6 5 4 3 2 1

OIL DISCHARGE
ABSORBER FLUSHING FROM 1st STAGE
LINE TO BILGE TANK TO SLUDGE TANK

BACK TO BILGE LINE


D D
FIRST STAGE
COARSE SCREEN
F001 (2mm sustested opening)

ISOLATION VALVE
OW002

OVERBOARD
DISCHARGE LINE
BILGE PUMP
BP
C BP DRY RUNNING C
PROTECTION LINE
ISOLATION VALVE
OW003

NON-RETURN VALVE
BACKWASH LINE OW001
BILGE PUMP SECOND STAGE
BP "ABSORBER"

BILGE TANK

SUCTION HEIGHT
MAXIMUM 5m
ELECTRICAL DATA
TYPE FIT 0.25 FIT 0.5 FIT 1.0 FIT 2.0/2.5 FIT 5.0 FIT 7.5 FIT 10.0
CAPACITY (m /h) 0.25 0.5 1 2.0/2.5 5 7.5 10
B PUMP (KW) 0.37 0.75 0.75 0.75 1.5 1.5 1.5 B
ELECTRIC HEATER (KW) - - - 3.0 3.0 3.63 3.0
CONTROL PANEL (W) 160 160 160 160 160 160 160
RATED CURRENT (A) 1.21 1.21 2 2.8 3.6 5.1 6.4
STARTING CURRENT (A) 3.5 3.5 12 16.8 21.6 30.6 38.4
NOTE: The presented instalation arrangement is for reference only TOTAL POWER CONSUMPTION (KW) 0.53 0.91 0.91 3.91 4.66 4.66 4.66

TECHNICAL DATA STATUS: ............ PROJECT: ............


TYPE FIT 0.25 FIT 0.5 FIT 1.0 FIT 2.0 FIT 2.5 FIT 5.0 FIT 7.5 FIT 10.0
CAPACITY (m /h) 0.25 0.5 1 2.0 2.5 5 7.5 10
PIPING VESSEL: ......... SHIPYARD: ............
1" 1" 1 1/2" 2" 2" 3" 3" 3"
BILGE INLET
(DN25) (DN25) (DN40) (DN50) (DN50) (DN80) (DN80) (DN80) UNLESS OTHERWISE SPECIFIED RELEASE DATE THIS DRAWING CONTAINS PROPRIETARY
INFORMATION. SUCH INFORMATION SHALL
BACKWASH LINE
1/2"
(DN15)
1/2"
(DN15)
3/4"
(DN20)
3/4"
(DN20)
3/4"
(DN20)
3/4"
(DN20)
3/4"
(DN20)
3/4"
(DN20)
(DY-MO-YEAR) NOT BE PUBLISHED OR DISCLOSED TO
epe
OIL DISCHARGE LINE FROM 1/2" 1/2" 3/4" 1" 1" 1" 1" 1" ALL DIMENSIONS ARE IN 17/12/2016 OTHERS OR USED FOR ANY PURPOSE
Engineered to Respond

FIRST STAGE (SLUDGE LINE) (DN15) (DN15) (DN20) (DN25) (DN25) (DN25) (DN25) (DN25) MILLIMETERS WITHOUT WRITTEN PERMISSION FROM EPE.
OIL FLUSHING LINE FROM 1/2" 1/2" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" DIMENSIONS IN BRACKETS ARE DESIGNED BY: THIS DOCUMENT SHALL NOT
A SECOND STAGE (BILGE LINE) (DN15) (DN15) (DN20) (DN20) (DN20) (DN20) (DN20) (DN20)
IN INCHES S. Kardaris BE DUPLICATED IN WHOLE OR IN PART. A
1/2" 1/2" 1" 1 1/4" 1 1/4" 1 1/2" 1 1/2" 1 1/2"
OVERBOARD DISCHARGE LINE
(DN15) (DN15) (DN25) (DN32) (DN32) (DN40) (DN40) (DN40) CHECKED BY: TITLE: Poseidon FIT 2.0 instalation drawing
FIRST ANGLE PROJECTION DESCRIPTION: System instalation drawing
RETURN TO BILGE
1/2"
(DN15)
1/2"
(DN15)
1"
(DN25)
1 1/4"
(DN32)
1 1/4"
(DN32)
1 1/2"
(DN40)
1 1/2"
(DN40)
1 1/2"
(DN40)
N. Kyritsis
WEIGHT (Kg) APPROVED BY: SIZE: A3 DRAWING No: INSTDR-PF-2.0-O
EMPTY 157 157 400 720 650 845 870 1060
K. Stampedakis SCALE: 1:17 REVISION: - SHEET No: 1/2
IN OPERATION 215 215 500 890 800 2050 2100 2300
6 5 4 3 2 1
6 5 4 3 2 1

D D

1000
600

2675
2206

1006
C C

1675
600
B 100 1633 600 B
2333

STATUS: ............ PROJECT: ............

VESSEL: ......... SHIPYARD: ............


UNLESS OTHERWISE SPECIFIED RELEASE DATE THIS DRAWING CONTAINS PROPRIETARY
INFORMATION. SUCH INFORMATION SHALL
(DY-MO-YEAR) NOT BE PUBLISHED OR DISCLOSED TO
epe
ALL DIMENSIONS ARE IN 17/12/2016 OTHERS OR USED FOR ANY PURPOSE
Engineered to Respond

MILLIMETERS WITHOUT WRITTEN PERMISSION FROM EPE.


DIMENSIONS IN BRACKETS ARE DESIGNED BY: THIS DOCUMENT SHALL NOT
A IN INCHES S. Kardaris BE DUPLICATED IN WHOLE OR IN PART. A
CHECKED BY: TITLE: Poseidon FIT 2.0 instalation drawing
FIRST ANGLE PROJECTION DESCRIPTION: maintenance space
N. Kyritsis
APPROVED BY: SIZE: A3 DRAWING No: INSTDR-PF-2.0-O
K. Stampedakis SCALE: 1:15 REVISION: - SHEET No: 2/2
6 5 4 3 2 1
6 5 4 3 2 1

14 5 4 4 14
88 235 25 113

D 2 1 D
25
11 13 7
18 7 6 1 12
11 10

15
12
700 21

1675
21

140
1530
1519
18

1082
18

944
704

902
460 13
90
8

785
17
C 26 C

230
26
100

1450 160 60 760


24 380 22 260
16

673
3 23
19 20 4
53
461

10 13 15
336
73
180

380

8
140

38 90

760

B 11 B
135

7
380

464
25 STATUS: ............ PROJECT: ............
18 6 5 1 VESSEL: ......... SHIPYARD: ............
24 2 3 23 14
UNLESS OTHERWISE SPECIFIED RELEASE DATE THIS DRAWING CONTAINS PROPRIETARY
INFORMATION. SUCH INFORMATION SHALL
HYDRAULIC CONNECTIONS (DY-MO-YEAR) NOT BE PUBLISHED OR DISCLOSED TO
epe
ALL DIMENSIONS ARE IN 17/12/2016 Engineered to Respond
Line Name Standard OTHERS OR USED FOR ANY PURPOSE
Bilge inlet MILLIMETERS WITHOUT WRITTEN PERMISSION FROM EPE.
ISO DN50 PN10 DESIGNED BY:
DIMENSIONS IN BRACKETS ARE THIS DOCUMENT SHALL NOT
A Backwash line " IN INCHES S. Kardaris BE DUPLICATED IN WHOLE OR IN PART. A
Oil Discharge Line 1" CHECKED BY: TITLE: Poseidon FIT 2.0 ov/iew & dim/sions drawings
Oil Flushing Line " FIRST ANGLE PROJECTION DESCRIPTION: Overview & dimensions drawing
N. Kyritsis
Overboard Discharge Line ISO DN32 PN10 SIZE: A3 DRAWING No: OVDIM-PF-2.0-O
Back to Bilges Line ISO DN32 PN10 APPROVED BY:
K. Stampedakis SCALE: 1:17 REVISION: - SHEET No: 1/3
Compressed air supply connection 8 copper tube
6 5 4 3 2 1
6 5 4 3 2 1

D D

PART LIST
No. DESCRIPTION Standard Part Number Comments
1 Control panel - 25-5005
2 Oil content monitor device - 25-9009 (5ppm), 25-9012 (15ppm)
3 Backwash valve (FW004) 3/4" BSP thread 25-2020
4 First stage oil discharge valve (SL002) 1" BSP thread 25-2021
5 1st stage Oil level detection device (OD001) - 25-8004
6 2nd stage oil level detection device (OD002) - 25-8025
7 Second stage oil flushing valve (BL001) 3/4" BSP thread 25-6003
8 Bilge inlet Flange ISO DN 50, PN10
9 Bilge pump Inlet DN50 PN10, outlet DN50 PN10 25-1606-000 Loose supply item
10 No1 3-way shutter valve (BW002) 1 1/4" BSP thread 25-2031
C 11 No2 3-way shutter valve (BW005) 1 1/4" BSP thread 25-2031 C
12 Manual 3-way valve (BW007) 1 1/4" BSP thread 25-2034
13 2-way sampling solenoid valves (BS001, BS002) 1/4" BSP thread 25-2000-013
14 1st stage pressure gauge (PI001) - 25-8001
15 Pressure relief valve SV001 (activation at 6 bars) 3/4" BSP thread 25-6003
16 Sampling point No 1 1/4"
17 Sampling point No 2 1/4"
18 2nd stage & 2nd stage effluent line pressure gauge (PI002, PI003) - 25-8001
19 Compressed air supply connection 8 copper tube
20 Air pressure regulator valve (CA001) - 25-8021
21 Ball valve DN32 (BW004) 1 1/4" BSP thread 203085
22 Ball valve DN32 (BW001) 1 1/4" BSP thread 203085
23 Backwash line pressure reduction valve (FW003) 3/4" BSP thread 20-3209
24 Backwash non-return valve (FW005-FW006) 3/4" BSP thread 203209
B 25 Heater - 25-8012 B
26 2nd stage outlet non-return valve (BW003) 1 1/4" 25-6011

STATUS: ............ PROJECT: ............

VESSEL: ......... SHIPYARD: ............


UNLESS OTHERWISE SPECIFIED RELEASE DATE THIS DRAWING CONTAINS PROPRIETARY
INFORMATION. SUCH INFORMATION SHALL
(DY-MO-YEAR) NOT BE PUBLISHED OR DISCLOSED TO
epe
ALL DIMENSIONS ARE IN 17/12/2016 OTHERS OR USED FOR ANY PURPOSE
Engineered to Respond

MILLIMETERS WITHOUT WRITTEN PERMISSION FROM EPE.


DIMENSIONS IN BRACKETS ARE DESIGNED BY: THIS DOCUMENT SHALL NOT
A IN INCHES S. Kardaris BE DUPLICATED IN WHOLE OR IN PART. A
CHECKED BY: TITLE: Poseidon FIT 2.0 ov/iew & dim/sions drawings
FIRST ANGLE PROJECTION DESCRIPTION: Part list
N. Kyritsis
APPROVED BY: SIZE: A3 DRAWING No: OVDIM-PF-2.0-O
K. Stampedakis SCALE: REVISION: - SHEET No: 2/3
6 5 4 3 2 1
6 5 4 3 2 1

D D

100 625 625 100


25

18
x)
C (6 C
710
25

B B

STATUS: ............ PROJECT: ............

VESSEL: ......... SHIPYARD: ............


UNLESS OTHERWISE SPECIFIED RELEASE DATE THIS DRAWING CONTAINS PROPRIETARY
INFORMATION. SUCH INFORMATION SHALL
(DY-MO-YEAR) NOT BE PUBLISHED OR DISCLOSED TO
epe
ALL DIMENSIONS ARE IN 17/12/2016 OTHERS OR USED FOR ANY PURPOSE
Engineered to Respond

MILLIMETERS WITHOUT WRITTEN PERMISSION FROM EPE.


DIMENSIONS IN BRACKETS ARE DESIGNED BY: THIS DOCUMENT SHALL NOT
A IN INCHES S. Kardaris BE DUPLICATED IN WHOLE OR IN PART. A
CHECKED BY: TITLE: Poseidon FIT 2.0 ov/iew & dim/sions drawings
FIRST ANGLE PROJECTION DESCRIPTION: Foundation drawing
N. Kyritsis
APPROVED BY: SIZE: A3 DRAWING No: OVDIM-PF-2.0-O
K. Stampedakis SCALE: 1:10 REVISION: - SHEET No: 3/3
6 5 4 3 2 1
OIL DISCHARGE
TO BILGE TK
ABSORBER FLUSHING TO SLUDGE TK
LINE TO BILGE TK

DN32

DN20
BW006

DN25
BL002
SL003

SAMPLE

DN25
TO BILGE

DN20
DN32

DN32
PI004 BILGE
+
ALARM
FW IN MONITOR
Ø8 copper tube

SAMPLE
BL001
NOTE 1
BW007 BW005 BW004 BW002
BW008 SL002
No.2 No.1
DN32 DN32 DN32

DISCHARGE TO OD001
OVERBOARD NOTE 2 VV001
PI001
PI002

VV002
TI001 +
+

DN32
OD002
PI003
+ SL001
FIRST STAGE
BS001
ELECTRIC

MS001
SAMPLE HEATER
SAMPLE SECOND POINT A
CA DISTRIBUTION POINT B STAGE
BLOCK "ABSORBER" SV001
CA IN PI004 COALESCING FILTER
4-6 bar CA001 +
Ø8 copper tube connection NOTE 3 BS002

CA PRESSURE BW003
REGULATION VALVE OW003

DN32
DV002 DV001
DN50 DN50

BW001
FW006 BILGE PUMP
OW002

FW004 FW005

F001
BACKWASH WATER PRESSURE
FW003
REGULATION VALVE

FW002
DN20
COMPRESSED AIR LINE FOR PUMP DRY
RUNNING PROTECTION SUCTION LINE OW001
SAMPLE WATER LINE FW001 FROM BILGE Tk.
EPE scope of supply

3 WAY PNEUMATIC PISTON VALVE BACKWASH


LINE 2-4 bar
3 WAY BALL VALVE MANUAL OPERATED

epe Title: Poseidon FIT 2.0 Process Flow Diagram Revision


SOLENOID VALVE
Engineered to Respond -
Schisto Industrial Park (VIPAS) Block 13
2 WAY PNEUMATIC PISTON VALVE Keratsiniou - Skaramaga ave. Description: ....... Status
188 63 Perama, Greece
Tel: (+30)210 4093000, Fax: (+30)210 4015503 ....
BALL VALVE http:// www.ermafirst.com

GLOBE VALVE Project: .... Drawing Nr: DIAG-PF-2.0 Model:


NOTES:
PF 2.0
NON RETURN VALVE Hull Nr: ..... Shipyard: ....
1. FIRST STAGE EFFLUENT LESS THAN 4/14ppm TO OVERBOARD MORE THAN 4/14ppm VIA SECOND STAGE
SAFETY VALVE (ACTIVATION PRESSURE 5 bar) 2. SECOND STAGE INLET FROM FIRST STAGE MORE THAN 4/14ppm Drawn: Stathis Kardaris Date: 16/12/20116 Scale:
3. SECOND STAGE EFFLUENT LESS THAN 5/15ppm TO OVERBOARD MORE THAN 5/15ppm TO BILGE Tk
+ 4. BILGE PUMP, LOOSE SUPPLY. MAXIMUM SUCTION HEAD, 5m
PRESSURE GAUGE
5. COMPRESSED AIR CONNECTION, ATTACHED ON 2nd STAGE Checked: Nick Kyritsis Date: 16/12/2016
± COMBINED PRESSURE VACUUM 6. SUGGESTED SCREEN OPENING, 2mm Size: Sheet number:
GAUGE
7. BACKWASH LINE WATER SHOULD HAVE CONDUCTIVITY MORE THAN 5μS/cm. POTENTIAL PROBLEM WHEN FW GEN. IS USED WITHOUT Approved: Konstantinos Stampedakis Date: 16/12/2016 A3 1/1
REHARDENING FILTER
PIPING LOOP 8. BW004 VALVE MUST BE ADJUSTED FOR BACK-PRESSURE 1.5-2 BAR AT PI003 WITH 2ND's STAGE CARTRIDGE FILTERS CLEANED
9. AT BACKWASH INLET, FW003 PRESSURE REDUCTION VALVE CAN BE ADJUSTED BETWEEN 2-4 BAR THOUGHT
COMPONENTS ID TABLE COMPONENTS ID TABLE
TAG NAME DESCRIPTION STANDARD SUPPLY TAG NAME DESCRIPTION STANDARD SUPPLY
BL001 PNEUMATIC PISTON V/V DN20 EPE FW002 GLOBE V/V DN20 SHIPYARD
BL002 GLOBE V/V DN20 SHIPYARD FW003 PRESSURE REGULATION DN20 EPE
BS001 SOLENOID V/V DN8 EPE V/V
BS002 SOLENOID V/V DN8 EPE FW004 PNEUMATIC PISTON V/V DN20 EPE
BW001 BALL V/V DN32 EPE FW005 NON-RETURN V/V DN20 EPE
FW006 NON-RETURN V/V DN20 EPE
BW002 3-WAY PNEUMATIC DN32 EPE
MS001 MANUAL SAMPLING DN8 EPE
PISTON V/V
BALL V/V
BW003 NON-RETURN V/V DN32 EPE
OD001-2 OIL DETECTORS - EPE
BW004 BALL V/V DN32 EPE
OW001 NON-RETURN DN50 SHIPYARD
BW005 3-WAY PNEUMATIC DN32 EPE
OW002 GLOBE V/V DN50 SHIPYARD
PISTON V/V
OW003 GLOBE V/V DN50 SHIPYARD
BW006 GLOBE V/V DN32 SHIPYARD
BW007 3-WAY BALL V/V DN32 EPE PI001-4 PRESSURE INDICATORS - EPE
BW008 DN32 SHIPYARD SL001 NON-RETURN VALVE DN32 EPE
GLOBE V/V
CA001 PRESSURE REGULATION DN8 EPE SL002 PNEUMATIC PISTON V/V DN25 EPE
V/V SL003 GLOBE V/V DN25 SHIPYARD
DV001 DRAIN BALL V/V DN20 EPE SV001 SAFETY RELIEF V/V DN20 EPE
DV002 DRAIN BALL V/V DN20 EPE TI001 TEMPERATURE - EPE
F001 SCREEN DN50 SHIPYARD INDICATOR
FW001 GLOBE V/V DN20 SHIPYARD VV001 BALL V/V DN8 EPE
VV002 BALL V/V DN8 EPE

epe Title: Poseidon FIT 2.0 Process Flow Diagram Revision


Engineered to Respond -
Schisto Industrial Park (VIPAS) Block 13
Keratsiniou - Skaramaga ave. Description: Components ID table Status
188 63 Perama, Greece
Tel: (+30)210 4093000, Fax: (+30)210 4015503 ....
http:// www.ermafirst.com

Project: .... Drawing Nr: DIAG-PF-2.0 Model:


PF 2.0
Hull Nr: ..... Shipyard: ....

Drawn: Stathis Kardaris Date: 16/12/2016 Scale:

Checked: Nick Kyritsis Date: 16/12/2016


Size: Sheet number:
Approved: Konstantinos Stampedakis Date: 16/12/2016 A3 2/2
6 5 4 3 2 1

363 87 403 40 70
(4x) 12

20
17 23

15

12
D D

104
75

75
15
20
38 34 15
150

225
Dismantling space

143
143

80
C C

125
90

90
963 225

Pump's outlet connection


Flange ISO PN 10, DN50
963
388
121

B B
156

90
Pump's inlet connection
Flange ISO PN 10, DN50

(4x) 19

epe Title: Bilge pump 2 m /h Revision


-
Engineered to Respond
Schisto Industrial Park (VIPAS) Block 13
Keratsiniou - Skaramaga ave. Description: Pump overview & dimensions Status
188 63 Perama, Greece
Tel: (+30)210 4093000, Fax: (+30)210 4015503 For offer
http:// www.epe.gr

Project: Drawing Nr: BP-2 ROTO-O Model:


Poseidon FIT
Hull Nr: Shipyard:
2.0
A A
Drawn: Stathis Kardaris Date: 16/6/2017 Scale:

Power consumption: 0.75 kW Checked: Nick Kyritsis Date: 16/6/2017


Protection degree: IP55 Size: Sheet number:
Weight: About 50 Kgr Approved: Konstantinos Stampedakis Date: 16/6/2017 A3 1 /2

6 5 4 3 2 1
6 5 4 3 2 1

D D

C C

B B

epe Title: Bilge pump 2 m /h Revision


-
Engineered to Respond
Schisto Industrial Park (VIPAS) Block 13
Keratsiniou - Skaramaga ave. Description: Pump performance curves Status
188 63 Perama, Greece
Tel: (+30)210 4093000, Fax: (+30)210 4015503 For offer
http:// www.epe.gr

Project: Drawing Nr: BP-2 ROTO-O Model:


Poseidon FIT
Hull Nr: Shipyard:
2.0
A A
Drawn: Stathis Kardaris Date: 16/6/2017 Scale:

Checked: Nick Kyritsis Date: 16/6/2017


Size: Sheet number:
Approved: Konstantinos Stampedakis Date: 16/6/2017 A3 2 /2

6 5 4 3 2 1
6 5 4 3 2 1

D D

54
48
23
40

3
182

OMD sampling outlet


Back to bilge 360
8 copper tube OMD sampling outlet
20 160 160 20 Back to bilge Solenoid valve
8 copper tube
(6x) 9 180
47

Sensor unit
C C
135 Fresh water manual valve Master unit

Fresh water inlet Fresh water inlet


8 copper tube 37 8 copper tube
240

240
175

175
94

94
40
39
16

23
B B
48 3 OMD drain outlet
54 1/4" BSP thread OMD sampling inlet
8 copper tube
89
99

epe Title: BilgMon 488 OMD drawing Revision


Oil range: 0-30 ppm -
Engineered to Respond
Resolution: 0.1 ppm Schisto Industrial Park (VIPAS) Block 13
Accurancy: Acc. to IMO MEPC. 107 (49) Keratsiniou - Skaramaga ave. Description: OMD overview & dimensions Status
188 63 Perama, Greece
Tel: (+30)210 4093000, Fax: (+30)210 4015503 For offer
http:// www.epe.gr
Power supply: 230V AC 50-60 Hz
Current output: 0-20 mA Project: Drawing Nr: OMD-BILGMON 488-O Model:
IP degree: 65
Hull Nr: Shipyard:
Note: Fresh water manual valve should be normally closed and should be opened before fresh before initiation of cleaning cell process.
A A
Additionally, is closed during maintenance works to isolate the sensor. Drawn: Stathis Kardaris Date: 10/1/2017 Scale:

Fresh water supply is 200-300 lt/h at 1-2 bars. Fresh water is consumed if monitor autoflush feature is activated, flushing at operator's choice of intervals Checked: Nick Kyritsis Date: 10/1/2017
and durations when OWS is not in operation and if oil content exceeds the alarm limit for more than 60 seconds when the OWS is in operation. Size: Sheet number:
Approved: Konstantinos Stampedakis Date: 26/11/2016 A3 1 /2

6 5 4 3 2 1
6 5 4 3 2 1

D D

C C

B B

epe Title: BilgMon 488 OMD drawing Revision


-
Engineered to Respond
Schisto Industrial Park (VIPAS) Block 13
Keratsiniou - Skaramaga ave. Description: Wiring diagram Status
188 63 Perama, Greece
Tel: (+30)210 4093000, Fax: (+30)210 4015503 For offer
http:// www.epe.gr

Project: Drawing Nr: OMD-BILGMON 488-O Model:

Hull Nr: Shipyard:


A A
Drawn: Stathis Kardaris Date: 10/1/2017 Scale:

Checked: Nick Kyritsis Date: 10/1/2017


Size: Sheet number:
Approved: Konstantinos Stampedakis Date: 26/11/2016 A3 2 /2

6 5 4 3 2 1
3x380-440V@50/60Hz

epe Title: Revision


Engineered to Respond -
Schisto Industrial Park (VIPAS) Block 13
Keratsiniou - Skaramaga ave. Description: ELECTRICAL DRAWINGS Status
188 63 Perama, Greece
Tel: (+30)210 4093000, Fax: (+30)210 4015503 POWER DIAGRAM ....
http:// www.ermafirst.com

Project: Drawing Nr: ELEDR-PF-SM-LED Model:

Hull Nr: ... Shipyard:

Drawn: M. Sarantakis Date: 12/01/2017 Scale:

Checked: M. Sarantakis Date: 12/01/2017


Size: Sheet number:
Approved: M. Sarantakis Date: 12/01/2017 A4 1/7
epe Title: Revision
Engineered to Respond -
Schisto Industrial Park (VIPAS) Block 13
Keratsiniou - Skaramaga ave. Description: ELECTRICAL DRAWINGS Status
188 63 Perama, Greece
Tel: (+30)210 4093000, Fax: (+30)210 4015503 TERMINALS DRAWING ....
http:// www.ermafirst.com

Project: Drawing Nr: ELEDR-PF-SM-LED Model:


-
Hull Nr: ... Shipyard:

Drawn: M. Sarantakis Date: 12/01/2017 Scale:

Checked: M. Sarantakis Date: 12/01/2017


Size: Sheet number:
Approved: M. Sarantakis Date: 12/01/2017 A4 2/7
epe Title: Revision
Engineered to Respond -
Schisto Industrial Park (VIPAS) Block 13
Keratsiniou - Skaramaga ave. Description: ELECTRICAL DRAWINGS Status
188 63 Perama, Greece
Tel: (+30)210 4093000, Fax: (+30)210 4015503 OUTPUTS DRAWING ....
http:// www.ermafirst.com

Project: Drawing Nr: ELEDR-PF-SM-LED Model:

Hull Nr: ... Shipyard:

Drawn: M. Sarantakis Date: 12/01/2017 Scale:

Checked: M. Sarantakis Date: 12/01/2017


Size: Sheet number:
Approved: M. Sarantakis Date: 12/01/2017 A4 3/7
epe Title: Revision
Engineered to Respond -
Schisto Industrial Park (VIPAS) Block 13
Keratsiniou - Skaramaga ave. Description: ELECTRICAL DRAWINGS Status
188 63 Perama, Greece
Tel: (+30)210 4093000, Fax: (+30)210 4015503 INPUTS DRAWING ....
http:// www.ermafirst.com

Project: Drawing Nr: ELEDR-PF-SM-LED Model:


.....
Hull Nr: ... Shipyard:

Drawn: M. Sarantakis Date: 12/01/2017 Scale:

Checked: M. Sarantakis Date: 12/01/2017


Size: Sheet number:
Approved: M. Sarantakis Date: 12/01/2017 A4 4/7
epe Title: Revision
Engineered to Respond -
Schisto Industrial Park (VIPAS) Block 13
Keratsiniou - Skaramaga ave. Description: ELECTRICAL DRAWINGS Status
188 63 Perama, Greece
Tel: (+30)210 4093000, Fax: (+30)210 4015503 VALVES DRAWING ....
http:// www.ermafirst.com

Project: Drawing Nr: ELEDR-PF-SM-LED Model:

Hull Nr: ... Shipyard:

Drawn: M. Sarantakis Date: 12/01/2017 Scale:

Checked: M. Sarantakis Date: 12/01/2017


Size: Sheet number:
Approved: M. Sarantakis Date: 12/01/2017 A4 5/7
epe Title: Revision
Engineered to Respond -
Schisto Industrial Park (VIPAS) Block 13
Keratsiniou - Skaramaga ave. Description: ELECTRICAL DRAWINGS Status
188 63 Perama, Greece
Tel: (+30)210 4093000, Fax: (+30)210 4015503 ALARMS DRAWING ....
http:// www.ermafirst.com

Project: Drawing Nr: ...... Model:

Hull Nr: ... Shipyard:

Drawn: M. Sarantakis Date: 12/01/2017 Scale:

Checked: M. Sarantakis Date: 12/01/2017


Size: Sheet number:
Approved: M. Sarantakis Date: 12/01/2017 A4 6/7
epe Title: Revision
Engineered to Respond -
Schisto Industrial Park (VIPAS) Block 13
Keratsiniou - Skaramaga ave. Description: ELECTRICAL DRAWINGS Status
188 63 Perama, Greece
Tel: (+30)210 4093000, Fax: (+30)210 4015503 230 VAC CIRCUIT DRAWING ....
http:// www.ermafirst.com

Project: Drawing Nr: ELEDR-PF-SM-LED Model:

Hull Nr: ... Shipyard:

Drawn: M. Sarantakis Date: 12/01/2017 Scale:

Checked: M. Sarantakis Date: 12/01/2017


Size: Sheet number:
Approved: M. Sarantakis Date: 12/01/2017 A4 7/7
POSEIDON FIT – BILL OF MATERIALS (BOM)

POSEIDON FIT – FREE OF CHARGE SPARES (FOC)


No. DESCRIPTION QUANTITY CODE
1 SRRHN-2CN-SL-230VAC micro relay 2P230V 1 35-5000-002
2 Switch handle 1 25-5000-031
3 Contact NO ZBE101 1 25-5000-037
4 Contact NC ZBE102 1 850391