JADESTONE ENERGY

(LEMANG) PTE. LTD.

Vendor's Name : PT. REVANINDO ABADI JAYA

Company’s Name : JADESTONE ENERGY (LEMANG) PTE. LTD.

Purchaser's Name : PT. JGC INDONESIA

Plant Location : Jambi Province, Sumatera, Indonesia

Project Name : EPCI AKATARA GAS PROCESSING FACILITY & SALES GAS PIPELINE PROJECT

Purchase Order No. : 0-0825-0-P-215Z-004-A

Equipment/ Material Name : FIRE FIGHTING EQUIPMENT INDOOR BUILDING

Item Number : Common

Document Title : SAT PROCEDURE AND REPORT

EPCI AKATARA GAS PROCESSING


FACILITY & SALES GAS PIPELINE PROJECT
(JOB No. : 0-0825-00-0000)

ISSUE PURPOSE: IFC (by Vendor)


RESULT CODE : 1, 2, 3, 4, 5 (by Purchaser)
NEXT STATUS : IFI, IFA, IFC, ASB, NA (by Purchaser)
RESUBMISSION DATE : 18-Sep-2023 (by Purchaser)
RESPONSIBLE DEPT./ PERSON : FIRE / MSA/AH (by Purchaser)
Review Date: 23-Aug-2023 (by Purchaser)
1 : Reviewed with No Comments
2 : Reviewed with Minor Comments
3 : Reviewed with Major Comments
4 : Rejected
5 : Information Only

Approval or review hereunder shall not be construed to relieve Supplier/


Subcontractor of his responsibilities and liability under the Contract.

ISSUANCE TO COMPANY

ISSUED FOR INFORMATION

X Key Non-Key

VENDOR PURCHASER COMPANY


REV. PURPOSE TO PURCHASER DATE
PREP'D CHECK'D APP'D CHECK'D APP'D APP'D

0 Issued for Construction 10-Aug-2023 AB EL OY/ML MSA/AH SN ASJ

A Issued for Approval 17-May-2023 AB EL OY/ML MSA/AH SN ASJ

TOTAL SHEET ORIG. PO NO. SERIAL

D M S3 DOCUMENT

-
J04-Sep- 2 0 2
INTED
15
NO.
V- 215Z-004-A- 502
R
HEN P
ROLLED W
NCONT
TABLE OF CONTENTS
1 INTRODUCTION.........................................................................................................................................2
2 SCOPE .......................................................................................................................................................2
3 DEFINITIONS AND ABBREVIATIONS ........................................................................................................ 3
3.1 Definitions ...........................................................................................................................................3
3.2 Abbreviations.......................................................................................................................................3
4 REFERENCE DOCUMENT.........................................................................................................................3
5 VISUAL CHECK..........................................................................................................................................4
5.1 Scope ..................................................................................................................................................4
5.2 Procedure............................................................................................................................................4
6 FUNCTION TEST .......................................................................................................................................4
6.1 Scope ..................................................................................................................................................4
6.2 Procedure............................................................................................................................................4
ATTACHMENT-1 SAT PROCEDURE .................................................................................................................5
ATTACHMENT-2 SAT REPORT .........................................................................................................................
FORM 8

Vendor to attached
approved and signed
SAT Report in this
VDoc later

DM02S3
1

J-04-Sep-2 RINTE
D
ED WHEN P
T ROLL
NCON
1 INTRODUCTION
The Akatara Field is located onshore Jambi Province, Sumatra Island, Indonesia, (Figure 1.1), in the Lemang
Block Production Sharing Contract (PSC) and is operated by Jadestone Energy (Lemang) Pte. Ltd.

Central Sumatera Basin


Lemang PSC

Fields South Sumatera Basin


Oil
Gas
Basin
Gas & Condensate

Figure 1-1 Akatara Field Location


COMPANY intends to commercialize gas from existing and new wells located on existing Well pads A, B, C
& D. Produced wellhead raw gas (25 MMSCFD) will be processed to meet sales gas specification in a new
Gas and Liquefied Petroleum Gas (“LPG”) processing facilities. The existing in-field flowline system will be
maintained.
Sales lean gas of 20 MMSCFD will be exported via a new 8” NB x 17 Km CS pipeline to an existing tie-in
point at the gas transporter’s facility, including its custody gas metering station. The extracted LPG and
condensate will be sold as separate products. The new gas and LPG processing facilities will be constructed
on partly using the existing storage / basecamp area and the new peat land area next to it.

2 SCOPE
The purpose of this document is used for SAT in terms of function test and performance FM-200 Fire
Suppression system at Akatara project.
This document includes detailed information on how to install the device, visual check, installation and testing.
Such as physical/visual inspection and function test, to ensure that all equipment is function properly.

DM02S3
2

J-04-Sep-2 RINTE
D
ED WHEN P
T ROLL
NCON
3 DEFINITIONS AND ABBREVIATIONS

3.1 Definitions

Project : Akatara Gas Processing Facility & Sales Gas Pipeline Project

COMPANY : Jadestone Energy (Lemang) Pte.Ltd. (JELPL)

CONTRACTOR : PT. JGC Indonesia

Vendor : Selected Party which be responsible to supply or manufacture the goods,


material, equipment, or services as specified in Purchase Order (PO) or Work
Order (WO)

Certification Agency : Third Party Inspection Agency is appointed by the COMPANY

3.2 Abbreviations

BMP : Bit Per Minute


SAT : Site Acceptance Test
BoQ : Bill of Quantity
NFPA : National Fire Protection Association
PO : Purchase Order

4 REFERENCE DOCUMENT

V-215Z-004-A-104 Single Line Diagram FM-200 System

V-215Z-004-A-105 Cause & Effect Diagram FM-200 System

NFPA 2001 Standard on Clean Agent Fire Extinguishing System

NFPA 70 National Electrical Code [NEC]

NFPA 72 National Fire Alarm Code

DM02S3
3

J-04-Sep-2 RINTE
D
ED WHEN P
T ROLL
NCON
5 VISUAL CHECK
5.1 Scope
This section describes a visual inspection of the entire device.

5.2 Procedure
1. Panel check, laying, placement and installation.
2. Checking the number of installed devices, according to the latest BOQ revision or PO.
3. Examination of terminals and cable installation.
4. Inspection of Smoke Detector.
5. Inspection of Manual Call Point and Abort Switch.
6. Inspection of Horn Strobe and Alarm Bell.
7. Inspection of Evacuate Area Lights and Gas Discharge Lights.
8. Inspection of installation of pipes, supports and other auxiliary materials.
9. Inspection of Clean Agent and Solenoid gas cylinders.

Inspection of Indoor
6 FUNCTION TEST Portable Fire
Extinguisher
6.1 Scope
Implementation must be carried out by simulating the work function of device, include the entire circuit must
be tested, starting from the detection of fire alarms, panel, sound alarms, light alarms, manual discharge,
discharge cancellation and Solenoid actuation functions.

6.2 Procedure
Make sure all devices are connected to the Panel (alarm bell, horn strobe, abort station, manual release,
alarm lamp, etc). Refer to Attachment-1 for SAT Procedure & Attachment-2 for SAT Report. Form

DM02S3
4

J-04-Sep-2 RINTE
D
ED WHEN P
T ROLL
NCON
Please add SAT Procedure for
Fire Alarm System & Indoor
Portable Fire Extinguisher
ATTACHMENT-1 SAT PROCEDURE

Area Main Control Room Main Substation Metering Warehouse & Workshop
System FM-200 System

Tools 1. Multiple testers


2. Toolbox set.
3. Smoke testers
4. Nitrogen Cylinder
5. Ladder
Note Refer to Cause-and-Effect Diagram FM200 system (V-215Z-004-A-105) for detail logic of FM200 system.

No Procedure Acceptance Criteria

1 Visual Check Quantity of devices are according to the latest BOQ or PO, and installation comply with
Installation Layout FM-200 System (V-215Z-004-A-100)

2 System checks for normal conditions, activate The LED light indicated in the Panel is green light (ON)
the electricity source from PLN [220 VAC].

3 Check the function of the indicator light on the All LED lights are ON.
Panel by accessing the “Check Indicator Lamp”
on the Panel.
1. Buzzer on Panel.
4 Checking the battery backup by disconnecting
2. The “Power Supply Fault” indicator light on the Panel is ON.
the mains connection from PLN [220 VAC]. 3. The system continues to work [with trouble status].

D M S3
-
J04-Sep- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
No Procedure Acceptance Criteria

1. In “Main” Mode, then all Solenoid at Main Cylinder shall standby mode.
5 Main/Reserve Switch active
2. In “Reserve” Mode, then all Solenoid at Main Cylinder shall standby mode.
3. No indication Main/Reserve status in Panel.
1. FAULT alarm in the Panel turns ON
6 Maintenance Switch active
1. Buzzer on Panel.
7 Spray the Smoke Tester on one (1) of the
2. The display and indicator light on the Panel show indication of Alarm 1.
Smoke Detectors [Zone 1]. 3. Horn/Strobe turns ON at 20 BPM/Temporal.
4. Integration of active relay contacts (HVAC/Damper)
1. Buzzer on Panel.
8 Spray the Smoke Tester on one (1) of the
2. Display and indicator light on the Panel shows indication of Alarm 2.
Smoke Detectors [Zone-2]. 3. The screen on the Panel displays a countdown time delay of 30 seconds.
4. Horn/Strobe turns ON at 120 BPM/March.
5. The Evacuate Area light is ON.
6. Integration of active relay contacts (HVAC/Damper)
1. The screen on the Panel shows the Abort Switch is active.
9 Activate the Abort Switch
2. The countdown delay time stops at the 10th second.
3. Check indication on Solenoid [Impulse Valve Operator], PIN is not exposed.
1. Alarm bell turns ON.
10 Gas Release Mode [does not activate Abort
2. Horn/Strobe turns ON continuously.
Switch]/Pressure Switch High (PSH) active 3. PIN in Solenoid exposed.
4. Gas Discharge lamp is ON.
1. “Trouble” alarm turns ON
11 Pressure Switch Low (PSL) active
1. Buzzer on Panel.
12 Manual Release Activation
2. The indicator lights ON, the Panel indicates Manual Release is active.
3. Horn/Strobe turns ON continuously.
4. Evacuate Area light turns ON.
5. Alarm bell turns ON.
6. Gas Discharge lamp turns ON.
7. Integration of active relay contacts (HVAC/Damper)
8. PIN in Solenoid exposed.
6

D M S3
-
J04-Sep- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
No Procedure Acceptance Criteria

13 Reset the Panel system Return to Normal Mode.

D M S3
-
J04-Sep- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ATTACHMENT-2
SITE ACCEPTANCE TEST REPORT

VISUAL INSPECTION Please add SAT Report Form for


SYSTEM : FM-200 GAS SUPPRESSION & FIRE ALARM SYSTEM Indoor Portable Fire Extinguisher
VENUE OF TESTING : PT. REVANINDO ABADI JAYA
TESTING METHOD : VISUAL INSPECTION
TESTING LIMITATION : N2 DISCHARGE TEST as per datasheet &
BUILLDING
PROTECTED AREA
:
:
installation layout
:

EQUIPMENT STATUS
ACCEPTANCE
NO QUANTITY (ea) REMARK
CRITERIA
ADDRESING MODULE POINT TYPE CUSTOM LABEL C NC
MAIN CONTROL BUILDING
1 M1-1 IDNETISO ISO ISOLATOR MODULE MCR
2 M1-2 RIAM SRELAY MCR-VAF/AAF-01
3 M1-3 RIAM SRELAY MCR-VAF/AAF-02
4 M1-4 RIAM SRELAY MCR-AB-01
5 M1-5 RIAM SRELAY MCR-AB-02
6 M1-6 RIAM SRELAY MCR-H/S-01
7 M1-7 RIAM SRELAY MCR-H/S-02
8 M1-8 RIAM SRELAY MCR-EV-01
9 M1-9 RIAM SRELAY MCR-EV-02
10 M1-10 RIAM SRELAY MCR-GAS/D-01
11 M1-11 RIAM SRELAY MCR-GAS/D-02
12 M1-12 RIAM RRELAY MCR-HSD-01
13 M1-13 RIAM SRELAY MCR-SPARE
14 M1-14 RELEASE SUPRELS MCR-SRP
15 M1-15 IAM SUPERV MCR-SRV-01
16 M1-16 IAM SUPERV MCR-LPS-01
17 M1-17 IAM SUPERV MCR-PS-02
18 M1-21 ADRPUL PULL MCR-MCP-01
19 M1-22 PHOTO SUPDET MCR-SD-01 RAISED FLOOR
20 M1-23 PHOTO SUPDET MCR-SD-02 RAISED FLOOR
21 M1-24 PHOTO SMOKE MCR-SD-03 INSTRUMENT ROOM
22 M1-25 PHOTO SUPDET MCR-SD-04 INSTRUMENT ROOM
23 M1-26 PHOTO SUPDET MCR-SD-05 INSTRUMENT ROOM
24 M1-27 PHOTO SUPDET MCR-SD-06 INSTRUMENT ROOM
25 M1-28 IAM SUPABRT MCR-AS-01 CONTROL ROOM
26 M1-29 ADRPUL SUPDUMP MCR-MR-01 CONTROL ROOM
27 M1-30 ADRPUL PULL MCR-MCP-02 CONTROL ROOM
28 M1-31 PHOTO SMOKE MCR-SD-07 CONTROL ROOM
29 M1-32 PHOTO SMOKE MCR-SD-08 CONTROL ROOM
30 M1-33 ADRPUL PULL MCR-MCP-03 ENTRANCE LOBBY
31 M1-34 PHOTO SMOKE MCR-SD-09 ENTRANCE LOBBY
32 M1-35 PHOTO SMOKE MCR-SD-10 TOOLS FIRE FIGHTING ROOM

Inspected By Reviewed By

PT. Revanindo Abadi Jaya PT. JGC Indonesia Jadestone Energy


Name: Name:

S3
Date: Date:

- D M
J04-Sep - 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ATTACHMENT-2
SITE ACCEPTANCE TEST REPORT

VISUAL INSPECTION
SYSTEM : FM-200 GAS SUPPRESSION & FIRE ALARM SYSTEM
VENUE OF TESTING : PT. REVANINDO ABADI JAYA
TESTING METHOD : VISUAL INSPECTION
TESTING LIMITATION : N2 DISCHARGE TEST
BUILLDING :
PROTECTED AREA :
:

EQUIPMENT STATUS
ACCEPTANCE
NO QUANTITY (ea) REMARK
CRITERIA
ADDRESING MODULE POINT TYPE CUSTOM LABEL C NC
MAIN CONTROL BUILDING
33 M1-36 PHOTO SMOKE MCR-SD-11 SUPERVISOR ROOM
34 M1-37 PHOTO SMOKE MCR-SD-12 PRAY ROOM
35 M1-38 HEAT HEAT MCR-HD-01 PANTRY
36 M1-39 PHOTO SMOKE MCR-SD-13 OFFICE AREA
37 M1-40 PHOTO SMOKE MCR-SD-14 MEETING ROOM

Inspected By Reviewed By

PT. Revanindo Abadi Jaya PT. JGC Indonesia Jadestone Energy


Name: Name:

S3
Date: Date:

- D M
J04-Sep - 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ATTACHMENT-2
SITE ACCEPTANCE TEST REPORT

VISUAL INSPECTION
SYSTEM : FM-200 GAS SUPPRESSION & FIRE ALARM SYSTEM
VENUE OF TESTING : PT. REVANINDO ABADI JAYA
TESTING METHOD : VISUAL INSPECTION
TESTING LIMITATION : N2 DISCHARGE TEST
BUILLDING :
PROTECTED AREA :
:

EQUIPMENT STATUS
ACCEPTANCE
NO QUANTITY (ea) REMARK
CRITERIA
ADDRESING MODULE POINT TYPE CUSTOM LABEL C NC

MAIN SUBSTATION BUILDING


1 M1-51 IDNETISO ISO ISOLATOR MODULE MSB
2 M1-52 RIAM SRELAY MSB-VAF/AAF-01
3 M1-53 RIAM SRELAY MSB-AB-01
4 M1-54 RIAM SRELAY MSB-AB-02
5 M1-55 RIAM SRELAY MSB-AB-03
6 M1-56 RIAM SRELAY MSB-H/S-01
7 M1-57 RIAM SRELAY MSB-H/S-02
8 M1-58 RIAM SRELAY MSB-H/S-03
9 M1-59 RIAM SRELAY MSB-EV-01
10 M1-60 RIAM SRELAY MSB-EV-02
11 M1-61 RIAM SRELAY MSB-EV-03
12 M1-62 RIAM SRELAY MSB-GAS/D-01
13 M1-63 RIAM SRELAY MSB-GAS/D-02
14 M1-64 RIAM SRELAY MSB-GAS/D-03
15 M1-65 RIAM RRELAY MSB-HSD-01 HVAC SHUTDOWN
16 M1-66 RIAM SRELAY MSB-SPARE
17 M1-67 RELEASE SUPRELS MSB-SRP
18 M1-68 IAM SUPERV MSB-SRV-01
19 M1-69 IAM SUPERV MSB-SRV-02
20 M1-70 IAM SUPERV MSB-PS-01
21 M1-71 IAM SUPERV MSB-LPS-01
22 M1-72 IAM SUPERV MSB-PS-02
23 M1-73 MBZAM FIRE MSB-HD(IS)-01
24 M1-74 ADRPUL PULL MSB-MCP-01 ELECTRICAL ROOM
25 M1-75 IAM SUPABRT MSB-AS-01 ELECTRICAL ROOM
26 M1-76 ADRPUL SUPDUMP MSB-MR-01 ELECTRICAL ROOM
27 M1-77 ADRPUL PULL MSB-MCP-02 BATTERY ROOM
28 M1-78 ADRPUL PULL MSB-MCP-03 ELECTRICAL ROOM
29 M1-79 IAM SUPABRT MSB-AS-02 ELECTRICAL ROOM
30 M1-80 ADRPUL SUPDUMP MSB-MR-02 ELECTRICAL ROOM
31 M1-81 ADRPUL SUPDUMP MSB-MR-03 ELECTRICAL ROOM
32 M1-82 IAM SUPABRT MSB-AS-03 ELECTRICAL ROOM

Inspected By Reviewed By

PT. Revanindo Abadi Jaya PT. JGC Indonesia Jadestone Energy


Name: Name:

S3
Date: Date:

- D M
J04-Sep - 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ATTACHMENT-2
SITE ACCEPTANCE TEST REPORT

VISUAL INSPECTION
SYSTEM : FM-200 GAS SUPPRESSION & FIRE ALARM SYSTEM
VENUE OF TESTING : PT. REVANINDO ABADI JAYA
TESTING METHOD : VISUAL INSPECTION
TESTING LIMITATION : N2 DISCHARGE TEST
BUILLDING :
PROTECTED AREA :
:

EQUIPMENT STATUS
ACCEPTANCE
NO QUANTITY (ea) REMARK
CRITERIA
ADDRESING MODULE POINT TYPE CUSTOM LABEL C NC

MAIN SUBSTATION BUILDING


33 M1-84 PHOTO SUPDET MSB-SD-01 ELECTRICAL ROOM
34 M1-85 PHOTO SUPDET MSB-SD-02 ELECTRICAL ROOM
35 M1-86 PHOTO SUPDET MSB-SD-03 ELECTRICAL ROOM
36 M1-87 PHOTO SUPDET MSB-SD-04 ELECTRICAL ROOM
37 M1-88 PHOTO SUPDET MSB-SD-05 ELECTRICAL ROOM
38 M1-89 4009A4 SIGNAL MSB-NAC.EXT-001
39 M1-89-1 MSIGB SSIGNAL NAC 1 POWER 24 MSB
40 M1-89-2 MSIGB SSIGNAL NAC 2 POWER 24 MSB
41 M1-89-3 MSIGB SQALERT NAC 3 SRP MSB
42 M1-89-4 MSIGB SSIGNAL NAC 4 SPARE

Inspected By Reviewed By

PT. Revanindo Abadi Jaya PT. JGC Indonesia Jadestone Energy


Name: Name:

S3
Date: Date:

- D M
J04-Sep - 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ATTACHMENT-2
SITE ACCEPTANCE TEST REPORT

VISUAL INSPECTION
SYSTEM : FM-200 GAS SUPPRESSION & FIRE ALARM SYSTEM
VENUE OF TESTING : PT. REVANINDO ABADI JAYA
TESTING METHOD : VISUAL INSPECTION
TESTING LIMITATION : N2 DISCHARGE TEST
BUILLDING :
PROTECTED AREA :
:

EQUIPMENT STATUS
ACCEPTANCE
NO QUANTITY (ea) REMARK
CRITERIA
ADDRESING MODULE POINT TYPE CUSTOM LABEL C NC

WAREHOUSE & WORKSHOP BUILDING


1 M2-1 IDNETISO ISO ISOLATOR MODULE WWB
2 M2-2 RIAM SRELAY WWB-VAF/AAF-01
3 M2-3 RIAM SRELAY WWB-VAF/AAF-02
4 M2-4 RIAM SRELAY WWB-VAF/AAF-03
5 M2-5 RIAM SRELAY WWB-VAF/AAF-04
6 M2-6 RIAM SRELAY WWB-SPARE
7 M2-7 ADRPUL PULL WWB-MCP-01 WORKSHOP
8 M2-8 HEAT HEAT WWB-HD-01 WORKSHOP
9 M2-9 HEAT HEAT WWB-HD-02 WORKSHOP
10 M2-10 HEAT HEAT WWB-HD-03 WORKSHOP
11 M2-11 HEAT HEAT WWB-HD-04 WORKSHOP
12 M2-12 HEAT HEAT WWB-HD-05 WORKSHOP
13 M2-13 HEAT HEAT WWB-HD-06 WORKSHOP
14 M2-14 ADRPUL PULL WWB-MCP-02 WORKSHOP
15 M2-15 PHOTO SMOKE WWB-SD-01 INST TOOLS ROOM
16 M2-16 PHOTO SMOKE WWB-SD-02 MECH TOOLS ROOM
17 M2-17 PHOTO SMOKE WWB-SD-03 MECH SUPV ROOM
18 M2-18 PHOTO SMOKE WWB-SD-04 ELEC SUPV ROOM
19 M2-19 PHOTO SMOKE WWB-SD-05 INST SUPV ROOM
20 M2-20 PHOTO SMOKE WWB-SD-06 CHEMICAL & BULK STORAGE
21 M2-21 PHOTO SMOKE WWB-SD-07 CHEMICAL & BULK STORAGE
22 M2-22 ADRPUL PULL WWB-MCP-03 CHEMICAL & BULK STORAGE
23 M2-23 PHOTO SMOKE WWB-SD-08 OFFICE
24 M2-24 ADRPUL PULL WWB-MCP-04 OFFICE
25 M2-25 PHOTO SMOKE WWB-SD-09 ME STORAGE
26 M2-26 PHOTO SMOKE WWB-SD-10 STORAGE
27 M2-27 ADRPUL PULL WWB-MCP-05 STORAGE
28 M2-251 ISO ISO CARD 3 LOOP A ISOLATOR
29 M2-252 ISO ISO CARD 3 LOOP B ISOLATOR
30 IO1 RELAY RRELAY CONFIRM FIRE
31 IO2 RELAY RRELAY FAULT ALARM
32 IO3 RELAY RRELAY CLEAN AGENT RELEASED

Inspected By Reviewed By

PT. Revanindo Abadi Jaya PT. JGC Indonesia Jadestone Energy


Name: Name:

S3
Date: Date:

- D M
J04-Sep - 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ATTACHMENT-2
SITE ACCEPTANCE TEST REPORT

VISUAL INSPECTION
SYSTEM : FM-200 GAS SUPPRESSION & FIRE ALARM SYSTEM
VENUE OF TESTING : PT. REVANINDO ABADI JAYA
TESTING METHOD : VISUAL INSPECTION
TESTING LIMITATION : N2 DISCHARGE TEST
BUILLDING :
PROTECTED AREA :
:

EQUIPMENT STATUS
ACCEPTANCE
NO QUANTITY (ea) REMARK
CRITERIA
ADDRESING MODULE POINT TYPE CUSTOM LABEL C NC

WAREHOUSE & WORKSHOP BUILDING


1 IO4 RELAY RRELAY CLOSE DAMPER
2 IO5 RELAY RELAY 8 POINT ZONE RELAY CARD 4 POINT IO5
3 IO6 RELAY RELAY 8 POINT ZONE RELAY CARD 4 POINT IO6
4 IO7 RELAY RELAY 8 POINT ZONE RELAY CARD 4 POINT IO7
5 IO8 RELAY RELAY 8 POINT ZONE RELAY CARD 4 POINT IO8

Inspected By Reviewed By

PT. Revanindo Abadi Jaya PT. JGC Indonesia Jadestone Energy


Name: Name:

S3
Date: Date:

- D M
J04-Sep - 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ATTACHMENT-2
SITE ACCEPTANCE TEST REPORT

SYSTEM : FM-200 GAS SUPPRESSION & FIRE ALARM SYSTEM


VENUE OF TESTING : PT. REVANINDO ABADI JAYA
TESTING METHOD : LOGIC TEST (REFER TO CAUSE & EFFECT DIAGRAM, D-00-1241-002 & V-215Z-004-A-105)
TESTING LIMITATION : N2 DISCHARGE TEST
:

SCENARIO COMMON CONFIRMED COMMON GAS HVAC STATUS


NO TAG NO. ALARM FAULT REMARK
DESCRIPTION ALARM (FIRE 1) FIRE (FIRE 2) FAULT DISCHARGE
S/D D/C C NC
MAIN CONTROL BUILDING - FIRE ALARM SYSTEM
1 Random Detector
2 Random MCP
MAIN CONTROL BUILDING - FM 200 SYSTEM
1 Room Detectors
2 Raised Floor Detectors
3 Manual Release
4 Pressure Switch High
5 Abort Switch
6 Maintenance Switch
7 Main/Reserve Switch
8 Pressure Switch Low
MAIN SUBSTATION BUILDING - FIRE ALARM SYSTEM
1 IS Type Heat Detector
2 MCP
MAIN SUBSTATION BUILDING - FM 200 SYSTEM
1 Room Detectors
2 Manual Release
3 Pressure Switch High
4 Abort Switch
5 Maintenance Switch
6 Main/Reserve Switch
7 Pressure Switch Low
WAREHOUSE & WORKSHOP BUILDING - FIRE ALARM SYSTEM
1 Random Detector
2 Random MCP
ADDITIONAL TESTED DETECTOR(S)
1
2
3
4
5
ABBREVIATION
C Comply
NC Not Comply
S/D Shutdown
C/D Closed Damper

Inspected By Reviewed By

PT. Revanindo Abadi Jaya PT. JGC Indonesia Jadestone Energy


Name: Name: Name:

S3
Date: Date: Date:

- D M
J04-Sep - 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON

You might also like