J-DMS: Jadestone Energy (Lemang) Pte. LTD
J-DMS: Jadestone Energy (Lemang) Pte. LTD
Project Name : EPCI AKATARA GAS PROCESSING FACILITY & SALES GAS PIPELINE PROJECT
ISSUANCE TO COMPANY
X Key Non-Key
D M S3 DOCUMENT
-
J04-Sep- 2 0 2
INTED
15
NO.
V- 215Z-004-A- 502
R
HEN P
ROLLED W
NCONT
TABLE OF CONTENTS
1 INTRODUCTION.........................................................................................................................................2
2 SCOPE .......................................................................................................................................................2
3 DEFINITIONS AND ABBREVIATIONS ........................................................................................................ 3
3.1 Definitions ...........................................................................................................................................3
3.2 Abbreviations.......................................................................................................................................3
4 REFERENCE DOCUMENT.........................................................................................................................3
5 VISUAL CHECK..........................................................................................................................................4
5.1 Scope ..................................................................................................................................................4
5.2 Procedure............................................................................................................................................4
6 FUNCTION TEST .......................................................................................................................................4
6.1 Scope ..................................................................................................................................................4
6.2 Procedure............................................................................................................................................4
ATTACHMENT-1 SAT PROCEDURE .................................................................................................................5
ATTACHMENT-2 SAT REPORT .........................................................................................................................
FORM 8
Vendor to attached
approved and signed
SAT Report in this
VDoc later
DM02S3
1
J-04-Sep-2 RINTE
D
ED WHEN P
T ROLL
NCON
1 INTRODUCTION
The Akatara Field is located onshore Jambi Province, Sumatra Island, Indonesia, (Figure 1.1), in the Lemang
Block Production Sharing Contract (PSC) and is operated by Jadestone Energy (Lemang) Pte. Ltd.
2 SCOPE
The purpose of this document is used for SAT in terms of function test and performance FM-200 Fire
Suppression system at Akatara project.
This document includes detailed information on how to install the device, visual check, installation and testing.
Such as physical/visual inspection and function test, to ensure that all equipment is function properly.
DM02S3
2
J-04-Sep-2 RINTE
D
ED WHEN P
T ROLL
NCON
3 DEFINITIONS AND ABBREVIATIONS
3.1 Definitions
Project : Akatara Gas Processing Facility & Sales Gas Pipeline Project
3.2 Abbreviations
4 REFERENCE DOCUMENT
DM02S3
3
J-04-Sep-2 RINTE
D
ED WHEN P
T ROLL
NCON
5 VISUAL CHECK
5.1 Scope
This section describes a visual inspection of the entire device.
5.2 Procedure
1. Panel check, laying, placement and installation.
2. Checking the number of installed devices, according to the latest BOQ revision or PO.
3. Examination of terminals and cable installation.
4. Inspection of Smoke Detector.
5. Inspection of Manual Call Point and Abort Switch.
6. Inspection of Horn Strobe and Alarm Bell.
7. Inspection of Evacuate Area Lights and Gas Discharge Lights.
8. Inspection of installation of pipes, supports and other auxiliary materials.
9. Inspection of Clean Agent and Solenoid gas cylinders.
Inspection of Indoor
6 FUNCTION TEST Portable Fire
Extinguisher
6.1 Scope
Implementation must be carried out by simulating the work function of device, include the entire circuit must
be tested, starting from the detection of fire alarms, panel, sound alarms, light alarms, manual discharge,
discharge cancellation and Solenoid actuation functions.
6.2 Procedure
Make sure all devices are connected to the Panel (alarm bell, horn strobe, abort station, manual release,
alarm lamp, etc). Refer to Attachment-1 for SAT Procedure & Attachment-2 for SAT Report. Form
DM02S3
4
J-04-Sep-2 RINTE
D
ED WHEN P
T ROLL
NCON
Please add SAT Procedure for
Fire Alarm System & Indoor
Portable Fire Extinguisher
ATTACHMENT-1 SAT PROCEDURE
Area Main Control Room Main Substation Metering Warehouse & Workshop
System FM-200 System
1 Visual Check Quantity of devices are according to the latest BOQ or PO, and installation comply with
Installation Layout FM-200 System (V-215Z-004-A-100)
2 System checks for normal conditions, activate The LED light indicated in the Panel is green light (ON)
the electricity source from PLN [220 VAC].
3 Check the function of the indicator light on the All LED lights are ON.
Panel by accessing the “Check Indicator Lamp”
on the Panel.
1. Buzzer on Panel.
4 Checking the battery backup by disconnecting
2. The “Power Supply Fault” indicator light on the Panel is ON.
the mains connection from PLN [220 VAC]. 3. The system continues to work [with trouble status].
D M S3
-
J04-Sep- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
No Procedure Acceptance Criteria
1. In “Main” Mode, then all Solenoid at Main Cylinder shall standby mode.
5 Main/Reserve Switch active
2. In “Reserve” Mode, then all Solenoid at Main Cylinder shall standby mode.
3. No indication Main/Reserve status in Panel.
1. FAULT alarm in the Panel turns ON
6 Maintenance Switch active
1. Buzzer on Panel.
7 Spray the Smoke Tester on one (1) of the
2. The display and indicator light on the Panel show indication of Alarm 1.
Smoke Detectors [Zone 1]. 3. Horn/Strobe turns ON at 20 BPM/Temporal.
4. Integration of active relay contacts (HVAC/Damper)
1. Buzzer on Panel.
8 Spray the Smoke Tester on one (1) of the
2. Display and indicator light on the Panel shows indication of Alarm 2.
Smoke Detectors [Zone-2]. 3. The screen on the Panel displays a countdown time delay of 30 seconds.
4. Horn/Strobe turns ON at 120 BPM/March.
5. The Evacuate Area light is ON.
6. Integration of active relay contacts (HVAC/Damper)
1. The screen on the Panel shows the Abort Switch is active.
9 Activate the Abort Switch
2. The countdown delay time stops at the 10th second.
3. Check indication on Solenoid [Impulse Valve Operator], PIN is not exposed.
1. Alarm bell turns ON.
10 Gas Release Mode [does not activate Abort
2. Horn/Strobe turns ON continuously.
Switch]/Pressure Switch High (PSH) active 3. PIN in Solenoid exposed.
4. Gas Discharge lamp is ON.
1. “Trouble” alarm turns ON
11 Pressure Switch Low (PSL) active
1. Buzzer on Panel.
12 Manual Release Activation
2. The indicator lights ON, the Panel indicates Manual Release is active.
3. Horn/Strobe turns ON continuously.
4. Evacuate Area light turns ON.
5. Alarm bell turns ON.
6. Gas Discharge lamp turns ON.
7. Integration of active relay contacts (HVAC/Damper)
8. PIN in Solenoid exposed.
6
D M S3
-
J04-Sep- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
No Procedure Acceptance Criteria
D M S3
-
J04-Sep- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ATTACHMENT-2
SITE ACCEPTANCE TEST REPORT
EQUIPMENT STATUS
ACCEPTANCE
NO QUANTITY (ea) REMARK
CRITERIA
ADDRESING MODULE POINT TYPE CUSTOM LABEL C NC
MAIN CONTROL BUILDING
1 M1-1 IDNETISO ISO ISOLATOR MODULE MCR
2 M1-2 RIAM SRELAY MCR-VAF/AAF-01
3 M1-3 RIAM SRELAY MCR-VAF/AAF-02
4 M1-4 RIAM SRELAY MCR-AB-01
5 M1-5 RIAM SRELAY MCR-AB-02
6 M1-6 RIAM SRELAY MCR-H/S-01
7 M1-7 RIAM SRELAY MCR-H/S-02
8 M1-8 RIAM SRELAY MCR-EV-01
9 M1-9 RIAM SRELAY MCR-EV-02
10 M1-10 RIAM SRELAY MCR-GAS/D-01
11 M1-11 RIAM SRELAY MCR-GAS/D-02
12 M1-12 RIAM RRELAY MCR-HSD-01
13 M1-13 RIAM SRELAY MCR-SPARE
14 M1-14 RELEASE SUPRELS MCR-SRP
15 M1-15 IAM SUPERV MCR-SRV-01
16 M1-16 IAM SUPERV MCR-LPS-01
17 M1-17 IAM SUPERV MCR-PS-02
18 M1-21 ADRPUL PULL MCR-MCP-01
19 M1-22 PHOTO SUPDET MCR-SD-01 RAISED FLOOR
20 M1-23 PHOTO SUPDET MCR-SD-02 RAISED FLOOR
21 M1-24 PHOTO SMOKE MCR-SD-03 INSTRUMENT ROOM
22 M1-25 PHOTO SUPDET MCR-SD-04 INSTRUMENT ROOM
23 M1-26 PHOTO SUPDET MCR-SD-05 INSTRUMENT ROOM
24 M1-27 PHOTO SUPDET MCR-SD-06 INSTRUMENT ROOM
25 M1-28 IAM SUPABRT MCR-AS-01 CONTROL ROOM
26 M1-29 ADRPUL SUPDUMP MCR-MR-01 CONTROL ROOM
27 M1-30 ADRPUL PULL MCR-MCP-02 CONTROL ROOM
28 M1-31 PHOTO SMOKE MCR-SD-07 CONTROL ROOM
29 M1-32 PHOTO SMOKE MCR-SD-08 CONTROL ROOM
30 M1-33 ADRPUL PULL MCR-MCP-03 ENTRANCE LOBBY
31 M1-34 PHOTO SMOKE MCR-SD-09 ENTRANCE LOBBY
32 M1-35 PHOTO SMOKE MCR-SD-10 TOOLS FIRE FIGHTING ROOM
Inspected By Reviewed By
S3
Date: Date:
- D M
J04-Sep - 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ATTACHMENT-2
SITE ACCEPTANCE TEST REPORT
VISUAL INSPECTION
SYSTEM : FM-200 GAS SUPPRESSION & FIRE ALARM SYSTEM
VENUE OF TESTING : PT. REVANINDO ABADI JAYA
TESTING METHOD : VISUAL INSPECTION
TESTING LIMITATION : N2 DISCHARGE TEST
BUILLDING :
PROTECTED AREA :
:
EQUIPMENT STATUS
ACCEPTANCE
NO QUANTITY (ea) REMARK
CRITERIA
ADDRESING MODULE POINT TYPE CUSTOM LABEL C NC
MAIN CONTROL BUILDING
33 M1-36 PHOTO SMOKE MCR-SD-11 SUPERVISOR ROOM
34 M1-37 PHOTO SMOKE MCR-SD-12 PRAY ROOM
35 M1-38 HEAT HEAT MCR-HD-01 PANTRY
36 M1-39 PHOTO SMOKE MCR-SD-13 OFFICE AREA
37 M1-40 PHOTO SMOKE MCR-SD-14 MEETING ROOM
Inspected By Reviewed By
S3
Date: Date:
- D M
J04-Sep - 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ATTACHMENT-2
SITE ACCEPTANCE TEST REPORT
VISUAL INSPECTION
SYSTEM : FM-200 GAS SUPPRESSION & FIRE ALARM SYSTEM
VENUE OF TESTING : PT. REVANINDO ABADI JAYA
TESTING METHOD : VISUAL INSPECTION
TESTING LIMITATION : N2 DISCHARGE TEST
BUILLDING :
PROTECTED AREA :
:
EQUIPMENT STATUS
ACCEPTANCE
NO QUANTITY (ea) REMARK
CRITERIA
ADDRESING MODULE POINT TYPE CUSTOM LABEL C NC
Inspected By Reviewed By
S3
Date: Date:
- D M
J04-Sep - 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ATTACHMENT-2
SITE ACCEPTANCE TEST REPORT
VISUAL INSPECTION
SYSTEM : FM-200 GAS SUPPRESSION & FIRE ALARM SYSTEM
VENUE OF TESTING : PT. REVANINDO ABADI JAYA
TESTING METHOD : VISUAL INSPECTION
TESTING LIMITATION : N2 DISCHARGE TEST
BUILLDING :
PROTECTED AREA :
:
EQUIPMENT STATUS
ACCEPTANCE
NO QUANTITY (ea) REMARK
CRITERIA
ADDRESING MODULE POINT TYPE CUSTOM LABEL C NC
Inspected By Reviewed By
S3
Date: Date:
- D M
J04-Sep - 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ATTACHMENT-2
SITE ACCEPTANCE TEST REPORT
VISUAL INSPECTION
SYSTEM : FM-200 GAS SUPPRESSION & FIRE ALARM SYSTEM
VENUE OF TESTING : PT. REVANINDO ABADI JAYA
TESTING METHOD : VISUAL INSPECTION
TESTING LIMITATION : N2 DISCHARGE TEST
BUILLDING :
PROTECTED AREA :
:
EQUIPMENT STATUS
ACCEPTANCE
NO QUANTITY (ea) REMARK
CRITERIA
ADDRESING MODULE POINT TYPE CUSTOM LABEL C NC
Inspected By Reviewed By
S3
Date: Date:
- D M
J04-Sep - 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ATTACHMENT-2
SITE ACCEPTANCE TEST REPORT
VISUAL INSPECTION
SYSTEM : FM-200 GAS SUPPRESSION & FIRE ALARM SYSTEM
VENUE OF TESTING : PT. REVANINDO ABADI JAYA
TESTING METHOD : VISUAL INSPECTION
TESTING LIMITATION : N2 DISCHARGE TEST
BUILLDING :
PROTECTED AREA :
:
EQUIPMENT STATUS
ACCEPTANCE
NO QUANTITY (ea) REMARK
CRITERIA
ADDRESING MODULE POINT TYPE CUSTOM LABEL C NC
Inspected By Reviewed By
S3
Date: Date:
- D M
J04-Sep - 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ATTACHMENT-2
SITE ACCEPTANCE TEST REPORT
Inspected By Reviewed By
S3
Date: Date: Date:
- D M
J04-Sep - 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON