRAWING CONTAINS PROPRIETARY
INFORMATION. SUCH INFORMATION SHALL
HYDRAULIC CONNECTIONS (DY-MO-YEAR) NOT BE PUBLISHED OR DISCLOSED TO
epe
ALL DIMENSIONS ARE IN 17/12/2016 Engineered to Respond
Line Name Standard OTHERS OR USED FOR ANY PURPOSE
Bilge inlet MILLIMETERS WITHOUT WRITTEN PERMISSION FROM EPE.
ISO DN50 PN10 DESIGNED BY:
DIMENSIONS IN BRACKETS ARE THIS DOCUMENT SHALL NOT
A Backwash line " IN INCHES S. Kardaris BE DUPLICATED IN WHOLE OR IN PART. A
Oil Discharge Line 1" CHECKED BY: TITLE: Poseidon FIT 2.0 ov/iew & dim/sions drawings
Oil Flushing Line " FIRST ANGLE PROJECTION DESCRIPTION: Overview & dimensions drawing
N. Kyritsis
Overboard Discharge Line ISO DN32 PN10 SIZE: A3 DRAWING No: OVDIM-PF-2.0-O
Back to Bilges Line ISO DN32 PN10 APPROVED BY:
K. Stampedakis SCALE: 1:17 REVISION: - SHEET No: 1/3
Compressed air supply connection 8 copper tube
6 5 4 3 2 1
6 5 4 3 2 1
D D
PART LIST
No. DESCRIPTION Standard Part Number Comments
1 Control panel - 25-5005
2 Oil content monitor device - 25-9009 (5ppm), 25-9012 (15ppm)
3 Backwash valve (FW004) 3/4" BSP thread 25-2020
4 First stage oil discharge valve (SL002) 1" BSP thread 25-2021
5 1st stage Oil level detection device (OD001) - 25-8004
6 2nd stage oil level detection device (OD002) - 25-8025
7 Second stage oil flushing valve (BL001) 3/4" BSP thread 25-6003
8 Bilge inlet Flange ISO DN 50, PN10
9 Bilge pump Inlet DN50 PN10, outlet DN50 PN10 25-1606-000 Loose supply item
10 No1 3-way shutter valve (BW002) 1 1/4" BSP thread 25-2031
C 11 No2 3-way shutter valve (BW005) 1 1/4" BSP thread 25-2031 C
12 Manual 3-way valve (BW007) 1 1/4" BSP thread 25-2034
13 2-way sampling solenoid valves (BS001, BS002) 1/4" BSP thread 25-2000-013
14 1st stage pressure gauge (PI001) - 25-8001
15 Pressure relief valve SV001 (activation at 6 bars) 3/4" BSP thread 25-6003
16 Sampling point No 1 1/4"
17 Sampling point No 2 1/4"
18 2nd stage & 2nd stage effluent line pressure gauge (PI002, PI003) - 25-8001
19 Compressed air supply connection 8 copper tube
20 Air pressure regulator valve (CA001) - 25-8021
21 Ball valve DN32 (BW004) 1 1/4" BSP thread 203085
22 Ball valve DN32 (BW001) 1 1/4" BSP thread 203085
23 Backwash line pressure reduction valve (FW003) 3/4" BSP thread 20-3209
24 Backwash non-return valve (FW005-FW006) 3/4" BSP thread 203209
B 25 Heater - 25-8012 B
26 2nd stage outlet non-return valve (BW003) 1 1/4" 25-6011
D D
18
x)
C (6 C
710
25
B B
DN32
DN20
BW006
DN25
BL002
SL003
SAMPLE
DN25
TO BILGE
DN20
DN32
DN32
PI004 BILGE
+
ALARM
FW IN MONITOR
Ø8 copper tube
SAMPLE
BL001
NOTE 1
BW007 BW005 BW004 BW002
BW008 SL002
No.2 No.1
DN32 DN32 DN32
DISCHARGE TO OD001
OVERBOARD NOTE 2 VV001
PI001
PI002
VV002
TI001 +
+
DN32
OD002
PI003
+ SL001
FIRST STAGE
BS001
ELECTRIC
MS001
SAMPLE HEATER
SAMPLE SECOND POINT A
CA DISTRIBUTION POINT B STAGE
BLOCK "ABSORBER" SV001
CA IN PI004 COALESCING FILTER
4-6 bar CA001 +
Ø8 copper tube connection NOTE 3 BS002
CA PRESSURE BW003
REGULATION VALVE OW003
DN32
DV002 DV001
DN50 DN50
BW001
FW006 BILGE PUMP
OW002
FW004 FW005
F001
BACKWASH WATER PRESSURE
FW003
REGULATION VALVE
FW002
DN20
COMPRESSED AIR LINE FOR PUMP DRY
RUNNING PROTECTION SUCTION LINE OW001
SAMPLE WATER LINE FW001 FROM BILGE Tk.
EPE scope of supply
363 87 403 40 70
(4x) 12
20
17 23
15
12
D D
104
75
75
15
20
38 34 15
150
225
Dismantling space
143
143
80
C C
125
90
90
963 225
B B
156
90
Pump's inlet connection
Flange ISO PN 10, DN50
(4x) 19
6 5 4 3 2 1
6 5 4 3 2 1
D D
C C
B B
6 5 4 3 2 1
6 5 4 3 2 1
D D
54
48
23
40
3
182
Sensor unit
C C
135 Fresh water manual valve Master unit
240
175
175
94
94
40
39
16
23
B B
48 3 OMD drain outlet
54 1/4" BSP thread OMD sampling inlet
8 copper tube
89
99
Fresh water supply is 200-300 lt/h at 1-2 bars. Fresh water is consumed if monitor autoflush feature is activated, flushing at operator's choice of intervals Checked: Nick Kyritsis Date: 10/1/2017
and durations when OWS is not in operation and if oil content exceeds the alarm limit for more than 60 seconds when the OWS is in operation. Size: Sheet number:
Approved: Konstantinos Stampedakis Date: 26/11/2016 A3 1 /2
6 5 4 3 2 1
6 5 4 3 2 1
D D
C C
B B
6 5 4 3 2 1
3x380-440V@50/60Hz