Naitwar Mori HEP ( 2 x 30 MW )

2ACS01-0000-10303616
Unit Running Sequence Diagram
Revision A

Unit Sequence Diagram


Control System and Digital Governor
Rev. Page Description Created by Approved by Date

- First Issue SHARVIN JOSHIH 2023-06-10


A Second Issue BHARDWP VIJAYS 2023-11-07

SJVN LIMITED representatives: Mr.______________________

Voith Hydro representatives: Mr. Akash Negi


Mr. Prashant Bhardwaj
Mr. Prateek Kumar

Executing OU Created by Checked by Approved by SJVNL VOITH Issue Date

Name
Name Signature Name Signature Sanjay Signature
VHN 2023-11-11
Prashant bhardwp Mayank sharmay VijayS
Vijay

Confidential, all rights reserved ISO 16016. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by
any means, without prior permission. All rights reserved in the event of the granting of a patent or the registration of a utility model or design.
Offenders will be held liable for the payment of damages.

Start Stop Sequence NTMR1.doc Page 1 of 22


Naitwar Mori HEP ( 2 x 30 MW )
2ACS01-0000-10303616
Unit Running Sequence Diagram
Revision A

TABLE OF CONTENTS

1 LEGENDS .............................................................................................................................................. 3
2 PRE-STARTING CONDITION FOR TURBINE OPERATION................................................................ 4
Unit Control Board ........................................................................................................................................ 4
Generator ...................................................................................................................................................... 4
Brake… ......................................................................................................................................................... 4
CW System ................................................................................................................................................... 5
HPU System ................................................................................................................................................. 5
Governor System .......................................................................................................................................... 5
EXCITATION System .................................................................................................................................... 5
Protection System ........................................................................................................................................ 5
GCB….. ......................................................................................................................................................... 6
Generator Transformer................................................................................................................................. 6
HPIS…. ......................................................................................................................................................... 6
MIV Bypass ................................................................................................................................................... 6
3 SEQUENCE OVERVIEW ....................................................................................................................... 7
4 START SEQUENCE: ............................................................................................................................. 8
5 STOP SEQUENCE…………………………………………………………………………………………....11
6 MECHANICAL SEQUENCE…………………………………………………………………………………..14
7 EMERGENCY SEQUENCE………………………………………………………………………...…………16

Executing OU Created by Checked by Approved by SJVNL VOITH Issue Date

Name
Name Signature Name Signature Sanjay Signature
VHN 2023-11-11
Prashant bhardwp Mayank sharmay VijayS
Vijay

Confidential, all rights reserved ISO 16016. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by
any means, without prior permission. All rights reserved in the event of the granting of a patent or the registration of a utility model or design.
Offenders will be held liable for the payment of damages.

Start Stop Sequence NTMR1.doc Page 2 of 22


Naitwar Mori HEP ( 2 x 30 MW )
2ACS01-0000-10303616
Unit Running Sequence Diagram
Revision A

1 LEGENDS

& AND Logic

=> OR Logic

1 NOT Logic

Sequence Steps

Initial / Final Step

Feedback

Time Delay

Executing OU Created by Checked by Approved by SJVNL VOITH Issue Date

Name
Name Signature Name Signature Sanjay Signature
VHN 2023-11-11
Prashant bhardwp Mayank sharmay VijayS
Vijay

Confidential, all rights reserved ISO 16016. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by
any means, without prior permission. All rights reserved in the event of the granting of a patent or the registration of a utility model or design.
Offenders will be held liable for the payment of damages.

Start Stop Sequence NTMR1.doc Page 3 of 22


Naitwar Mori HEP ( 2 x 30 MW )
2ACS01-0000-10303616
Unit Running Sequence Diagram
Revision A

2 PRE-STARTING CONDITION FOR


TURBINE OPERATION

Unit Control Board

• Unit Emergency Button Not Pressed


• Emergency Safety Relay Reset
• CCB PLC Watchdog Active
• CCB Emergency Button Not Pressed
• UCB 24V DC Healthy
• UCB Control Voltage Ok
• UCB Power Supply Aux Ok
• Unit Mode SCADA
• Electrical Overspeed from GOV Ok
• Electrical Overspeed from Speed Relay Ok
• Network Switch Ok

Generator

• All Winding Temp ok


• All Core Temp Ok
• All Bearing Temp Ok
• All Bearing Oil Levels Ok
• All Air Coolers Temp Ok
• Brakes Air Pressure Ok
• Rotor Position not in Jacking

Brake

• Brake in Remote
• Brake Dust Extr. In Remote
• Carbon Dust Extr. In Remote.

Executing OU Created by Checked by Approved by SJVNL VOITH Issue Date

Name
Name Signature Name Signature Sanjay Signature
VHN 2023-11-11
Prashant bhardwp Mayank sharmay VijayS
Vijay

Confidential, all rights reserved ISO 16016. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by
any means, without prior permission. All rights reserved in the event of the granting of a patent or the registration of a utility model or design.
Offenders will be held liable for the payment of damages.

Start Stop Sequence NTMR1.doc Page 4 of 22


Naitwar Mori HEP ( 2 x 30 MW )
2ACS01-0000-10303616
Unit Running Sequence Diagram
Revision A

CW System

• CW MOV Remote Selected


• Shaft Seal MOV Remote Selected
• Heat Exchanger MOV Remote Selected
• CW Pumps Not Trip Feedbacks (from CCB)

HPU System

• Pumps Healthy
• Sump Oil Level Ok
• Sump Oil Temp Ok
• Pump Remote selected
• HPU System Pressure Ok

Governor System

• PLC Watchdog Active


• Emergency Not Pressed
• Ready to Start
• Supply Ok
• Governor not Trip
• System in Remote

EXCITATION System

• Excitation System Remote


• Excitation System Healthy

Protection System

• All Relay Healthy


• Supply Healthy
• No Urgent Fault
• No Non-Urgent Fault
Executing OU Created by Checked by Approved by SJVNL VOITH Issue Date

Name
Name Signature Name Signature Sanjay Signature
VHN 2023-11-11
Prashant bhardwp Mayank sharmay VijayS
Vijay

Confidential, all rights reserved ISO 16016. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by
any means, without prior permission. All rights reserved in the event of the granting of a patent or the registration of a utility model or design.
Offenders will be held liable for the payment of damages.

Start Stop Sequence NTMR1.doc Page 5 of 22


Naitwar Mori HEP ( 2 x 30 MW )
2ACS01-0000-10303616
Unit Running Sequence Diagram
Revision A

• Gen 50BF Healthy

GCB

• DC Supply Healthy
• Breaker In Remote
• Spring Charged
• SF6 Pressure ok

Generator Transformer

• All System in Remote


• All System Healthy
• All Pump Not Trip

HPIS

• System in Remote
• AC Pump Ok

MIV Bypass

• System in Remote
• Upstream Pressure OK
• All Seal OK

Executing OU Created by Checked by Approved by SJVNL VOITH Issue Date

Name
Name Signature Name Signature Sanjay Signature
VHN 2023-11-11
Prashant bhardwp Mayank sharmay VijayS
Vijay

Confidential, all rights reserved ISO 16016. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by
any means, without prior permission. All rights reserved in the event of the granting of a patent or the registration of a utility model or design.
Offenders will be held liable for the payment of damages.

Start Stop Sequence NTMR1.doc Page 6 of 22


Naitwar Mori HEP ( 2 x 30 MW )
2ACS01-0000-10303616
Unit Running Sequence Diagram
Revision A

3 SEQUENCE OVERVIEW
Reachable
Process State

SS
Standstill

SNL
Turbine No-load

TU
Generation

STOP MECH.STOP ELSTOP EMERGSTOP

SS

SNL

TU

Executing OU Created by Checked by Approved by SJVNL VOITH Issue Date

Name
Name Signature Name Signature Sanjay Signature
VHN 2023-11-11
Prashant bhardwp Mayank sharmay VijayS
Vijay

Confidential, all rights reserved ISO 16016. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by
any means, without prior permission. All rights reserved in the event of the granting of a patent or the registration of a utility model or design.
Offenders will be held liable for the payment of damages.

Start Stop Sequence NTMR1.doc Page 7 of 22


Naitwar Mori HEP ( 2 x 30 MW )
2ACS01-0000-10303616
Unit Running Sequence Diagram
Revision A

4 START SEQUENCE:
STANDSTILL TO TURBINE OPERATION

START STEP 10
START STEP 1

START STEP 9
START STEP 2

START STEP 8
START STEP 3

START STEP 7
START STEP 4

START STEP 5 START STEP 6

START STEP 6 START STEP 5

START STEP 7 START STEP 4

START STEP 8 START STEP 3

START STEP 9 START STEP 2

START STEP 10 START STEP 1

Executing OU Created by Checked by Approved by SJVNL VOITH Issue Date

Name
Name Signature Name Signature Sanjay Signature
VHN 2023-11-11
Prashant bhardwp Mayank sharmay VijayS
Vijay

Confidential, all rights reserved ISO 16016. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by
any means, without prior permission. All rights reserved in the event of the granting of a patent or the registration of a utility model or design.
Offenders will be held liable for the payment of damages.

Start Stop Sequence NTMR1.doc Page 8 of 22


Naitwar Mori HEP ( 2 x 30 MW )
2ACS01-0000-10303616
Unit Running Sequence Diagram
Revision A

Start Sequence 1:- Speed Standstill (SS)

• Pre-Condition For Turbine Operation is ok

• & UCB ( Local ) or ( Remote ) Control Selected


• Auto or Step By Step Mode Selected

• Excitation & Governor Panel in Remote

❖ STEP-1 ➢ CW DT Valve Open CMD


➢ CW Shaft Seal Open CMD
➢ CW Heat Exchanger Open CMD
➢ CW Pr.Shaft Seal Open CMD
➢ CW Gen Comm Header Valve Open CMD
➢ CW R, Y, B Phase MOV Open CMD

Feedback
& CW DT Valve Open
& CW Shaft Seal Valve Open
& CW Heat Exchanger MOV Open
& CW Primary Shaft Seal Open
& CW Gen Comm Header Valve Open

& CW R, Y, B MOV Open

❖ STEP-2 ➢ Cooling Water Primary Pump ON CMD


➢ Cooling Water Secondary Pump ON CMD

Feedback
& Cooling Water Primary Pump ON
& Cooling Water Secondary Pump ON
& Turbine Brg CW Flow OK
& Generator Air Cooler Flow Ok
& Generator LCBrg CW Flow Ok
& Shaft Seal CW Inlet Flow ok
& Generator UGBrg CW Flow Ok
Executing OU Created by Checked by Approved by SJVNL VOITH Issue Date

Name
Name Signature Name Signature Sanjay Signature
VHN 2023-11-11
Prashant bhardwp Mayank sharmay VijayS
Vijay

Confidential, all rights reserved ISO 16016. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by
any means, without prior permission. All rights reserved in the event of the granting of a patent or the registration of a utility model or design.
Offenders will be held liable for the payment of damages.

Start Stop Sequence NTMR1.doc Page 9 of 22


Naitwar Mori HEP ( 2 x 30 MW )
2ACS01-0000-10303616
Unit Running Sequence Diagram
Revision A

& HPU Cooler Out CW Flow Ok


& Shaft Seal Pressure ok

❖ STEP-3 ➢ Brake Applied CMD


➢ Gen Brake Dust Ext Start
❖ STEP-4 ➢ HPU Pump Start
➢ HPU Jockey Pump Start
➢ HPIS On CMD

Feedback
& Brake Applied
& HPU Pump ON
& Jockey Pump On
& HPU Run Pressure Ok
& System Oil Pressure Ok
& HPIS On
& Gen Brake Dust Start
& WG Closed

❖ STEP-4 ➢ Bypass Valve Open CMD


➢ MIV Close CMD
➢ LCBrg Oil Mist Ext. Start

Feedback
& Bypass Valve Open
& Differential Pressure ok
& MIV Close
& LCBrg Oil Mist Ext On
& MIV Close

❖ STEP-5 ➢ MIV Open CMD

Feedback
& MIV Open

Executing OU Created by Checked by Approved by SJVNL VOITH Issue Date

Name
Name Signature Name Signature Sanjay Signature
VHN 2023-11-11
Prashant bhardwp Mayank sharmay VijayS
Vijay

Confidential, all rights reserved ISO 16016. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by
any means, without prior permission. All rights reserved in the event of the granting of a patent or the registration of a utility model or design.
Offenders will be held liable for the payment of damages.

Start Stop Sequence NTMR1.doc Page 10 of 22


Naitwar Mori HEP ( 2 x 30 MW )
2ACS01-0000-10303616
Unit Running Sequence Diagram
Revision A

❖ STEP-6 ➢ Bypass Valve Close CMD


➢ Brake Release CMD
➢ Digital Governor Start Enabled
➢ Gen Brake Dust Ext Stop CMD
➢ HPU OFF CMD

Feedback
& Bypass Valve Close
& Brake Release
& Digital Governor Ready To Start
& Gen Brake Dust Ext OFF
& HPU OFF

❖ STEP-7 ➢ Governor Start CMD

Feedback
& Governor Start
& Speed 90%

❖ STEP-8 ➢ HPIS Pump OFF CMD


➢ Excitation Mode ON CMD

Feedback
& HPIS Pump OFF
& Excitation Ready To Start

❖ STEP-9 ➢ Excitation ON CMD


➢ Gen Carbon Dust Ext Start

Feedback
& Excitation ON
& Generator Voltage ok
Executing OU Created by Checked by Approved by SJVNL VOITH Issue Date

Name
Name Signature Name Signature Sanjay Signature
VHN 2023-11-11
Prashant bhardwp Mayank sharmay VijayS
Vijay

Confidential, all rights reserved ISO 16016. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by
any means, without prior permission. All rights reserved in the event of the granting of a patent or the registration of a utility model or design.
Offenders will be held liable for the payment of damages.

Start Stop Sequence NTMR1.doc Page 11 of 22


Naitwar Mori HEP ( 2 x 30 MW )
2ACS01-0000-10303616
Unit Running Sequence Diagram
Revision A

& Synch Auto/Manual


& Governor Opening No Load
& Gen Carbon Dust Ext On

❖ STEP-10 ➢ Unit Synch Enable CMD

Feedback
& Generator Circuit Breaker Closed

✓ Sequence : Turbine Operation Completed TU

Executing OU Created by Checked by Approved by SJVNL VOITH Issue Date

Name
Name Signature Name Signature Sanjay Signature
VHN 2023-11-11
Prashant bhardwp Mayank sharmay VijayS
Vijay

Confidential, all rights reserved ISO 16016. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by
any means, without prior permission. All rights reserved in the event of the granting of a patent or the registration of a utility model or design.
Offenders will be held liable for the payment of damages.

Start Stop Sequence NTMR1.doc Page 12 of 22


Naitwar Mori HEP ( 2 x 30 MW )
2ACS01-0000-10303616
Unit Running Sequence Diagram
Revision A

Stop Sequence 2 :- Turbine Operation ( TU )

• Excitation & Governor in Remote


• & UCB ( Local ) or ( Remote ) Control Selected

• Auto or Step By Step Mode Selected

❖ STEP-1 ➢ Governor Unloading CMD

Feedback
& Base Load reached

❖ STEP-2 ➢ Unit Breaker Open CMD

Feedback
& Breaker Open

❖ STEP-3 ➢ Excitation OFF CMD


➢ Gen Carbon Dust Ext Stop CMD

Feedback
& Excitation OFF FB
& Gen Carbon Dust Ext On

❖ STEP-4 ➢ HPU ON CMD


➢ Jockey Pump ON CMD
➢ HPIS ON CMD
➢ Digital Governor Stop CMD

Feedback
& Digital Governor Off
& HPU ON
& HPU System Pressure ok
& Jockey Pump ON
& HPIS ON
& HPU Pump Pr OK

Executing OU Created by Checked by Approved by SJVNL VOITH Issue Date

Name
Name Signature Name Signature Sanjay Signature
VHN 2023-11-11
Prashant bhardwp Mayank sharmay VijayS
Vijay

Confidential, all rights reserved ISO 16016. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by
any means, without prior permission. All rights reserved in the event of the granting of a patent or the registration of a utility model or design.
Offenders will be held liable for the payment of damages.

Start Stop Sequence NTMR1.doc Page 13 of 22


Naitwar Mori HEP ( 2 x 30 MW )
2ACS01-0000-10303616
Unit Running Sequence Diagram
Revision A

& Speed<90%

❖ STEP-5 ➢ MIV Close CMD


➢ Bypass Valve Close CMD

Feedback
& MIV Close
& WG Closed
& Bypass Valve Close

❖ STEP-6 ➢ Brake Applied CMD at Speed <30%


➢ Brake Dust Ext Start

Feedback
& Speed Brake ON
& Brake Applied
& Gen Brake Dust Ext ON
& Speed Standstill

❖ STEP-7 ➢ HPU OFF CMD


➢ Jockey Pump OFF CMD

Feedback
& HPU OFF
& Jockey Pump OFF

❖ STEP-8 ➢ Gen Brake Dust Ext Stop CMD


➢ LCBrg Oil Mist Ext Stop CMD
➢ HPIS OFF CMD
➢ Brake Release CMD

Feedback
& Brake Release
& Brake Dust Ext OFF
& HPIS OFF

Executing OU Created by Checked by Approved by SJVNL VOITH Issue Date

Name
Name Signature Name Signature Sanjay Signature
VHN 2023-11-11
Prashant bhardwp Mayank sharmay VijayS
Vijay

Confidential, all rights reserved ISO 16016. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by
any means, without prior permission. All rights reserved in the event of the granting of a patent or the registration of a utility model or design.
Offenders will be held liable for the payment of damages.

Start Stop Sequence NTMR1.doc Page 14 of 22


Naitwar Mori HEP ( 2 x 30 MW )
2ACS01-0000-10303616
Unit Running Sequence Diagram
Revision A

& LCBrg Oil Mist Ext Stop

❖ STEP-9 ➢ CW Primary Pump Stop CMD


➢ CW Secondary Pump Stop CMD

Feedback
& CW Primary Pump Stop
& CW Secondary Pump Stop

❖ STEP-10 ➢ CW DT Valve Close CMD


➢ CW Shaft Seal Close CMD
➢ CW Heat Exchanger Close CMD
➢ CW Pr.Shaft Seal Close CMD
➢ CW R, Y, B Phase MOV Close CMD
➢ CW Gen Comm Header Valve Close CMD

Feedback
& CW DT Valve Close
& CW Shaft Seal Valve Close
& CW Heat Exchanger MOV Close
& CW Primary Shaft Seal Close
& CW R, Y, B MOV Close
& CW Gen Comm Header Valve Close

✓ Sequence: Speed Standstill ( SS )

Executing OU Created by Checked by Approved by SJVNL VOITH Issue Date

Name
Name Signature Name Signature Sanjay Signature
VHN 2023-11-11
Prashant bhardwp Mayank sharmay VijayS
Vijay

Confidential, all rights reserved ISO 16016. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by
any means, without prior permission. All rights reserved in the event of the granting of a patent or the registration of a utility model or design.
Offenders will be held liable for the payment of damages.

Start Stop Sequence NTMR1.doc Page 15 of 22


Naitwar Mori HEP ( 2 x 30 MW )
2ACS01-0000-10303616
Unit Running Sequence Diagram
Revision A

Mechanical Sequence 3:- Turbine Operation ( TU )

• Excitation & Governor in Remote


• & UCB ( Local ) or ( Remote ) Control Selected

• Auto or Step By Step Mode Selected

❖ STEP-1 ➢ Governor Unloading CMD

Feedback
& Base Load reached

❖ STEP-2 ➢ Breaker Open CMD


➢ HPU Pump ON CMD
➢ HPU Jockey Pump ON CMD

Feedback
& Breaker Open
& HPU ON
& HPU Pump Pr. Ok
& HPU Jockey Start
& HPU System Pr. Ok

❖ STEP-3 ➢ Excitation OFF CMD


➢ Digital Governor Stop CMD
➢ HPIS ON CMD
➢ Gen Carbon Dust Ext Stop CMD

Feedback
& Excitation OFF FB
& Digital Governor Off
& HPIS ON
& Speed < 90%
& Gen Carbon Dust Ext OFF

Executing OU Created by Checked by Approved by SJVNL VOITH Issue Date

Name
Name Signature Name Signature Sanjay Signature
VHN 2023-11-11
Prashant bhardwp Mayank sharmay VijayS
Vijay

Confidential, all rights reserved ISO 16016. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by
any means, without prior permission. All rights reserved in the event of the granting of a patent or the registration of a utility model or design.
Offenders will be held liable for the payment of damages.

Start Stop Sequence NTMR1.doc Page 16 of 22


Naitwar Mori HEP ( 2 x 30 MW )
2ACS01-0000-10303616
Unit Running Sequence Diagram
Revision A

❖ STEP-4 ➢ MIV Close CMD


➢ Bypass Valve Close CMD
➢ LCBrg Oil Mist Ext Stop CMD
➢ Gen Brake Dust Ext Stop CMD
➢ Brake Applied CMD at Speed<30%

Feedback
& MIV Close
& WG Close
& Speed Brake On
& Bypass Valve Close
& Brake Applied
& Gen Brake Dust Ext ON
& LCBrg Oil Mist Ext OFF
& Speed Standstill

❖ STEP-5 ➢ HPU Pump OFF CMD


➢ HPU Jockey Pump OFF CMD
➢ Brake Release CMD
➢ Gen Brake Dust Ext Stop
➢ HPIS OFF CMD
➢ CW Primary Stop CMD
➢ CW Secondary Stop CMD

Feedback
& HPU OFF
& HPU Jockey Pump OFF
& Brake Release
& Brake Dust Ext Stop
& HPIS OFF
& CW Primary Stop
& CW Secondary Stop

Executing OU Created by Checked by Approved by SJVNL VOITH Issue Date

Name
Name Signature Name Signature Sanjay Signature
VHN 2023-11-11
Prashant bhardwp Mayank sharmay VijayS
Vijay

Confidential, all rights reserved ISO 16016. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by
any means, without prior permission. All rights reserved in the event of the granting of a patent or the registration of a utility model or design.
Offenders will be held liable for the payment of damages.

Start Stop Sequence NTMR1.doc Page 17 of 22


Naitwar Mori HEP ( 2 x 30 MW )
2ACS01-0000-10303616
Unit Running Sequence Diagram
Revision A

❖ STEP-6 ➢ CW DT Valve Close CMD


➢ CW Shaft Seal Close CMD
➢ CW Heat Exchanger Close CMD
➢ CW Pr.Shaft Seal Close CMD
➢ CW R, Y, B Phase MOV Close CMD
➢ CW Gen Comm Header MOV Close CMD

Feedback
& CW DT Valve Close
& CW Shaft Seal Valve Close
& CW Heat Exchanger MOV Close
& CW Primary Shaft Seal Close
& CW R, Y, B MOV Close

& CW Gen Comm Header MOV Close

✓ Sequence : Speed Standstill (SS)

Executing OU Created by Checked by Approved by SJVNL VOITH Issue Date

Name
Name Signature Name Signature Sanjay Signature
VHN 2023-11-11
Prashant bhardwp Mayank sharmay VijayS
Vijay

Confidential, all rights reserved ISO 16016. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by
any means, without prior permission. All rights reserved in the event of the granting of a patent or the registration of a utility model or design.
Offenders will be held liable for the payment of damages.

Start Stop Sequence NTMR1.doc Page 18 of 22


Naitwar Mori HEP ( 2 x 30 MW )
2ACS01-0000-10303616
Unit Running Sequence Diagram
Revision A

Emergency Sequence 3 :- Turbine Operation ( TU )

• Excitation & Governor in Remote


• & UCB ( Local ) or ( Remote ) Control Selected

• Auto or Step By Step Mode Selected

❖ STEP-1 ➢ Governor Stop CMD


➢ Breaker Open CMD
➢ Excitation OFF CMD
➢ HPU Pump ON CMD
➢ HPIS Pump ON CMD
➢ HPU Jockey PUMP ON CMD
➢ Gen Carbon Dust Ext Stop CMD

Feedback
& Breaker Open
& Excitation OFF FB
& Digital Governor Off
& HPU ON
& HPU System Pressure ok
& HPU Pump Pressure ok
& HPU Jockey Pump ON
& HPIS ON
& Speed <90%
& Gen Carbon Dust Ext OFF

❖ STEP-2 ➢ MIV Close CMD


➢ Bypass Valve Close CMD

Feedback
& MIV Close
& Speed Brake On
& WG Closed

Executing OU Created by Checked by Approved by SJVNL VOITH Issue Date

Name
Name Signature Name Signature Sanjay Signature
VHN 2023-11-11
Prashant bhardwp Mayank sharmay VijayS
Vijay

Confidential, all rights reserved ISO 16016. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by
any means, without prior permission. All rights reserved in the event of the granting of a patent or the registration of a utility model or design.
Offenders will be held liable for the payment of damages.

Start Stop Sequence NTMR1.doc Page 19 of 22


Naitwar Mori HEP ( 2 x 30 MW )
2ACS01-0000-10303616
Unit Running Sequence Diagram
Revision A

& Bypass Valve Close

❖ STEP-3 ➢ Brake Applied CMD


➢ Gen Brake Dust Ext Start CMD

Feedback
& Brake Applied
& Speed Standstill
& Gen Brake Dust Ext Start

❖ STEP-4 ➢ HPU Pump OFF CMD


➢ HPU Jockey Pump OFF CMD
➢ HPIS Pump OFF CMD
➢ Gen Brake Dust Ext OFF CMD
➢ Brake Release CMD
➢ LCBrg Oil Mist Ext Stop CMD

Feedback
& HPIS Pump OFF
& HPU Pump OFF
& Brake Release
& HPU Jockey Pump OFF
& Gen Brake Dust Ext Stop
& LCBrg Oil Mix Ext Stop

❖ STEP-5 ➢ CW Primary Pump OFF CMD


➢ CW Secondary Pump OFF CMD

Feedback
& CW Primary Pump Stop
& CW Secondary Pump Stop

Executing OU Created by Checked by Approved by SJVNL VOITH Issue Date

Name
Name Signature Name Signature Sanjay Signature
VHN 2023-11-11
Prashant bhardwp Mayank sharmay VijayS
Vijay

Confidential, all rights reserved ISO 16016. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by
any means, without prior permission. All rights reserved in the event of the granting of a patent or the registration of a utility model or design.
Offenders will be held liable for the payment of damages.

Start Stop Sequence NTMR1.doc Page 20 of 22


Naitwar Mori HEP ( 2 x 30 MW )
2ACS01-0000-10303616
Unit Running Sequence Diagram
Revision A

❖ STEP-6 ➢ CW DT Valve Close CMD


➢ CW Shaft Seal Close CMD
➢ CW Heat Exchanger Close CMD
➢ CW Pr.Shaft Seal Close CMD
➢ CW R, Y, B Phase MOV Close CMD
➢ CW Gen Comm Header MOV Close CMD

Feedback

& CW DT Valve Close


& CW Shaft Seal Valve Close
& CW Heat Exchanger MOV Close
& CW Primary Shaft Seal Close
& CW R, Y, B MOV Close
& Gen Comm Header MOV Close

✓ Sequence : Speed Standstill (SS)

Executing OU Created by Checked by Approved by SJVNL VOITH Issue Date

Name
Name Signature Name Signature Sanjay Signature
VHN 2023-11-11
Prashant bhardwp Mayank sharmay VijayS
Vijay

Confidential, all rights reserved ISO 16016. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by
any means, without prior permission. All rights reserved in the event of the granting of a patent or the registration of a utility model or design.
Offenders will be held liable for the payment of damages.

Start Stop Sequence NTMR1.doc Page 21 of 22


Naitwar Mori HEP ( 2 x 30 MW )
2ACS01-0000-10303616
Unit Running Sequence Diagram
Revision A

Unit Selection: U1 and U2


Synchronization Selection:
Auto or Manual

Manual Synch Auto Synch


Check Synchro relay 1. Match Voltage 1. Auto Voltage match
ON 2. Match Frequency 2. Auto Frequency match
Synchronoscope
12’O’ Clock position

GCB close via GCB close via


ILPB Autosynchronizer

GCB Closed GCB Closed

END

After synchronization the units shall reach the base load automatically and the power setpoint
could be raised from the HMI present in UCBs or SCADA.

Executing OU Created by Checked by Approved by SJVNL VOITH Issue Date

Name
Name Signature Name Signature Sanjay Signature
VHN 2023-11-11
Prashant bhardwp Mayank sharmay VijayS
Vijay

Confidential, all rights reserved ISO 16016. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by
any means, without prior permission. All rights reserved in the event of the granting of a patent or the registration of a utility model or design.
Offenders will be held liable for the payment of damages.

Start Stop Sequence NTMR1.doc Page 22 of 22

You might also like